AGCO® NA ST22A TRACTOR Repair Time Schedule Manual 79032822A – PDF DOWNLOAD
$26.95
AGCO® NA ST22A TRACTOR Repair Time Schedule Manual 79032822A – PDF DOWNLOAD
Description
AGCO® NA ST22A TRACTOR Repair Time Schedule Manual 79032822A – PDF DOWNLOAD
FILE DETAILS:
AGCO® NA ST22A TRACTOR Repair Time Schedule Manual 79032822A – PDF DOWNLOAD
Language : English
Pages :96
Downloadable : Yes
File Type : PDF
Size:5.53 MB
DESCRIPTION:
AGCO® NA ST22A TRACTOR Repair Time Schedule Manual 79032822A – PDF DOWNLOAD
INTRODUCTION
A. TIME ALLOWANCE
- The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
- They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
C.REVIEW OF TIMES
If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:
TABLE OF CONTENTS:
AGCO® NA ST22A TRACTOR Repair Time Schedule Manual 79032822A – PDF DOWNLOAD
Section
Contents
Description
Engine Components
Chassis
Wheels
Component Breakdowns
CHASSIS
ACCELERATOR LEVER SYSTEM 33
AIR CLEANER SYSTEM 29
AXLE BRACKET SYSTEM 61
AXLE HOUSING SYSTEM 64
AXLE HOUSING, WHEEL SHAFT SYSTEM 53
BATTERY SYSTEM 32
BEVEL CASE SYSTEM 63
BRAKE PEDAL SYSTEM 55
BRAKE SYSTEM 54
CHANGE (4WD) SYSTEM 44
CHANGE (PTO) SYSTEM 45
CHANGE (SUB) SYSTEM 43
CONTROL SYSTEM 68
COOLING SYSTEM 27
COVER SYSTEM 76
CYLINDER CASE SYSTEM 67
CYLINDER SYSTEM 59
DI FF-LOCK SYSTEM 52
DIFF-LOCKPEDAL SYSTEM 56
DIFFERENTIAL GEAR SYSTEM 51
DRIVE SHAFT SYSTEM 62
ENGINE MOUNT SYSTEM 26
EXHAUST SYSTEM 28
FENDER SYSTEM 77
FLOOR SYSTEM 79
FUEL PUMP SYSTEM 30
FUEL TANK SYSTEM 31
GEAR (4WD) SYSTEM 40
GEAR (PTO) SYSTEM 41
GEAR CASE, FRONT SYSTEM 65
GRILLE, HEAD LAMP SYSTEM 75
HARNESS SYSTEM 83
HOOD SYSTEM 74
HST SYSTEM 37
INPUT SHAFT SYSTEM 34
INSTRUMENT PANEL SYSTEM 81
LABELS (CAUTION) 88
LABELS (CONTROL) 87
LEVEL (SUB,4WD) SYSTEM 46
LEVER (PTO) SYSTEM 47
LIFT ROD SYSTEM 72
LINK SYSTEM (3PT) 71
MAIN PIPING SYSTEM 69
METAL (HST) SYSTEM 36
METAL (PTO) SYSTEM 42
MOWER LINK SYSTEM 73
ORNAMENTATION GC2300, GC2310 86
PARKING BRAKE SYSTEM 57
PEDAL (HST) SYSTEM (A TYPE) 2 OF 2 49
PEDAL (HST) SYSTEM (EXCEPT A TYPE) 48
PINION (DRIVE) SYSTEM 50
POWER STEERING PIPING SYSTEM 60
POWER STEERING SYSTEM 58
PUMP GEAR SYSTEM 38
ROPS SYSTEM 84
ROPS SYSTEM (TLB TYPE ONLY) 85
SEAT SYSTEM 78
SMV BRACKET 89
SUB GEAR SYSTEM 39
SUB PIPING SYSTEM 70
SWITCH SYSTEM 82
TAIL LAMP SYSTEM 80
TIE ROD SYSTEM 66
TRANSMISSION CASE SYSTEM 35
ST22A TRACTOR
COMPONENT BREAKDOWNS
ALTERNATOR COMPONENTS 95
CONTROL VALVE ASSY COMPONENTS 91
FUEL FILTER ASSY COMPONENTS 93
HYDROSTATIC TRANSMISSION COMPONENTS 92
PTO CLUTCH ASSY COMPONENTS 94
ENGINE COMPONENTS
ADAPTER 23
CAMSHAFT 14
COOLING FAN 19
CRANKSHAFT 16
CYLINDER BLOCK 9
CYLINDER HEAD 5
CYLINDER HEAD COVER 6
ELECTRIC (1) STARTER AND ALTERNATOR 24
ELECTRIC (2) SWITCHES, SOLENOID & RELAY 25
EXHAUST MANIFOLD 8
FUEL PIPE 22
INJECTION NOZZLE 20
INJECTION PUMP 21
INTAKE MANIFOLD 7
OIL PAN 10
OIL PUMP 17
PISTON STANDARD 15
REAR PLATE 11
TIMING GEAR CASE 12
VALVE TRAIN 13
WATER PUMP AND THERMOSTAT 18
WHEELS
FRONT & REAR WHEEL 90
4
INDEX
IMAGES PREVIEW OF THE MANUAL:

Customer Support: [email protected]
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.M
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

AGCO® NA 8792 8776 Planter SERVICE MANUAL 79034268 B - PDF DOWNLOAD

AGCO® NA Compact Tractor ST34A ST41A SERVICE MANUAL 79033000 A - PDF DOWNLOAD

