YANMAR ViO15-2 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
YANMAR VIO15-2 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD:
IMAGE PREVIEW:
YANMAR ViO15-2 EXCAVATOR SERVICE MANUAL – PDF DOWNLOADYANMAR ViO15-2 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
DESCRIPTION:
YANMAR ViO15-2 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
Correct work means the quickest possible completion of according to the correct procedures and the specified standards.
It is important when conducting certain operations always to bear in mind the equipment, tools, gauges, materials, oil and grease, etc. that you must have ready, as well as items to be checked, adjusted, or disassembled, and cautions to watch out for.
(1) Never attempt servicing while engine is running or immediately after stopping operation. (2) Wear work cloths, safety shoes and helmet. (3) Check the equipment and tools before use. Especially, be sure to check the crane, lifting equipment and tools.
(4) When working together with other persons, allocate everyone’s share of job, arrange the signals and act in concert with the other persons. (5) The operation of the crane and slinging work must be performed by qualified persons.
(6) Do not enter or pass under the raised load. (7) Lift and support the massive parts by crane before removing the installation bolts. (8) Disconnect cables from battery before repairing the electric system.
(9) Remove the battery when welding the machine. (1) Check the service record of the machine. (That is, check how many months or hours the machine has been used since the preceding overhaul, what was the trouble then and what parts were replaced.)
(2) Have all servicing tools ready, i.e., tools, measuring devices (which have received periodic maintenance), containers, oil & grease, etc. (3) Have the service literature (operation manual, parts catalog, etc.) ready.
(1) Clean the machine before disassembly. (2) Check and record the condition of the machine before disassembly : • Model, machine number, operation hours • Reasons for repair, history of repair •
Contamination of filters • Fuel and oil condition • Damage to parts, etc. (3) Place alignment marks on the necessary parts to facilitate reassembly. (4) Clean all the removed parts and new replacement parts and put them in order. (5) Use new seals, split pins, etc. for reassembly.
TABLE OF CONTENTS:
YANMAR ViO15-2 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
SM ViO15-2 (chap7-11).pdf.......................................................................... 0
COVER.......................................................................................... 0
FOREWORD....................................................................................... 0
CONTENTS....................................................................................... 0
CHAPTER 1 GENERAL CAUTIONS FOR MAINTENANCE WORK................................................ 0
1. General Cautions for Maintenance Work................................................... 0
1-1 Correct Work....................................................................... 0
1-2 Safety Precautions................................................................. 0
1-3 Preparations....................................................................... 0
1-4 Cautions for Disassembly and Reassembly............................................ 0
1-5 Cautions for Removal and Installation of Hydraulic Equipment....................... 0
1-6 Cautions for Removal and Installation of Hydraulic Piping.......................... 0
1-7 Cautions for Handling Seals........................................................ 0
1-8 Correct Installation of Hydraulic Hose............................................. 0
1-9 Specifications of Hydraulic Hose................................................... 0
1-10 Air Release of Hydraulic Equipment................................................ 0
CHAPTER 2 TECHNICAL DATA....................................................................... 0
2. Technical Data.......................................................................... 0
2-1 Specifications..................................................................... 0
2-2 Outline Drawing and Working Area................................................... 0
2-3 Weight List of Main Parts.......................................................... 0
2-4 Lifting Capacity List.............................................................. 0
CHAPTER 3 SERVICE STANDARDS.................................................................... 0
3. Service Standards....................................................................... 0
3-1 Machine Performance................................................................ 0
3-2 Engine............................................................................. 0
3-3 Undercarriage...................................................................... 0
3-3-1 Rubber Crawler Specifications................................................ 0
3-4 Controls........................................................................... 0
3-5 Hydraulic Equipment................................................................ 0
3-5-1 Hydraulic Cylinders.......................................................... 0
3-6 Implement.......................................................................... 0
3-6-1 Front Attachments............................................................ 0
3-6-2 Blade Moving Device.......................................................... 0
3-6-3 Bucket Teeth................................................................. 0
3-7 List of Tightening Torque.......................................................... 0
3-7-1 Machine...................................................................... 0
3-7-2 Engine....................................................................... 0
3-7-3 Tightening Torque for General Bolts and Nuts................................. 0
