Terex Crane CC 2500-1 Mounting Manual – PDF DOWNLOAD
$36.95
Terex Crane CC 2500-1 Mounting Manual – PDF DOWNLOAD
Description
Terex Crane CC 2500-1 Mounting Manual – PDF DOWNLOAD
FILE DETAILS:
Terex Crane CC 2500-1 Mounting Manual – PDF DOWNLOAD
Language : English
Pages : 1950
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Terex Crane CC 2500-1 Mounting Manual – PDF DOWNLOAD
Contents
IVZ(Master)_en 1
Contents
Foreword
1 Safety Instructions 3
1 1 General 3
2 β
3 Assembling and Dismantling the Crane 3
3 1 General 3
3 1 1 Pin Connections 3
3 1 2 Hydraulic Cylinders β Protecting the Piston Rods 5
3 1 3 Assembly Instructions 7
3 2 Assembling the Crane β
Selfβassembly with the Aβframe 9
3 2 1 General 9
3 3 Assembling the Superstructure 13
3 3 1 General 13
3 3 2 Assembly Procedure 13
3 4 Swinging the Crane Operatorβs Cab into Operating Position
and Tilting 21
3 4 1 General 21
3 4 2 Swinging the Crane Operatorβs Cab into the Operating Position 21
3 4 3 Tilting the Crane Operatorβs Cab 23
3 5 Lifting and shifting of the Aβframe into mounting position 25
3 6 Assembling the Central Ballast on the Chassis 27
3 6 1 General 27
3 6 2 Assembly Procedure (with an Auxiliary Crane) 27
3 7 Assembling the Track Frame 29
3 7 1 General 29
3 7 2 Assembling the Leftβhand Track Frame 31
3 7 2 1 General 31
3 7 2 2 Assembly Procedure for the Leftβhand Track Frame 33
3 7 3 Assembling the Right Track Frame 37
3 7 3 1 General 37
3 7 3 2 Assembly Procedure for the Rightβhand Track Carrier 39
3 7 4 Connecting the hydraulic lines via quick release coupling 45
3 8 Assembling of the Counterweight 47
3 8 1 General 47
3 8 2 Mounting Sequence 49
3 9 Assembly of the Auxiliary Support on the Chassis
(Optional Equipment) 51
3 9 1 General 51
3 9 2 Assembly Procedure 51
Contents
IVZ(Master)_en 2
3 10 Dismantling the crane 53
3 10 1 General 53
3 11 Dismantling of the Auxiliary Support on the Chassis
(Optional Equipment) 57
3 12 Dismantling the Counterweight 59
3 13 Dismantling the Track Frames 61
3 13 1 General 61
3 13 2 Dismantling the Hydraulic Lines 63
3 13 3 Supporting the Crane on Outriggers 65
3 13 4 Dismantling the Rightβhand Track Frame 67
3 13 4 1 General 67
3 13 4 2 Dismantling Procedure 69
3 13 5 Dismantling the Left Track Carrier 73
3 13 5 1 General 73
3 13 5 2 Dismantling 75
3 14 Dismantling the Central Ballast on the Chassis 79
3 15 Folding the Aβframe into the Transport Position 81
3 15 1 General 81
3 16 Tilting and Slewing the Cab into the Transport Position 83
3 16 1 General 83
3 16 2 Tilting the Crane Operatorβs Cab 83
3 16 3 Swinging the Crane Operatorβs Cab into the Transport Position 85
3 17 Dismantling the Superstructure 87
3 17 1 General 87
3 17 2 Lifting Off the Superstructure 87
Contents
IVZ(Master)_en 3
4 Assembling the Main Boom 3
4 1 General 3
4 2 Assembling and Fitting the Main Boom SH 7
4 2 1 Assembling Main Boom Combinations SH 9
4 2 2 Fitting Main Boom Combination SH 11
4 2 3 Assembling the Main Boom Stay Bars with the Combination SH 23
4 2 4 Fitting the Runner to the Connecting Head 25
4 2 4 1 General 25
4 2 4 2 Assembly Procedure 27
4 2 5 Dismantling the Runner 31
4 2 6 Assembly of auxil bracing (bracing chains) with the combin SH 33
4 2 6 1 Assembling the Additional Bracing (Bracing Chains) for the
Combination SH β Boom Length 72 m (236 ft) 33
4 2 6 2 Assembling the Additional Bracing (Bracing Chains) for the
Combination SH β Boom Length 78 m (256 ft) 35
4 2 6 3 Assembling the Additional Bracing (Bracing Chains) for the
Combination SH β Boom Length 84 m (276 ft) 37
4 3 Assembling and Fitting the Main Boom SH/LH 39
4 3 1 Assembling Main Boom Combinations SH/LH 41
4 3 2 Fitting the Main Boom Combinations SH / LH 45
4 3 3 Assembling the Main Boom Stay Bars for the Combination SH/LH 57
4 3 4 Fitting the Runner to the Main Boom SH/LH 59
4 3 4 1 General 59
4 3 4 2 Assembly Procedure 61
4 3 5 Dismantling the Runner 65
4 3 6 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH 67
4 3 6 1 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH β Boom Lengths 66 m (217 ft) and
78 m (256 ft) 67
4 3 6 2 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH β Jib Length 72 m (236 ft) 69
4 3 6 3 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH β
Boom Lengths 84 m (276 ft) and 90 m (295 ft) 71
4 3 6 4 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH β
Boom Lengths 96 m (315 ft) and 102 m (335 ft) 73
4 3 6 5 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH β Jib Length 108 m (354 ft) 75
4 4 Assembly and fitting of the SH/LH main boom with maximum heavy
basic length (SGL max ) of the main boom (special combin S 1) 77
4 4 1 Assembly of the SH/LH main boom combination with maximum heavy
basic length (SGL max ) of the main boom (special combin S1) 79
4 4 2 Fitting the Main Boom Combination SH/LH (SGL Max , S1) 81
