AGCO® NA Round Baler5146 5456 Repair Time Schedule Manual – PDF DOWNLOAD
$22.95
AGCO® NA Round Baler5146 5456 Repair Time Schedule Manual – PDF DOWNLOAD
Description
AGCO® NA Round Baler5146 5456 Repair Time Schedule Manual – PDF DOWNLOAD
FILE DETAILS:
AGCO® NA Round Baler5146 5456 Repair Time Schedule Manual – PDF DOWNLOAD
Language : English
Pages :75
Downloadable : Yes
File Type : PDF
Size:18.6 MB
DESCRIPTION:
AGCO® NA Round Baler5146 5456 Repair Time Schedule Manual – PDF DOWNLOAD
INTRODUCTION
A. TIME ALLOWANCE
- The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
- They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
C.REVIEW OF TIMES
If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:
TABLE OF CONTENTS:
AGCO® NA Round Baler5146 5456 Repair Time Schedule Manual – PDF DOWNLOAD
Section
Contents
Description
Drives
Pickup
Electrical
Bale Forming
Frame, Wheels and Shields
Hydraulics
BALE FORMING
BALE TENSIONING ROLLERS 25
BELT GUIDE AND MOUNTING (W/O MESH WRAP) 28
FORMING BELTS AND LACING 29
MAIN ROLLERS 24
TAILGATE ROLLERS 26
TAILGATE SUPPORTS (MESH WRAP) 27
THREADER 31
TWINE CUTOFF 32
TWINE ROUTING 30
DRIVES
DRIVE (Continued) 9
DRIVELINE ASSEMBLY (1000 RPM) 6
DRIVELINE ASSEMBLY (540 RPM) 5
GEARBOX ASSEMBLY (700727084 GEARBOX ASSEMBLY) 8
MAIN DRIVE 7
PICKUP DRIVE MOUNTING-LEFT 10
PICKUP DRIVE MOUNTING-RIGHT 11
ELECTRICAL
ACTUATOR ASSEMBLY (700709661 ACTUATOR ASSEMBLY-LINEAR) 21
BALE SHAPE 23
CONTROL BOX ASSEMBLY (700728955 CONTROL BOX ASSEMBLY) 18
CONTROL BOX MOUNTING 17
ELECTRICAL-FRONT AND LEFT 19
ELECTRICAL-RIGHT 20
LIGHTS 16
MESH WRAP ELECTRICAL 22
FRAME, WHEELS AND SHIELDS
ACTUATOR MOUNTING-MESH WRAP 47
HITCH, JACK AND SAFETY CHAIN 33
HUB AND SPINDLE ASSEMBLY (700166809 HUB AND SPINDLE ASSEMBLY) 41
KICKER 49
MESH WRAP CARRIAGE 44
MESH WRAP FRAME (LOWER) 42
MESH WRAP FRAME (UPPER) 43
MESH WRAP ROLLER SUPPORT 45
MESH WRAP ROLLERS 46
MESH WRAP SHIELD 48
SHIELDS-FRONT 34
SHIELDS-LEFT 35
SHIELDS-RIGHT 36
TAILGATE LATCH 50
TAILGATE SHIELDS (W/MESH WRAP) 38
TAILGATE SHIELDS (W/O MESH WRAP) 37
WHEEL AND AXLE MOUNTING (15 INCH) (LEFT SIDE SHOWN,
RIGHT SIDE OPPOSITE) 39
WHEEL AND AXLE MOUNTING (161 INCH) (LEFT SIDE SHOWN,
RIGHT SIDE OPPOSITE) 40
HYDRAULICS
ALLIGATOR RIVET LACING KIT (700721237 ALLIGATOR RIVET LACING KIT) 62
BALE RAMP KIT (MK51270 BALE RAMP KIT) 63
BALE TENSION VALVE ASSEMBLY (700730678 VALVE ASSEMBLY-BALE TENSION) 53
FIRE EXTINGUISHER KIT (MK50556 FIRE EXTINGUISHER KIT) 69
GATHERING WHEEL KIT (MK51266 GATHERING WHEEL KIT) 64
HYDRAULIC CYLINDER ASSEMBLY (700714707 CYLINDER ASSEMBLY-HYDRAULIC) 68
HYDRAULIC CYLINDER ASSEMBLY
(700717929 CYLINDER ASSEMBLY-HYDRAULIC) (TENSION) 55
HYDRAULIC CYLINDER ASSEMBLY (700719621 HYDRAULIC CYLINDER ASSEMBLY) 60
HYDRAULIC CYLINDER ASSEMBLY (700719621 HYDRAULIC CYLINDER ASSEMBLY) 74
HYDRAULIC CYLINDER ASSEMBLY (700728499 CYLINDER ASSEMBLY-HYDRAULIC) (LIFT) 54
4X6 / 5X6 ROUND BALERS
HYDRAULICS (CONTINUED)
HYDRAULIC SHUTOFF VALVE ASM (TAILGATE)
(700717995 HYDRAULIC SHUTOFF VALVE ASM) 56
HYDRAULIC VALVE ASSEMBLY (700731595 HYDRAULIC VALVE ASSEMBLY) 67
HYDRAULIC VALVE ASSEMBLY-KICKER (700728750 HYDRAULIC VALVE ASSEMBLY) 59
HYDRAULIC VALVE ASSEMBLY-KICKER (700728750 HYDRAULIC VALVE ASSEMBLY) 73
HYDRAULICS-LEFT 51
HYDRAULICS-RIGHT 52
KICKER HYDRAULICS-LEFT 57
KICKER HYDRAULICS-RIGHT 58
KICKER KIT (MK51267 KICKER KIT) 70
KICKER KIT-Continued (LEFT SIDE) 71
KICKER KIT-Continued (RIGHT SIDE) 72
LACING PIN KIT-7 INCH (700721236 LACING PIN KIT-7 INCH) 61
PICKUP LIFT-HYDRAULIC KIT (MK51269 PICKUP LIFT-HYDRAULIC KIT) 66
SPINDLE ASSEMBLY (700721838 SPINDLE ASSEMBLY) 65
PICKUP
PICKUP FRAME AND WRAPPER 13
ROTOR ASSEMBLY (700166585 ROTOR ASSEMBLY) 14
TINEBAR ASSEMBLY (700166589 TINEBAR ASSEMBLY) 15
WINDGUARD MOUNTING 12
INDEX
IMAGES PREVIEW OF THE MANUAL:

Questions? Email us: [email protected]
PLEASE NOTE:
- This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
- Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.
S.M
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

AGCO NA 1835 1837 1839 Small Square Baler Service Manual - PDF DOWNLOAD


AGCO®NA 8792-8776 Planter Repair Time Schedule Manual 79034636 A - PDF DOWNLOAD
