★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
⚡
Instant Delivery
Available Immediately

AGCO® NA 5545 5546 5556 Auto-Tie Round Baler Repair Time Schedule Manual 79032863A – PDF DOWNLOAD

$26.95

AGCO® NA 5545 5546 5556 Auto-Tie Round Baler Repair Time Schedule Manual 79032863A – PDF DOWNLOAD

Buy now
⚡
Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

AGCO® NA 5545 5546 5556 Auto-Tie Round Baler Repair Time Schedule Manual 79032863A – PDF DOWNLOAD

FILE DETAILS:

AGCO® NA 5545 5546 5556 Auto-Tie Round Baler Repair Time Schedule Manual 79032863A – PDF DOWNLOAD

Language : English
Pages :111
Downloadable : Yes
File Type : PDF
Size:24.7 MB

DESCRIPTION:

AGCO® NA 5545 5546 5556 Auto-Tie Round Baler Repair Time Schedule Manual 79032863A – PDF DOWNLOAD

INTRODUCTION

A. TIME ALLOWANCE

  • The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
  • They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
  • The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
  • Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.

B.TIMES

All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.

C.REVIEW OF TIMES 

If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:

TABLE OF CONTENTS:

AGCO® NA 5545 5546 5556 Auto-Tie Round Baler Repair Time Schedule Manual 79032863A – PDF DOWNLOAD