4 4 3 Assembling the Stay Bars HA for the Combination SH/LH
(SGL Max , S1) 93
4 4 4 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH (SGL max , S1) 95
4 4 4 1 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH (SGL max , S1) β
Main Boom Lengths 66 m (216 ft), 72 m (236 ft), 78 m (256 ft),
96 m (315 ft) and 102 m (335 ft) 95
4 4 4 2 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH (SGL max , S1) β Main Boom Lengths
84 m (276 ft) and 90 m (295 ft) 97
Contents
IVZ(Master)_en 4
5 Assembling the Main Boom and Fly Jib 3
5 1 General 3
5 2 Assembling and Fitting Fly Jib Combination SW 5
5 2 1 Assembling Main Boom Combination SH for Variant SW 7
5 2 2 Assembling Fly Jib Combinations for Variant SW 11
5 2 3 Fitting Main Boom and Fly Jib SW 13
5 2 4 Fitting the Runner 51
5 2 5 Assembling Stay Bars HA and HI and Bracing Rods WU for the
Combination SW 59
5 2 6 Assembly of the Auxiliary Bracing (Bracing Chains) on the Main
Boom (Combination WAF) β
Boom Length 72 m (236 ft) 61
5 2 7 Assembling the auxiliary bracing (bracing chains) on the fly jib
(Combination SW) 63
5 3 Dismantling the Fly Jib Combinations SW 71
5 3 1 Setting down the boom combination 71
Contents
IVZ(Master)_en 5
6 Assembling and Dismantling the SuperLift 3
6 1 General 3
6 1 1 Pin Connections 3
6 1 2 Hydraulic Cylinders β Protecting the Piston Rods 7
6 1 3 Assembly Instructions 9
6 2 Assembling and Fitting the SuperLift Mast 11
6 2 1 General 11
6 3 Assembly of the SuperLift Mast (Standard) with Connecting Ropes
to the Counterweight Frame 19
6 3 1 Assembling the SuperLift mast (Standard) with connecting ropes
to the counterweight frame, mast radiuses 12 5 m (41 0 ft), 14 5 m
(47 6 ft) and 16 5 m (54 1 ft), SL counterweight radius 12 m (39 4 ft),
14 m (45 9 ft) and 16 m (52 5 ft) 21
6 3 1 1 Counterweight frame and connecting ropes β SL counterweight radiuses
12 m (39 ft), 14m (46 ft) and 16 m (53 ft) 23
6 3 2 Fitting the SuperLift Mast (Standard SuperLift) 25
6 3 3 Assembling the Support Rods and the Derricking Spreader Bar 29
6 3 3 1 Assembling the Rods 29
6 3 3 2 Assembling the Luffing Lifting Beam 29
6 3 4 Fitting the SuperLift Counterweight 31
6 4 Removing the SuperLift with Connecting Ropes to the Counterweight
Frame (Standard SuperLift) 37
6 4 1 General 37
6 4 2 Dismantling the SuperLift Counterweight with Connecting Ropes
to the Counterweight Frame 41
6 4 3 Dismantling the Support Rods and the Luffing Crossbar 47
6 4 3 1 Dismantling the Support Rods 47
6 4 3 2 Dismantling the Luffing Lifting Beam 47
6 4 4 Dismantling the SuperLift Mast 49
6 4 4 1 Dismantling the Hydraulic Lines for Luffing Gear 2 49
6 4 4 2 Setting Down the SuperLift Mast 49
6 5 Assembling the SuperLift Mast with Adjustment Winch to the
Counterweight Frame 51
6 5 1 Assembly of the Superlift Mast with Adjustment Winch to the
Counterweight Frame, Mast Radius 10 5 m (34 4 ft) β 16 5 m (54 1 ft),
SL counterweight radius 10 m (32 8 ft) β 16 m (52 5 ft) 53
6 5 1 1 Counterweight frame and adjustment winch
(SL counterweight radius 10 m / 32 8 ft β 16 m / 52 5 ft) 57
6 5 2 Fitting the SuperLift Mast 59
6 5 3 Assembling the Support Rods and the Derricking Spreader Bar 63
6 5 3 1 Assembly of the support rods with cylinder 63
6 5 3 2 Assembling the Luffing Lifting Beam 63
6 5 4 Fitting the SuperLift Counterweight with Adjustment Winch 65
6 6 Dismantling the SuperLift with Adjustment Winch to the
Counterweight Frame 73
6 6 1 General 73
6 6 2 Dismantling the SuperLift Counterweight with Adjustment Winch 77
6 6 3 Dismantling the Derricking Spreader Bar and the Support Rods 85
6 6 3 1 General 85
6 6 3 2 Dismantling the Support Rods 85
6 6 3 3 Dismantling the Luffing Lifting Beam 85
6 6 4 Dismantling the SuperLift Mast 87
6 6 4 1 Dismantling the Hydraulic Lines for Luffing Gear 2 87
6 6 4 2 Setting Down the SuperLift Mast 87
Contents
IVZ(Master)_en 6
7 Assembling the Main Boom with SuperLift 3
7 1 General 3
7 2 Assembling and Fitting the SSL SuperLift Combination 7
7 2 1 Assembling the SSL Main Boom Combinations 9
7 2 2 Fitting the SSL Main Boom Combination 11
7 2 2 1 Fitting Procedure on the Ground 11
7 2 2 2 Assembling the Stay Bars on the Main Boom 15
7 2 2 3 Erecting the Main Boom 17
7 2 3 Assembling the Main Boom Stay Bars with the Combination SSL 21
7 2 4 Fitting the Runner to the Main Boom SSL 23
7 2 4 1 General 23
7 2 5 Fitting the Runner to the Connecting Head 25
7 2 6 Dismantling the Runner 29
7 2 7 Assembling the Bracing (Bracing Chains) for the Combination SSL β
Boom Length 96 m (315 ft) 31
7 3 Assembling and Fitting the SSL/LSL Main Boom 33
7 3 1 Assembling the SSL / LSL Main Boom Combinations 35
7 3 2 Fitting the SSL/LSL Main Boom Combination 39
7 3 2 1 Fitting Procedure on the Ground 39
7 3 2 2 Erecting the Main Boom 45