CHAPTER 4 ENGINE............................................................................... 0
4. Engine.................................................................................. 0
4-1 Measurement, Inspection and Adjustment............................................. 0
4-1-1 Measuring the Compression Pressure........................................... 0
4-1-2 Adjusting the Valve Clearance................................................ 0
4-1-3 Checking the V-belt Tension.................................................. 0
4-1-4 Checking the Fuel Injection Valve............................................ 0
4-1-5 Checking and adjusting the Fuel Injection Timing............................. 0
4-1-6 Adjusting the Maximum (or Minimum) Idling Speed.............................. 0
4-1-7 Checking the Cooling Water System and Radiator for Water Leakage............. 0
4-1-8 Checking the Sensors......................................................... 0
4-2 Measurement Procedure, Service Data and Corrective Action.......................... 0
4-2-1 Cylinder Head................................................................ 0
4-2-2 Cylinder Block............................................................... 0
4-2-3 Valve Rocker Arm............................................................. 0
4-2-4 Piston and Piston Rings...................................................... 0
4-2-5 Connecting Rod............................................................... 0
4-2-6 Cam shaft.................................................................... 0
4-2-7 Crank shaft.................................................................. 0
4-2-8 Gears........................................................................ 0
4-2-9 Trochoid Pump................................................................ 0
4-3 Precautions for Reassembly......................................................... 0
4-4 Fuel Injection System.............................................................. 0
4-4-1 Fuel Injection Pump.......................................................... 0
4-4-2 Fuel Injection Valve......................................................... 0
4-4-3 Governor Mechanism........................................................... 0
4-4-4 Specifications of Fuel Injection Pump........................................ 0
4-4-5 Service Date for Fuel Injection Equipment.................................... 0
4-5 Electrical Equipment............................................................... 0
4-5-1 Starter Motor................................................................ 0
4-5-2 Alternator................................................................... 0
4-5-3 Glow Plug.................................................................... 0
CHAPTER 5 HYDRAULIC SYSTEM..................................................................... 0
5. Hydraulic System........................................................................ 0
5-1 Outline............................................................................ 0
5-1-1 Control Valve Operation...................................................... 0
5-1-2 Additional Operation of Control Valve........................................ 0
5-2 Hydraulic Circuit Schematic........................................................ 0
5-2-1 For Standard Type Machines................................................... 0
5-3 Circuit Operation.................................................................. 0
5-3-1 Boom......................................................................... 0
5-3-2 Arm.......................................................................... 0
5-3-3 Bucket....................................................................... 0
5-3-4 Swing........................................................................ 0
5-3-5 Boom Swing................................................................... 0
5-3-6 Blade........................................................................ 0
5-3-7 Travel....................................................................... 0
5-3-8 Track Gauge Change........................................................... 0
5-3-9 Simultaneous Operation of Blade and Travel................................... 0
5-3-10 Simultaneous Operation of Boom and Arm...................................... 0
5-3-11 Simultaneous Operation of Boom and Bucket................................... 0
5-3-12 Simultaneous Operation of Arm and Swing..................................... 0
5-3-13 Simultaneous Operation of Arm and Bucket.................................... 0
5-3-14 Simultaneous Operation of Boom, Arm and Swing............................... 0
5-3-15 Hydraulic P.T.O............................................................. 0
5-4 Pressure Adjustment................................................................ 0
5-4-1 Relief Valves................................................................ 0
5-4-2 Swing Brake Valve............................................................ 0
5-4-3 Cut-Off Valve................................................................ 0
CHAPTER 6 HYDRAULIC EQUIPMENT.................................................................. 0
6. Hydraulic Equipment..................................................................... 0
6-1 Hydraulic Pump..................................................................... 0
6-2 Control Valve...................................................................... 0
6-3 Pilot Valve........................................................................ 0
6-4 Swing Motor........................................................................ 0
6-5 Travel Motor....................................................................... 0
CHAPTER 7 ADJUSTMENT AND REPAIR................................................................253
7. Adjustment and Repair...................................................................254
