★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

$29.95

Grove GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

FILE DETAILS:

Grove GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Language : English
Pages : 400
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Grove GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Basic safety instructions:

  • In principle, the basic safety instructions apply from the Operating Instruc- tions GMK 6400. The
    basic safety instructions for the lattice extensions sup- plied for the truck crane are given
    below.
  • Information regarding the warnings and symbols used; à Operating Instructions GMK 6400.

Intended use:

The GMK 6400 is a state-of-the-art truck crane, designed in accordance with approved safety
regulations. Nevertheless, the operator or third parties can still be endangered and the crane or
other property put at risk while using it.

  • In addition to the following specifications, also observe the specifications for intended use in
    the Operating Instructions GMK 6400.
  • The GMK 6400 may only be operated with parts of equipment which are permitted by Manitowoc Crane
    Group Germany GmbH and which are labelled with the serial number of the GMK 6400.

Observe the inspection and maintenance requirements for the lattice exten- sion according to the
Maintenance chapter.
Only use the rigging winch (special equipment) to do the following:
– To pull the rope of the hoisting gear to the head when rigging the boom extension and the
luffing jib
– To pull the rope of the hoisting gear over the luffing control arm to the
upper hook block when rigging the luffing jib

Improper use:

  • Manitowoc Crane Group Germany GmbH is not liable for damage resulting from the improper or
    unauthorized use of the GMK 6400 truck crane. The user alone bears the risk.
  • In addition to the following specifications, also observe the information regarding improper use in
    the Operating Instructions GMK 6400.

If a rigging winch (additional equipment) is mounted, improper use also includes:
– Pulling the main hoist rope using the rigging winch (additional equip- ment) to the main boom
head when no lattice extension is mounted
– Any type of vertical hoisting of loads using the rigging winch

 Organisational measures:

In addition to the following specifications, also observe the organisational measures in the
Operating Instructions GMK 6400 and in the Maintenance Manual.
Make sure the maintenance personnel also have the necessary expertise to operate the crane safely.
Make sure the maintenance personnel have access to the operating manual.

  • Only qualified or instructed personnel may carry out work on the truck crane.
  • The responsibilities regarding the operation of the crane, rigging, mainte- nance and repair work
    must be clearly defined.
  • Make sure that persons who will work on the truck crane are provided with the required information
    prior to commencing work. Instruct your person- nel (e.g. banksmen, slingers, rigging personnel)
    accordingly.
  • Observe all safety instructions and warnings on the truck crane.
  • Climb on the foot section only via the ladder provided. Erect the railing. This
    gives you a safe access to the foot section.

TABLE OF CONTENTS:

Grove GMK 6400 Lattice Extension Operating Instruction Manual 3112975 – PDF DOWNLOAD

