★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
⚡
Instant Delivery
Available Immediately

AGCO® 9365 Windrower Repair Time Schedule Manual 79032860B – PDF DOWNLOAD

$27.95

AGCO® 9365 Windrower Repair Time Schedule Manual 79032860B – PDF DOWNLOAD

Buy now
⚡
Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

AGCO® 9365 Windrower Repair Time Schedule Manual 79032860B – PDF DOWNLOAD

FILE DETAILS:

AGCO® 9365 Windrower Repair Time Schedule Manual 79032860B – PDF DOWNLOAD

Language : English
Pages :146
Downloadable : Yes
File Type : PDF
Size:35.8 MB

DESCRIPTION:

AGCO® 9365 Windrower Repair Time Schedule Manual 79032860B – PDF DOWNLOAD

INTRODUCTION

A. TIME ALLOWANCE

  • The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
  • They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
  • The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
  • Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.

B.TIMES

All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.

C.REVIEW OF TIMES 

If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:

TABLE OF CONTENTS:

AGCO® 9365 Windrower Repair Time Schedule Manual 79032860B – PDF DOWNLOAD

Section
Contents
Description
Electrical
Engine
Engine Accessories
Frame, Wheels and Shields
Hydraulics
6 Steering
ELECTRICAL
CAB LIGHTS (REAR) 28
CAB LIGHTS (UPPER FRONT) 27
CONSOLE PANEL WIRING 21
CONSOLE WIRE HARNESS 20
CONSOLE WIRING HARNESS-LOWER 23
CONTROL FRAME AND STEERING CABLE 22
CONTROL HANDLE AND MOUNTING 24
CONTROL HANDLE ASSEMBLY 25
CONTROL WIRING AND HARNESS 19
ELECTRONIC CONTROL (FRONT) 29
ELECTRONIC CONTROL (REAR) 30
FLASHER LIGHT MOUNTING 36
HEATER AND AIR COND CONTROL PANEL 26
HYDRAULIC VALVE WIRING HARNESS 35
MONITOR MOUNTING 18
TRACTOR WIRING 31
TRACTOR WIRING-Continued 32
ENGINE
ALTERNATOR 143
COOLANT PUMP 139
CRANKSHAFT 132
CYLINDER HEAD 134
ENGINE 129
ENGINE OVERHAUL PARTS 145
ENGINE WIRING 142
ENGINE-GEAR HOUSING 130
FLYWHEEL AND HOUSING 131
FUEL FILTER 141
FUEL PUMP 140
INLET AND EXHAUST MANIFOLD 135
OIL AND SUMP 137
OIL FILTER 138
STARTER ASSEMBLY 144
TURBO AND PIPING 136
VALVE MECHANISM 133
ENGINE ACCESSORIES
AIR CLEANER ASSEMBLY 12
AIR CLEANER, HOSE AND MOUNTING 11
CHARGE AIR COOLER MOUNTING 14
CHARGE AIR COOLER MOUNTING-Continued 15
ENGINE EXHAUST AND MOUNTING 10
ENGINE MOUNTING AND ACCESSORIES 7
FUEL LINE MOUNTING 17
FUEL TANK AND MOUNTING 16
RADIATOR, HOSES AND MOUNTING 13
U-JOINT ASSEMBLY (FRONT) 8
U-JOINT ASSEMBLY (REAR) 9
FRAME, WHEELS AND SHIELDS
AIR CONDITIONER AND HEATER 72
AIR CONDITIONER FILTER 74
AIR CONDITIONER MOUNTING 71
AUXILIARY SEAT 63
BATTERY BOXES AND MOUNTING 83
CAB FRAME, MIRRORS AND SHIELDS (SN HS46101 THAU HT46598) 48
CAB FRAME, MIRRORS AND SHIELDS (SN HT46599 AND LATER) 49
CAB INSULATION (SN HS46101 THAU HT46598) 61
CAB MOUNTING 50
CAB SUSPENSION 51
CAB UPHOLSTERY 60