Section
Contents
Description
Drives
Pickup
Electrical
Tailgate
Bale Forming
Frame, Wheels and Shields
Hydraulics
BALE FORMING
BALE MONITOR 51
BALE TENSIONING ROLLERS 43
BELT TENSIONING ROLLERS 44
FORMING BELT 47
ROLLER MOUNTING 40
TAILGATE ROLLERS 42
TAILGATE SUPPORTS (MESH WRAP ONLY) 41
TENSIONING LUBE 46
TENSIONING MOUNTING (RIGHT) 45
TWINE CUTOFF 48
TWINE GUIDE MOUNTING 50
TWINE THREADER 49
DRIVES
CLUTCH ASSEMBLY (700719432 CLUTCH ASSEMBLY) 11
CLUTCH ASSEMBLY (700726882 CLUTCH ASSEMBLY) 16
CLUTCH MOUNTING 10
GEARBOX ASSEMBLY (700727084 GEARBOX ASSEMBLY) 8
IMPLEMENT DRIVELINE ASSEMBLY (1000 RPM) 6
IMPLEMENT DRIVELINE ASSEMBLY (540 RPM) 5
MAIN DRIVE 7
PICKUP, STUFFER AND AUGER DRIVE 12
ROLLER AND AUGER DRIVE-LOWER 15
ROLLER DRIVE-UPPER 17
STUFFER DRIVE 13
STUFFER FRAME, AND SUPPORTS 14
U-JOINT ASSEMBLY-DOUBLE (700728117 U-JOINT ASSEMBLY) 9
ELECTRICAL
BALE MONITOR-ELECTRICAL 31
CONTROL ASSEMBLY 25
ELECTRICAL HARNESS SERVICE PARTS (CONTINUED) 35
ELECTRICAL MESH WRAP 32
ELECTRICAL-KICKER 30
ELECTRICAL-MAIN HARNESS 22
ELECTRICAL-MAIN HARNESS (CONTINUED) 23
ELECTRICAL-MAIN HARNESS, CONTINUED 24
ELECTRICAL-TAILLIGHTS 28
ELECTRICAL-TAILLIGHTS (WITH MESH) 29
GTA CONSOLE AND MOUNTING 33
GTA MOUNTING (OPTIONAL PARTS) 34
SENSOR ASSEMBLY (BALE SIZE) 27
SENSOR ASSEMBLY (TWINE ARM) 26
FRAME, WHEELS AND SHIELDS
MAINFRAME PANELS 55
MAINFRAME, AXLE AND PICKUP CRANK 53
MESH WRAP CARRIAGE 65
MESH WRAP FRAME (LOWER) 61
MESH WRAP FRAME (UPPER) 62
MESH WRAP ROLLER SUPPORT 66
MESH WRAP ROLLERS 67
MESH WRAP SHIELD 68
SAFETY CHAIN AND JACK 52
SHIELD AND HINGE (LEFT-FRONT) 59
SHIELD AND HINGE (RIGHT-FRONT) 60
SHIELDS (FRONT) 56
SHIELDS AND HINGE (LEFT) 57
SHIELDS AND HINGE (RIGHT) 58
TAILGATE SHIELDS (WITH MESH WRAP) 64
TAILGATE SHIELDS (WITHOUT MESH WRAP) 63
WHEEL, HUB AND AXLE 54
HYDRAULICS
ALLIGATOR RIVET LACING KIT (700721237 ALLIGATOR RIVET LACING KIT) 97
AUTO-TIE ROUND BALER
HYDRAULICS (CONTINUED)
BALE KICKER KIT (700714707 HYDRAULIC CYLINDER ASSEMBLY) (CONTINUED) 95
BALE KICKER KIT (700725906 HYDRAULIC VALVE ASSEMBLY) (CONTINUED) 94
BALE KICKER KIT (CONTINUED) (ELECTRICAL ASSEMBLY) 93
BALE KICKER KIT (CONTINUED) (RIGHT KICKER ASSEMBLY) 90
BALE KICKER KIT (K51133 BALE KICKER KIT) (LEFT KICKER ASSEMBLY) 89
BALE KICKER KIT-ELECTRICAL (CONTINUED) 91
BALE KICKER KIT-HYDRAULIC (CONTINUED) 92
BALE RAMP KIT (K50921 BALE RAMP KIT) 98
DECAL LOCATION-OPERATIONAL (CONTINUED) 81
FIRE EXTINGUISHER KIT (K50556 FIRE EXTINGUISHER KIT) 86
GTA CONSOLE AND MOUNTING KIT (K51198 GTA CONSOLE AND MOUNTING KIT) 110
HYDRAULIC (LEFT) 69
HYDRAULIC (RIGHT) 70
HYDRAULIC CYLINDER ASM-TAILGATE (700720811 HYDRAULIC CYLINDER ASSEMBLY) 74
HYDRAULIC CYLINDER ASSEMBLY (700714707 CYLINDER ASSEMBLY-HYDRAULIC) 76
HYDRAULIC CYLINDER ASSEMBLY (700714707 CYLINDER ASSEMBLY-HYDRAULIC) 80
HYDRAULIC CYLINDER ASSEMBLY (700716327 HYDRAULIC CYLINDER ASSEMBLY) 85
HYDRAULIC CYLINDER ASSEMBLY (700719621 HYDRAULIC CYLINDER ASSEMBLY) 75
HYDRAULIC PICKUP LIFT KIT (K50920 HYDRAULIC PICKUP LIFT KIT) 84
HYDRAULIC SHUTOFF VALVE ASSEMBLY (700717995 SHUTOFF VALVE ASSEMBLY) 73
HYDRAULIC TRACTOR REMOTE KIT (K51001 HYDRAULIC TRACTOR REMOTE KIT) 83
HYDRAULIC VALVE ASSEMBLY (700727398 HYDRAULIC VALVE ASSEMBLY) 71
HYDRAULIC VALVE ASSEMBLY (CONTINUED) 72
HYDRAULIC VALVE ASSEMBLY-KICKER (700728426 HYDRAULIC VALVE ASSEMBLY) 79
HYDRAULICS-KICKER 78
HYDRAULICS-TONGUE 77
LACING PIN KIT-7 INCH (700721236-7 INCH LACING PIN KIT) 96
MESH WRAP KIT (CONTINUED) (ACTUATOR MOUNTING) 108
MESH WRAP KIT (CONTINUED) (CARRIAGE) 106
MESH WRAP KIT (CONTINUED) (ELECTRICAL) 109
MESH WRAP KIT (CONTINUED) (FRAME-LOWER) 101
MESH WRAP KIT (CONTINUED) (REAR SHIELDS) 103
MESH WRAP KIT (CONTINUED) (ROLLER SUPPORT) 107
MESH WRAP KIT (CONTINUED) (ROLLERS) 104
MESH WRAP KIT (CONTINUED) (TAILGATE SHIELDS) 102
MESH WRAP KIT (CONTINUED) (TAILGATE SUPPORT AND ROLLERS) 105
MESH WRAP KIT (K51180 MESH WRAP KIT) (FRAME UPPER) 100
SHORT CROP KIT (K51199 SHORT CROP KIT) 82
SILAGE KIT (CONTINUED) 88
SILAGE KIT (K51200 SILAGE KIT) 87
STARTING ROLLER FLAP KIT (K51201 STARTING ROLLER FLAP KIT) 99
PICKUP
PICKUP FRAME, FLOTATION AND SUPPORT 19
PICKUP ROTOR ASSEMBLY 20
PICKUP WRAPPER AND SHIELD 21
WINDGUARD AND MOUNTING (700155980 WINDGUARD ASSEMBLY) 18
TAILGATE
KICKER-LEFT 38
KICKER-RIGHT 39
TAILGATE 36
TAILGATE LATCH 37
INDEX

IMAGES PREVIEW OF THE MANUAL:

Questions? Email us: [email protected]

https://vimeo.com/837316865?share=copy

PLEASE NOTE:

  • This is the SAME exact manual used by your dealers to fix your vehicle.
  • The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
  • Any queries / doubts regarding your purchase, please feel free to contact [email protected]

s.m

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
🛒
Recently Purchased
🕒 verified order