KKT cBoxX 60 70 100 Philips MRI Chiller Installation Guidelines PDF Download
$14.95 Original price was: $14.95.$8.95Current price is: $8.95.
29-page KKT cBoxX Series Philips installation guide covering foundations, dimensions, transport, piping, MRI/LCC application data, grounding and startup preparation. Instant PDF download.
Description
KKT cBoxX Series Philips Installation Guidelines
This 29-page KKT chillers installation guide covers site preparation and installation requirements for cBoxX Series chillers used with Philips applications. The cover identifies cBoxX 60, cBoxX 70 and cBoxX 100, while the technical sections provide foundation, transport, piping, hydraulic, grounding and startup-preparation information.
Chiller Models Covered
- cBoxX 60
- cBoxX 70
- cBoxX 100
The document also contains dimensional and installation-table references to additional cBoxX sizes within the series, but the main cover identification is 60, 70 and 100.
Philips MRI Applications Shown
The piping/application tables specifically associate cBoxX 60 and cBoxX 70 configurations with Philips MRI systems including Ingenia 1.5T / 3T, Ingenia Ambition X and Multiva 1.5T, with Copley 781 and Copley 787 combinations identified where applicable.
Installation Subjects Included
- Concrete foundation requirements
- Foundation sizing and load considerations
- Leveling and anchoring arrangements
- Minimum pad dimensions
- Chiller weights and cabinet dimensions
- Crane transport and lifting precautions
- Hydraulic system design
- Piping layout and allowed elbows
- Pipe-diameter selection versus chiller-to-Philips-LCC distance
- Maximum vertical separation between chiller and LCC
- Cooling-medium concentration
- Return and inlet pressure requirements
- Static filling-pressure guidance
- Electrical grounding requirements
- Site and startup preparation
Useful Installation Data
The guide gives actual pad dimensions and chiller dimensions, then provides application-specific hydraulic tables. For example, the cBoxX 60 table identifies Philips MRI applications using C781 and gives connection size, elevation limit, allowed long-radius elbows, water/glycol concentration, LCC inlet pressure, estimated LCC pressure drop and piping-size guidance. The cBoxX 70 section provides corresponding data for C781/C787 arrangements.
The electrical section includes grounding requirements and specifies that the chiller grounding system must be correctly connected. Startup preparation includes pre-arrival plumbing flushing, air leak checking, completed wiring and tested safety disconnects.
Why This Guide Is Useful
This document is useful when planning or checking the infrastructure around a Philips MRI cooling installation. It puts the civil, mechanical, hydraulic and electrical preparation information in one place so installers can verify the pad, piping route, connection sizes, elevation, grounding and startup readiness before commissioning work begins.
Instant PDF Download
Delivered as an instant PDF download for immediate use by installers, facility engineers and service personnel on any PDF-capable device.



Reviews
There are no reviews yet.