★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112976 – PDF DOWNLOAD

$28.95

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112976 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112976 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112976 – PDF DOWNLOAD

Language : English
Pages : 396
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112976 – PDF DOWNLOAD

Basic safety instructions:

  • In principle, the basic safety instructions apply from the Operating Instruc- tions GMK 6400. The
    basic safety instructions for the lattice extensions sup- plied for the truck crane are given
    below.
  • Information regarding the warnings and symbols used; à Operating Instructions GMK 6400.

 Intended use:

The GMK 6400 is a state-of-the-art truck crane, designed in accordance with approved safety
regulations. Nevertheless, the operator or third parties can still be endangered and the crane or
other property put at risk while using it.

  • In addition to the following specifications, also observe the specifications for intended use in
    the Operating Instructions GMK 6400.
  • The GMK 6400 may only be operated with parts of equipment which are permitted by Manitowoc Crane
    Group Germany GmbH and which are labelled with the serial number of the GMK 6400.
  • Observe the inspection and maintenance requirements for the lattice exten- sion according to the
    Maintenance chapter.

Only use the rigging winch (special equipment) to do the following:
– To pull the rope of the hoisting gear to the head when rigging the boom extension and the
luffing jib
– To pull the rope of the hoisting gear over the luffing control arm to the
upper hook block when rigging the luffing jib

Improper use:

  • Manitowoc Crane Group Germany GmbH is not liable for damage resulting from the improper or
    unauthorized use of the GMK 6400 truck crane. The user alone bears the risk.
  • In addition to the following specifications, also observe the information regarding improper use in
    the Operating Instructions GMK 6400.

If a rigging winch (additional equipment) is mounted, improper use also includes:
– Pulling the main hoist rope using the rigging winch (additional equip- ment) to the main boom
head when no lattice extension is mounted
– Any type of vertical hoisting of loads using the rigging winch

Organisational measures:

In addition to the following specifications, also observe the organisational measures in the
Operating Instructions GMK 6400 and in the Maintenance Manual.
Make sure the maintenance personnel also have the necessary expertise to operate the crane safely.
Make sure the maintenance personnel have access to the operating manual.

  • Only qualified or instructed personnel may carry out work on the truck crane.
  • The responsibilities regarding the operation of the crane, rigging, mainte- nance and repair work
    must be clearly defined.
  • Make sure that persons who will work on the truck crane are provided with the required information
    prior to commencing work. Instruct your person- nel (e.g. banksmen, slingers, rigging personnel)
    accordingly.
  • Observe all safety instructions and warnings on the truck crane.
  • Climb on the foot section only via the ladder provided. Erect the railing. This
    gives you a safe access to the foot section.

TABLE OF CONTENTS:

Grove Crane GMK 6400 Lattice Extension Operating Instruction Manual 3112976 – PDF DOWNLOAD