Operating Instructions Lattice extension..........................................................  1
Additional page: Slinging points on the auxiliary single-sheave boom top..........................  3
Additional page: Modified rigging winch...........................................................  5
	Validity......................................................................................  5
		Modifications.............................................................................  5
	Rope guide....................................................................................  6
		Rope guide for the mounting sites.........................................................  6
			Additional support roller.............................................................  6
		Positioning the rigging rope on the support roller/taking it off the support roller.......  7
		Setting the support roller upright/laying it down.........................................  7
Additional page: Operating with the luffing jib
..................................................  9
Correction sheet: Electrical connection head/foot section......................................... 11
Additional page: Luffing jib – Reduction in transport height ..................................... 13
Luffing jib correction sheet ..................................................................... 17
	1 Luffing jib – Fall-back guard strut maintenance work........................................ 17
		Invalidation of the description........................................................... 17
		1.1 Luffing control arm with fall-back guard strut........................................ 17
		1.2 Maintenance interval for the fall-back guard strut.................................... 18
			GROVE- Part numbers................................................................... 18
			1.2.1 Visual inspection............................................................... 18
			1.2.2 Pressure test................................................................... 18
1 Overview........................................................................................ 23
	1.1 Accidents................................................................................. 23
	1.2 Warranty.................................................................................. 23
	1.3 Terms used................................................................................ 24
		1.3.1 For the boom extension.............................................................. 24
		1.3.2 For the luffing jib................................................................. 26
		1.3.3 For the heavy load lattice extension................................................ 28
		1.3.4 For the auxiliary single-sheave boom top............................................ 29
		1.3.5 For operation of the rigging winch.................................................. 30
		1.3.6 On the main boom.................................................................... 31
	1.4 Notes about the lattice extension operating manual........................................ 33
		1.4.1 What do the symbols used mean?...................................................... 33
		1.4.2 Definitions of direction information................................................ 33
			Basic rule............................................................................ 33
			Switches and buttons................................................................. 34
			General information on the operating elements......................................... 34
			General rules for buttons and symbols................................................ 34
		1.4.3 How are the operating instructions structured?...................................... 35
		1.4.4 How do I find the information I need?............................................... 36
	1.5 Conversion table for US measurements...................................................... 37
2 Basic safety instructions....................................................................... 41
	2.1 Intended use.............................................................................. 41
	2.2 Improper use.............................................................................. 42
	2.3 Organisational measures................................................................... 42
	2.4 Personnel qualifications.................................................................. 43
		Requirements.............................................................................. 43
		Training courses.......................................................................... 43
	2.5 Safety instructions for working with the lattice extension............................... 44
	2.6 Information on transporting persons....................................................... 45
3 For operations planning......................................................................... 49
	3.1 Boom extension, luffing jib and heavy load lattice extension.............................. 49
		3.1.1 Notes on assembly................................................................... 49
		3.1.2 Assembly of the boom extension 3 inclined.......................................... 50
		3.1.3 Assembly of the boom extension 25 inclined......................................... 56
		3.1.4 Assembly of the luffing jib without inclination..................................... 60
		3.1.5 Assembly of the luffing jib with inclination........................................ 64
		3.1.6 Assembly of the heavy load lattice extension........................................ 66
		3.1.7 Transport dimensions and weights.................................................... 67
			Foot section in different combinations.............................................. 70
			Intermediate sections pushed into each other......................................... 72
		3.1.8 Identification...................................................................... 73
		3.1.9 Slinging points..................................................................... 77
			Slinging points on the foot section................................................... 79
		3.1.10 Transport.......................................................................... 81
			Applicable for all sections........................................................... 81
			For the foot section/luffing control arm............................................. 81
			For the head.......................................................................... 82
	3.2 Auxiliary single-sheave boom top.......................................................... 83
		3.2.1 Assembly............................................................................ 83
		3.2.2 Identification and slinging point................................................... 83
		3.2.3 Transport dimensions and weight..................................................... 84
4 Additional operating and display elements....................................................... 87
	4.1 Overview of the operating elements........................................................ 87
		4.1.1 On the crane control display........................................................ 87
			Main menu............................................................................. 87
			Luffing jib submenu.................................................................. 88
			Power unit speeds submenu............................................................. 88
		4.1.2 On the RCL display.................................................................. 89
			Submenu for entering rigging mode..................................................... 89
			Submenu for RCL monitoring............................................................ 89
		4.1.3 On the hand-held control............................................................ 90
	4.2 Brief description of the operating elements............................................... 91
		4.2.1 On the crane control display........................................................ 91
			In the power unit speed submenu....................................................... 91
			In the Luffing jib submenu............................................................ 91
		4.2.2 On the RCL display.................................................................. 99
			Entering rigging mode in submenu...................................................... 99
			In the RCL monitoring submenu.........................................................100
