Agco 1745 Round Baler REPAIR TIME SCHEDULE MANUAL 79034416 A – PDF DOWNLOAD
$25.95
Agco 1745 Round Baler REPAIR TIME SCHEDULE MANUAL 79034416 A – PDF DOWNLOAD
Description
Agco 1745 Round Baler REPAIR TIME SCHEDULE MANUAL 79034416 A – PDF DOWNLOAD
FILE DETAILS:
Agco 1745 Round Baler REPAIR TIME SCHEDULE MANUAL 79034416 A – PDF DOWNLOAD
Language : English
Pages :99
Downloadable : Yes
File Type : PDF
Size:25.1 MB
DESCRIPTION:
Agco 1745 Round Baler REPAIR TIME SCHEDULE MANUAL 79034416 A – PDF DOWNLOAD
A. TIME ALLOWANCE
- The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
- They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
C.REVIEW OF TIMESย
If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:
TABLE OF CONTENTS:
Agco 1745 Round Baler REPAIR TIME SCHEDULE MANUAL 79034416 A – PDF DOWNLOAD
BALE FORMING
BELT TENSIONER ROLLER 40
FORMING BELTS AND LACING 41
MESH WRAP BRAKE AND KNIFE 47
MESH WRAP FEED 46
MESH WRAP PAN MOUNTING 50
MESH WRAP SHIELDS 48
MESH WRAP SHIELDS (Continued) 49
ROLLER-LOWER (SN AHR02101 THRU AHR02234) 36
ROLLER-LOWER (SN AHR02235 AND LATER) 37
ROLLER-UPPER (SN AHR02101 THRU AHR02234) 34
ROLLER-UPPER (SN AHR02235 AND LATER) 35
TAILGATE ROLLER (SN AHR02101 THRU AHR02234) 38
TAILGATE ROLLER (SN AHR02235 AND LATER) 39
THREADER 44
TWINE CUTOFF 45
TWINE ROUTING (SN AHR02101 THRU AHR02234) 42
TWINE ROUTING (SN AHR02235 AND LATER) 43
DRIVES
DRIVE 7
GEARBOX ASSEMBLY (700722701 GEARBOX ASSEMBLY) 8
IMPLEMENT DRIVELINE ASSEMBLY (SN AHR02101 THRU AHR02234) 5
IMPLEMENT DRIVELINE ASSEMBLY (SN AHR02235 AND LATER) 6
PICKUP DRIVE MOUNTING-LEFT 9
PICKUP DRIVE MOUNTING-RIGHT 10
ELECTRICAL
ACTUATOR ASSEMBLY (700709661 ACTUATOR-LINEAR) 19
CONTROL BOX ASSEMBLY (UPGRADE) (700162991 MONITOR CONTROL BOX ASSEMBLY) 23
CONTROLLER-AUTO TIE (SN AHR02101 THRU AHR02234) 26
CONTROLLER-AUTO TIE (TWINE AND MESH) (SN AHR02235 AND LATER) 28
CONTROLLER-AUTO TIE (TWINE) (SN AHR02235 AND LATER) 27
ELECTRIC THREADER 18
ELECTRIC THREADER CONTROL BOX ASSEMBLY 20
ELECTRICAL CONTROLLER (UPGRADE) (SN AHR02101 THRU AHR02234) 21
ELECTRICAL CONTROLLER (UPGRADE) (SN AHR02235 AND LATER) 22
ELECTRICAL CONTROLLER-AUTO TIE (SN AHR02101 THRU AHR02234) 24
ELECTRICAL CONTROLLER-AUTO TIE (SN AHR02235 AND LATER) 25
ELECTRICAL-BALE KICKER 29
ELECTRICAL-TAILLIGHTS (SN AHR02101 THRU AHR02234) 15
MESH WRAP ELECTRICAL 17
TAILLIGHT ELECTRICAL-W/OUT MESH WRAP (SN AHR02235 AND LATER) 16
FRAME WHEELS AND SHIELDS
HITCH, JACK AND SAFETY CHAIN ASSEMBLY 51
SHIELD AND BELT GUIDE (W/OUT MESH WRAP) 58
SHIELDS (TOP AND FRONT) 52
SHIELDS-FRONT 53
SHIELDS-LEFT (SN AHR02101 THRU AHR02234) 54
SHIELDS-LEFT (SN AHR02235 AND LATER) 56
SHIELDS-RIGHT (SN AHR02101 THRU AHR02234) 55
SHIELDS-RIGHT (SN AHR02235 AND LATER) 57
WHEEL, HUB AND AXLE ASSEMBLY (SN AHR02101 THRU AHR02234) 59
WHEEL, HUB AND AXLE ASSEMBLY (SN AHR02235 AND LATER) (LEFT SIDE SHOWN, RIGHT
SIDE OPPOSITE) 60
HYDRAULICS