7 3 3 Assembling the HA Stay Bars for Combination SSL/LSL 49
7 3 4 Fitting the Runner to the Main Boom SSL/LSL 51
7 3 4 1 General 51
7 3 5 Fitting the Runner on the Top Piece 53
7 3 6 Dismantling the Runner 57
7 3 7 Assembling the Bracing (Bracing Chains) for the
Combination SSL/LSL 59
7 3 7 1 Assembling the Bracing (Bracing Chains) for the Combination
SSL/LSL β Boom Length 78 m (256 ft) 59
7 3 7 2 Assembling the Bracing (Bracing Chains) for the Combination
SSL/LSL β Boom Length 84 m (276 ft) 63
7 3 7 3 Assembling the Bracing (Bracing Chains) for the Combination
SSL/LSL β Boom Length 90 m (295 ft) 67
7 3 7 4 Assembling the Bracing (Bracing Chains) for the Combination
SSL/LSL β
Boom lengths 96 m (295 ft), 120 m (394 ft) and 126 m (413 ft) 69
7 3 7 5 Assembling the Bracing (Bracing Chains) for the Combination
SSL/LSL β Boom Length 102 m (335 ft) 71
7 3 7 6 Assembling the Guying (Bracing Chains) for the Combination
SSL/LSL β Boom Lengths 108 m (354 ft) and 114 m (374 ft) 73
7 3 8 Assembly of the auxiliary bracing 77
7 3 9 Assembly of the rope deflector 77
7 4 Assembling and Fitting the Main Boom SSL/LSL with Maximum
Heavy Basic Length (SGL max , S1) 79
7 4 1 Assembling the Main Boom Combinations SSL/LSL with Maximum
Heavy Basic Length (SGL max , S1) of the Main Boom 81
7 4 2 Fitting the Main Boom Combination SSL/LSL with Maximum Heavy
Basic Length (SGL max , S1) of the Main Boom 83
7 4 2 1 Fitting Procedure on the Ground 83
7 4 2 2 Erecting the Main Boom 89
7 4 3 Assembling the Main Boom Stay Bars for the Combination SSL/LSL
(SGL max S1) 93
Contents
IVZ(Master)_en 7
7 4 4 Fitting the runner on the main boom SSL/LSL (SGL max , S1) 95
7 4 4 1 General 95
7 4 5 Fitting the Runner on the Top Piece 97
7 4 6 Dismantling the Runner 101
7 4 7 Assembly of the Guying (Bracing Chains) for the Combination
SSL/LSL (SGL max , S1) 103
7 4 7 1 Assembling the Bracing (Bracing Chains) for the Combination
SSL/LSL (SGL max , S1) β
Main Boom Length 108 m (354 ft) 103
7 4 7 2 Assembling the Bracing (Bracing Chains) for the Combination
SSl/LSL (SGL max , S1) β
Main boom length 114 m (374 ft) 105
7 4 7 3 Assembling the Bracing (Bracing Chains) for the Combination
SSl/LSL (SGL max , S1) β
Main boom length 120 m (394 ft) 109
7 4 7 4 Assembling the Bracing (Bracing Chains) for the Combination
SSl/LSL (SGL max , S1) β
Main boom length 126 m (394 ft) 111
8 Assembling the Main Boom and Fly Jib with SuperLift 3
8 1 General 3
8 2 Assembling and Fitting the Boom Combination SWSL 5
8 2 1 Assembling the Main Boom Combination for the Variant SWSL 7
8 2 2 Assembling the Fly Jib Combination for the Variant SWSL 11
8 2 3 Fitting the Main Boom and Fly Jib Combination SWSL 13
8 2 4 Fitting the Runner 49
8 2 5 Assembling Stay Bars HA and HI and Bracing Rods WU for the
Combination SW 57
8 2 6 Assembly of the Auxiliary Bracing (Bracing Chains) on the Main
Boom (Combination SWSL) β Boom Length 96 m (315 ft) 59
8 2 7 Assembly of the auxiliary bracing (bracing chains) to the fly jib
(combination SWSL) 61
8 2 7 1 Assembling the Auxiliary Bracing (Bracing Chains) on the Fly Jib
(Combination SWSL) β
Boom Lengths 60 m (196 9 ft) and 78 m (255 9 ft) 61
8 2 7 2 Assembly of the Auxiliary Bracing (Bracing Chains) on the Fly Jib
(Combination SWSL) β
Boom Length 66 m (216 5 ft) 63
8 2 7 3 Assembly of the Auxiliary Bracing (Bracing Chains) on the Fly Jib
(Combination SWSL) β
Boom Length 72 m (236 2 ft) 65
8 2 7 4 Assembly of the Auxiliary Bracing (Bracing Chains) on the Fly Jib
(Combination SWSL) β
Boom Length 84 m (276 ft) 67
8 3 Dismantling the Fly Jib Combinations SWSL 69
8 3 1 Setting down the boom combination 69
Contents
IVZ(Master)_en 8
9 Reeving the Ropes 3
9 1 General 3
9 1 1 Rope End Fixture with Rope Pocket and Spin Stabiliser 5
9 1 1 1 Hoist Ropes 5
9 1 1 2 Luffing Ropes 7
9 1 2 Load Handling Equipment 9
9 1 3 Auxiliary Reeving Winch 11
9 2 Reeving the Luffing Ropes 15
9 2 1 General 15
9 2 2 Table for Reeving the Luffing Ropes 15
9 3 Reeving the Luffing Ropes 17
9 3 1 Reeving the Luffing rope W1 17
9 3 1 1 General 17
9 3 1 2 Table for Reeving the Luffing Rope W1 17
9 3 2 Reeving the Luffing Rope W2 19
9 3 2 1 General 19
9 3 2 2 Table for Reeving the Luffing Rope W2 19
9 4 Reeving the Hoist Ropes 21
9 4 1 General 21
9 4 1 1 Reeving 23
9 4 1 2 Unreeving 25
9 4 1 3 Fitting the Shift Weight 27
9 4 2 Power measurement socket installation in twoβhook operation 33
9 4 3 Hook Block 35
9 4 3 1 Definition 35
9 4 3 2 Markings 35
9 4 3 3 Operation 37
9 4 4 Reeving the Hoist Ropes on the Main Boom and on the Runner
(Combination SH) 43
9 4 5 Reeving the Hoist Ropes on the Stepped Main Boom and on the
Runner (Combination SH/LH) 61
9 4 6 Reeving the Hoist Ropes on the Jib Top Section and on the Runner
(Combination SW) 83
9 4 7 Reeving the Hoist Ropes on the Main Boom and on the Runner