		4.2.3 On the hand-held control............................................................101
			Pre-selection.........................................................................101
			Movements of the rigging winch........................................................102
5 Boom extension..................................................................................105
	5.1 Checklists for rigging work...............................................................105
		5.1.1 CHECKLIST: Rigging the boom extension...............................................105
		5.1.2 CHECKLIST: Unrigging the boom extension.............................................111
	5.2 Description of the rigging work...........................................................115
		5.2.1 Pulling apart/pushing together intermediate sections................................115
			Folding up/folding out holders........................................................115
			Installing/removing the rear pendant links...........................................115
			Pulling apart intermediate sections...................................................116
			Pushing together intermediate sections...............................................117
		5.2.2 Checking the bracing arms...........................................................118
		5.2.3 Rigging mode of the truck crane at installation and removal.........................119
		5.2.4 Establishing/disconnecting the connections for the hydraulic lock...................120
			Making the connections...............................................................120
			Breaking the connections.............................................................121
		5.2.5 Securing/releasing locks............................................................122
		5.2.6 Locking the foot section/releasing the lock.........................................123
			Prerequisites.........................................................................123
			Locking the foot section..............................................................123
			Releasing the lock....................................................................124
		5.2.7 Handling the pins...................................................................125
		5.2.8 Installing/removing boom extension sections.........................................126
			Before the installation...............................................................126
			Installing............................................................................126
			Removing..............................................................................127
		5.2.9 Blocking the joint on the foot section..............................................128
		5.2.10 Removing/installing the deflection sheave on the angle piece.......................129
		5.2.11 Replacing deflection sheaves on the angle piece....................................130
		5.2.12 Folding deflection sheaves up/down.................................................131
			On the angle piece....................................................................131
			On the foot section..................................................................132
		5.2.13 Setting the angle position of the boom extension...................................133
		5.2.14 Installing/removing the lifting limit switch.......................................135
			Installing lifting limit switch.......................................................135
			Removing the lifting limit switch....................................................136
		5.2.15 Anemometer and air traffic control light...........................................137
			Installing............................................................................137
			Removing..............................................................................137
		5.2.16 Electrical connection foot section/main boom.......................................138
			Establishing..........................................................................138
			Disconnecting.........................................................................138
		5.2.17 Electric connection head/foot section..............................................139
			Connecting cable......................................................................139
			Establishing..........................................................................139
			Disconnecting.........................................................................140
		5.2.18 Placing and reeving the hoist rope.................................................142
			Possible reeving methods..............................................................144
	5.3 Operation with boom extension.............................................................147
		5.3.1 Operating the RCL...................................................................148
			Entering the RCL code.................................................................148
			Enter components......................................................................148
			Accepting the rigging mode...........................................................150
			Checks and displays in the Monitoring submenu.........................................150
		5.3.2 RCL shutdown........................................................................152
		5.3.3 Crane movements.....................................................................152
		5.3.4 Telescoping with rigged boom extension..............................................153
		5.3.5 Checks when operating with the boom extension.......................................154
			Horizontal alignment.................................................................154
			Checking the wind speed...............................................................154
6 Luffing jib.....................................................................................159
	6.1 Checklists for rigging work...............................................................159
		6.1.1 CHECKLIST: Rigging the luffing jib..................................................159
		6.1.2 CHECKLIST: Unrigging the luffing jib................................................167
	6.2 Description of the rigging work...........................................................173
		6.2.1 Ladder and railing..................................................................173
			When rigging..........................................................................173
			When unrigging........................................................................174
			Railing on the luffing control arm....................................................176
		6.2.2 Pulling apart/pushing together intermediate sections................................177
		6.2.3 Checking the bracing arms...........................................................177
		6.2.4 Rigging mode of the truck crane at installation and removal.........................177
		6.2.5 Installing/removing the luffing control arm.........................................178
			Installation..........................................................................178
			Removal...............................................................................181
		6.2.6 Raising/setting down the luffing control arm........................................184
			Raising the luffing control arm.......................................................184
			Setting down the luffing control arm..................................................184
		6.2.7 Hand-held control...................................................................185
			Moving the hoists.....................................................................185
			Moving the rigging winch.............................................................185
		6.2.8 Separating/connecting catcher 2 and raising cylinder................................186
			Setting down/ raising catcher 2.......................................................186
			Separating catcher 2 and the raising cylinder.........................................187
			Connecting catcher 2 and raising cylinder............................................187
		6.2.9 Reeving the auxiliary hoist rope to the upper hook block............................188
		6.2.10 Preparing the upper hook block for rigging.........................................190
			Before mounting the foot section......................................................190
			After mounting the foot section.......................................................191