Additional page: Slinging points on the auxiliary single-sheave boom top..........................  3
Additional pages: Modified rigging winch..........................................................  5
	Validity......................................................................................  5
		Modifications.............................................................................  5
	Rope guide....................................................................................  6
		Rope guide for the mounting sites.........................................................  6
			Additional support roller.............................................................  6
		Positioning the rigging rope on the support roller/taking it off the support roller.......  7
		Setting the support roller upright/laying it down.........................................  7
Additional page: Operating with the luffing jib
..................................................  9
Correction sheet: Electrical connection head/foot section......................................... 11
1 Overview........................................................................................ 17
	1.1 Accidents................................................................................. 17
	1.2 Warranty.................................................................................. 17
	1.3 Terms used................................................................................ 18
		1.3.1 For the boom extension.............................................................. 18
		1.3.2 For the luffing jib................................................................. 20
		1.3.3 For the heavy load lattice extension................................................ 22
		1.3.4 For the auxiliary single-sheave boom top............................................ 23
		1.3.5 For operation of the rigging winch.................................................. 24
		1.3.6 On the main boom.................................................................... 25
	1.4 Notes about the lattice extension operating manual........................................ 27
		1.4.1 What do the symbols used mean?...................................................... 27
		1.4.2 Definitions of direction information................................................ 27
			Basic rule............................................................................ 27
			Switches and buttons................................................................. 28
			General information on the operating elements......................................... 28
			General rules for buttons and symbols................................................ 28
		1.4.3 How are the operating instructions structured?...................................... 29
		1.4.4 How do I find the information I need?............................................... 30
	1.5 Specifications in US standard units of measurement........................................ 31
		1.5.1 Boom extension...................................................................... 31
		1.5.2 Luffing jib......................................................................... 32
		1.5.3 Heavy load lattice extension........................................................ 32
	1.6 Conversion table for US measurements...................................................... 33
2 Basic safety instructions....................................................................... 37
	2.1 Intended use.............................................................................. 37
	2.2 Improper use.............................................................................. 38
	2.3 Organisational measures................................................................... 38
	2.4 Personnel qualifications.................................................................. 39
		Requirements.............................................................................. 39
		Training courses.......................................................................... 39
	2.5 Safety instructions for working with the lattice extension............................... 40
	2.6 Information on transporting persons....................................................... 41
3 For operations planning......................................................................... 45
	3.1 Boom extension, luffing jib and heavy load lattice extension.............................. 45
		3.1.1 Notes on assembly................................................................... 45
		3.1.2 Assembly of the boom extension 3 inclined.......................................... 46
		3.1.3 Assembly of the boom extension 25 inclined......................................... 52
		3.1.4 Assembly of the luffing jib without inclination..................................... 56
		3.1.5 Assembly of the luffing jib with inclination........................................ 60
		3.1.6 Assembly of the heavy load lattice extension........................................ 62
		3.1.7 Transport dimensions and weights.................................................... 63
			Foot section in different combinations.............................................. 66
			Intermediate sections pushed into each other......................................... 68
		3.1.8 Identification...................................................................... 69
		3.1.9 Slinging points..................................................................... 73
			Slinging points on the foot section................................................... 75
		3.1.10 Transport.......................................................................... 77
			Applicable for all sections........................................................... 77
			For the foot section/luffing control arm............................................. 77
			For the head.......................................................................... 78
	3.2 Auxiliary single-sheave boom top.......................................................... 79
		3.2.1 Assembly............................................................................ 79
		3.2.2 Identification and slinging point................................................... 79
		3.2.3 Transport dimensions and weight..................................................... 80
4 Additional operating and display elements....................................................... 83
	4.1 Overview of the operating elements........................................................ 83
		4.1.1 On the crane control display........................................................ 83
			Main menu............................................................................. 83
			Luffing jib submenu.................................................................. 84
			Power unit speeds submenu............................................................. 84
		4.1.2 On the RCL display.................................................................. 85
			Submenu for entering rigging mode..................................................... 85
			Submenu for RCL monitoring............................................................ 85
		4.1.3 On the hand-held control............................................................ 86
	4.2 Brief description of the operating elements............................................... 87
		4.2.1 On the crane control display........................................................ 87
			In the power unit speed submenu....................................................... 87
			In the Luffing jib submenu............................................................ 87
		4.2.2 On the RCL display.................................................................. 95
			Entering rigging mode in submenu...................................................... 95
			In the RCL monitoring submenu......................................................... 96
		4.2.3 On the hand-held control............................................................ 97
			Pre-selection......................................................................... 97
			Movements of the rigging winch........................................................ 98
5 Boom extension..................................................................................101
	5.1 Checklists for rigging work...............................................................101
