Manitowoc Grove Crane RT 700E Series Operator’s Manual – PDF DOWNLOAD
$20.95
The Manitowoc Grove Crane RT 700E Series Operator’s Manual, available for PDF download, is a vital resource. It delivers essential insights on operation, maintenance, and safety protocols, ensuring proficient and secure use of the RT 700E crane.
Description
Manitowoc Grove Crane RT 700E Series Operator’s Manual – PDF DOWNLOAD
FILE DETAILS:
Manitowoc Grove Crane RT 700E Series Operator’s Manual – PDF DOWNLOAD
Language : English
Pages : 88
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Manitowoc Grove Crane RT 700E Series Operator’s Manual – PDF DOWNLOAD
Section 1 – INTRODUCTION
GENERAL 1-1
NOISE VIBRATION TEST RESULTS 1-1
Section 2: SAFETY PRECAUTIONS
GENERAL 2-1
OPERATOR’S INFORMATION 2-1
OPERATOR’S QUALIFICATIONS 2-2
CRANE STABILITY/STRUCTURAL STRENGTH 2-3
Load Charts 2-3
Work Site 2-4
Lifting Operations 2-4
Counterweight 2-6
Multiple Crane Lifts 2-6
LOAD MOMENT INDICATING SYSTEMS 2-6
Two-Blocking 2-6
Work Area Definition System 2-7
ELECTROCUTION HAZARD 2-7
Set Up and Operation 2-8
Electrocution Hazard Devices 2-8
Electrical Contact 2-9
Special Operating Conditions and Equipment 2-9
CRUSHING HAZARDS 2-10
PERSONNEL HANDLING 2-11
TRAVEL OPERATION 2-11
MAINTENANCE 2-12
Service and Repairs 2-12
Lubrication 2-13
Tires 2-13
Wire Rope 2-13
BATTERIES 2-14
ENGINE 2-15
WORK PRACTICES 2-15
Crane Access 2-15
Job Preparation 2-15
Working 2-15
Lifting 2-16
Hand Signals 2-17
TRANSPORTING THE CRANE 2-17
SHUTDOWN 2-17
BOOM EXTENSION/JIB 2-18
COLD WEATHER OPERATION 2-19
TEMPERATURE EFFECTS ON HYDRAULIC CYLINDERS 2-20
Section 3 – CAB CONTROLS AND INDICATORS
CONTROLS AND INDICATORS 3-1
Defroster Switch 3-1
Hand Throttle Lock Control 3-1
Ignition Switch 3-1
Voltmeter 3-1
Transmission Oil Temperature Gauge 3-1
Heat Control Knob 3-1
vi
TABLE OF CONTENTS (CONTINUED)
Page
Fan Control Switch 3-4
Park Brake Control Switch 3-4
Air Conditioner Control Switch (Optional) 3-4
Swing Brake Control Switch 3-4
Differential Lock Control Switch (Optional) 3-4
Wait-To-Start Indicator 3-4
Transmission Range Selector Switch 3-4
Water-In-Fuel Indicator 3-4
Outrigger Selector Panel 3-4
Work Light Switch 3-5
Headlights Switch 3-5
Boom Lights Switch (Optional) 3-5
Hazard Lights Switch 3-5
Engine Oil Pressure Gauge 3-5
Fuel Gauge 3-5
Engine Diagnostics Switches 3-5
Test Mode Switch 3-5
Idle Switch 3-5
Engine Coolant Temperature Gauge 3-5
Tachometer 3-5
Crane Function Power Switch 3-5
Outriggers Extend/Retract Switch 3-6
Load Moment Indicating (LMI) and Work Area Definition System Control Panel 3-6
Transmission Service Indicator 3-6
Low Brake Pressure 3-6
Rear Steer Control Switch 3-6
Auxiliary Hoist Switch (Optional) 3-6
Swing Control Lever 3-6
Turn Signal Lever and Windshield Wiper/Washer Control 3-6
Bubble Level Indicator 3-6
Cab Circulating Fan 3-6
Swing Brake Pedal 3-6
Telescope Control Foot Pedal (Optional) 3-7
Windshield Wiper 3-7
Defroster Fan 3-7
Brake Foot Pedal 3-7
Spotlight (Optional) 3-7
Foot Throttle Pedal 3-7
Transmission Shift Lever 3-7
Circuit Breaker Panel 3-7
Pin Swing Lock Control (Pin Type) 3-7
Hoist Rotation Indicators 3-7
Main Hoist Control Lever 3-7
360 Degree Swing Lock Control (Positive Lock Type) (Optional) 3-7
Main Hoist Speed Selector Switch 3-8
Hydraulic Boost Switch 3-8
Cab Dome Light 3-8
Fire Extinguisher 3-8
Boom Lift Control Lever 3-8
12 VDC Accessory Outlet 3-8
vii
