AGCO®NA 8792-8776 Planter Repair Time Schedule Manual 79034636 A – PDF DOWNLOAD
$25.95
AGCO®NA 8792-8776 Planter Repair Time Schedule Manual 79034636 A – PDF DOWNLOAD
Description
AGCO®NA 8792-8776 Planter Repair Time Schedule Manual 79034636 A – PDF DOWNLOAD
FILE DETAILS:
AGCO®NA 8792-8776 Planter Repair Time Schedule Manual 79034636 A – PDF DOWNLOAD
Language : English
Pages :151
Downloadable : Yes
File Type : PDF
Size:37.2 MB
DESCRIPTION:
AGCO®NA 8792-8776 Planter Repair Time Schedule Manual 79034636 A – PDF DOWNLOAD
INTRODUCTION
A. TIME ALLOWANCE
- The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
- They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
C.REVIEW OF TIMES
If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:
TABLE OF CONTENTS:
AGCO®NA 8792-8776 Planter Repair Time Schedule Manual 79034636 A – PDF DOWNLOAD
Section
Contents
Description
Drives
Air Tubes
Electrical
Row Units
Markers
6 Tongue, Frame and Wheels
AIRTUBES
AIR DUCTS-CENTER (8776) (30 INCH ROW SPACING) 21
AIR DUCTS-CENTER (8792) (36 INCH ROW SPACING) 26
AIR DUCTS-CENTER (8792) (38 AND 40 INCH ROW SPACING) 31
AIR DUCTS-LEFT CENTER (8776) (30 INCH ROW SPACING) 20
AIR DUCTS-LEFT CENTER (8792) (36 INCH ROW SPACING) 25
AIR DUCTS-LEFT CENTER (8792) (38 AND 40 INCH ROW SPACING) 30
AIR DUCTS-LEFT WING (8776) (30 INCH ROW SPACING) 23
AIR DUCTS-LEFT WING (8792) (36 INCH ROW SPACING) 28
AIR DUCTS-LEFT WING (8792) (38 AND 40 INCH ROW SPACING) 33
AIR DUCTS-RIGHT CENTER (8776) (30 INCH ROW SPACING) 22
AIR DUCTS-RIGHT CENTER (8792) (36 INCH ROW SPACING) 27
AIR DUCTS-RIGHT CENTER (8792) (38 AND 40 INCH ROW SPACING) 32
AIR DUCTS-RIGHT WING (8776) (30 INCH ROW SPACING) 24
AIR DUCTS-RIGHT WING (8792) (36 INCH ROW SPACING) 29
AIR DUCTS-RIGHT WING (8792) (38 AND 40 INCH ROW SPACING) 34
AIR GAUGE AND MOUNTING 35
BLOWER MOUNTING 36
COMPRESSOR ASSEMBLY (700732694 COMPRESSOR ASSEMBLY) 42
COMPRESSOR BOX ASSEMBLY 41
PNEUMATIC DOWN FORCE ASSEMBLY (8776) 39
PNEUMATIC DOWN FORCE ASSEMBLY (8792) 37
PNEUMATIC DOWN FORCE HOSES (8776) 40
PNEUMATIC DOWN FORCE HOSES (8792) 38
DRIVES
CLUTCH ASSEMBLY-POINT ROW (700733559 CLUTCH ASM-LEFT) (700733560 CLUTCH ASM-
RIGHT) (LEFT SHOWN, RIGHT OPPOSITE) 19
GROUND DRIVE CLUTCH-CENTER 8
GROUND DRIVE CLUTCH-LEFT 7
GROUND DRIVE CLUTCH-RIGHT 9
HYDRAULIC DRIVE ASSEMBLY 16
POINT ROW CLUTCH (GROUND DRIVE) (ONE ASSEMBLY SHOWN, THREE REQUIRED) 17
POINT ROW CLUTCH (HYDRAULIC DRIVE) 18
ROW UNIT DRIVE 10
SPROCKET ASSEMBLY 14
TRANSMISSION (GROUND DRIVE) 11
TRANSMISSION DRIVE SPROCKET ASSEMBLY 15
TRANSMISSION SPROCKET ASSEMBLY (FRONT CLUSTER) 12
TRANSMISSION SPROCKET ASSEMBLY (REAR CLUSTER) 13
ELECTRICAL
CONSOLE ASSEMBLY (SM400SE) 44
GTA ANTENNA AND MOUNTING (OPTIONAL PARTS) 48
GTA CONSOLE EXT HARNESS AND TEST SWITCH 51
GTA CONSOLE HARNESS (IMPLEMENT SWITCH) 50
GTA I CONSOLE AND MOUNTING 46
GTA II CONSOLE AND MOUNTING 49
GTA MOUNTING (OPTIONAL PARTS) 47
HARNESS ASSEMBLY-LOW POWER (SM400SE) 45
