★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 3302868 – PDF DOWNLOAD

$28.95

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 3302868 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 3302868 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 3302868 – PDF DOWNLOAD

Language : English
Pages : 334
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 3302868 – PDF DOWNLOAD

Important information:
About these operating instructions:

Abbreviations used:

These operating instructions describe a load increasing system, which is available as additional
equipment. The system is called Mega Wing Lift and is abbreviated in these operating instructions
to MWL (Mega Wing Lift).

Validity of these operating instructions:

  • These operating instructions only apply to original parts supplied by Manitowoc Crane Group Germany
    GmbH and describe the operation of the MWL.
  • In addition, operation of the truck crane is also subject to all the specifica- tions in the
    Operating instructions accompanying the GMK 7450 for which the MWL was manufactured.
    For the operation of the truck crane with the lattice extensions described in these operating
    instructions, but without the MWL, the GMK 7450 Lattice extension operating instructions apply.

Prerequisites for assembly and operation:

The MWL described in these operating instructions may only be operated together with a GROVE GMK
7450 truck crane whose serial number is iden- tical with the serial number that is marked on the
MWL.

Safety instructions:

The operation of GMK 7450 with the MWL described in these operating instructions is subject to:
– the basic safety instructions to be found in the subsequent section Basic safety instructions
and
– the safety instructions contained in the operating instructions supplied for
the GMK 7450.

TABLE OF CONTENTS:

Grove Crane GMK 7450 Mega Wing Lift (MWL) Operating instructions Manual 3302868 – PDF DOWNLOAD