TABLE OF CONTENTS (CONTINUED)
Page
Telescope or Auxiliary Hoist Control Lever 3-8
Horn 3-8
Right Turn Signal Indicator 3-8
Rear Wheels Not Centered Indicator 3-8
Hoist 3rd Wrap Indicator (Optional W/CE) 3-8
Engine Stop Indicator 3-9
Engine Warning Indicator 3-9
Engine Service Indicator 3-9
Throttle Mode Switch 3-9
Hourmeter (Not Shown) 3-9
Skylight Wiper (Not Shown) 3-9
Backup Alarm (Not Shown) 3-9
Section 4 – OPERATING PROCEDURES
PRE-STARTING CHECKS 4-1
Fuel Supply 4-1
Engine Oil 4-1
Engine Coolant 4-1
Batteries 4-1
Signal and Running Lights 4-1
Foot and Parking Brakes 4-1
Daily Lubrication 4-1
Hydraulic Reservoir and Filter 4-1
Tires 4-1
Wire Rope 4-1
Hook Block 4-1
Air Cleaner 4-1
COLD WEATHER OPERATION 4-1
ENGINE OPERATION 4-2
Start-Up Procedure 4-2
Warm Engine 4-2
Cold Engine 4-3
Idling the Engine 4-3
Racing the Engine 4-3
Shutdown Procedure 4-3
CRANE TRAVEL OPERATION 4-3
Traveling – General 4-3
Traveling With Boom Extension Erected 4-4
Extended Travel 4-5
Moving the Crane 4-5
Steering 4-5
Front Wheel Steering 4-6
Rear Wheel Steering 4-6
Four Wheel Steering 4-6
Crabbing 4-6
Traveling – Forward 4-6
Traveling – Reverse 4-6
Four-Wheel Drive Operation 4-7
Proper Operation Of Differential Lock 4-7
General 4-7
Operation 4-7
viii
TABLE OF CONTENTS (CONTINUED)
Page
Proper Operation Of Axle Oscillation Lockouts 4-8
GENERAL CRANE OPERATION 4-8
Pump Drive 4-8
Setting the Park Brake When Crane is on Outriggers 4-8
Control Lever Operation 4-8
Preload Check 4-9
USING YOUR LOAD CHART 4-9
CRANE FUNCTIONS 4-10
Setting the Outriggers 4-10
Engaging the Mid-Extend Lock Pin 4-11
Stowing the Outriggers 4-11
Stowing the Mid-Extend Lock Pin 4-11
Swinging the Boom 4-11
Elevating and Lowering the Boom 4-12
Elevating the Boom 4-12
Lowering the Boom 4-12
Telescoping the Boom 4-12
Extending the Boom 4-12
Retracting the Boom 4-13
Telescope Control Pedal 4-13
Lowering and Raising the Cable 4-13
Lowering the Cable 4-13
Raising the Cable 4-13
Hoist Speed Range Selection 4-13
Operational Aids 4-13
Load Moment Indicator (LMI) System 4-13
Control Lever Lockout System 4-14
Stowing and Parking 4-14
Section 5 – LUBRICATION
GENERAL 5-1
Arctic Conditions Below -18°C (0°F) 5-1
LUBRICATION POINTS 5-1
WIRE ROPE LUBRICATION 5-9
Section 6 – SET-UP AND INSTALLATION PROCEDURES
GENERAL 6-1
INSTALLING CABLE ON THE HOIST 6-1
CABLE REEVING 6-1
DEAD-END RIGGING/WEDGE SOCKETS 6-6
Installing Wedge and Socket 6-6
ERECTING AND STOWING THE SWINGAWAY BOOM EXTENSION 6-8
Erecting 6-8
Stowing 6-15
Setting The Folding Swingaway Offset 6-16
ERECTING AND STOWING THE SWINGAWAY BOOM EXTENSION USING THE 6 1 M (20 FOOT) INSERT 6-17
Erecting 6-17
Stowing 6-19
Basic Nomenclature 1-2
Cab Controls and Indicators 3-2
Terms to Know 4-8
Lubrication Chart 5-3
Installing the Cable Anchor Wedge 6-1
Reeving 6-2
Quick Reeving Hook Block 6-6
Installing Wedge and Socket 6-6
Configurations for Dead-Ending Wire Rope 6-8
Boom Extension Stop Block 6-8
Erecting and Stowing the Swingaway Boom Extension 6-9
Boom Extension Stop Block 6-16
Erecting And Stowing The Swingaway Boom Extension Using The 6 1 M (20 Foot) Insert 6-18
Need help? Contact: [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Manitowoc Mobile Cranes KMK5120 Hydraulic Diagrams Manual - PDF DOWNLOAD

Manitowoc Mobile Cranes KMK2025 Electric Wiring Diagrams Manual EN_DE - PDF DOWNLOAD

Manitowoc Mobile Cranes KMK4080 Hydraulic Diagrams Manual - PDF DOWNLOAD