		6.2.11 Fastening the upper hook block on the luffing control arm..........................191
			Releasing the safety device on the upper hook block...................................191
			Pulling the upper hook block towards the luffing control arm.........................192
			Locking the upper hook block..........................................................193
		6.2.12 Releasing the upper hook block from the luffing control arm........................195
			Releasing the locking pin.............................................................195
			Pulling the upper hook block towards the catcher......................................196
			Securing the upper hook block in the catcher..........................................197
			Reeling up the hoist rope.............................................................198
		6.2.13 Replacing the intermediate sections on the foot section............................199
			Prerequisites.........................................................................199
			When rigging..........................................................................200
			When unrigging........................................................................201
		6.2.14 Installing/removing sections of the luffing jib and rear pendant links.............202
			Before the installation..............................................................202
			Installing............................................................................202
			Removing..............................................................................204
			Rear pendant link transport protection...............................................206
		6.2.15 Hinge lock in the foot section.....................................................207
			Releasing the hinge lock..............................................................207
			Locking the hinge.....................................................................209
		6.2.16 Setting the angle of the luffing jib...............................................211
		6.2.17 Placing and reeving the hoist rope.................................................213
			Possible reeving methods..............................................................214
		6.2.18 Opening the luffing jib submenu....................................................215
		6.2.19 Telescoping with the luffing jib...................................................216
			Prerequisites.........................................................................216
			Telescoping with teleautomation.......................................................217
			Telescoping with semi-automatic.......................................................219
		6.2.20 Derricking luffing jib when rigging................................................221
			Prerequisites.........................................................................221
		6.2.21 Derricking main boom with installed luffing jib....................................223
			Derricking between –1.5 to 82.......................................................223
			Derricking between 80 and 60........................................................224
		6.2.22 Putting the luffing jib into working position......................................225
			Raising the luffing jib...............................................................225
			Telescoping to fixed length...........................................................226
			Lowering to working position.........................................................227
		6.2.23 Preparing the luffing jib for unrigging............................................228
	6.3 Operating with the luffing jib............................................................231
		6.3.1 Operating the RCL...................................................................232
			Entering the RCL code for the luffing jib.............................................232
			Entering components for the luffing jib..............................................232
			Accepting the rigging mode...........................................................234
			Checks and displays in the Monitoring submenu.......................................235
		6.3.2 RCL shutdown........................................................................237
		6.3.3 Crane movements.....................................................................238
			Controlling...........................................................................238
			Derricking the main boom..............................................................238
			Maximum power unit speeds.............................................................238
			Shutdowns.............................................................................238
		6.3.4 Working range and shutdowns.........................................................239
		6.3.5 Checks when operating with the luffing jib..........................................241
			Horizontal alignment.................................................................241
			Checking the wind speed...............................................................241
7 Heavy load lattice extension....................................................................245
	7.1 Rigging the heavy load lattice extension..................................................245
		7.1.1 CHECKLIST: Rigging the heavy load lattice extension.................................245
		7.1.2 CHECKLIST: Unrigging the heavy load lattice extension...............................249
	7.2 Description of the rigging work...........................................................253
		7.2.1 Truck crane rigging mode during installation of the heavy load lattice extension....253
		7.2.2 Establishing/disconnecting the connections for the hydraulic lock...................254
			Making the connections...............................................................254
			Breaking the connections.............................................................255
		7.2.3 Securing/releasing locks............................................................256
		7.2.4 Handling the pins...................................................................257
		7.2.5 Locking the adapter/releasing the pin...............................................258
			Prerequisites.........................................................................258
			Locking the adapter...................................................................258
			Releasing the locking pin.............................................................259
		7.2.6 Replacing deflection sheaves on the angle piece.....................................260
		7.2.7 Installing/removing head section and angle piece....................................261
			Installing............................................................................261
			Removing..............................................................................261
		7.2.8 Folding deflection sheaves up/down..................................................263
			On the angle piece....................................................................263
			On the adapter........................................................................264
		7.2.9 Setting the angle position of the heavy load lattice extension......................265
		7.2.10 Installing/removing the lifting limit switch.......................................267
			Installing lifting limit switch.......................................................267
			Removing the lifting limit switch....................................................268
		7.2.11 Anemometer and air traffic control light...........................................269
			Installing............................................................................269
			Removing..............................................................................269
		7.2.12 Establishing/disconnecting the electrical connection...............................270
			Establishing aconnection.............................................................270
			Disconnecting.........................................................................271
		7.2.13 Placing and reeving hoist rope.....................................................272
			Possible reeving methods..............................................................273
	7.3 Operating the heavy load lattice extension................................................275
		7.3.1 Operating the RCL...................................................................275
			Entering the RCL code for the heavy load lattice extension...........................275
