Massey Ferguson EU Tractor 1533 1540 1547 1552 1560 Repair Time Schedule Manual – PDF DOWNLOAD
$98.95 Original price was: $98.95.$19.95Current price is: $19.95.
Massey Ferguson EU Tractor 1533 1540 1547 1552 1560 Repair Time Schedule Manual – PDF DOWNLOAD
Form Number 4283390M4
Description
Massey Ferguson EU Tractor 1533 1540 1547 1552 1560 Repair Time Schedule Manual – PDF DOWNLOAD
MASSEY FERGUSON EU TRACTOR 1533 1540 1547 1552 1560 REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD:
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Massey Ferguson EU Tractor 1533 1540 1547 1552 1560 Repair Time Schedule Manual – PDF DOWNLOAD
Form Number 4283390M4
TIME ALLOWANCE:
- The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions. They DO NOT include any traveling to or from the farm or site.
- The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available. The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual.
- The times are based on a second hand machine in reasonable condition properly maintained using approved parts. Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
TIMES :
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
TABLE OF CONTENTS:
Massey Ferguson EU Tractor 1533 1540 1547 1552 1560 Repair Time Schedule Manual – PDF DOWNLOAD
Description
Caution and Control Labels
Engine
Chassis
Wheels
Components Parts
Loader and Backhoe R & R
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected].
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment



MASSEY FERGUSON MF 175 TRACTOR PARTS MANUAL 651190M97 - PDF Download