ISO PUMP HARNESS (HYDRAULIC DRIVE) 69
ISO SYSTEM HARNESS-HYDRAULIC DRIVE 61
ISO SYSTEM-HYDRAULIC DRIVE 60
LIFT SWITCH AND MOUNTING 70
MAGNETIC DISTANCE SENSOR AND MOUNTING 58
NON ISO BRIDGE MODULE AND MOUNTING 59
RADAR DISTANCE SENSOR AND MOUNTING 55
RADAR Y HARNESS 57
ROW SENSOR HARNESS-CENTER (8792) (ROWS 5, 6, 7 AND 8) 67
ROW SENSOR HARNESS-LEFT (8776) (ROWS 1, 2, 3 AND 4) 62
ROW SENSOR HARNESS-LEFT (8792) (ROWS 1, 2, 3 AND 4) 66
ROW SENSOR HARNESS-LEFT CENTER (8776) (ROWS 5, 6, 7 AND 8) 63
ROW SENSOR HARNESS-RIGHT (8776) (ROWS 13, 14, 15 AND 16) 65
ROW SENSOR HARNESS-RIGHT (8776) (ROWS 9, 10, 11 AND 12) 64
8776 / 8792 STACK FOLD PLANTER
ELECTRICAL (CONTINUED)
ROW SENSOR HARNESS-RIGHT (8792) (ROWS 9, 10, 11 AND 12) 68
SENSOR AND TUBE (HIGH RATE) 53
SENSOR AND TUBE (SEED SMART) 54
STORAGE TUBE (TEST SWITCH) 52
TRANSPORT LIGHTS 43
MARKERS
MARKER (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 90
MARKER DISC AND HUB (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 91
MARKER MOUNTING (LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE) 89
ROW UNITS
2 BUSHEL HOPPER AND MOUNTING 78
3 BUSHEL HOPPER AND MOUNTING 79
CLOSING WHEEL AND MOUNTING (RUBBER/CAST) 84
CLOSING WHEEL ASSEMBLY (CAST) (854077 CLOSING WHEEL ASSEMBLY) (LEFT SIDE SHOWN,
RIGHT SIDE OPPOSITE) 86
CLOSING WHEEL ASSEMBLY (RUBBER) (700727676 CLOSING WHEEL ASSEMBLY) 85
DEPTH ADJUSTMENT 80
DISC ASSEMBLY (700164107 DISC ASSEMBLY) 75
GAUGE WHEEL ASSEMBLY (700727657 GAUGE WHEEL ASSEMBLY) 83
GAUGE WHEEL ASSEMBLY-LEFT 81
GAUGE WHEEL ASSY-RIGHT 82
ROW UNIT CHAIN TIGHTENER 73
ROW UNIT LINKAGE AND MOUNTING 72
ROW UNIT MOUNTING 71
ROW UNIT-LOWER 74
SEED DISC IDENTIFICATION CHART 77
SEED METER 76
SEED METER FUNNEL 88
SINGLE CLOSING WHEEL 87
TONGUE, FRAME AND WHEELS
BLOWER HYDRAULICS (GROUND DRIVE) 104
BLOWER HYDRAULICS (HYDRAULIC DRIVE) 114
BLOWER INLET KIT (6000797 BLOWER INLET KIT) 132
DECALS (SEED RATE CHART AND MOUNTING) 128
DRIVE PUMP & MOUNTING (HYDRAULIC DRIVE) 102
DUAL BLOWER KIT-GROUND DRIVE (8776) (AIR DUCTS-LEFT WING) (Kit Continued) 143
DUAL BLOWER KIT-GROUND DRIVE (8776) (AIR DUCTS-RIGHT WING) (Kit Continued) 144
DUAL BLOWER KIT-GROUND DRIVE (8776) (LEFT BLOWER MOUNTING
SHOWN-RIGHT SAME) (Kit Continued) 142
DUAL BLOWER KIT-GROUND DRIVE (8776) (RIGHT BLOWER HYDRAULICS) (Kit Continued) 141
DUAL BLOWER KIT-GROUND DRIVE (8776) LEFT BLOWER HYO, 700957416
DUAL BLOWER KIT-GROUND DRIVE 140
DUAL BLOWER KIT-HYO DRIVE (8776) (LEFT BLOWER HYD-WITH TRACTOR REMOTE)
(700957413 DUAL BLOWER KIT) 145
DUAL BLOWER KIT-HYO DRIVE (8776) (LEFT BLOWER HYDRAULICS WITH PTO PUMP)
(700957414 DUAL BLOWER KIT) 147
DUAL BLOWER KIT-HYDRAULIC DRIVE (8776) (LEFT HYDRAULIC COOLER
SHOWN-RIGHT SAME) (Kit Continued) 149
DUAL BLOWER KIT-HYDRAULIC DRIVE (8776) (RIGHT BLOWER HYD-WITH
TRACTOR REMOTE) (Kit Continued) 146
DUAL BLOWER KIT-HYDRAULIC DRIVE (8776) (RIGHT BLOWER HYDRAULICS WITH
PTO PUMP) (Kit Continued) 148
DUAL BLOWER KIT-HYDRAULIC DRIVE (8776) (TRACTOR REMOTE-HYDRAULIC DRIVE)