Operating Instructions for MWL................................................................................  1
	Additional pages..........................................................................................  3
		Additional maintenance work...........................................................................  3
	1 Important information...................................................................................  9
		1.1 About these operating instructions................................................................  9
		1.2 Supplementary instructions to the operating instructions for the GMK 7450......................... 10
			1.2.1 Addition to the driving mode table.......................................................... 10
			1.2.2 Addition to the Telescoping emergency program submenu....................................... 10
			1.2.3 Addition to applications engineering........................................................ 11
		1.3 Basic safety instructions......................................................................... 13
			1.3.1 Warnings and symbols........................................................................ 13
		1.4 Intended use...................................................................................... 15
		1.5 Organisational measures........................................................................... 17
		1.6 Personnel qualifications.......................................................................... 19
		1.7 Safety instructions for truck crane work.......................................................... 21
	2 Transport dimensions and weights........................................................................ 25
		2.1 Mega Wing Lift (MWL).............................................................................. 25
		2.2 Add-on parts for the truck crane.................................................................. 25
		2.3 Add-on parts for lattice extension................................................................ 26
	3 Scope of delivery and function.......................................................................... 29
		3.1 Scope of delivery................................................................................. 29
			3.1.1 Add-on parts on the main boom............................................................... 30
			3.1.2 MWL and components.......................................................................... 31
		3.2 Function of the MWL............................................................................... 32
	4 Additional operating and display elements............................................................... 37
		4.1 Location of the additional operating and display elements......................................... 37
			4.1.1 Crane control display....................................................................... 37
			4.1.2 On the SLI display.......................................................................... 43
			4.1.3 On the hand-held control.................................................................... 44
		4.2 Function of the additional operating and display elements......................................... 45
			4.2.1 In the main menu and in the luffing jib submenu............................................. 45
			4.2.2 In the submenu Operation MWL................................................................ 45
			4.2.3 In the submenu Rigging MWL.................................................................. 54
			4.2.4 On the SLI display – Enter rigging mode submenu............................................. 59
			4.2.5 On the hand-held control.................................................................... 61
	5 MWL – Rigging and unrigging............................................................................. 69
		5.1 Identification and slinging points................................................................ 69
			5.1.1 Identification.............................................................................. 69
			5.1.2 Slinging points............................................................................. 71
		5.2 Checklists for rigging work....................................................................... 73
			5.2.1 CHECKLIST: Rigging the MWL.................................................................. 73
			5.2.2 CHECKLIST: MWL – unrigging.................................................................. 78
		5.3 Rigging work...................................................................................... 83
			5.3.1 Preparing the truck crane................................................................... 83
			5.3.2 Installing/removing the rests for the rear pendant links.................................... 85
			5.3.3 Moving the rope grab........................................................................ 88
			5.3.4 Installing/removing the lateral head sheaves................................................ 90
			5.3.5 Using the rigging tool...................................................................... 94
			5.3.6 MWL – Slinging and fastening the guide ropes................................................ 96
			5.3.7 Push the supports in/out.................................................................... 98
			5.3.8 Establishing/breaking the hydraulic connection between the MWL and the main boom............100
			5.3.9 MWL – lowering/raising on the main boom.....................................................102
			5.3.10 Connecting/disconnecting the holding frame and main boom...................................104
			5.3.11 Establishing/disconnecting the hydraulic connection........................................105
			5.3.12 Establishing/disconnecting the electrical connection.......................................108
			5.3.13 Connecting/removing the hand-held control..................................................110
			5.3.14 Connecting/disconnecting the raising cylinder and main boom................................112
			5.3.15 Moving the turnbuckles for the rear pendant links into the position Operation/Transport....117
			5.3.16 Establishing/releasing the connection between the gantry masts and the holding frame.......118
			5.3.17 Moving the deflection sheaves into the position Operation/ Transport.......................119
			5.3.18 Running the hoist rope to the main boom head...............................................121
			5.3.19 Positioning/removing the hoist ropes on/from the deflection sheaves........................122
			5.3.20 MWL – raising/setting down.................................................................123
			5.3.21 Positioning/removing the guy ropes.........................................................127
			5.3.22 Securing/releasing the lateral head sheaves................................................133
			5.3.23 Transporting the MWL.......................................................................135
		5.4 Operation from the crane cabin during rigging.....................................................137
			5.4.1 In the submenu Rigging – MWL................................................................137
			5.4.2 In the submenu Operation – MWL..............................................................145
	6 Operation with the main boom and the MWL................................................................149
		6.1 Further rigging work..............................................................................150
			6.1.1 CHECKLIST: Rigging for operation with main boom.............................................150
			6.1.2 CHECKLIST: Unrigging after operation with the main boom.....................................151
			6.1.3 Installing/removing the three-part rope holding rod.........................................152
			6.1.4 Reeving the hoist rope......................................................................154
		6.2 Operation with braced boom system.................................................................157
			6.2.1 CHECKLIST: Bringing the boom system into the operating condition............................157
			6.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................158
			6.2.3 Setting the SLI.............................................................................159
			6.2.4 Opening the submenu Operation – MWL.........................................................161
			6.2.5 Telescoping with rigged MWL.................................................................162
			6.2.6 Folding the gantry masts out/in.............................................................163
			6.2.7 Brace the boom system.......................................................................165
			6.2.8 Locking/unlocking the winches...............................................................167
		6.3 Operation with MWL set down.......................................................................169
			6.3.1 Bringing the boom system into the operating condition.......................................169
			6.3.2 Bringing the boom system into the rigging mode..............................................171
		6.4 Operation with unbraced boom system and raised MWL................................................173
			6.4.1 Bringing the boom system into the operating condition.......................................173
			6.4.2 Bringing the boom system into the rigging mode..............................................175
		6.5 Driving with rigged truck crane and rigged MWL....................................................177
			6.5.1 Driving route...............................................................................177
			6.5.2 Rigging modes for moving and axle loads.....................................................178
			6.5.3 Driving the rigged truck crane..............................................................180
	7 Operation with boom extension and MWL...................................................................185
		7.1 Further rigging work..............................................................................187
			7.1.1 CHECKLIST: Rigging for operation with boom extension........................................187
			7.1.2 CHECKLIST: Unrigging after operation with the boom extension................................188
			7.1.3 Installing the deflection sheave with support roller........................................189
			7.1.4 Positioning the supporting roller on the foot section.......................................190
			7.1.5 Extra information on positioning the hoist rope with rigged MWL.............................191
		7.2 Operation with braced boom system.................................................................193
			7.2.1 CHECKLIST: Bringing the boom system into the operating condition............................193
			7.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................194
