AGCO NA 2846 2846A 2856 2856A Round Baler REPAIR TIME SCHEDULE Manual 79034248B – PDF DOWNLOAD
$25.95
AGCO NA 2846 2846A 2856 2856A Round Baler REPAIR TIME SCHEDULE Manual 79034248B – PDF DOWNLOAD
Description
AGCO NA 2846 2846A 2856 2856A Round Baler REPAIR TIME SCHEDULE Manual 79034248B – PDF DOWNLOAD
FILE DETAILS:
AGCO NA 2846 2846A 2856 2856A Round Baler REPAIR TIME SCHEDULE Manual 79034248B – PDF DOWNLOAD
Language : English
Pages :125
Downloadable : Yes
File Type : PDF
Size:29.7 MB
DESCRIPTION:
AGCO NA 2846 2846A 2856 2856A Round Baler REPAIR TIME SCHEDULE Manual 79034248B – PDF DOWNLOAD
INTRODUCTION
A. TIME ALLOWANCE
- The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
- They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
C.REVIEW OF TIMESย
If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:
TABLE OF CONTENTS:
AGCO NA 2846 2846A 2856 2856A Round Baler REPAIR TIME SCHEDULE Manual 79034248B – PDF DOWNLOAD
Description
Drives
Pickup
Electrical
Tailgate
Bale Forming
Frame Wheels and Shields
Hydraulics
BALE FORMING
BALE TWINE THREADER 48
MESH WRAP BRAKE AND KNIFE 56
MESH WRAP FEED 55
MESH WRAP PAN MOUNTING 57
MESH WRAP SHIELDS 58
MESH WRAP SHIELDS (CONTINUED) 59
TWINE ARM ASSEMBLY 49
TWINE BOX MOUNTING-LEFT 53
TWINE BOX MOUNTING-RIGHT 54
TWINE CUTOFF 50
TWINE THREADING-LEFT 51
TWINE THREADING-RIGHT 52
DRIVES
CLUTCH ASSEMBLY (700719432 CLUTCH ASSEMBLY) 13
CLUTCH ASSEMBLY-OVERRUNNING (700730222 CLUTCH ASSEMBLY-OVERRUNNING) 17
DRIVE LINE ASSEMBLY (1000 RPM) 11
DRIVELINE ASSEMBLY (540 RPM) 10
GEARBOX ASSEMBLY (700727084 GEARBOX ASSEMBLY) 9
MAIN DRIVE-FRONT (1000 RPM) 8
MAIN DRIVE-FRONT (540 RPM) 7
MAIN DRIVE-FRONT, LEFT 12
MAIN HYDRAULIC DRIVE (WITH ON BOARD HYDRAULICS) 18
PICKUP DRIVE-LOWER, LEFT 15
STUFFER DRIVE-LOWER, RIGHT 16
UPPER ROLLER DRIVE-LEFT 14
ELECTRICAL
BALE SIZE SENSOR ASSEMBLY 33
ELECTRICAL CONTROL ASSEMBLY 35
ELECTRICAL-BALE KICKER 36
ELECTRICAL-BALE SHAPE MONITOR 40
ELECTRICAL-FRONT (WITH ON BOARD HYDRAULICS) 30
ELECTRICAL-FRONT (WITHOUT ON BOARD HYDRAULICS) 26
ELECTRICAL-LEFT (WITH ON BOARD HYDRAULICS) 31
ELECTRICAL-LEFT (WITHOUT ON BOARD HYDRAULICS) 27
ELECTRICAL-RIGHT (CONTINUED) (WITHOUT ON BOARD HYDRAULICS) 29
ELECTRICAL-RIGHT (WITH ON BOARD HYDRAULICS) 32
ELECTRICAL-RIGHT (WITH ON BOARD HYDRAULICS) 34
ELECTRICAL-RIGHT (WITHOUT ON BOARD HYDRAULICS) 28
