★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately
Sale!

Hitachi ZX300LC-6 ZX300LCN-6 Hydraulic Excavator Workshop Manual (WDDN50-EN-00) – PDF Download

5.00 out of 5
(1 customer review)

Original price was: $88.95.Current price is: $26.95.

  • Hitachi ZX300LC-6 ZX300LCN-6 Hydraulic Excavator Workshop Manual
  • Part No:WDDN50-EN-00
Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Hitachi ZX300LC-6 ZX300LCN-6 Hydraulic Excavator Workshop Manual (WDDN50-EN-00)

File Details:

Hitachi ZX300LC-6 ZX300LCN-6 Hydraulic Excavator Workshop Manual (WDDN50-EN-00)

  • Manual Language:English
  • Pages: 1200+
  • Size: 18.7 MB
  • Format:PDF
  • Downloadable:Yes

HITACHI ZX300LC-6 ZX300LCN-6 HYDRAULIC EXCAVATOR WORKSHOP MANUAL (WDDN50-EN-00) – PDF DOWNLOAD:

Image Preview:

Description:

Hitachi ZX300LC-6 ZX300LCN-6 Hydraulic Excavator Workshop Manual (WDDN50-EN-00)

To The Reader
This manual is written for an experienced technician to provide technical information needed to maintain and repair this machine. The machine specification and description according to destination may be explained on this manual.
 Be sure to thoroughly read this manual for correct product information and service procedures.
 If you have any questions or comments, at if you found any errors regarding the contents of this manual, please contact using “Service Manual Revision Request Form” at the end of this manual.
Additional References
Please refer to the other materials (operator’s manual, parts catalog, engine technical material and Hitachi training material etc.) in addition to this manual.
Manual Composition
This manual consists the Technical Manual, the Workshop Manual and the Engine Manual.
 Information included in the Technical Manual: Technical information needed for redelivery and delivery, operation and activation of all devices and systems, operational performance tests, and troubleshooting procedures.
 Information included in the Workshop Manual: Technical information needed for maintenance and repair of the machine, tools and devices needed for maintenance and repair, maintenance standards, and removal / installation and assemble / disassemble procedures.
 Information included in the Engine Manual: Technical information needed for redelivery and delivery and maintenance and repair of the machine, operation and activation of all devices and systems, troubleshooting and assemble / disassemble procedures.

Table Of Contents:

Hitachi ZX300LC-6 ZX300LCN-6 Hydraulic Excavator Workshop Manual (WDDN50-EN-00)