(Combination SSL) 105
9 4 8 Reeving the Hoist Ropes on the Stepped Main Boom and on the
Runner (Combination SSL/LSL) 123
9 4 9 Reeving the hoist ropes of luffing fly jibs (combination SWSL) 145
9 4 10 Reev hoist ropes on the main boom or fly jib (combin SH+LF1) 167
9 4 11 Reeving the hoist ropes on the stepped main boom or on the fly jib
(combination SH/LH + LF1) 181
9 4 12 Reev hoist ropes on the main boom or fly jib (combin SSL+LF1) 197
9 4 13 Reeving the hoist ropes on the stepped main boom or on the fly jib
(combination SSL/LSL + LF1) 217
9 4 14 Reeving of the hoist ropes on the fly jib (combination SH + LF2) 239
9 4 15 Reeving the hoist ropes on the fly jib with reeved simple hook block
on the main boom (combination SSL/LSL + LF2) 247
9 4 16 Reeving of the hoist ropes on the fly jib (combin SH/LH + LF2) 255
9 4 17 Reeving of the hoist ropes on the fly jib (combination SSL + LF2) 263
9 4 18 Reeving the hoist ropes on the fly jib with reeved double hook block
on the main boom (combination SSL/LSL + LF2) 271
9 4 19 Special reeving of the hoist ropes on the fixed fly jib LF2
(combination SSL/LSL (SGL max S1) + LF2) 279
Contents
IVZ(Master)_en 9
10 Erecting and Lowering the Boom System 3
10 1 General Instructions 3
10 1 1 Assembling the erecting device 5
10 2 Erecting Boom Variant SH 13
10 2 1 General Instructions 13
10 2 2 Erecting the boom variant SH,
without WU rods on main boom, without runner 15
10 2 2 1 Erecting boom variant SH,
without WU rods on main boom,
without runner, with auxiliary crane 17
10 2 3 Erecting the boom variant SH,
without WU rods on main boom, with runner 19
10 2 3 1 Erecting boom variant SH,
without WU rods on main boom, with runner, with auxiliary crane 21
10 3 Erecting Boom Variant SH/LH 23
10 3 1 General Instructions 23
10 3 2 Erecting the boom variant SH/LH,
without WU rods on main boom, without runner 25
10 3 2 1 Erecting boom variant SH/LH,
without WU rods on main boom, without runner,
with auxiliary crane 27
10 3 3 Erecting the boom variant SH/LH,
without WU rods on main boom, with runner 29
10 3 3 1 Erecting boom variant SH/LH,
without WU rods on main boom, with runner, with auxiliary crane 31
10 4 Erecting the boom variant SH/LH + LF2 with maximum heavy basic
length (SGL max ) of the main boom and special combination S1 35
10 4 1 General Instructions 35
10 4 2 Erection procedure the Boom variant SH/LH (SGL max , special
combination S1),
without WU rods, without Runner 37
10 4 2 1 Erecting Boom Variant SH/LH (SGL max , special combination S1),
without WU rods, without Runner, with auxiliary crane 41
10 4 3 Erection procedure the Boom variant SH/LH (SGL max , special
combination S1), without WU rods, with Runner 45
10 4 3 1 Erecting Boom Variant SH/LH (SGL max , special combination S1),
without WU rods, with Runner,
with auxiliary crane 49
10 5 Erecting Boom Variant SW 53
10 5 1 General Instructions 53
10 5 2 Erecting Boom Variant SW,
without Runner, without Roller set on main boom 55
10 5 2 1 Erecting Boom Variant SW,
without Runner, without Roller set on main boom,
with auxiliary crane 67
10 5 3 Erecting Boom Variant SW,
with Runner, without Roller set on main boom 79
10 5 3 1 Erecting Boom Variant SW,
with Runner, without Roller set on main boom, with auxiliary crane 89
10 5 4 Erecting Boom Variant SW,
without Runner, with Roller set and Hook block (4 9 t / 10 800 lbs)
on main boom 99
10 5 4 1 Erecting Boom Variant SW,
without Runner, with Roller set and Hook block (4 9 t / 10 800 lbs)
on main boom, with auxiliary crane 107
Contents
IVZ(Master)_en 10
10 5 5 Erecting Boom Variant SW,
with Runner, with Roller set and Hook block (4 9 t / 10 800 lbs) on
main boom 119
10 5 5 1 Erecting Boom Variant SW,
with Runner, with Roller set and Hook block (4 9 t / 10 800 lbs) on
main boom, with auxiliary crane 127
10 6 Erecting Boom Variant SH + LF2 137
10 6 1 General Instructions 137
10 6 2 Erecting Boom Variant SH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on Main boom 139
10 6 2 1 Erecting Boom Variant SH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the main boom, without Roller set on main boom,
with auxiliary crane 147
10 6 3 Erecting Boom Variant SH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on Main boom, with Roller set and Hook block
(4 2 t / 9259 lbs) on Main boom 153
10 6 3 1 Erecting Boom Variant SH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on main boom, with Roller set and Hook block
(4 2 t / 9259 lbs) on main boom, with auxiliary crane 159
10 7 Erecting Boom Variant SH/LH + LF2 165
10 7 1 General Instructions 165
10 7 2 Erecting Boom Variant SH/LH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on main boom 167
10 7 2 1 Erecting Boom Variant SH/LH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on main boom, with auxiliary crane 173