		5.1.1 CHECKLIST: Rigging the boom extension...............................................101
		5.1.2 CHECKLIST: Unrigging the boom extension.............................................107
	5.2 Description of the rigging work...........................................................111
		5.2.1 Pulling apart/pushing together intermediate sections................................111
			Folding up/folding out holders........................................................111
			Installing/removing the rear pendant links...........................................111
			Pulling apart intermediate sections...................................................112
			Pushing together intermediate sections...............................................113
		5.2.2 Checking the bracing arms...........................................................114
		5.2.3 Rigging mode of the truck crane at installation and removal.........................115
		5.2.4 Establishing/disconnecting the connections for the hydraulic lock...................116
			Making the connections...............................................................116
			Breaking the connections.............................................................117
		5.2.5 Securing/releasing locks............................................................118
		5.2.6 Locking the foot section/releasing the lock.........................................119
			Prerequisites.........................................................................119
			Locking the foot section..............................................................119
			Releasing the lock....................................................................120
		5.2.7 Handling the pins...................................................................121
		5.2.8 Installing/removing boom extension sections.........................................122
			Before the installation...............................................................122
			Installing............................................................................122
			Removing..............................................................................123
		5.2.9 Blocking the joint on the foot section..............................................124
		5.2.10 Removing/installing the deflection sheave on the angle piece.......................125
		5.2.11 Replacing deflection sheaves on the angle piece....................................126
		5.2.12 Folding deflection sheaves up/down.................................................127
			On the angle piece....................................................................127
			On the foot section..................................................................128
		5.2.13 Setting the angle position of the boom extension...................................129
		5.2.14 Installing/removing the lifting limit switch.......................................131
			Installing lifting limit switch.......................................................131
			Removing the lifting limit switch....................................................132
		5.2.15 Anemometer and air traffic control light...........................................133
			Installing............................................................................133
			Removing..............................................................................133
		5.2.16 Electrical connection foot section/main boom.......................................134
			Establishing..........................................................................134
			Disconnecting.........................................................................134
		5.2.17 Electric connection head/foot section..............................................135
			Connecting cable......................................................................135
			Establishing..........................................................................135
			Disconnecting.........................................................................136
		5.2.18 Placing and reeving the hoist rope.................................................138
			Possible reeving methods..............................................................140
	5.3 Operation with boom extension.............................................................143
		5.3.1 Operating the RCL...................................................................144
			Entering the RCL code.................................................................144
			Enter components......................................................................144
			Accepting the rigging mode...........................................................146
			Checks and displays in the Monitoring submenu.........................................146
		5.3.2 RCL shutdown........................................................................148
		5.3.3 Crane movements.....................................................................148
		5.3.4 Telescoping with rigged boom extension..............................................149
		5.3.5 Checks when operating with the boom extension.......................................150
			Horizontal alignment.................................................................150
			Checking the wind speed...............................................................150
6 Luffing jib.....................................................................................155
	6.1 Checklists for rigging work...............................................................155
		6.1.1 CHECKLIST: Rigging the luffing jib..................................................155
		6.1.2 CHECKLIST: Unrigging the luffing jib................................................163
	6.2 Description of the rigging work...........................................................169
		6.2.1 Ladder and railing..................................................................169
			When rigging..........................................................................169
			When unrigging........................................................................170
			Railing on the luffing control arm....................................................172
		6.2.2 Pulling apart/pushing together intermediate sections................................173
		6.2.3 Checking the bracing arms...........................................................173
		6.2.4 Rigging mode of the truck crane at installation and removal.........................173
		6.2.5 Installing/removing the luffing control arm.........................................174
			Installation..........................................................................174
			Removal...............................................................................177
		6.2.6 Raising/setting down the luffing control arm........................................180
			Raising the luffing control arm.......................................................180
			Setting down the luffing control arm..................................................180
		6.2.7 Hand-held control...................................................................181
			Moving the hoists.....................................................................181
			Moving the rigging winch.............................................................181
		6.2.8 Separating/connecting catcher 2 and raising cylinder................................182
			Setting down/ raising catcher 2.......................................................182
			Separating catcher 2 and the raising cylinder.........................................183
			Connecting catcher 2 and raising cylinder............................................183
		6.2.9 Reeving the auxiliary hoist rope to the upper hook block............................184
		6.2.10 Preparing the upper hook block for rigging.........................................186
			Before mounting the foot section......................................................186
			After mounting the foot section.......................................................187
		6.2.11 Fastening the upper hook block on the luffing control arm..........................187
			Releasing the safety device on the upper hook block...................................187
			Pulling the upper hook block towards the luffing control arm.........................188
			Locking the upper hook block..........................................................189
