Description
Ammann AFW 150-2 Asphalt Paver, Wheeled Hatz 1B50E EU Stage V, U.S. EPA Tier 4f Operating Manual SN 3011193 – PDF DOWNLOAD
FILE DETAILS:
Ammann AFW 150-2 Asphalt Paver, Wheeled Hatz 1B50E EU Stage V, U.S. EPA Tier 4f Operating Manual SN 3011193 – PDF DOWNLOAD
Language : English
Pages : 202
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Ammann AFW 150-2 Asphalt Paver, Wheeled Hatz 1B50E EU Stage V, U.S. EPA Tier 4f Operating Manual SN 3011193 – PDF DOWNLOAD
Contents 8
1 SPECIFICATION MANUAL 13
1 1Basic dataΒ 14
1 2Dimensional drawing of the machineΒ 16
1 3Technical data 18
1 3 1Specification tableΒ 18
1 3 2Machine gradeability and lateral static stabilityΒ 20
1 3 3Optional equipmentΒ Β 22
1 3 3 1Screed vibration unitsΒ Β 23
1 3 3 2Mechanical screed extension 24
1 3 3 3Dual wheelsΒ 26
1 3 3 4Front wheel scraperΒ Β 27
1 3 3 5Material hopper extensionΒ Β 28
1 3 3 6Additional lightingΒ Β 29
1 3 3 7Screed copying system 30
2 OPERATING MANUALΒ 33
2 1Main safety precautions 34
2 1 1Obligations before putting into operation 34
2 1 2Assurance of safety precautions by the owner 34
2 1 3Requirements for qualified personnelΒ Β 35
2 1 4Machine operator’s obligationsΒ Β 36
2 1 5Screed operators’ obligations 37
2 1 6Driver’s stand and screed operator stand during machine operation 38
2 1 7Dangerous zone and safe distance 39
2 1 8Machine operation at unclear working areasΒ Β 42
2 1 9Manual signals 42
2 1 10Safety notices and symbols used on the machine 46
2 1 11Personal protective equipmentΒ Β 50
2 1 12General safety precautionsΒ Β 51
2 1 13Safety precautions during machine operation 51
2 1 14Safety and fire precautions during the use of gas bottlesβ© 52
2 1 15Safety precautions for the use of portable fire extinguisherΒ 53
2 1 16Safety and fire precautions during welding on the machineΒ 53
2 1 17Safety precautions for electrical and electronic equipment of the machine 54
2 1 18Prohibited activitiesΒ 55
2 2Preservation and storageΒ Β 57
2 2 1Storage places and storage conditionsΒ 57
2 2 2Preservation and storage of the machine for 1β2 monthsΒ Β 58
2 2 3Preservation and storage of the machine for a period over 2 monthsΒ Β 59
2 2 4Removing chemical preservatives and putting the machine into operationΒ 60
2 3Machine disposalΒ 61
2 3 1Machine disposal after its service lifeΒ Β 61
2 4Machine descriptionΒ 62
2 4 1Description of main parts of the machine and screedΒ Β 63
2 4 2Main dashboard 67
2 4 3DisplayΒ 71
2 4 4 Foot switchΒ Β 73
2 5Operation of the machineΒ Β 75
2 5 1Turning ON/OFF the battery disconnecterΒ Β 75
2 5 2Basic equipment of the machineΒ Β 76
2 5 3Machine footboard 79
2 5 4Deposition boxes and safety covers on the machineΒ 80
2 5 5Mounting of screed reduction plates 82
2 5 6BeaconΒ Β 84
2 5 7Driver’s stand 85
2 5 8Starting the engineΒ 86
2 5 9Starting the engine using starting leads from external power supplyΒ 87
2 5 10Travel and reversing of the machineΒ Β 88
2 5 11Stopping the machine and engine 90
2 5 12Machine parkingΒ 91
2 5 13Front wheelΒ Β 92
2 5 14Using and setting the paving direction indicatorΒ 93
2 5 15HopperΒ 94
2 5 16Material outletΒ 95
2 5 17ConveyorΒ Β 96
2 5 18Conveyor limit switchΒ 97
2 5 19AugersΒ 98
2 6Operation of the screed 99
2 6 1Lifting and lowering the screedΒ 99
2 6 2Screed lockΒ Β 100
2 6 3Setting the paving widthΒ 102
2 6 4Setting the paving thickness 104
2 6 5Setting the roadway profileΒ 105
2 6 6Setting the end gatesΒ 106
2 6 7Screed vibration (optional equipment) 107
2 6 8Screed gas heatingΒ 108
2 6 9Loading material to the machine 115
2 6 10Start of paving 116
2 6 11End of pavingΒ Β 117
2 7Machine transportΒ Β 118
2 7 1Preparation of the machine for transport 118
2 7 2Loading the machine using a rampΒ Β 119