10 7 3 Erecting Boom variant SH/LH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on main boom,
with Hook block (4 2 t / 9 300 lbs) on main boom 179
10 7 3 1 Erecting Boom Variant SH/LH + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on main boom, with Hook block (4 2 t / 9 300 lbs)
on main boom, with auxiliary crane 185
10 8 Erecting the boom variant SH/LH + LF2,
with maximum heavy basic length (SGL max ) of the main boom and
special combination S1 + LF2 191
10 8 1 General Instructions 191
10 8 2 Erecting Boom Variant SH/LH (SGL max ,S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom 193
10 8 2 1 Erecting Boom Variant SH/LH (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with auxiliary crane 199
10 8 3 Erecting Boom Variant SH/LH (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
with Hook block (4 2 t / 9259 lbs) on Main boom 205
10 8 3 1 Erecting Boom Variant SH/LH (SGL max ,S1) + LF2,
without WU rods on Main boom, with Hook block (4 2 t / 9259 lbs)
on Main boom, boom position LF2 10 degrees, 20 degrees and
30 degrees, with auxiliary crane 211
Contents
IVZ(Master)_en 11
10 9 Erecting Boom Variant SSL 217
10 9 1 General Instructions 217
10 9 2 Erection procedure Boom variant SSL,
without WU rods on main boom, without Runner,
mast radius 14 m / 46 ft 219
10 9 3 Erection procedure Boom variant SSL,
without WU rods on main boom, without Runner,
mast radius 16 m / 52 5 ft 223
10 9 4 Erection procedure Boom variant SSL,
without WU rods on main boom, with Runner,
mast radius 14 m / 46 ft 225
10 9 5 Erection procedure Boom variant SSL,
without WU rods on main boom, with Runner,
mast radius 16 m / 52 5 ft 229
10 10 Erecting Boom Variant SSL/LSL 231
10 10 1 General Instructions 231
10 10 2 Erection procedure Boom variant SSL/LSL,
without WU rods on main boom, without Runner,
mast radius 14 m / 46 ft 233
10 10 3 Erection procedure Boom variant SSL/LSL,
without WU rods on main boom, without Runner,
mast radius 16 m / 52 5 ft 237
10 10 4 Erection procedure Boom variant SSL/LSL,
without WU rods on main boom, with Runner,
mast radius 14 m / 46 ft 239
10 10 5 Erection procedure Boom variant SSL/LSL,
without WU rods on main boom, with Runner,
mast radius 16 m / 52 5 ft 243
10 11 Erecting the boom variant SSL/LSL
with maximum heavy basic length (SGL max ) of the main boom
and special combination S1 245
10 11 1 General Instructions 245
10 11 2 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods on the Main boom, without Runner,
mast radius 14 m/46 ft, Superlift counterweight radius 16 m/52 5 ft 249
10 11 3 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods on the Main boom, without Runner,
mast radius 14 m / 46 ft, Superlift counterweight radius 14 m/46 ft 251
10 11 4 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods on the Main boom, without Runner,
mast radius 14 m/46 ft, Superlift counterweight radius 12 m/39 4 ft 253
10 11 5 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods on the Main boom, without Runner,
mast radius 16 m/52 5 ft,
Superlift counterweight radius 16 m/52 5 ft 255
10 11 6 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods of the Main boom, with Runner,
mast radius 14 m/46 ft,
Superlift counterweight radius 16 m/52 5 ft 257
10 11 7 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods of the Main boom, with Runner,
mast radius 14 m/46 ft, Superlift counterweight radius 14 m/46 ft 259
10 11 8 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods on the Main boom, with Runner,
mast radius 14 m/46 ft, Superlift counterweight radius 12 m/39 4 ft 261
10 11 9 Erection procedure Boom variant SSL/LSL (SGL max , S1),
without WU rods on the Main boom, with Runner, mast radius
16 m/52 5 ft, Superlift counterweight radius 16 m/52 5 ft 263
Contents
IVZ(Master)_en 12
10 12 Erecting Boom Variant SWSL 265
10 12 1 General Instructions 265
10 12 2 Erecting Boom Variant SWSL,
without Runner, without Roller set on Main boom,
mast radius 14 m / 46 ft 267
10 12 3 Erecting Boom Variant SWSL,
with Runner, without Roller set on main boom 299
10 12 4 Erecting Boom Variant SWSL,
without Runner, with Roller set and Hook block (4 9 t / 10 800 lbs)
on Main boom, mast radius 14 m / 46 ft 331
10 12 5 Erecting Boom Variant SWSL,
with Runner, with Roller set and Hook block (4 9 t / 10 800 lbs) on
Main boom, mast radius 14 m / 46 ft 363
10 13 Erecting Boom Variant SSL + LF2 395
10 13 1 General Instructions 395
10 13 2 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, without Roller set on Main boom,
mast radius 14 m/46 ft, Superlift counterweight radius 16 m/52 5 ft 399
10 13 3 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on the Main boom,
mast radius 14 m/46 ft, Superlift counterweight radius 14 m/46 ft 405
