YANMAR ViO50-1 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
YANMAR VIO50-1 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD:
IMAGE PREVIEW:
YANMAR ViO50-1 EXCAVATOR SERVICE MANUAL – PDF DOWNLOADYANMAR ViO50-1 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
DESCRIPTION:
YANMAR ViO50-1 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
Correct work means the quickest possible completion of according to the correct procedures and the specified standards.
It is important when conducting certain operations always to bear in mind the equipment, tools, gauges, materials, oil and grease, etc. that you must have ready, as well as items to be checked, adjusted, or disassembled, and cautions to watch out for.
(1) Never attempt servicing while engine is running or immediately after stopping operation. (2) Wear work cloths, safety shoes and helmet. (3) Check the equipment and tools before use. Especially, be sure to check the crane, lifting equipment and tools.
(4) When working together with other persons, allocate everyone’s share of job, arrange the signals and act in concert with the other persons. (5) The operation of the crane and slinging work must be performed by qualified persons.
(6) Do not enter or pass under the raised load. (7) Lift and support the massive parts by crane before removing the installation bolts. (8) Disconnect cables from battery before repairing the electric system.
(9) Remove the battery when welding the machine. (1) Check the service record of the machine. (That is, check how many months or hours the machine has been used since the preceding overhaul, what was the trouble then and what parts were replaced.)
(2) Have all servicing tools ready, i.e., tools, measuring devices (which have received periodic maintenance), containers, oil & grease, etc. (3) Have the service literature (operation manual, parts catalog, etc.) ready.
(1) Clean the machine before disassembly. (2) Check and record the condition of the machine before disassembly : • Model, machine number, operation hours • Reasons for repair, history of repair •
Contamination of filters • Fuel and oil condition • Damage to parts, etc. (3) Place alignment marks on the necessary parts to facilitate reassembly. (4) Clean all the removed parts and new replacement parts and put them in order. (5) Use new seals, split pins, etc. for reassembly.
TABLE OF CONTENTS:
YANMAR ViO50-1 EXCAVATOR SERVICE MANUAL – PDF DOWNLOAD
Vio50-1......................................................................................... 1
FOREWORD........................................................................................ 2
CONTENTS........................................................................................ 3
1 GENERAL CAUTIONS FOR MAINTENANCE WORK......................................................... 6
1-1 Correct Work............................................................................ 7
1-2 Safety Precautions...................................................................... 7
1-3 Preparations............................................................................ 7
1-4 Cautions for Disassembly and Reassembly................................................. 7
1-5 Cautions for Removal and Installation of Hydraulic Equipment............................ 8
1-6 Cautions for Removal and Installation of Hydraulic Piping............................... 8
1-7 Cautions for Handling Seals............................................................. 8
1-8 Correct Installation of Hydraulic Hose.................................................. 9
1-9 Specifications of Hydraulic Hose........................................................ 11
1-10 Air Release of Hydraulic Equipment..................................................... 15
2 TECHNICAL DATA................................................................................ 16
2-1 Specifications.......................................................................... 17
2-2 Machine Dimensions and Working Ranges................................................... 24
2-2-1 Canopy Type....................................................................... 24
2-2-2 Cabin Type........................................................................ 25
2-3 Component Weights....................................................................... 26
2-4 Lifting Capacities...................................................................... 27
3 SERVICING STANDARDS........................................................................... 28
3-1 Machine Performance..................................................................... 29
3-2 Engine.................................................................................. 33
3-3 Undercarriage........................................................................... 36
3-3-1 Rubber Crawler Specifications..................................................... 36
3-3-2 Steel Crawler Specifications...................................................... 37
3-3-3 Common Specifications of Steel & Rubber Crawlers.................................. 38
3-4 Controls................................................................................ 39
3-5 Hydraulic Equipment..................................................................... 40
3-5-1 Hydraulic Cylinder................................................................ 40
3-6 Work Implements......................................................................... 41
3-6-1 Front Attachments................................................................. 41
3-6-2 Blade Moving Device............................................................... 42
3-6-3 Bucket Teeth...................................................................... 42
3-7 List of Tightening Torque............................................................... 43
3-7-1 Machine........................................................................... 43
3-7-2 Engine............................................................................ 45
3-7-3 Tightening Torque for General Bolts and Nuts...................................... 45
4 ENGINE........................................................................................ 46
4-1 Cylinder Block.......................................................................... 47
4-2 Cylinder Head........................................................................... 52
4-3 Piston and Piston Pin................................................................... 59
4-4 Connecting Rod.......................................................................... 63
4-5 Crankshaft and Main Bearing............................................................. 66
4-6 Camshaft and Tappets.................................................................... 69
4-7 Timing Gear............................................................................. 72
4-8 Service Data............................................................................ 74
4-9 Cooling System.......................................................................... 77
4-10 Lubrication System..................................................................... 83
4-11 Fuel Supply System..................................................................... 91
4-12 Starter Motor..........................................................................144
4-13 Alternator.............................................................................155
4-14 Starting Aids..........................................................................164
4-15 Adjustment of Engine Output............................................................165
5 HYDRAULIC SYSTEM..............................................................................167
5-1 Outline.................................................................................168
5-1-1 Control Valve Operation...........................................................171