		6.2.12 Releasing the upper hook block from the luffing control arm........................191
			Releasing the locking pin.............................................................191
			Pulling the upper hook block towards the catcher......................................192
			Securing the upper hook block in the catcher..........................................193
			Reeling up the hoist rope.............................................................194
		6.2.13 Replacing the intermediate sections on the foot section............................195
			Prerequisites.........................................................................195
			When rigging..........................................................................196
			When unrigging........................................................................197
		6.2.14 Installing/removing sections of the luffing jib and rear pendant links.............198
			Before the installation..............................................................198
			Installing............................................................................198
			Removing..............................................................................200
			Rear pendant link transport protection...............................................202
		6.2.15 Hinge lock in the foot section.....................................................203
			Releasing the hinge lock..............................................................203
			Locking the hinge.....................................................................205
		6.2.16 Setting the angle of the luffing jib...............................................207
		6.2.17 Placing and reeving the hoist rope.................................................209
			Possible reeving methods..............................................................210
		6.2.18 Opening the luffing jib submenu....................................................211
		6.2.19 Telescoping with the luffing jib...................................................212
			Prerequisites.........................................................................212
			Telescoping with teleautomation.......................................................213
			Telescoping with semi-automatic.......................................................215
		6.2.20 Derricking luffing jib when rigging................................................217
			Prerequisites.........................................................................217
		6.2.21 Derricking main boom with installed luffing jib....................................219
			Derricking between –1.5 to 82.......................................................219
			Derricking between 80 and 60........................................................220
		6.2.22 Putting the luffing jib into working position......................................221
			Raising the luffing jib...............................................................221
			Telescoping to fixed length...........................................................222
			Lowering to working position.........................................................223
		6.2.23 Preparing the luffing jib for unrigging............................................224
	6.3 Operating with the luffing jib............................................................227
		6.3.1 Operating the RCL...................................................................228
			Entering the RCL code for the luffing jib.............................................228
			Entering components for the luffing jib..............................................228
			Accepting the rigging mode...........................................................230
			Checks and displays in the Monitoring submenu.......................................231
		6.3.2 RCL shutdown........................................................................233
		6.3.3 Crane movements.....................................................................234
			Controlling...........................................................................234
			Derricking the main boom..............................................................234
			Maximum power unit speeds.............................................................234
			Shutdowns.............................................................................234
		6.3.4 Working range and shutdowns.........................................................235
		6.3.5 Checks when operating with the luffing jib..........................................237
			Horizontal alignment.................................................................237
			Checking the wind speed...............................................................237
7 Heavy load lattice extension....................................................................241
	7.1 Rigging the heavy load lattice extension..................................................241
		7.1.1 CHECKLIST: Rigging the heavy load lattice extension.................................241
		7.1.2 CHECKLIST: Unrigging the heavy load lattice extension...............................245
	7.2 Description of the rigging work...........................................................249
		7.2.1 Truck crane rigging mode during installation of the heavy load lattice extension....249
		7.2.2 Establishing/disconnecting the connections for the hydraulic lock...................250
			Making the connections...............................................................250
			Breaking the connections.............................................................251
		7.2.3 Securing/releasing locks............................................................252
		7.2.4 Handling the pins...................................................................253
		7.2.5 Locking the adapter/releasing the pin...............................................254
			Prerequisites.........................................................................254
			Locking the adapter...................................................................254
			Releasing the locking pin.............................................................255
		7.2.6 Replacing deflection sheaves on the angle piece.....................................256
		7.2.7 Installing/removing head section and angle piece....................................257
			Installing............................................................................257
			Removing..............................................................................257
		7.2.8 Folding deflection sheaves up/down..................................................259
			On the angle piece....................................................................259
			On the adapter........................................................................260
		7.2.9 Setting the angle position of the heavy load lattice extension......................261
		7.2.10 Installing/removing the lifting limit switch.......................................263
			Installing lifting limit switch.......................................................263
			Removing the lifting limit switch....................................................264
		7.2.11 Anemometer and air traffic control light...........................................265
			Installing............................................................................265
			Removing..............................................................................265
		7.2.12 Establishing/disconnecting the electrical connection...............................266
			Establishing aconnection.............................................................266
			Disconnecting.........................................................................267
		7.2.13 Placing and reeving hoist rope.....................................................268
			Possible reeving methods..............................................................269
	7.3 Operating the heavy load lattice extension................................................271
		7.3.1 Operating the RCL...................................................................271
			Entering the RCL code for the heavy load lattice extension...........................271
			Entering components for the heavy load lattice extension..............................271
			Accepting the rigging mode...........................................................273
