Sale!

Massey Ferguson 9695 Combine Repair Time Schedule Manual – PDF DOWNLOAD

Original price was: $87.95.Current price is: $20.95.

Massey Ferguson 9695 Combine Repair Time Schedule Manual – PDF DOWNLOAD

Form Number 42833 82M2

Buy now
⚡
Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Massey Ferguson 9695 Combine Repair Time Schedule Manual – PDF DOWNLOAD

FILE DETAILS:

Massey Ferguson 9695 Combine Repair Time Schedule Manual – PDF DOWNLOAD

Size: 299 MB
Pages : 314
Format: PDF
Language: English
Brand: Massey Ferguson

MASSEY FERGUSON 9695 COMBINE REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD:

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Massey Ferguson 9695 Combine Repair Time Schedule Manual – PDF DOWNLOAD

Form Number 42833 82M2

A. TIME ALLOWANCE:

  • The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
  • They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
  • The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
  • Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.

B.TIMES:

All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.

TABLE OF CONTENTS:

Massey Ferguson 9695 Combine Repair Time Schedule Manual – PDF DOWNLOAD

  • Decals and Labels
  • Engine
  • Cab
  • Electrical
  • Feeder
  • Lateral Tilt
  • Processor
  • Separator
  • Grain Bin & Elevators
  • Shields
  • Hydraulics
  • Drives
  • Auto Guide

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
🛒
Recently Purchased
🕒 verified order