CAP ASSEMBLY 55
CONDENSER AND COMPRESSOR MOUNTING 73
WINDROWERTRACTOR
FRAME, WHEELS AND SHIELDS (CONTINUED)
DOOR ASSEMBLY 53
DOOR ASSEMBLY (LEFT AND RIGHT) 80
DOOR MOUNTING 79
FAN SHROUD AND OIL COOLER SUPPORT 76
FRONT AND REAR COVERS 45
FRONT WHEEL (LEFT AND RIGHT) 88
GLASS ASSEMBLY (RIGHT AND REAR) 54
HEADLINER AND HINGE MOUNTING 56
HOOD 77
HOOD MOUNTING 78
INSULATION (SN HT46599 AND LATER) 62
LIFT ARM AND FLOTATION (LEFT) 84
LIFT ARM AND FLOTATION (RIGHT) 85
PLATFORM AND RAILS (RIGHT) 47
PLATFORM AND STEPS (LEFT) 46
RADIATOR SUPPORT 75
RADIO AND SPEAKER MOUNTING 59
ROTARY SCREEN 81
ROTARY SCREEN-Continued 82
SEAT ASSEMBLY (700725041 SEAT ASSEMBLY) (SN HS46101 THAU HT46598) 66
SEAT ASSEMBLY (700732935 SEAT ASSEMBLY) (SN HT46599 AND LATER) 70
SEAT ASSEMBLY-Continued (700725041 SEAT ASSEMBLY) (SN HS46101 THAU HT46598) 67
SEAT MOUNTING (SN HS46101 THAU HT46598) 64
SEAT MOUNTING (SN HT46599 AND LATER) 65
STEERING COLUMN 58
STEERING COLUMN SHIELDS AND MOUNTING 57
TAIL WHEEL AND AXLE-LEFT 86
TAIL WHEEL AND AXLE-RIGHT 87
TAIL WHEEL AND HUB 90
WINDSHIELD AND MOUNTING 52
HYDRAULICS
BRAKE ASSEMBLY-LEFT 98
BRAKE ASSEMBLY-RIGHT 99
COUPLER KIT-HEADER 124
COUPLER KIT-TRACTOR 125
CYLINDER STOP (LEFT) 118
CYLINDER STOP (RIGHT) 119
EASY ATTACH KIT (HEADER ANGLE TILT) 120
GEARCASE ASSEMBLY 94
GEARCASE COOLER 117
HEADER DRIVE 111
HEADER DRIVE PUMP ASSEMBLY 112
HEADER LIFT HYDRAULICS 106
HITCH KIT 126
HYDRAULIC ACTUATOR MOUNTING 115
HYDRAULIC CHARGE 113
HYDRAULIC CYLINDER ASSEMBLY 116
HYDRAULIC CYLINDER ASSEMBLY-LEFT 109
HYDRAULIC CYLINDER ASSEMBLY-RIGHT 110
HYDRAULIC DRIVE AND BRAKES 91
HYDRAULIC DRIVE AND BRAKES-Continued 92
HYDRAULIC HEADER ANGLE TILT 114
HYDRAULIC MASTER CYLINDER ASSEMBLY-LEFT 107
HYDRAULIC SLAVE CYLINDER ASSEMBLY-RIGHT 108
HYDRAULIC STEERING 105
HYDRAULIC SUPPLY AND RETURN (FRONT) 100
HYDRAULIC SUPPLY AND RETURN (REAR) 102
HYDRAULIC VALVE ASSEMBLY 96
MANIFOLD ASSEMBLY 103
OFFSET TAILWHEEL KIT 128
OIL FILTER ASSEMBLY 104
OIL RESERVOIR AND MOUNTING 101
INDEX
INDEX
WINDROWERTRACTOR
HYDRAULICS (CONTINUED)
PLANETARY GEARBOX ASSEMBLY 95
RADIO KIT-AM/FM, CASSETTE W/WEATHERBAND 122
RADIO KIT-AM/FM, WITH CASSETTE 123
TRANSMISSION ASSEMBLY 93
WEIGHT BRACKET KIT 127
WHEEL DRIVE MOTOR ASSEMBLY 97
WINDSHIELD WIPER KIT 121
STEERING
BRAKE AND NEUTRAL LOCK 37
HYDRAULIC CYLINDER ASSEMBLY 38
HYDRAULIC SERVO-CONTROL ASSEMBLY 40
STEERING AND MOUNTING 39
STEERING AND MOUNTING-Continued 42
STEERING ASSEMBLY 44
STEERING YOKE ASSEMBLY 43
TENSIONER ASSEMBLY 41

IMAGES PREVIEW OF THE MANUAL:

Need help? Contact: [email protected]

https://vimeo.com/837324046?share=copy

PLEASE NOTE:

  • This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
  • Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.

S.M

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
🛒
Recently Purchased
🕒 verified order