			Checks and displays in the Monitoring submenu.......................................274
		7.3.2 RCL shutdown........................................................................275
		7.3.3 Crane movements.....................................................................275
		7.3.4 Telescoping with rigged heavy load lattice extension................................276
		7.3.5 Checks when operating with the heavy load lattice extension.........................277
			Horizontal alignment.................................................................277
			Checking the wind speed...............................................................277
		7.3.6 Notes on two-hook operation.........................................................278
8 Auxiliary single-sheave boom top................................................................281
	8.1 Installing/removing.......................................................................281
		8.1.1 Installing/removing the auxiliary single-sheave boom top............................281
			Installing............................................................................281
			Removing..............................................................................282
	8.2 Rigging the auxiliary single-sheave boom top..............................................283
		8.2.1 Rigging in working position/transport position......................................283
		8.2.2 Attaching and removing the hoist rope...............................................284
			Possible reeving methods..............................................................285
		8.2.3 Lifting limit switch and anemometer.................................................286
			Lifting limit switch..................................................................286
			Installing and removing...............................................................287
	8.3 Operation with the auxiliary single-sheave boom top.......................................288
		8.3.1 Setting the RCL.....................................................................288
		8.3.2 Derricking, telescoping the main boom...............................................288
		8.3.3 Notes on RCL shutdown...............................................................289
		8.3.4 Procedure if permissible wind speeds are exceeded...................................289
		8.3.5 RCL display with the auxiliary single-sheave boom top folded up/rigged..............290
		8.3.6 Notes on two-hook operation.........................................................290
9 Turning loads...................................................................................293
	9.1 Requirements..............................................................................294
	9.2 Setting the RCL to turn loads.............................................................295
		Entering the reevings....................................................................295
		Setting the RCL to the auxiliary hoist....................................................295
	9.3 Turning a load............................................................................297
10 Rigging winch (additional equipment)...........................................................303
	10.1 Overview.................................................................................303
		Operating principle and accessories.......................................................303
	10.2 Hand-held control........................................................................304
	10.3 Pulling the hoist rope to the head.......................................................305
		Requirements..............................................................................305
		Remarks...................................................................................305
		Rigging work on the sheaves for operating the rigging winch...............................306
		Reeling off the rigging rope..............................................................307
		Positioning the rigging rope..............................................................308
		Connecting the rigging rope and the hoist rope............................................308
		Unreeling the hoist rope..................................................................309
		Separating the rigging rope and the hoist rope............................................310
		Rolling the rigging rope onto the drum....................................................310
		Rigging work on the sheaves for crane operation...........................................312
	10.4 Pulling the hoist rope to the upper hook block...........................................313
		Requirements..............................................................................313
		Rigging work on the sheaves for operating the rigging winch...............................314
		Reeling off the rigging rope..............................................................315
		Positioning the rigging rope..............................................................316
		Connecting the rigging rope and the main hoist rope.......................................317
		Reeling off the main hoist rope...........................................................317
		Separating the rigging rope and the main hoist rope.......................................317
		Rolling the rigging rope onto the drum....................................................318
	10.5 Rigging work.............................................................................319
		10.5.1 For operation of the rigging winch.................................................319
			Releasing the winch lock..............................................................319
			Locking the winch.....................................................................319
			Loosening the rigging rope at the rope attachment point...............................320
			Fastening the rigging rope at the rope attachment point...............................321
			Installing the rigging winch..........................................................321
			Removing the rigging winch............................................................323
		10.5.2 Connecting/disconnecting the electrical connection.................................324
			Establishing..........................................................................324
			Disconnecting.........................................................................324
		10.5.3 Establishing/disconnecting the hydraulic connection................................325
			Establishing..........................................................................325
			Disconnecting.........................................................................325
		10.5.4 Rigging on the foot section........................................................326
			For operation of the rigging winch....................................................326
			For crane operation...................................................................327
		10.5.5 Guide sheaves......................................................................328
			Inserting or removing the rigging rope................................................328
		10.5.6 On the angle piece.................................................................329
			For operation of the rigging winch....................................................329
			For crane operation...................................................................329
		10.5.7 On the head........................................................................330
			For operation of the rigging winch....................................................330
			For crane operation...................................................................330
		10.5.8 Rope connector.....................................................................331
			Establishing the connection...........................................................331
			Undoing the connection................................................................333
11 Driving with rigged truck crane................................................................337
	11.1 Driving distance.........................................................................338
	11.2 Permissible rigging modes and axle loads.................................................338
		11.2.1 Rigging modes with boom extension..................................................338