10 13 4 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on the Main boom,
mast radius 16 m/52 5 ft,
Superlift counterweight radius 16 m/52 5 ft 411
10 13 5 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on the Main boom,
mast radius 12 m/39 4 ft,
Superlift counterweight radius 12 m/39 4 ft 417
10 13 6 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block
(4,2 t / 9259 lbs) on Main boom,
mast radius 14 m/46 ft, Superlift counterweight radius 16 m/52 5 ft 423
10 13 7 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block (
4 2 t / 9259 lbs) on Main boom,
mast radius 14 m / 46 ft, Superlift counterweight radius 14 m/46 ft 429
10 13 8 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block
(4 2 t / 9259 lbs) on Main boom,
mast radius 16 m/52 5 ft,
Superlift counterweight radius 16 m/52 5 ft 435
10 13 9 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block (
4 2 t / 19259 lbs) on Main boom,
mast radius 12 m / 39 4 ft,
Superlift counterweight radius 12 m/39 4 ft 441
Contents
IVZ(Master)_en 13
10 14 Erecting Boom Variant SSL/LSL + LF2 447
10 14 1 General Instructions 447
10 14 2 Erecting Boom Variant SSL/LSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on the Main boom,
mast radius 14 m / 46 ft,
Superlift counterweight radius 16 m/52 5 ft 451
10 14 3 Erecting Boom Variant SSL/LSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on the Main boom,
mast radius 14 m / 46 ft,
Superlift counterweight radius 14 m/46 ft 457
10 14 4 Erecting Boom Variant SSL/LSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on the Main boom,
mast radius 16m / 52 5 ft,
Superlift counterweight radius 16 m/52 5 ft 463
10 14 5 Erecting Boom Variant SSL/LSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Roller set on the Main boom,
mast radius 12 m / 39 4 ft,
Superlift counterweight radius 12 m/39 4 ft 469
10 14 6 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block (
4 2 t / 9259 lbs) on Main boom,
mast radius 14 m / 46 ft
Superlift counterweight radius 16 m/52 5 ft 475
10 14 7 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block (
4 2 t / 9259 lbs) on Main boom,
mast radius 14 m / 46 ft,
Superlift counterweight radius 14 m/46 ft 481
10 14 8 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block (
4 2 t / 9259 lbs) on Main boom,
mast radius 16 m / 52 5 ft,
Superlift counterweight radius 16 m/52 5 ft 487
10 14 9 Erecting Boom Variant SSL + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Roller set and Hook block (
4 2 t / 9259 lbs) on Main boom,
mast radius 12 m / 39 4 ft,
Superlift counterweight radius 12 m/39 4 ft 493
Contents
IVZ(Master)_en 14
10 15 Erecting the boom variant SSL/LSL with maximum heavy basic length
(SGL max ) of the main boom and special combination S1 + LF2 499
10 15 1 General Instructions 499
10 15 2 Erecting Boom Variant SSL/LSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Hook block on Main boom,
mast radius 14 m / 46 ft,
Superlift counterweight radius 16 m/52 5 ft 503
10 15 3 Erecting Boom Variant SSL/LSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Hook block on Main boom,
mast radius 14 m / 46 ft,
Superlift counterweight radius 14 m/46 ft 507
10 15 4 Erecting Boom Variant SSL/LSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Hook block on Main boom,
mast radius 14 m / 46 ft
Superlift counterweight radius 12 m/39 4 ft 511
10 15 5 Erecting Boom Variant SSL/LSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
without Hook block on Main boom,
mast radius 16 m / 52 5 ft,
Superlift counterweight radius 16 m/52 5 ft 515
10 15 6 Erecting Boom Variant SSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
with Hook block (4 2 t / 9259 lbs) on Main boom,
mast radius 14 m/46 ft,
Superlift counterweight radius 16 m/52 5 ft 519
10 15 7 Erecting Boom Variant SSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
with Hook block (4 2 t / 9259 lbs) on Main boom,
mast radius 14 m/46 ft,
Superlift counterweight radius 14 m/46 ft 523
10 15 8 Erecting Boom Variant SSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom, with Hook block (4 2 t / 9259 lbs)
on Main boom,
mast radius 14 m/46 ft,
Superlift counterweight radius 12 m/39 4 ft 527
10 15 9 Erecting Boom Variant SSL (SGL max , S1) + LF2,
boom position LF2 10 degrees, 20 degrees and 30 degrees,
without WU rods on the Main boom,
with Hook block (4 2 t / 9259 lbs) on Main boom,
mast radius 16 m/52 5 ft,
Superlift counterweight radius 16 m/52 5 ft 531
Contents
IVZ(Master)_en 15
10 16 Erecting Boom Variant LFVL 535
10 16 1 General Instructions 535
10 16 2 Erecting Boom Variant LFVL,
boom position LF 17 5 degrees,
without WU rods on Main boom,
without Roller set on Main boom,
mast radius 14 m / 46 ft 537
10 16 3 Erecting Boom Variant LFVL,
boom position LF 17 5 degrees,
without WU rods on Main boom,