ALLIGATOR RIVET LACING KIT (700721237 ALLIGATOR RIVET LACING KIT) 75
BALE COUNTER KIT (AK51092 BALE COUNTER KIT) 78
BALE KICKER HYDRAULICS-LEFT 70
BALE KICKER HYDRAULICS-RIGHT 71
BALE KICKER KIT (700719621 HYDRAULIC CYLINDER ASSEMBLY) (Kit Continued) 90
BALE KICKER KIT (700728750 VALVE ASSEMBLY-KICKER) (Kit Continued) 91
1745/ RB452 ROUND BALER
HYDRAULICS (CONTINUED)
BALE KICKER KIT (700957454A BALE KICKER KIT) (LEFT STRUT AND MOUNTING) 86
BALE KICKER KIT (KICKER ELECTRICAL) (Kit Continued) 92
BALE KICKER KIT (KICKER HYDRAULICS-LEFT) (Kit Continued) 88
BALE KICKER KIT (KICKER HYDRAULICS-RIGHT) (Kit Continued) 89
BALE KICKER KIT (RIGHT STRUT AND MOUNTING) (Kit Continued) 87
BALE RAMP KIT (AK51270 BALE RAMP KIT) 77
BALE SHAPE KIT (700957455A BALE SHAPE KIT) 85
BALE TENSION VALVE ASSEMBLY (700721402 VALVE ASSEMBLY-BALE TENSION) 69
CONTROL BOX ASSEMBLY (UPGRADE) (700162991 MONITOR CONTROL BOX ASSEMBLY) 81
CONTROLLER UPGRADE KIT (AK51157 CONTROLLER UPGRADE KIT) 82
FIRE EXTINGUISHER KIT (AK50556 FIRE EXTINGUISHER KIT) 76
GATHERING WHEEL KIT (AK51090 GATHERING WHEEL KIT) 79
HARNESS POWER KIT (AK51181 HARNESS POWER KIT) 84
HYDRAULIC CYLINDER ASSEMBLY (700715833 HYDRAULIC CYLINDER ASSEMBLY) 66
HYDRAULIC CYLINDER ASSEMBLY (700719621 HYDRAULIC CYLINDER ASSEMBLY) 73
HYDRAULIC CYLINDER ASSEMBLY (700732413 HYDRAULIC CYLINDER ASSEMBLY) 67
HYDRAULIC SHUTOFF VALVE ASM (TAILGATE) (700717995 HYDRAULIC SHUTOFF VALVE ASM)
68
HYDRAULICS-LEFT (SN AHR02101 THAU AHR02234) 61
HYDRAULICS-LEFT (SN AHR02235 AND LATER) 63
HYDRAULICS-RIGHT (SN AHR02101 THAU AHR02234) 62
HYDRAULICS-RIGHT (SN AHR02235 AND LATER) 64
HYDRAULICS-TONGUE (SN AHR02235 AND LATER) 65
LACING PIN KIT-7 INCH (700721236 LACING PIN KIT-7 INCH) 74
MESH WRAP KIT (700957457A MESH WRAP KIT) (FEED ASSEMBLY) 93
MESH WRAP KIT (ELECTRICAL) (Kit Continued) 98
MESH WRAP KIT (MESH WRAP BRAKE AND KNIFE) (Kit Continued) 94
MESH WRAP KIT (MESH WRAP SHIELDS) (Kit Continued) 96
MESH WRAP KIT (PAN MOUNTING) (Kit Continued) 95
SPINDLE ASSEMBLY (700721838 SPINDLE ASSEMBLY) 80
STARTING ROLL SCRAPER KIT (AK51159 STARTING ROLL SCRAPER KIT) 83
VALVE ASSEMBLY-KICKER (700728750 VALVE ASSEMBLY-KICKER) 72
PICKUP
PICKUP FRAME AND WRAPPER 11
ROTOR ASSEMBLY (700160795 ROTOR ASSEMBLY) 12
TINEBAR ASSEMBLY (700160797 TINEBAR ASSEMBLY) 13
WINDGUARD MOUNTING 14
TAILGATE
BALE KICKER-LEFT 32
BALE KICKER-RIGHT 33
TAILGATE LATCH (SN AHR02101 THAU AHR02234) 30
TAILGATE LATCH (SN AHR02235 AND LATER) 31
INDEX
IMAGES PREVIEW OF THE MANUAL:

Contact us: [email protected]
https://vimeo.com/837550537?share=copy
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contactย [email protected]
s.m
What Our Customers Say
๐ Related Products
Discover more professional manuals for your equipment

AGCOยฎ NA 8792 8776 Planter SERVICE MANUAL 79034268 B - PDF DOWNLOAD

AGCO ST60A Compact Tractor Service Manual 79033002B - PDF DOWNLOAD

AGCOยฎ NA 8831 Planter SERVICE MANUAL 79033455 A - PDF DOWNLOAD