(Kit Continued) 150
FILTER ASSEMBLY (GROUND DRIVE) (W247850B FILTER ASSEMBLY) 106
FRAME FOLD HYDRAULICS 124
FRAME-CENTER, HINGES AND PINS RIGHT SIDE SHOWN, LEFT SIDE OPPOSITE 94
TONGUE, FRAME AND WHEELS (CONTINUED)
GRANULAR HERBICIDE KIT (6001044 GRANULAR HERBICIDE KIT) (LEFT ASSEMBLY
SHOWN, RIGHT SAME) 134
GRANULAR HERBICIDE KIT (LEFT ASSEMBLY SHOWN, RIGHT SAME) (Kit Continued) 135
GULL WING LIFT HYDRAULICS 122
HOPPER LID HOOK KIT (6001002 HOPPER LID HOOK KIT) 131
HYDRAULIC CYLINDER ASSEMBLY (FRAME FOLD) (700735699 HYDRAULIC
CYLINDER ASSEMBLY) 125
HYDRAULIC CYLINDER ASSEMBLY (GULL WING) (700735264 HYDRAULIC
CYLINDER ASSEMBLY) 123
HYDRAULIC CYLINDER ASSEMBLY (WHEEL LIFT) (700735534 HYDRAULIC
CYLINDER ASSEMBLY) 118
HYDRAULIC CYLINDER ASSEMBLY-MARKERS (700735566 HYDRAULIC CYLINDER
ASSEMBLY) 120
HYDRAULIC FLOW CONTROL VALVE (BLOWER) (N856657 HYDRAULIC VALVE ASSEMBLY) 105
HYDRAULIC SEED DRIVE MOTOR AND VALVE (HYDRAULIC DRIVE) 108
HYDRAULIC SEED DRIVE VALVE ASSEMBLY (700734461 VALVE ASSEMBLY) 109
MAIN DRIVE HYDRAULICS (HYDRAULIC DRIVE) 107
MAIN DRIVE HYDRAULICS (HYDRAULIC DRIVE) (8776) 111
MAIN DRIVE HYDRAULICS (HYDRAULIC DRIVE) (8792) 110
MAINFRAME, WINGS AND LINKAGE (8776) 92
MAINFRAME, WINGS AND LINKAGE (8792) 93
MARKER AND WHEEL LIFT HYDRAULICS 117
MARKER HYDRAULIC SEQUENCE VALVE ASSEMBLY (N851998 SEQUENCE VALVE
ASSEMBLY) 121
MARKER HYDRAULICS (WITHOUT WHEEL LIFT ASSIST) 119
PTO PUMP & MOUNT-GROUND DRIVE (540 RPM)(1000 RPM 1-3/8 100
PTO PUMP ASSEMBLY (540 RPM) (W247844B PTO PUMP ASSEMBLY) 101
RESIDUE MANAGER ATTACHMENT KIT (6001245 RESIDUE MANAGER
ATTACHMENT KIT) (SHARK TOOTH WHEEL) 139
RESIDUE MANAGER ATTACHMENT KIT (6001249 RESIDUE MANAGER
ATTACHMENT KIT) (10 INCH WHEEL) 137
RESIDUE MANAGER ATTACHMENT KIT (6001250 RESIDUE
MANAGER ATTACHMENT KIT) (13 INCH WHEEL) 138
ROW UNIT EXTENSION KIT-WITH STEP (6000758 ROW UNIT EXTENSION KIT W/STEP) 133
SEED DISC IDENTIFICATION CHART 127
SEED METER FUNNEL KIT (6000628 SEED METER FUNNEL KIT) 129
SMV EMBLEM AND MOUNTING 126
TRACTOR REMOTE & BLOWER DRIVE HYO GROUND DRIVE 103
TRACTOR REMOTE (HYDRAULIC DRIVE) 113
TRANSMISSION SHIELD KIT (6100057 TRANSMISSION SHIELD KIT) 130
VALVE ASSEMBLY (700734033 VALVE ASSEMBLY) 112
VALVE ASSEMBLY-BLOWER (700734035 VALVE ASSEMBLY-BLOWER) 115
WHEEL ARM ASSY (GROUND AND HYO DRIVE) 96
WHEEL LIFT ASSIST FRAME (8776) 97
WHEEL LIFT ASSIST HUB ASSEMBLY (700735339 HUB ASSEMBLY) 99
WHEEL LIFT ASSIST-LOWER MOUNTING 98
WHEEL LIFT HYDRAULICS (WITHOUT MARKERS) 116
WING FRAMES-OUTER, HINGES AND PINS LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE 95
IMAGES PREVIEW OF THE MANUAL:

Need help? Contact: [email protected]
PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer
S.M
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

AGCO® NA RTA series tractors Technician Service Book Workshop Service Manual - PDF DOWNLOAD

AGCO® NA 5545 5546 5556 5546A 5556A Round Baler SERVICE MANUAL 79027368 A - PDF DOWNLOAD