GTA I CONSOLE AND MOUNTING 24
GTA MOUNTING (OPTIONAL PARTS) 25
MESH WRAP ELECTRICAL 37
TAILLIGHT ELECTRICAL (W/O MESH WRAP) 38
TWINE ARM SENSOR ASSEMBLY 39
FRAME WHEELS AND SHIELDS
AXLE (STANDARD WITH FLOTATION TIRES) 71
AXLE (STANDARD) 70
AXLE (SUSPENSION WITH FLOTATION TIRES) 72
FRONT SHIELDS (WITHOUT ON BOARD HYDRAULICS) 62
HUB AND SPINDLE (FLOTATION TIRES) (LEFT SHOWN, RIGHT OPPOSITE) 68
HUB AND SPINDLE (STANDARD) (LEFT SHOWN, RIGHT OPPOSITE) 67
JACK AND MOUNTING 61
MAINFRAME SHIELDS (FRONT AND TOP) 64
MAINFRAME SHIELDS (LEFT AND RIGHT) 65
SAFETY CHAIN AND HITCH 60
SHIELD AND BELT GUIDE (W/OUT MESH WRAP) 66
SHIELDS-FRONT (WITH ON BOARD HYDRAULICS) 63
WHEELS (161 X 11) (LEFT SHOWN, RIGHT OPPOSITE) 73
WHEELS (161 X W18C) (LEFT SHOWN, RIGHT OPPOSITE) 74
HYDRAULICS
ALLIGATOR RIVET LACING KIT (700721237 ALLIGATOR RIVET LACING KIT) 100
4X6AND5X6ROUNDBALERS
HYDRAULICS (CONTINUED)
AUTO SOFT CORE KIT (700958130A AUTO SOFT CORE KIT) (WITH ON BOARD HYDRAULICS)
104
BALE KICKER HYDRAULICS-LEFT 93
BALE KICKER HYDRAULICS-RIGHT 94
BALE KICKER KIT (700719621 HYDRAULIC CYLINDER ASSEMBLY) (KIT CONTINUED) 109
BALE KICKER KIT (700957930A BALE KICKER KIT) (LEFT STRUT AND MOUNTING) 105
BALE KICKER KIT (KICKER ELECTRICAL) (KIT CONTINUED) 110
BALE KICKER KIT (KICKER HYDRAULICS-LEFT) (KIT CONTINUED) 107
BALE KICKER KIT (KICKER HYDRAULICS-RIGHT) (KIT CONTINUED) 108
BALE KICKER KIT (RIGHT STRUT AND MOUNTING) (KIT CONTINUED) 106
BALE SHAPE HYDRAULICS-LEFT 78
BALE SHAPE HYDRAULICS-RIGHT 79
BASIC SOFT CORE KIT (700732068 VALVE ASSEMBLY) (KIT CONTINUED) 103
BASIC SOFT CORE KIT (700958129A BASIC SOFT CORE KIT) (WITHOUT ON BOARD HYDRAULICS)
102
FIRE EXTINGUISHER KIT (AK50556 FIRE EXTINGUISHER KIT) 98
GTA I CONSOLE AND MOUNTING (AK51261 GTA I CONSOLE KIT) 95
HARNESS KIT-POWER SWITCHED (AK51249 HARNESS KIT-POWER SWITCHED) 96
HYDRAULIC CYLINDER ASM-TAILGATE (700732546 HYDRAULIC CYLINDER ASSEMBLY) 89
HYDRAULIC CYLINDER ASSEMBLY (700714707 CYLINDER ASSEMBLY-HYDRAULIC) 81
HYDRAULIC CYLINDER ASSEMBLY (700719621 HYDRAULIC CYLINDER ASSEMBLY) 82
HYDRAULIC CYLINDER ASSEMBLY (700731779 HYDRAULIC CYLINDER ASSEMBLY) 77
HYDRAULIC MANIFOLD ASSEMBLY (700730772 MANIFOLD ASSEMBLY) 85
HYDRAULIC PUMP ASSEMBLY (700727393 PUMP ASSEMBLY) 91
HYDRAULIC RESERVOIR AND MOUNTING (WITH ON BOARD HYDRAULICS) 90