			7.2.3 Setting the SLI.............................................................................195
		7.3 Operation with MWL set down.......................................................................197
			7.3.1 Bringing the boom system into the operating condition.......................................197
			7.3.2 Bringing the boom system into the rigging mode..............................................199
		7.4 Rigging mode with unbraced boom system and raised MWL.............................................201
		7.5 Driving with rigged crane and rigged boom extension with rigged MWL...............................203
			7.5.1 Driving route...............................................................................204
			7.5.2 Rigging modes for moving and axle loads.....................................................204
			7.5.3 Driving the rigged crane....................................................................209
			7.5.4 Notes for rigging counterweight sections....................................................212
	8 Operation with the luffing jib and the MWL..............................................................215
		8.1 Additional display in the submenu Operation – MWL.................................................216
		8.2 Further rigging work..............................................................................217
			8.2.1 CHECKLIST: Rigging for operation with luffing jib...........................................217
			8.2.2 CHECKLIST: Unrigging after operation with the luffing jib...................................219
			8.2.3 Installing the deflection sheave with support roller........................................220
			8.2.4 Positioning the supporting roller on the foot section.......................................221
			8.2.5 Extra information on positioning the hoist rope with rigged MWL.............................222
		8.3 Operation with braced boom system.................................................................223
			8.3.1 CHECKLIST: Bringing the boom system into operating condition................................223
			8.3.2 CHECKLIST: Bringing the boom system into rigging mode.......................................227
			8.3.3 Setting the SLI.............................................................................231
			8.3.4 Derricking main boom with rigged luffing jib and rigged MWL.................................233
			8.3.5 Telescoping main boom with rigged luffing jib and rigged MWL................................234
			8.3.6 Bracing boom system with rigged luffing jib.................................................236
		8.4 Operation with MWL set down.......................................................................237
			8.4.1 Bringing the boom system into the operating condition.......................................237
			8.4.2 Bringing the boom system into the rigging mode..............................................239
		8.5 Rigging mode with unbraced boom system and raised MWL.............................................241
		8.6 Driving with rigged crane, rigged luffing jib and rigged MWL......................................243
			8.6.1 Driving route...............................................................................243
			8.6.2 Rigging modes for moving and axle loads.....................................................244
			8.6.3 Driving the rigged crane....................................................................257
	9 Operation with heavy load lattice extension and MWL.....................................................263
		9.1 Further rigging work..............................................................................265
			9.1.1 Rigging for operation with heavy load lattice extension.....................................265
			9.1.2 Unrigging after operation with the heavy load lattice extension.............................265
			9.1.3 Extra information on positioning the hoist rope with rigged MWL.............................266
		9.2 Operation with braced boom system.................................................................267
			9.2.1 CHECKLIST: Bringing the boom system into operating condition................................267
			9.2.2 CHECKLIST: Bringing the boom system into the rigging mode...................................268
			9.2.3 Setting the SLI.............................................................................269
		9.3 Operation with MWL set down.......................................................................271
			9.3.1 Bringing the boom system into the operating condition.......................................271
			9.3.2 Bringing the boom system into the rigging mode..............................................273
		9.4 Rigging mode with unbraced boom system and raised MWL.............................................275
		9.5 Turning loads with the heavy load lattice extension...............................................277
			9.5.1 Prerequisites...............................................................................278
			9.5.2 Set SLI for turning the load................................................................279
			9.5.3 Turning a load..............................................................................281
		9.6 Driving with rigged crane and rigged heavy load lattice extension with rigged MWL.................283
			9.6.1 Driving route...............................................................................284
			9.6.2 Rigging modes for moving and axle loads.....................................................284
			9.6.3 Driving the rigged crane....................................................................288
	10 Malfunctions during operation with the MWL.............................................................293
		10.1 Electrical system................................................................................294
			10.1.1 Fuses......................................................................................294
		10.2 Troubleshooting..................................................................................295
			10.2.1 Malfunctions during operation with the MWL.................................................295
			10.2.2 Malfunctions when operating with the hand-held control.....................................298
			10.2.3 Malfunctions on the SLI....................................................................299
			10.2.4 Error messages on the crane control display................................................302
		10.3 Operation with emergency program switched on.....................................................303
			10.3.1 Operating the MWL in the emergency program.................................................303
			10.3.2 Telescoping in the emergency program with a rigged MWL.....................................306
	11 Maintenance work on the MWL............................................................................309
		11.1 For modules in need of protection during cleaning work...........................................309
		11.2 Maintenance plans................................................................................311
			11.2.1 Maintenance plan D.........................................................................311
			11.2.2 Maintenance plan W.........................................................................312
			11.2.3 Maintenance plan M 1.......................................................................312
			11.2.4 Maintenance plan M 3.......................................................................313
			11.2.5 Maintenance plan M 6.......................................................................313
			11.2.6 Maintenance plan M 12......................................................................313
		11.3 Maintenance work.................................................................................315
			11.3.1 Check the position of the guy ropes on the winch drum for correct operation................315
			11.3.2 Checking the lateral head sheaves..........................................................316
			11.3.3 General control of the winch gears.........................................................317
			11.3.4 Checking the oil level in the winch gears..................................................317
			11.3.5 Lubricating the joints on the holding frame................................................318
			11.3.6 Checking the end fastenings of the guy ropes...............................................319
			11.3.7 Lubricate winch gears......................................................................321
			11.3.8 Checking the condition of the guy ropes....................................................322
			11.3.9 Lubricate gear rims........................................................................324
			11.3.10 Lubricating the locking units.............................................................325
			11.3.11 Changing the oil at the winch gears.......................................................326
			11.3.12 Changing the guy ropes....................................................................328
	12 Index..................................................................................................335
		A.....................................................................................................337
		B.....................................................................................................337
		C.....................................................................................................337
		D.....................................................................................................337
		F.....................................................................................................338
		H.....................................................................................................338
		I.....................................................................................................338
		L.....................................................................................................338
		M.....................................................................................................338
		O.....................................................................................................339
		R.....................................................................................................341
		S.....................................................................................................342
		T.....................................................................................................342
3_303_014_EN_20200224.pdf.....................................................................................  0
	Additional maintenance work...............................................................................  3

IMAGES PREVIEW OF THE MANUAL:

Contact us: [email protected]

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order