WDDN50-EN-00...........................................................................  1
	CONTENTS...........................................................................  3
		SECTION 1GENERAL...............................................................  3
		SECTION 2MAINTENANCE STANDARD..................................................  5
		SECTION 3UPPERSTRUCTURE........................................................  7
		SECTION 4UNDERCARRIAGE.........................................................  9
		SECTION 5 FRONTATTACHMENT...................................................... 11
	INTRODUCTION....................................................................... 13
		To The Reader.................................................................. 13
		Additional References.......................................................... 13
		Manual Composition............................................................. 13
		Page Number.................................................................... 13
		Trademark...................................................................... 13
		Safety Alert Symbol and Headline Notations..................................... 14
		Units Used..................................................................... 14
	SYMBOL AND ABBREVIATION............................................................ 15
	SAFETY............................................................................. 17
		Recognize Safety Information................................................... 17
		Understand Signal Words........................................................ 17
		Follow Safety Instructions..................................................... 18
		Prepare for Emergencies........................................................ 19
		Wear Protective Clothing....................................................... 19
		Protect Against Noise.......................................................... 20
		Inspect Machine................................................................ 20
		General Precautions for the Cab................................................ 21
		Use Handholds and Steps........................................................ 22
		Adjust the Operator's Seat..................................................... 22
		Ensure Safety Before Rising from or Leaving Operator’s Seat.................... 23
		Fasten Your Seat Belt.......................................................... 23
		Move and Operate Machine Safely................................................ 24
		Operate Only from Operator's Seat.............................................. 24
		Jump Starting.................................................................. 25
		Keep Riders off Machine........................................................ 25
		Precautions for Operations..................................................... 26
		Investigate Job Site Beforehand................................................ 27
		Install OPG Guard.............................................................. 28
		Restriction of Attachment Installation......................................... 28
		Provide Signals for Jobs Involving Multiple Machines........................... 29
		Confirm Direction of Machine to Be Driven...................................... 29
		Drive Machine Safely........................................................... 30
		Avoid Injury from Rollaway Accidents........................................... 32
		Avoid Injury from Back-Over and Swing Accidents................................ 33
		Keep People Clear from Working Area............................................ 34
		Never Position the Bucket Over Anyone.......................................... 34
		Avoid Undercutting............................................................. 35
		Avoid Tipping.................................................................. 35
		Never Undercut a High Bank..................................................... 36
		Dig with Caution............................................................... 36
		Operate with Caution........................................................... 36
		Avoid Power Lines.............................................................. 37
		Precautions for Lightning...................................................... 37
		Object Handling................................................................ 38
		Protect Against Flying Debris.................................................. 38
		Park Machine Safely............................................................ 39
		Handle Fluids Safely−Avoid Fires............................................... 39
		Transport Safely............................................................... 40
		Practice Safe Maintenance...................................................... 41
		Warn Others of Service Work.................................................... 42
		Support Machine Properly....................................................... 42
		Stay Clear of Moving Parts..................................................... 43
		Prevent Parts from Flying...................................................... 43
		Avoid Injury from Attachment Falling Accident.................................. 44
		Prevent Burns.................................................................. 44
		Replace Rubber Hoses Periodically.............................................. 45
		Avoid High-Pressure Fluids..................................................... 45
		Prevent Fires.................................................................. 46
		Evacuating in Case of Fire..................................................... 48
		Beware of Exhaust Fumes........................................................ 48
		Precautions for Welding and Grinding........................................... 49
		Avoid Heating Near Pressurized Fluid Lines..................................... 50
		Avoid Applying Heat to Lines Containing Flammable Fluids....................... 50
		Precautions for Handling Accumulator and Gas Damper............................ 50
		Remove Paint Before Welding or Heating......................................... 51
		Beware of Asbestos and Silica Dust and Other Contamination..................... 51
		Prevent Battery Explosions..................................................... 52
		Service Air Conditioning System Safely......................................... 52
		Handle Chemical Products Safely................................................ 53
		Dispose of Waste Properly...................................................... 53
		Never Ride Attachment.......................................................... 54
		Notes on Aftertreatment Device................................................. 54
		Precautions for Communication Terminal......................................... 54
		Precautions for Communication Terminal Equipment............................... 55
		Notes on Protection of Operator’s Station whenthe Machine Rolls Over........... 57
		Before Returning the Machine to the Customer................................... 58
	SECTION AND GROUP CONTENTS......................................................... 59
	SECTION 1GENERAL................................................................... 63
		Group 1 Precautions for Disassembling and Assembling........................... 65
			Precautions for Disassembling and Assembling............................... 65
		Group 2 Tightening............................................................. 71
			Tightening Bolts and Nuts.................................................. 71
			Piping Joint............................................................... 74
		Group 3 Painting............................................................... 81
			Painting................................................................... 81
		Group 4 Bleeding Air........................................................... 83
			Bleeding Air from Hydraulic System......................................... 83
			Bleeding Air from Fuel System.............................................. 84
			Air Bleeding from the Diesel Exhaust Fluid Defrosting Piping............... 86
		Group 5 Preparation............................................................ 87
			Preparation before Inspection and Maintenance.............................. 87
			Hydraulic Circuit Pressure Release Procedure............................... 89
			Pressure Release from Hydraulic Oil Tank................................... 90
			Pressure Release from Expansion Tank....................................... 91
	SECTION 2 MAINTENANCE STANDARD..................................................... 95
		Group 1 Upperstructure......................................................... 97
			Pump Device................................................................ 97
			Swing Motor................................................................101
		Group 2 Undercarriage..........................................................105
			Travel Motor...............................................................105
			Sprocket...................................................................107
			Front Idler................................................................109
			Upper Roller...............................................................111
			Lower Roller...............................................................112
			Track......................................................................113
		Group 3 Front Attachment.......................................................117
			Pin and Bushing............................................................117
			Side Cutter (2021232, 2021233).............................................119