HYDRAULIC SHUTOFF VALVE ASSEMBLY (700717995 SHUTOFF VALVE ASSEMBLY) 80
HYDRAULIC TENSION VALVE ASSEMBLY (700732013 TENSION VALVE ASSEMBLY) (WITH ON
BOARD HYDRAULICS) 88
HYDRAULIC TRACTOR REMOTE KIT (AK51001 HYDRAULIC TRACTOR REMOTE KIT) 97
HYDRAULIC VALVE ASSEMBLY-COMPENSATOR (700727392 VALVE ASSEMBLY-COMPENSATOR) 92
LACING PIN KIT-7 INCH (700721236-7 INCH LACING PIN KIT) 99
MAIN HYDRAULICS-FRONT (WITHOUT ON BOARD HYDRAULICS) 75
MESH WRAP KIT (700958014A MESH WRAP KIT) (FEED ASSEMBLY) 112
MESH WRAP KIT (MESH WRAP BRAKE AND KNIFE) (KIT CONTINUED) 113
MESH WRAP KIT (MESH WRAP ELECTRICAL) (KIT CONTINUED) 117
MESH WRAP KIT (MESH WRAP PAN AND MOUNTING) (KIT CONTINUED) 114
MESH WRAP KIT (MESH WRAP SHIELDS) (KIT CONTINUED) 115
PICKUP LIFT HYDRAULICS 76
SHORT CROP KIT (700958018A SHORT CROP KIT) 101
SILAGE KIT (700958057 A SILAGE KIT) 111
TAILGATE HYDRAULICS-LEFT 83
TAILGATE HYDRAULICS-RIGHT (WITH ON BOARD HYDRAULICS) 87
TAILGATE HYDRAULICS-RIGHT (WITHOUT ON BOARD HYDRAULICS) 84
TWINE THREADER KIT (700958062A TWINE THREADER KIT) (THREADER ASSEMBLY) 118
TWINE THREADER KIT (TWINE ARM ASSEMBLY) (KIT CONTINUED) 119
TWINE THREADER KIT (TWINE BOX AND MOUNTING-LEFT) (KIT CONTINUED) 123
TWINE THREADER KIT (TWINE BOX AND MOUNTING-RIGHT) (KIT CONTINUED) 124
TWINE THREADER KIT (TWINE CUTOFF) (KIT CONTINUED) 120
TWINE THREADER KIT (TWINE GUIDES-RIGHT) (KIT CONTINUED) 122
TWINE THREADING KIT (TWINE GUIDES-LEFT) (KIT CONTINUED) 121
VALVE ASSEMBLY (700735256 VALVE ASSEMBLY) 86
PICKUP
PICKUP AND MOUNTING 20
PICKUP ROTOR ASSEMBLY 21
PICKUP SHIELDS AND GAUGE WHEELS 22
STUFFER AND FRAME 23
WINDGUARD AND MOUNTING 19
TAILGATE
BALE FORMING AND TENSIONING ROLLERS 42
4
INDEX
5
INDEX
4 X 6 AND 5 X 6 ROUND BALERS
TAILGATE (CONTINUED)
BALE FORMING ROLLERS 41
BALE KICKER-LEFT 45
BALE KICKER-RIGHT 46
FORMING BELTS AND LACING 47
TAILGATE LINKAGE 44
TAILGATE ROLLERS 43
IMAGES PREVIEW OF THE MANUAL:

Customer Support: [email protected]
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contactย [email protected]
s.m
What Our Customers Say
๐ Related Products
Discover more professional manuals for your equipment

AGCOยฎ NA ST30X ST32 Hydro Tractor SERVICE MANUAL 79023898 A - PDF DOWNLOAD

AGCO NA 1835 1837 1839 Small Square Baler Service Manual - PDF DOWNLOAD

AGCOยฎ DTb series tractors Workshop Service Manual - PDF DOWNLOAD
