★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

Valtra BH135i BH145 BH165 BH180 BH200 BH210i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Original price was: $86.95.Current price is: $27.95.

Valtra BH135i BH145 BH165 BH180 BH200 BH210i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Buy now
โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Valtra BH135i BH145 BH165 BH180 BH200 BH210i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

FILE DETAILS:

Valtra BH135i BH145 BH165 BH180 BH200 BH210i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Language : English
Pages : 121
Downloadable : Yes
File Type : PDF
Size: 16.3 MB

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Valtra BH135i BH145 BH165 BH180 BH200 BH210i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

INTRODUCTION AND UTILIZATION:

This LABOR CHART has been developed aiming at facilitating understanding of in-warranty paid labor times, as well as clearly identify through codes the malfunctions that caused component faults, analyze the effectiveness of the shop technical personnel, and provide guidelines in order to charge the customer.

  • The LC is divided into chapters that represent component groups, such as for instance: Front Axle, Rear Axle, Transmission, etc. Each chapter is subdivided into units that represent parts from these groups.
  • Units are described with their generic name, specific name, and an exploded view showing the parts. It also has 6 columns of information as follows: Item, Group, Fault Code, Hours, and Notes.

Item: This column associates the information with the exploded view.
Group: Represented by letters and numbers, which associate the various chapter parts. Groups are independent across the Fault Code
chapters: Number used to representa a fault in a given component.
Horas: Expresses the number of hours required for the operation.
Notes: A field where general procedure, location, and differentiated
times are described according to the product.

TIME;
The times listed in this publication are the result of a careful study of
each operation. These represent the time spent by a trained technician
with average ability to perform the task, using standard and special
tools. These do not incluid displacements and expenses up to the
equipment site.
The times also include the difficulties encountered in used machines
and are based on methods and recommendations on the use of special
tools, which are described in the Service Manuals.
The following activities are included in the times on this labor chart:
1. All operations such removal of covers, use of jacks, separation,
breaks, draining, and oil change, and parts cleaning.
2. Drive the machine in and out the service shop or to better locate it in
the farm.
3. Receive instructions, read service bulletins and manuals.
4. Perform routine diagnostics.
5. Receive and deliver special tools to the tools storehouse.
6. Removal of appropriated parts from the parts storehouse.
7. Take information to the office personnel.
8. Final checking.
9. Needs of the mechanic and fatigue effects.
10. Machine wash.

TABLE OF CONTENTS:

Valtra BH135i BH145 BH165 BH180 BH200 BH210i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Introduction 01
Engine and Equipments 20
Electric System 30
Gear Box and PTO 40
Final Drive and Brakes 50
Steering System 60
Wheelwork and Fuel Tank 70
Cabin and Bodywork 80
Hydraulic System 90

Questions? Email us: [email protected]

PLEASE NOTE:

  • This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.
  • This is the same manual used by the dealers inorder to diagnose your vehicle of its faults.
  • Require some other service manual or have any queries: please WRITE to us atย [email protected]

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
๐Ÿ›’
Recently Purchased
๐Ÿ•’ verified order