7-1 Electric Equipment of Machine......................................................254
7-1-1 Parts Layout of Electrical Equipment.........................................254
7-1-2 Monitor and Alarm Systems....................................................255
7-1-3 Wiring Diagram...............................................................258
7-1-4 Circuit Description of Engine Start and Stop, and Battery Charging...........259
7-1-5 Removal and Reinstallation of Engine.........................................261
7-1-6 Removal and Reinstallation of Starter Motor..................................267
7-1-7 Removal and Reinstallation of Fuel Injection Pump............................268
7-1-8 Removal and Reinstallation of Fuel Tank......................................270
7-1-9 Removal and Reinstallation of Radiator.......................................273
7-2 Undercarriage......................................................................276
7-2-1 Outline......................................................................276
7-2-2 Points of Reassembly.........................................................277
7-2-3 Crawler Tension Adjustment Procedure.........................................278
7-2-4 Removal and Reinstallation of Crawler........................................279
7-2-5 Disassembly and Reassembly of Idler..........................................280
7-2-6 Disassembly and Reassembly of Track Roller...................................282
7-2-7 Removal and Reinstallation of Track Gauge Change Cylinder....................284
7-3 Controls...........................................................................287
7-3-1 Control Train................................................................287
7-3-2 Mechanical Control Linkage...................................................288
7-3-3 Adjustment of Control Levers.................................................290
7-3-4 Adjustment of Travel Levers..................................................291
7-3-5 Adjustment of Boom Swing Pedal...............................................292
7-3-6 Adjustment of Blade Lever....................................................292
7-3-7 Adjustment of Lock Lever Switch..............................................293
7-3-8 Adjustment of Track Gauge Change Control Lever...............................293
7-3-9 Adjustment of Accelerator Lever..............................................294
7-3-10 Adjustment of P.T.O. Pedal..................................................295
7-3-11 Adjustment Procedure of Travel Alarm Switch (Left and Right)................296
7-4 Swing Bearing......................................................................297
7-5 Hydraulic Equipment................................................................299
7-5-1 Removal and Reinstallation of Hydraulic Pump.................................299
7-5-2 Removal and Reinstallation of Control Valve..................................302
7-5-3 Removal and Reinstallation of Swing Motor....................................305
7-5-4 Removal and Reinstallation of Swivel Joint...................................308
7-5-5 Disassembly and Reassembly of Swivel Joint...................................311
7-5-6 Disassembly and Reassembly of Hydraulic Cylinders............................314
7-5-7 Hydraulic Oil Tank...........................................................318
7-5-8 Piping Layout................................................................324
7-6 Implement..........................................................................331
7-6-1 Removal and Reinstallation of Implement......................................331
CHAPTER 8 PERIODIC INSPECTION AND SERVICING....................................................339
8. Periodic Inspection and Servicing.......................................................340
8-1 List of Periodic Inspection and Servicing..........................................340
CHAPTER 9 FUEL, LUBE OIL AND GREASE RECOMMENDED................................................342
9. Fuel, Lube Oil and Grease Recommended...................................................343
CHAPTER 10 TROUBLESHOOTING.....................................................................344
10. Troubleshooting........................................................................345
10-1 Non-Breakdowns....................................................................345
10-1-1 Natural Release of Bucket...................................................345
10-1-2 Discontinuous Arm Movement..................................................345
10-1-3 Drifting of Upperstructure on Quick Travel Operation........................346
10-1-4 Thermal Shock of Travel Motor...............................................347
10-1-5 Change of Blade Speed in Loaded Condition...................................348
10-1-6 Time Lag on Travel Speed Switching..........................................349
10-1-7 Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperature Change....350
10-2 Troubleshooting...................................................................351
10-2-1 Machine and Engine..........................................................351
10-2-2 Electrical Equipment on Panel...............................................372
CHAPTER 11 REFERENCE DATA......................................................................381
11. Reference Data.........................................................................382
11-1 Specifications for Attachment.....................................................382
COLOPHON.......................................................................................383
SPINE TITLE....................................................................................384
PLEASE NOTE:
This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer
SK
✹
What Our Customers Say
★★★★★Live reviews from customers
Loading customer reviews...
🌟 Related Products
Discover more professional manuals for your equipment