			Point (4512365)............................................................120
			Standard Dimensions for Arm and Bucket Connection..........................121
			Standard Dimensions for Arm and Boom Connection............................122
			Cylinder...................................................................123
	SECTION 3 UPPERSTRUCTURE...........................................................127
		Group 1 Cab....................................................................129
			Removal and Installation of Cab............................................129
		Group 2 Counterweight..........................................................155
		Group 3 Main Frame.............................................................157
			Removal and Installation of Main Frame.....................................157
		Group 4 Engine.................................................................165
			Removal and Installation of Engine.........................................165
		Group 8 Pump Device............................................................199
			Removal and Installation of Pump Device....................................199
			Removal and Installation of Coupling.......................................211
			Disassembly of Pump Device.................................................213
			Assembly of Pump Device....................................................221
			Disassembly of Regulator...................................................233
			Assembly of Regulator......................................................235
			Disassembly of Solenoid Valve Unit.........................................237
			Assembly of Solenoid Valve Unit............................................239
			Structure of Pilot Pump....................................................241
		Group 9 Control Valve..........................................................243
			Removal and Installation of Control Valve..................................243
		Group 10 Swing Device..........................................................267
			Removal and Installation of Swing Device...................................267
			Disassembly of Swing Reduction Gear........................................271
			Assembly of Swing Reduction Gear...........................................276
			Disassembly of Swing Motor.................................................283
			Assembly of Swing Motor....................................................286
		Group 11 Pilot Valve...........................................................289
			Removal and Installation of Pilot Valve (Left).............................289
			Removal and Installation of Pilot Valve (Right)............................301
			Removal and Installation of Travel Pilot Valve.............................317
			Disassembly of Pilot Valves (Right and Left)...............................321
			Assembly of Pilot Valves (Right and Left)..................................324
			Disassembly of Travel Pilot Valve..........................................327
			Assembly of Travel Pilot Valve.............................................331
		Group 12 Solenoid Valve........................................................337
			Removal and Installation of Pilot Shut-Off Solenoid Valve..................337
			Removal and Installation of 5-Spool Solenoid Valve Unit....................341
			Removal and Installation of 2-Spool Solenoid Valve Unit....................345
			Disassembly of Pilot Shut-Off Solenoid Valve...............................349
			Assembly of Pilot Shut-Off Solenoid Valve..................................351
			Structure of 5-Spool Solenoid Valve Unit...................................353
			Structure of 2-Spool Solenoid Valve Unit...................................355
		Group 13 Signal Control Valve..................................................357
			Removal and Installation of Signal Control Valve...........................357
			Structure of Signal Control Valve..........................................361
		Group 14 Aftertreatment Device.................................................365
			Removal and Installation of Aftertreatment Device..........................365
		Group 15 DEF Tank..............................................................389
			Removal and Installation of DEF Tank.......................................389
		Group 16 Coolant Control Valve.................................................403
			Removal and Installation of Coolant Control Valve..........................403
		Group 17 DEF Supply Module.....................................................405
			Removal and Installation of DEF Supply Module..............................405
	SECTION 4 UNDERCARRIAGE............................................................413
		Group 1 Swing Bearing..........................................................415
			Removal and Installation of Swing Bearing..................................415
			Disassembly of Swing Bearing...............................................421
			Assembly of Swing Bearing..................................................424
		Group 2 Travel Device..........................................................427
			Removal and Installation of Travel Device..................................427
			Disassembly of Travel Device...............................................431
			Assembly of Travel Device..................................................435
			Disassembly of Travel Motor................................................443
			Assembly of Travel Motor...................................................446
			Disassembly of Brake Valve.................................................451
			Assembly of Brake Valve....................................................453
			Precautions for Using Floating Seal........................................455
		Group 3 Center Joint...........................................................457
			Removal and Installation of Center Joint...................................457
			Disassembly of Center Joint................................................461
			Assembly of Center Joint...................................................463
			Replacement of Body and Spindle............................................466
		Group 4 Track Adjuster.........................................................467
			Removal and Installation of Track Adjuster.................................467
			Disassembly of Front Idler.................................................471
			Assembly of Front Idler....................................................474
			Disassembly of Track Adjuster..............................................477
			Assembly of Track Adjuster.................................................481
			Precautions for Using Floating Seal........................................485
		Group 6 Upper and Lower Rollers................................................487
			Removal and Installation of Upper Roller...................................487
			Removal and Installation of Lower Roller...................................493
			Disassembly of Lower Roller................................................499
			Assembly of Lower Roller...................................................501
			Precautions for Using Floating Seal........................................503
		Group 7 Track..................................................................505
			Removal and Installation of Track..........................................505
	SECTION 5 FRONTATTACHMENT..........................................................515
		Group 1 Front Attachment.......................................................517
			Removal and Installation of Front Attachment...............................517
		Group 2 Cylinder...............................................................527
			Removal and Installation of Boom Cylinder..................................527
			Removal and Installation of Arm Cylinder...................................535
			Removal and Installation of Bucket Cylinder................................543
			Removal and Installation of Positioning Cylinder...........................547
			Disassembly of Boom, Arm, and Bucket Cylinders.............................553
			Assembly of Boom, Arm, and Bucket Cylinders................................560
			Disassembly of Positioning Cylinder........................................569
			Assembly of Positioning Cylinder...........................................572
		Group 3 Hose Rupture Valve.....................................................575
			Removal and Installation of Hose Rupture Valve for Boom Cylinder...........575
			Removal and Installation of Hose Rupture Valve for Arm Cylinder............579
			Removal and Installation of Hose Rupture Valve for Positioning Cylinder....583
			Structure of Hose Rupture Valve for Boom Cylinder (Right)..................587
			Structure of Hose Rupture Valve for Boom Cylinder (Left)...................589
			Structure of Hose Rupture Valve for Arm Cylinder...........................591
			Structure of Hose Rupture Valve for Positioning Cylinder...................593
	SERVICE MANUAL REVISION REQUEST FORM...............................................597

Please Note:

⦁ This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.
⦁ This is the same manual used by the dealers inorder to diagnose your vehicle of its faults.
⦁ Require some other service manual or have any queries: please WRITE to us at [email protected]

1 review for Hitachi ZX300LC-6 ZX300LCN-6 Hydraulic Excavator Workshop Manual (WDDN50-EN-00) – PDF Download

  1. 5 out of 5

    Zev Abner

    Good deal, thanks.

Add a review

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order