Challenger L4258G4 L4330G4 Application System Repair Time Schedule Manual – PDF DOWNLOAD
$89.95 Original price was: $89.95.$18.95Current price is: $18.95.
Challenger L4258G4 L4330G4 Application System Repair Time Schedule Manual – PDF DOWNLOAD
Description
Challenger L4258G4 L4330G4 Application System Repair Time Schedule Manual – PDF DOWNLOAD
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
Challenger L4258G4 L4330G4 Application System Repair Time Schedule Manual – PDF DOWNLOAD
Introduction
This Repair Time Schedule gives the average time necessary for each repair procedure.
To calculate the average time for each repair, AGCO includes these conditions:
• one approved technician does the repair
• in typical work conditions
• with the correct tools
• on a used or correctly serviced machine
AGCO also includes the time to:
• find the cause of the fault
• get the correct tools and parts
• do a test before and after the repair
AGCO does not include time necessary to:
• go to and from the machine
• clean the machine
• remove and install any attached equipment
The repair times are shown in hours and parts of hours. Parts of hours are in decimals. Use decimal times on warranty claims.
Repair times are based on the latest information available at the time of publication. AGCO reserves the
right to publish revisions to these repair times as necessary. Revised repair times are the result of changes
in the design, method or technique.
TABLE OF CONTENTS:
Challenger L4258G4 L4330G4 Application System Repair Time Schedule Manual – PDF DOWNLOAD
1 Product Containment 1-1
11 Endgate1-3
12 Idler shaft 1-4
13 Drive shaft 1-5
14 Drive pulley shaft – L4330G41-6
15 Snubber pulley – L4330G4 1-7
16 Front conveyor guard1-8
17 V-hood 1-9
18 Material flow divider and shields 1-1 o
19 Hillside divider 1-11
110 Conveyor gear case 1-12
111 Conveyor gear case – L4330G4 1-13
112 Electrical box bracket 1-14
113 MultApplier bin 1-15
114 MultApplier bin seal1-16
115 Feedgate – MultApplier 1-17
116 Idler shaft – MultApplier 1-18
117 Drive shaft and bearings- MultApplier 1-19
118 Lubrication lines – MultApplier, L4330G4 1-20
119 MultApplier conveyor 1-21
120 MultApplier wiper 1-22
121 Hillside divider – MultApplier 1-23
122 MultApplier foot mount 1-24
123 Pressure gauge 1-25
124 Window 1-26
125 System tie-downs 1-27
126 Roll tarp 1-28
127 Handrail 1-29
2 Primary Product Distribution 2-1
21 Conveyor assembly 2-3
22 Chain oiler, if equipped 2-4
23 Spinner fan 2-5
24 Spinner frame assembly 2-6
25 Spinner guard and shields 2-7
3 Hydraulic System 3-1
31 Hydraulic tank and oil cooler3-3
32 Hydraulic hoses 3-4
33 Flow divider valve 3-5
34 Conveyor motor 3-6
35 Conveyor speed valve3-7
36 Hydraulic pumps 3-8
37 Spinner motor 3-9
Application System
552480O1A
Table of contents
38 Spinner speed valve 3-10
39 MultApplier conveyor motor 3-11
310 MultApplier conveyor speed valve 3-12
4 Electrical System 4-1
41 System keypad 4-3
42 Oiler switch4-4
43 Electrical box4-5
44 Product node 4-6
45 System harnesses 4-7
46 Spinner speed sensor 4-8
4 7 Application rate sensor4-9
48 Bin level sensor – MultApplier 4-10
49 Roll tarp electrical components 4-11
410 Tail lamp 4-12
411 Work lamps 4-13
5 Decals 5-1
51 Decals5-3
6 Attachments 6-1
61 Catch pan 6-3
62 Slow moving vehicle sign 6-4
7 Indexlndex-1
CHALLENGER L4258G4 L4330G4 APPLICATION SYSTEM REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD:
PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Challenger MT 600B Series MT 655 665B Techstar CVT Parts Manual - PDF DOWNLOAD


2006 Challenger 4450 MT SPRA-COUPE Liquid Sprayers Parts Manual - PDF DOWNLOAD