without Roller set on Main boom,
mast radius 16 m / 52 5 ft 543
10 16 4 Erecting Boom Variant LFVL,
boom position LF 17 5 degrees,
without WU rods on Main boom, with Roller set and Hook block
(4 2 t / 9 300 lbs) on Main boom,
mast radius 14 m / 46 ft 547
10 16 5 Erecting Boom Variant LFVL,
boom position LF 17 5 degrees,
without WU rods on Main boom, with Roller set and Hook block
(4 2 t / 9 300 lbs) on Main boom,
mast radius 16 m / 52 5 ft 553
11 β
12 β
13 Hydraulic power pack with pin locking
cylinder (optional equipment) 3
13 1 General 3
13 2 Commissioning 5
13 2 1 Preparatory measures 5
13 2 2 Leaving the drive motor running 7
13 2 3 Shutting down the drive motor 9
13 2 4 Check the hydraulic oil level 11
13 2 5 Driving with the hydraulic power pack 13
13 2 6 Starting operation of the hydraulic power pack 15
13 2 7 Malfunctions, causes, elimination 17
14 conversion of the Hook Block 3
14 1 Hook block 2 x 250 t (258 842 12) 3
14 2 Hook block 2 x 200 t (105 129 12) 9
14 3 Hook block 2 x 160 t (105 125 12) 15
Contents
IVZ(Master)_en 16
15 Assembling the Main Boom and Fly Jib LF2 3
15 1 General 3
15 2 Assembly and Fitting of the Main Boom SH with Fly Jib LF2 7
15 2 1 Assembling the Main Boom Combination SH for the Variant LF2 9
15 2 2 Assembling the Fly Jib Combination for the Variant LF2
(Main Boom SH) 11
15 2 2 1 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft) boom
length, boom position 105 11
15 2 2 2 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 15 degrees, 20 degrees and 30 degrees 15
15 2 3 Fitting the Main Boom and Fly Jib Combination SH + LF2 19
15 2 4 Assembling the Main Boom Stay Bars with the Combination SH 49
15 2 5 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH β Boom Lengths 72 m (236 ft) β 84 m (276 ft) 51
15 3 Dismantling the Fly Jib Combinations LF2 53
15 3 1 Setting down the boom combination 53
15 4 Assembling the Main Boom Combin SH/LH for the Variant LF2 57
15 4 1 Assembling the Main Boom Combin SH/LH for the Variant LF2 59
15 4 2 Assembling the Fly Jib Combination for the Variant LF2
(Main Boom SH/LH) 63
15 4 2 1 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft)
boom length, boom position 10 degrees,
Main boom length 42 m (138 ft) β 84 m (276 ft) 63
15 4 2 2 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft)
boom length, boom position 10 degrees,
Main boom length 90 m (295 ft) β 108 m (354 ft) 67
15 4 2 3 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 15 degrees 71
15 4 2 4 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 20 degrees 73
15 4 2 5 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 30 degrees 75
15 4 3 Fitting the Main Boom and Fly Jib Combination SH/LH + LF2 77
15 4 4 Assembling the Main Boom Stay Bars for the Combination SH/LH 107
15 4 5 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH 109
15 4 5 1 Boom length 66 m (217 ft) β 90 m (295 ft) 109
15 4 5 2 Boom length 96 m (315 ft) and 102 m (335 ft) 111
15 4 5 3 Boom length 108 m (354 ft) 113
15 5 Dismantling the Fly Jib Combinations LF2 115
15 5 1 Setting down the boom combination 115
15 6 Assembly and fitting of the LF2 fly jib combination of main boom
SH/LH with maximum heavy basic length (SGL max , S1) of the
main boom 119
15 6 1 Assembly of the of SH/LH main boom combination for the LF2
variant with maximum heavy basic length (SGL max , S1) of the
main boom 121
15 6 2 Assembling the Fly Jib Combination for the Variant LF2
(Main Boom SH/LH SGL max , S1) 123
15 6 2 1 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (18 ft) boom
length, boom position 105,
Main boom length 42 m (138 ft) β 102 m (335 ft) 123
15 6 2 2 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 15 degrees, 20 degrees and 30 degrees 127
Contents
IVZ(Master)_en 17
15 6 3 Fitting the main boom and fly jib combination
SH/LH (SGL max , S1) + LF2 131
15 6 4 Assembling the Stay Bars HA for the Combination SH/LH
(SGL Max , S1) 161
15 6 5 Assembling the Auxiliary Bracing (Bracing Chains) for the
Combination SH/LH (SGL max , S1) 163
15 7 Dismantling the Fly Jib Combinations LF2 165
15 7 1 Setting down the boom combination 165
16 Assembling and Dismantling the SuperLift (Dolly) 3
16 1 General 3
16 1 1 Pin Connections 3
16 1 2 Hydraulic Cylinders β Protecting the Piston Rods 7
16 1 3 Assembly Instructions 9
16 2 Assembling the SuperLift Equipment 11
16 2 1 General 11
16 3 Assembling and Fitting the SuperLiftMast (SL Mast) with
Counterweight Dolly 17
16 3 1 Assembling the SuperLift Mast (SL Mast) with Counterweight Dolly β
Counterweight Radius 12 m (39 ft) β 16 m (52 ft) 19
16 3 2 Counterweight vehicle and Telescopic connection β
SLβcounterweight radius 12 m (39 ft) β 16 m (52 ft) 21
16 3 3 Assembly Procedure 23
16 3 4 Assembling the Support Rods and the Derricking Spreader Bar 27