			Entering components for the heavy load lattice extension..............................275
			Accepting the rigging mode...........................................................277
			Checks and displays in the Monitoring submenu.......................................278
		7.3.2 RCL shutdown........................................................................279
		7.3.3 Crane movements.....................................................................279
		7.3.4 Telescoping with rigged heavy load lattice extension................................280
		7.3.5 Checks when operating with the heavy load lattice extension.........................281
			Horizontal alignment.................................................................281
			Checking the wind speed...............................................................281
		7.3.6 Notes on two-hook operation.........................................................282
8 Auxiliary single-sheave boom top................................................................285
	8.1 Installing/removing.......................................................................285
		8.1.1 Installing/removing the auxiliary single-sheave boom top............................285
			Installing............................................................................285
			Removing..............................................................................286
	8.2 Rigging the auxiliary single-sheave boom top..............................................287
		8.2.1 Rigging in working position/transport position......................................287
		8.2.2 Attaching and removing the hoist rope...............................................288
			Possible reeving methods..............................................................289
		8.2.3 Lifting limit switch and anemometer.................................................290
			Lifting limit switch..................................................................290
			Installing and removing...............................................................291
	8.3 Operation with the auxiliary single-sheave boom top.......................................292
		8.3.1 Setting the RCL.....................................................................292
		8.3.2 Derricking, telescoping the main boom...............................................292
		8.3.3 Notes on RCL shutdown...............................................................293
		8.3.4 Procedure if permissible wind speeds are exceeded...................................293
		8.3.5 RCL display with the auxiliary single-sheave boom top folded up/rigged..............294
		8.3.6 Notes on two-hook operation.........................................................294
9 Turning loads...................................................................................297
	9.1 Requirements..............................................................................298
	9.2 Setting the RCL to turn loads.............................................................299
		Entering the reevings....................................................................299
		Setting the RCL to the auxiliary hoist....................................................299
	9.3 Turning a load............................................................................301
10 Rigging winch (additional equipment)...........................................................307
	10.1 Overview.................................................................................307
		Operating principle and accessories.......................................................307
	10.2 Hand-held control........................................................................308
	10.3 Pulling the hoist rope to the head.......................................................309
		Requirements..............................................................................309
		Remarks...................................................................................309
		Rigging work on the sheaves for operating the rigging winch...............................310
		Reeling off the rigging rope..............................................................311
		Positioning the rigging rope..............................................................312
		Connecting the rigging rope and the hoist rope............................................312
		Unreeling the hoist rope..................................................................313
		Separating the rigging rope and the hoist rope............................................314
		Rolling the rigging rope onto the drum....................................................314
		Rigging work on the sheaves for crane operation...........................................316
	10.4 Pulling the hoist rope to the upper hook block...........................................317
		Requirements..............................................................................317
		Rigging work on the sheaves for operating the rigging winch...............................318
		Reeling off the rigging rope..............................................................319
		Positioning the rigging rope..............................................................320
		Connecting the rigging rope and the main hoist rope.......................................321
		Reeling off the main hoist rope...........................................................321
		Separating the rigging rope and the main hoist rope.......................................321
		Rolling the rigging rope onto the drum....................................................322
	10.5 Rigging work.............................................................................323
		10.5.1 For operation of the rigging winch.................................................323
			Releasing the winch lock..............................................................323
			Locking the winch.....................................................................323
			Loosening the rigging rope at the rope attachment point...............................324
			Fastening the rigging rope at the rope attachment point...............................325
			Installing the rigging winch..........................................................325
			Removing the rigging winch............................................................327
		10.5.2 Connecting/disconnecting the electrical connection.................................328
			Establishing..........................................................................328
			Disconnecting.........................................................................328
		10.5.3 Establishing/disconnecting the hydraulic connection................................329
			Establishing..........................................................................329
			Disconnecting.........................................................................329
		10.5.4 Rigging on the foot section........................................................330
			For operation of the rigging winch....................................................330
			For crane operation...................................................................331
		10.5.5 Guide sheaves......................................................................332
			Inserting or removing the rigging rope................................................332
		10.5.6 On the angle piece.................................................................333
			For operation of the rigging winch....................................................333
			For crane operation...................................................................333
		10.5.7 On the head........................................................................334
			For operation of the rigging winch....................................................334
			For crane operation...................................................................334
		10.5.8 Rope connector.....................................................................335
			Establishing the connection...........................................................335
			Undoing the connection................................................................337
11 Driving with rigged truck crane................................................................341
	11.1 Driving distance.........................................................................342
	11.2 Permissible rigging modes and axle loads.................................................342
