★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately

AGCO NA DTA Tractor Repair Time Schedule Manual 3378755M2 – PDF DOWNLOAD

$28.95

AGCO NA DTA Tractor Repair Time Schedule Manual 3378755M2 – PDF DOWNLOAD

Buy now
โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

AGCO NA DTA Tractor Repair Time Schedule Manual 3378755M2 – PDF DOWNLOAD

FILE DETAILS:

AGCO NA DTA Tractor Repair Time Schedule Manual 3378755M2 – PDF DOWNLOAD

Language : English
Pages : 398
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

AGCO NA DTA Tractor Repair Time Schedule Manual 3378755M2 – PDF DOWNLOAD

A . Allocation of time:

The times indicated in this document result from a careful study of the operation concerned; they represent the average time taken to carry out the operation by ONE mechanic with standard skills, having undergone the necessary training, using standard workshop tools and equipment located to allow reasonable access and working conditions. They DO NOT INCLUDE travelling time to or from the farm or site.

  • The times indicated take account of difficulties encountered when working on used rather than new machines, and are based on the special tools and procedures recommended by the manufacturer and specified in the workshop manual. No power tools are used and no shortcuts are taken.
  • The times are based on a used machine, in a reasonable condition and well maintained using approved parts. Additional time may be required to remove seized, rusted or damaged parts; a separate request must be submitted when work is carried out under warranty.
  • A factor has been allowed in the operation times cited to prepare the tractor in the workshop, gather all the tools and parts required, and clean and test the machine after repair.
  • The time needed to remove and reinstall the implements fitted, such as loaders, hedge cutters etc. which hamper the execution of specific tasks IS NOT INCLUDED in the allocated time.

B . Special tools:
Consult the workshop manual to determine which operations require the use of special tools.

C. Time:

All operation times are given in hours and decimal fractions of an hour. Decimal time must be used for all warranty requests. The table below shows how to convert these times.

  • The times shown in this repair time schedule are for a complete job, from start to finish. Where access has been cleared for an adjacent repair, only the time necessary for the second repair will be accepted, not the total time for the two separate repairs.
  • The term “ADD” indicates that the time may be added to the principal repair time, e.g. time for fault finding, pressure testing.

TABLE OF CONTENTS:

AGCO NA DTA Tractor Repair Time Schedule Manual 3378755M2 – PDF DOWNLOAD

INTRODUCTION AND WARRANTY
SPLITTING THE TRACTOR
ENGINE AND EQUIPMENT
CLUTCH
TRANSMISSION
REAR AXLE
LINKAGE
PTO-DRIVE MECHANISM
FRONT AXLE
HYDRAULICS
ELECTRIC EQUIPMENT & INSTRUMENT PANEL
ELECTRONIC EQUIPMENT
SHEET METAL
TRACTOR CAB
LIGHTING EQUIPMENT
RIMS AND WHEELS WEIGHTS
FAILURE CODE INDEX

Need help? Contact: [email protected]

PLEASE NOTE:

  • This is the SAME exact manual used by your dealers to fix your vehicle.
  • The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
  • Any queries / doubts regarding your purchase, please feel free to contactย [email protected]

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
๐Ÿ›’
Recently Purchased
๐Ÿ•’ verified order