		11.2.2 Rigging modes with luffing jib.....................................................339
		11.2.3 Rigging modes with the heavy load lattice extension................................342
		11.2.4 Rigging modes with the auxiliary single-sheave boom top............................342
	11.3 Before driving the rigged truck crane....................................................343
	11.4 Driving the rigged truck crane...........................................................343
		Driving from the driver's cab.............................................................343
		While driving.............................................................................343
	11.5 Tables with boom positions and axle loads................................................345
		Information about the tables..............................................................345
		11.5.1 Boom extension with 3 angle.......................................................346
		11.5.2 Boom extension with 25 angle......................................................346
		11.5.3 Luffing jib........................................................................346
		11.5.4 Heavy load lattice extension.......................................................346
		11.5.5 Auxiliary single-sheave boom top...................................................346
12 Malfunctions...................................................................................349
	12.1 Notes on troubleshooting.................................................................349
		General information......................................................................349
		What to do in theevent of malfunctions..................................................349
		Fuses.....................................................................................349
		ECOS malfunctions........................................................................349
		RCL malfunctions..........................................................................349
	12.2 Troubleshooting and remedies.............................................................351
		12.2.1 Boom extension and heavy load lattice extension....................................351
		12.2.2 Luffing jib........................................................................351
	12.3 RCL malfunctions.........................................................................355
		12.3.1 Table of lattice extension error codes.............................................356
		12.3.2 Checking RCL supply lines and connections..........................................357
			On the lattice extension..............................................................358
13 Maintenance....................................................................................361
	13.1 Cleaning work............................................................................362
		Overview of subassemblies easily damaged when cleaning....................................362
	13.2 Maintenance plans........................................................................365
		13.2.1 Maintenance plan M 1...............................................................365
		13.2.2 Maintenance plan M 3...............................................................365
		13.2.3 Maintenance plan Y 2...............................................................366
		13.2.4 Maintenance plan Y 5...............................................................366
		13.2.5 Maintenance plan Y 10..............................................................366
	13.3 Boom extension and luffing jib...........................................................367
		13.3.1 Lubricating the connecting and socket pins.........................................367
			Grease, tools.........................................................................367
			Prerequisites.........................................................................367
			Checking..............................................................................367
			Lubricating...........................................................................368
		13.3.2 Lubricating the lower joint........................................................369
			Grease, spare parts, tools............................................................369
			Prerequisites.........................................................................369
			Lubrication...........................................................................369
		13.3.3 Checking the sheaves...............................................................370
		13.3.4 Checking the nitrogen pressure and oil pressure in the fall-back guard strut.......371
			Spare parts and tools.................................................................371
			Prerequisites.........................................................................371
			Test connections......................................................................372
			Nitrogen pressure.....................................................................372
			Oil pressure..........................................................................376
		13.3.5 Required inspections for the fall-back guard strut.................................378
	13.4 Rigging winch (additional equipment).....................................................379
		13.4.1 Lubricating the bearings...........................................................379
			Grease, spare parts, tools............................................................379
			Prerequisites.........................................................................379
			Lubricating...........................................................................379
		13.4.2 Greasing the driving pinions.......................................................380
			Grease, spare parts, tools............................................................380
			Prerequisites.........................................................................380
			Greasing..............................................................................380
		13.4.3 Checking the condition of the rigging rope.........................................381
		13.4.4 Changing the rigging rope..........................................................382
			Spare parts and tools.................................................................382
			Prerequisites.........................................................................382
			Removing the old rope.................................................................382
			Attaching a new rope..................................................................383
14 Index..........................................................................................387
	A.............................................................................................389
	B.............................................................................................389
	C.............................................................................................389
	F.............................................................................................389
	H.............................................................................................389
	I.............................................................................................390
	L.............................................................................................390
	M.............................................................................................391
	O.............................................................................................391
	P.............................................................................................392
	R.............................................................................................392
	S.............................................................................................393
	T.............................................................................................393
	W.............................................................................................393

Customer Support: [email protected]

PLEASE NOTE:

  • This is the SAME exact manual used by your dealers to fix your vehicle.
  • The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
  • Any queries / doubts regarding your purchase, please feel free to contact [email protected]

S.V

 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order