2 7 3Loading the machine with a craneΒ Β 120
2 7 4Machine transportΒ Β 121
2 7 5Preparation of the machine for operation after transportation 121
2 8Special conditions to use the machine 122
2 8 1Towing the machineΒ 122
2 8 2Climatic conditions 123
2 8 3Operation of the machine in dusty environmentΒ 123
3 MAINTENANCE MANUALΒ 125
3 1Safety and other measures during maintenance of the machineΒ Β 127
3 1 1Safety precautions during machine maintenanceΒ 127
3 1 2Safety and fire precautions during replacement of operating fluidsΒ 128
3 1 3Environmental and hygienic principles 129
3 1 3 1Hygienic principlesΒ 129
3 1 3 2Environmental principlesΒ Β 129
3 2Specification of operating fluidsΒ 130
3 2 1Engine oil 130
3 2 2Fuel 131
3 2 3Hydraulic oil 131
3 2 4Anti-adherent solution 131
3 2 5Liquid gas 132
3 2 6Lubricating greaseΒ 132
3 3Table of fluid quantities 133
3 3 1Overview of fluids quantities and overview of symbols specified in maintenance plansΒ 133
3 4Lubrication and maintenance chartΒ 134
3 5Lubrication and service plan 136
3 5 1Maintenance plan 136
3 6Lubrication and maintenance operationsΒ Β 137
Every 10 hours at the beginning of work (daily)Β Β 138
3 6 1Fuel level checkΒ Β 138
3 6 2Engine oil checkΒ Β 139
3 6 3Hydraulic oil check in the hydraulic tankΒ 140
3 6 4Driver’s stand cleaningΒ 141
3 6 5Cleaning the hopper, outlets and conveyorΒ 142
3 6 6Auger cleaningΒ 143
3 6 7Test of burner ignition, flame position adjustment and spark plug maintenanceΒ 144
3 6 8Gas equipment tightness checkΒ 148
3 6 9Brake testΒ Β 149
3 6 9 1Check of the parking brakeΒ Β 149
3 6 9 2Check of the emergency brake 150
3 6 9 3Check of the service brakeΒ Β 151
3 6 10Check of the tightness of the fuel and hydraulic systemΒ 152
Every 10 hours at the end of work (daily)Β Β 153
3 6 11Fuel level checkΒ 153
3 6 12Cleaning the hopper, outlets and conveyor 154
3 6 13Auger cleaning 155
Every 50 hoursΒ Β 156
3 6 14Cleaning the water separatorΒ 156
3 6 15Machine lubricationΒ 157
Every 100 hours of operation 160
3 6 16Fuel system tightness checkΒ Β 160
3 6 17Rear wheel fastening check 161
3 6 18Conveyor chain tensioningΒ 162
Every 250 hours of operation 163
3 6 19Engine oil replacementΒ 163
3 6 20Engine air intake check 164
3 6 21Hydraulic oil cooler cleaning 165
3 6 22Hydraulic circuit tightness checkΒ Β 166
3 6 23Battery checkΒ 167
3 6 24Checking the conveyor drive chain tension 169
Every 500 hours of operation, but at least once a yearΒ 170
3 6 25Replacement of fuel filtersΒ Β 170
3 6 26Air filter replacementΒ 172
3 6 27Front and rear wheel condition checkΒ Β 173
Every 1000 hours 174
3 6 28Engine oil filter cleaning 174
3 6 29Hydraulic oil and hydraulic oil filter replacement 176
3 6 30Gas line hose replacementΒ 178
Maintenance as requiredΒ Β 179
3 6 31Battery replacementΒ 179
3 6 32Charging of the battery 180
3 6 33Screw connections tightness checkΒ Β 181
3 7TroubleshootingΒ 183
3 7 1TroubleshootingΒ 183
3 7 2Troubleshooting engine faults when indicator lamps are lit on the display 183
3 7 3Troubleshooting the hydraulic systemΒ 183
3 7 4Troubleshooting the electrical system 184
3 7 5Troubleshooting of screed heating when active error indicator lamp is lit and an error code is shown on the display 184
3 7 6List of error codes displayed on the displayΒ Β 185
3 8Appendices 188
3 8 1Machine wiring diagram 188
3 8 2Machine hydraulic system diagramΒ Β 194
3 8 2 1Measuring points of the hydraulic circuit 196
3 8 3Screed gas heating system diagramΒ 197
3 8 4Table of spare parts for regular maintenanceΒ Β 198
3 8 5Content of the filter set after 500 hours (4-760224) 198
3 8 6Content of the filter set after 1000 hours (4-760225)Β Β 198
Questions? Email us: [email protected]
S.V