5-1-2 Additional Operation of Control Valve.............................................173
5-2 Hydraulic Circuit Schematic.............................................................174
5-2-1 Standard Specifications...........................................................174
5-3 Circuit Operation.......................................................................175
5-3-1 Boom..............................................................................175
5-3-2 Arm...............................................................................177
5-3-3 Bucket............................................................................179
5-3-4 Swing.............................................................................181
5-3-5 Boom Swing........................................................................183
5-3-6 Blade.............................................................................185
5-3-7 Travel............................................................................187
5-3-8 Simultaneous Operation of Travel and Boom/Bucket..................................189
5-3-9 Simultaneous Operation of Travel and Arm/Boom Swing...............................191
5-3-10 Simultaneous Operation of Boom Up and Arm Retract................................193
5-3-11 Simultaneous Operation of Boom Up and Bucket.....................................195
5-3-12 Simultaneous Operation of Boom Up and Swing......................................197
5-3-13 Simultaneous Operation of Arm and Bucket.........................................199
5-3-14 Hydraulic P.T.O..................................................................201
5-4 Pressure Adjustment.....................................................................203
5-4-1 Relief Valves.....................................................................203
5-4-2 Swing Brake Valve.................................................................205
5-4-3 Cut-off Valve.....................................................................206
6 HYDRAULIC EQUIPMENT...........................................................................208
6-1 Hydraulic Pump..........................................................................209
6-2 Control Valve...........................................................................242
6-3 Pilot Valve.............................................................................287
6-4 Swing Motor.............................................................................294
6-5 Travel Motor............................................................................324
7 ADJUSTMENT AND REPAIR.........................................................................366
7-1 Electric Equipment of the Machine.......................................................367
7-1-1 Parts Layout of Electrical Equipment and Heater...................................367
7-1-2 Monitor and Alarm Systems.........................................................370
7-1-3 Wiring Diagram....................................................................374
7-2 Undercarriage...........................................................................376
7-2-1 Outline...........................................................................376
7-2-2 Major Parts.......................................................................376
7-2-3 Points of Reassembly (Rubber Crawler Models)......................................377
7-2-4 Points of Reassembly (Steel Crawler Models).......................................378
7-2-5 Disassembly and Reassembly of Idler...............................................380
7-2-6 Disassembly and Reassembly of Track Roller........................................383
7-2-7 Disassembly and Reassembly of Carrier Roller......................................385
7-2-8 Installation of Floating Seal.....................................................386
7-2-9 Drawings of Jigs..................................................................387
7-3 Controls................................................................................389
7-3-1 Control Train.....................................................................389
7-3-2 Mechanical Control Linkage........................................................390
7-3-3 Adjustment of Implement Control Levers............................................392
7-3-4 Adjustment of Travel Levers.......................................................394
7-3-5 Adjustment of 2-Speed Pedal.......................................................395
7-3-6 Adjustment of Boom Swing Pedal....................................................396
7-3-7 Adjustment of Blade Control Lever.................................................397
7-3-8 Adjustment of Lock Lever..........................................................398
7-3-9 Adjustment of Accelerator Lever...................................................399
7-4 Swing Bearing...........................................................................400
7-5 Hydraulic Equipment.....................................................................402
7-5-1 Removal and Reinstallation (R&R) of Hydraulic Pump................................402
7-5-2 Disassembly and Reassembly of Hydraulic Cylinder..................................407
7-5-3 Swivel Joint......................................................................408
7-5-4 Hydraulic Oil Tank................................................................412
7-5-5 Piping Layout.....................................................................414
7-6 Engine Hood and Cabin...................................................................421
7-6-1 Engine Hood.......................................................................421
7-6-2 Cabin.............................................................................422
8 PERIODIC INSPECTION AND SERVICING.............................................................434
8. List of Periodic Inspection and Servicing................................................435
9 FUEL,LUBE OIL AND GREASE RECOMMENDED..........................................................437
9. Fuel,Lube Oil and Grease Recommended by Yanmar...........................................438
10 TROUBLESHOOTING..............................................................................439
10-1 Non-breakdowns.........................................................................440
10-1-1 Natural Release of Bucket........................................................440
10-1-2 Discontinuous Arm Movement.......................................................440
10-1-3 Drifting of Upperstructure on Quick Travel Operation.............................441
10-1-4 Thermal Shock of Travel Motor....................................................442
10-1-5 Elongation of Boom Swing Cylinder on 70 degrees Swing............................443
10-1-6 Telescopic Motion of Boom Swing Cylinder with Lock Lever Set to Lock Position....444
10-1-7 Time Lag on Travel Speed Switching...............................................445
10-1-8 Fluctuation in Oil Level of Hydraulic Oil Tank Due to Temperture Change..........446
10-2 Troubleshooting........................................................................447
10-2-1 Machine and Engine...............................................................447
10-2-2 Electrical Equipment on Panel....................................................468
11 REFERENCE DATA...............................................................................476
11-1 Specifications for Attachment..........................................................477
PLEASE NOTE:
This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted
SK
✹
What Our Customers Say
★★★★★Live reviews from customers
Loading customer reviews...
🌟 Related Products
Discover more professional manuals for your equipment