16 3 5 Assembling and Fitting the Counterweight Vehicle 29
16 4 Dismantling the SuperLift Equipment 41
16 4 1 General 41
16 4 2 Dismantling the SuperLift Counterweight 45
16 4 3 Dismantling the Counterweight Dolly 49
16 4 4 Dismantling the Derricking Spreader Bar and the Support Rods 53
16 4 5 Dismantling the SuperLift Mast 55
16 4 5 1 Dismantling the Hydraulic Lines for Luffing Gear 2 55
16 4 5 2 Setting Down the SuperLift Mast 55
17 β
Contents
IVZ(Master)_en 18
18 Assembling the Main Boom and Fly Jib LF2 with SuperLift 3
18 1 General 3
18 2 Assembling and Fitting the Fly Jib Combination LF2
(Main Boom SSL) 7
18 2 1 Assembling the SSL Main Boom Combinations 9
18 2 2 Assembling the Fly Jib Combination for the Variant LF2
(Main Boom SSL) 11
18 2 2 1 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft)
boom length, boom position 10 degrees 11
18 2 2 2 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 15 degrees, 20 degrees and 30 degrees 15
18 2 3 Fitting the Main Boom and Fly Jib Combination SSL + LF2 19
18 2 3 1 Fitting Procedure on the Ground 19
18 2 4 Assembling the Main Boom Stay Bars with the Combination SSL 45
18 2 5 Assembling the Bracing (Bracing Chains) for the Combination SSL β
Boom Length 96 m (315 ft) 47
18 3 Dismantling the Fly Jib Combinations LF2 49
18 3 1 Setting down the boom combination 49
18 4 Assembling and Fitting the Main Boom Combination
SSL/LSL + LF2 53
18 4 1 Assembling the Main Boom Combinations SSL/LSL of the
Variant LF2 55
18 4 2 Assembling the Fly Jib Combinations LF2
(Main boom SSL/LSL) 59
18 4 2 1 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft)
boom length, boom position 10 degrees,
Main boom length 78 m (256 ft) 59
18 4 2 2 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft)
boom length, boom position 10 degrees,
Main boom length 84 m (276 ft) β 114 m (374 ft) 63
18 4 2 3 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft)
boom length, boom position 10 degrees,
Main boom length 120 m (394 ft) and 126 m (413 ft) 67
18 4 2 4 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 15 degrees, 20 degrees and 30 degrees,
Main boom length 78 m (256 ft) 71
18 4 2 5 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 15 degrees 75
18 4 2 6 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 20 degrees 77
18 4 2 7 Fly jib (type LF2), 12 m (39 ft) boom length,
boom position 30 degrees 79
18 4 3 Fitting the Main Boom and Fly Jib Combination SSL/LSL + LF2 81
18 4 3 1 Fitting Procedure on the Ground 81
18 4 4 Assembling the HA Stay Bars for Combination SSL/LSL 107
18 4 5 Assembling the Bracing (Bracing Chains) for the
Combination SSL/LSL 109
18 4 5 1 Boom length 78 m (256 ft), 84 m (276 ft) and 90 m (295 ft) 109
18 4 5 2 Boom length 96 m (315 ft) β 126 m (413 ft) 113
18 4 6 Assembly of the auxiliary bracing 117
18 4 7 Assembly of the rope deflector 117
18 5 Dismantling the Fly Jib Combinations LF2 119
18 5 1 Setting down the boom combination 119
Contents
IVZ(Master)_en 19
18 6 Assembling and fitting the fly jib combination LF2, main boom
SSL/LSL with maximum heavy basic length (SGL max , S1) of
the main boom 123
18 6 1 Assembly of the of SSL/LSL main boom combination for the LF2
variant with maximum heavy basic length (SGL max , S1) of the
main boom 125
18 6 2 Assembling the Fly Jib Combination for the Variant LF2
(Main Boom SSL/LSL, SGL max , S1) 127
18 6 2 1 Fly jib (type LF2), 12 m (39 ft), 24 m (79 ft) and 36 m (118 ft)
boom length, boom position 10 degrees 127
18 6 2 2 Fly jib (type LF2), 12 m (39 4 ft) boom length,
boom position 15 degrees, 20 degrees and 30 degrees 131
18 6 3 Fitting the main and fly jib combination SSL/LSL + LF2 with
maximum heavy basic length (SGL max , S1) of the main boom 135
18 6 3 1 Fitting Procedure on the Ground 135
18 6 4 Assembling the Main Boom Stay Bars for the Combination SSL/LSL
(SGL max S1) 167
18 6 5 Assembling the Bracing (Bracing Chains) for the Combination
SSL/LSL (SGL max , S1) β
Main Boom Length 108 m (354 ft) β 126 m (413 ft) 169
18 7 Dismantling the Fly Jib Combinations LF2 173
18 7 1 Setting down the boom combination 173
Contents
IVZ(Master)_en 20
19 Assembling the Main Boom and Fly Jib LFVL with SuperLift 3
19 1 General 3
19 2 Assembling and Fitting Fly Jib Combination LFVL 5
19 2 1 Assembling the Main Boom Combination for the Variant LFVL 7
19 2 2 Assembling the Fly Jib Combination for the Variant LFVL 11
19 2 3 Fitting Main Boom and Fly Jib Combination LFVL 13
19 2 4 Fitting the Runner 43
19 2 5 Assembling Stay Bars HA
S.V 07/24Β Β
What Our Customers Say
π Related Products
Discover more professional manuals for your equipment

Terex Ta40 Articulated Truck Parts Catalog Manual - PDF Download

Terex Genie GTH-4514 AU Part Manual - PDF DOWNLOAD

Terex Genie GTH 3007 AGRI 730 Part Manual - PDF DOWNLOAD
