★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

Valtra BM85 BM100 BM110 BM120 BM125i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Original price was: $86.95.Current price is: $27.95.

Valtra BM85 BM100 BM110 BM120 BM125i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Buy now
โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Valtra BM85 BM100 BM110 BM120 BM125i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

FILE DETAILS:

Valtra BM85 BM100 BM110 BM120 BM125i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Language : English
Pages : 108
Downloadable : Yes
File Type : PDF
Size: 13.4 MB

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Valtra BM85 BM100 BM110 BM120 BM125i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

INTRODUCTION AND UTILIZATION:

This LABOR CHART has been developed aiming at facilitating understanding of in-warranty paid labor times, as well as clearly identify through codes the malfunctions that caused component faults, analyze the effectiveness of the shop technical personnel, and provide guidelines in order to charge the customer.

  • The LC is divided into chapters that represent component groups, such as for instance: Front Axle, Rear Axle, Transmission, etc. Each chapter is subdivided into units that represent parts from these groups.
  • Units are described with their generic name, specific name, and an exploded view showing the parts. It also has 6 columns of information as follows: Item, Group, Fault Code, Hours, and Notes.

Item: This column associates the information with the exploded view.
Group: Represented by letters and numbers, which associate the various chapter parts. Groups are independent across the Fault Code
chapters: Number used to representa a fault in a given component.
Horas: Expresses the number of hours required for the operation.
Notes: A field where general procedure, location, and differentiated
times are described according to the product.

TIME;
The times listed in this publication are the result of a careful study of
each operation. These represent the time spent by a trained technician
with average ability to perform the task, using standard and special
tools. These do not incluid displacements and expenses up to the
equipment site.
The times also include the difficulties encountered in used machines
and are based on methods and recommendations on the use of special
tools, which are described in the Service Manuals.
The following activities are included in the times on this labor chart:
1. All operations such removal of covers, use of jacks, separation,
breaks, draining, and oil change, and parts cleaning.
2. Drive the machine in and out the service shop or to better locate it in
the farm.
3. Receive instructions, read service bulletins and manuals.
4. Perform routine diagnostics.
5. Receive and deliver special tools to the tools storehouse.
6. Removal of appropriated parts from the parts storehouse.
7. Take information to the office personnel.
8. Final checking.
9. Needs of the mechanic and fatigue effects.
10. Machine wash.

TABLE OF CONTENTS:

Valtra BM85 BM100 BM110 BM120 BM125i Tractor Repair Time Schedule Manual – PDF DOWNLOAD

Introduction 01
Engine and Equipments 20
Electrical System 30
Power Transmission 40
Final Drive and Brakes 50
Steering System 60
Wheels and Fuel Tank 70
Shields and Cab 80
Hydraulics System 90

Need help? Contact: [email protected]

https://vimeo.com/820249143?share=copy

PLEASE NOTE:

  • This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
  • Contact us atย [email protected]ย should you have any queries before your purchase or that you need any other service / repair / parts operators manual.

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
๐Ÿ›’
Recently Purchased
๐Ÿ•’ verified order