		11.2.1 Rigging modes with boom extension..................................................342
		11.2.2 Rigging modes with luffing jib.....................................................343
		11.2.3 Rigging modes with the heavy load lattice extension................................346
		11.2.4 Rigging modes with the auxiliary single-sheave boom top............................346
	11.3 Before driving the rigged truck crane....................................................347
	11.4 Driving the rigged truck crane...........................................................347
		Driving from the driver's cab.............................................................347
		While driving.............................................................................347
	11.5 Tables with boom positions and axle loads................................................349
		Information about the tables..............................................................349
		11.5.1 Boom extension with 3 angle.......................................................350
		11.5.2 Boom extension with 25 angle......................................................350
		11.5.3 Luffing jib........................................................................350
		11.5.4 Heavy load lattice extension.......................................................350
		11.5.5 Auxiliary single-sheave boom top...................................................350
12 Malfunctions...................................................................................353
	12.1 Notes on troubleshooting.................................................................353
		General information......................................................................353
		What to do in theevent of malfunctions..................................................353
		Fuses.....................................................................................353
		ECOS malfunctions........................................................................353
		RCL malfunctions..........................................................................353
	12.2 Troubleshooting and remedies.............................................................355
		12.2.1 Boom extension and heavy load lattice extension....................................355
		12.2.2 Luffing jib........................................................................355
	12.3 RCL malfunctions.........................................................................359
		12.3.1 Table of lattice extension error codes.............................................360
		12.3.2 Checking RCL supply lines and connections..........................................361
			On the lattice extension..............................................................362
13 Maintenance....................................................................................365
	13.1 Cleaning work............................................................................366
		Overview of subassemblies easily damaged when cleaning....................................366
	13.2 Maintenance plans........................................................................369
		13.2.1 Maintenance plan M 1...............................................................369
		13.2.2 Maintenance plan M 3...............................................................369
		13.2.3 Maintenance plan Y 2...............................................................370
		13.2.4 Maintenance plan Y 5...............................................................370
		13.2.5 Maintenance plan Y 10..............................................................370
	13.3 Boom extension and luffing jib...........................................................371
		13.3.1 Lubricating the connecting and socket pins.........................................371
			Grease, tools.........................................................................371
			Prerequisites.........................................................................371
			Checking..............................................................................371
			Lubricating...........................................................................372
		13.3.2 Lubricating the lower joint........................................................373
			Grease, spare parts, tools............................................................373
			Prerequisites.........................................................................373
			Lubrication...........................................................................373
		13.3.3 Checking the sheaves...............................................................374
		13.3.4 Checking the nitrogen pressure and oil pressure in the fall-back guard strut.......375
			Spare parts and tools.................................................................375
			Prerequisites.........................................................................375
			Test connections......................................................................376
			Nitrogen pressure.....................................................................376
			Oil pressure..........................................................................380
		13.3.5 Required inspections for the fall-back guard strut.................................382
	13.4 Rigging winch (additional equipment).....................................................383
		13.4.1 Lubricating the bearings...........................................................383
			Grease, spare parts, tools............................................................383
			Prerequisites.........................................................................383
			Lubricating...........................................................................383
		13.4.2 Greasing the driving pinions.......................................................384
			Grease, spare parts, tools............................................................384
			Prerequisites.........................................................................384
			Greasing..............................................................................384
		13.4.3 Checking the condition of the rigging rope.........................................385
		13.4.4 Changing the rigging rope..........................................................386
			Spare parts and tools.................................................................386
			Prerequisites.........................................................................386
			Removing the old rope.................................................................386
			Attaching a new rope..................................................................387
14 Index..........................................................................................391
	A.............................................................................................393
	B.............................................................................................393
	C.............................................................................................393
	F.............................................................................................393
	H.............................................................................................393
	I.............................................................................................394
	L.............................................................................................394
	M.............................................................................................395
	O.............................................................................................395
	P.............................................................................................396
	R.............................................................................................396
	S.............................................................................................397
	T.............................................................................................397
	W.............................................................................................397

Contact us: [email protected]

PLEASE NOTE:

  • This is the SAME exact manual used by your dealers to fix your vehicle.
  • The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
  • Any queries / doubts regarding your purchase, please feel free to contact [email protected]

S.V

 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order