★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately
Sale!

Komatsu WB140-2N WB150-2N Backhoe Loader Shop Manual CEBM012701 – PDF DOWNLOAD

4.50 out of 5
(2 customer reviews)

Original price was: $49.95.Current price is: $20.95.

Komatsu WB140-2N WB150-2N Backhoe Loader Shop Manual 

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Komatsu WB140-2N WB150-2N Backhoe Loader Shop Manual

FILE DETAILS:

Komatsu WB140-2N WB150-2N Backhoe Loader Shop Manual 

Brands: Komatsu
Equipment Type: Backhoe Loader
Manuals Type: Shop Manual
Machine Model: WB140-2N, WB150-2N
Serial Number: A20637 and up, A60029 and up
Book Code: CEBM012701
Language: English
Pages: 660
File Format: Portable Document Format (PDF)

DESCRIPTION:

Komatsu WB140-2N WB150-2N Backhoe Loader Shop Manual 

1 GENERAL :

This shop manual has been prepared as an aid to improve the quality of repairs by giving the serviceman an accurate understanding of the product and by showing him the correct way to perform repairs and make judgements. Make sure you understand the contents of this manual and use it to full effect at every opportunity. This shop manual mainly contains the necessary technical information for operations performed in a service workshop. For ease of understanding, the manual is divided into the following sections. These sections are further divided into each main group of components.
GENERAL:
This section lists the general machine dimensions, performance specifications, component weights, and fuel, coolant and lubricant specification charts.
STRUCTURE, FUNCTION AND MAINTENANCE STANDARD:
This section gives the judgement standards when inspecting disassembled parts. It explains the structure and function of each component. It serves not only to give an understanding of the structure, but also serves as reference material for troubleshooting.
TESTING, ADJUSTING AND TROUBLESHOOTING:
This section explains checks to be made before and after performing repairs, as well as adjustments to be made at completion of the checks and repairs. Troubleshooting charts correlating “Problems” to “Causes” are also included in this section.
DISASSEMBLY AND ASSEMBLY:
This section explains the order to be followed when removing, installing, disassembling or assembling each component, as well as precautions to be taken for these operations.

TABLE OF CONTENTS:

Komatsu WB140-2N WB150-2N Backhoe Loader Shop Manual 

COVER.............................................................................  1
FOREWORD..........................................................................  2
	CONTENTS......................................................................  2
	SAFETY........................................................................  9
		SAFETY NOTICE.............................................................  9
			IMPORTANT SAFETY NOTICE...............................................  9
			GENERAL PRECAUTIONS...................................................  9
			PREPARATIONS FOR WORK.................................................  9
			PRECAUTIONS DURING WORK...............................................  9
	GENERAL....................................................................... 11
	HOW TO READ THE SHOP MANUAL................................................... 12
		VOLUMES................................................................... 12
		DISTRIBUTION AND UPDATING................................................. 12
		FILING METHOD............................................................. 12
		REVISED EDITION MARK...................................................... 12
		REVISIONS................................................................. 12
		SYMBOLS................................................................... 12
	HOISTING INSTRUCTIONS......................................................... 13
		HOISTING.................................................................. 13
		WIRE ROPES................................................................ 13
	PUSH PULL COUPLER............................................................. 14
		TYPE 1.................................................................... 14
			DISCONNECTION......................................................... 14
			CONNECTION............................................................ 14
		TYPE 2.................................................................... 15
			DISCONNECTION......................................................... 15
			CONNECTION............................................................ 15
		TYPE 3.................................................................... 16
			DISCONNECTION......................................................... 16
			CONNECTION............................................................ 16
	COATING MATERIALS............................................................. 17
	STANDARD TIGHTENING TORQUE.................................................... 19
		STANDARD TIGHTENING TORQUE OF BOLTS AND NUTS.............................. 19
		TIGHTENING TORQUE OF HOSE NUTS............................................ 20
		TIGHTENING TORQUE OF SPLIT FLANGE BOLTS................................... 20
		TIGHTENING TORQUE FOR FLARED NUTS......................................... 20
		TABLE OF TIGHTENING TORQUES FOR O-RING BOSS PIPING JOINTS................. 21
		TABLE OF TIGHTENING TORQUES FOR O-RING BOSS PLUGS......................... 21
		TIGHTENING TORQUE TABLE FOR HOSES (TAPER SEAL TYPE AND FACE SEAL TYPE).... 21
	ELECTRIC WIRE CODE............................................................ 22
		CLASSIFICATION BY THICKNESS............................................... 22
		CLASSIFICATION BY COLOR AND CODE.......................................... 22
	CONVERSION TABLES............................................................. 23
		METHOD OF USING THE CONVERSION TABLE...................................... 23
01 GENERAL........................................................................ 29
	SPECIFICATIONS................................................................ 30
	WEIGHT TABLE.................................................................. 33
	FUEL COOLANT AND LUBRICANTS................................................... 34
10 STRUCTURE, FUNCTION AND MAINTENANCE STANDARD................................... 37
	ENGINE MOUNTING............................................................... 40
		TIER I ENGINE............................................................. 40
			4WD MACHINES.......................................................... 40
			2WD MACHINES.......................................................... 41
		TIER II ENGINE............................................................ 42
			4WD MACHINES.......................................................... 42
			2WD MACHINE........................................................... 43
	POWER TRAIN................................................................... 44
		4WD MACHINES.............................................................. 44
			DESCRIPTION........................................................... 44
			POWER FLOW - 4WD...................................................... 45
		2WD MACHINES.............................................................. 46
			DESCRIPTION........................................................... 46
	TRANSMISSION DIAGRAM.......................................................... 48
		4WD MACHINES.............................................................. 48
		2WD MACHINES.............................................................. 50
	TRANSMISSION.................................................................. 52
		COMPLETE ASSEMBLY......................................................... 52
		FORWARD REVERSE CLUTCH.................................................... 62
		1ST THROUGH 4TH SPEED SHAFT............................................... 62
		4WD SHAFT................................................................. 63
	FRONT AXLE.................................................................... 64
		4WD....................................................................... 64
			COMPLETE ASSEMBLY..................................................... 64
			DIFFERENTIAL.......................................................... 64
			PLANETARY............................................................. 66
		2WD....................................................................... 67
			COMPLETE ASSEMBLY..................................................... 67
			CENTER HOUSING........................................................ 68
			STEERING KNUCKLE...................................................... 69
	REAR AXLE..................................................................... 70
		COMPLETE ASSEMBLY......................................................... 70
		DIFFERENTIAL.............................................................. 71
		PLANETARY................................................................. 72
		BRAKES.................................................................... 73
		DIFFERENTIAL LOCK......................................................... 74
	HYDRAULIC PUMP................................................................ 75
		FUNCTION.................................................................. 80
		STRUCTURE................................................................. 80
		OPERATION................................................................. 81
			PUMP OPERATION........................................................ 81
			CONTROL OF DELIVERY................................................... 81
		PC VALVE, LS VALVE, SERVO PISTON.......................................... 82
			LS VALVE FUNCTION..................................................... 82
			OPERATION............................................................. 83
			PC VALVE FUNCTION..................................................... 88
			WORKING MODE SOLENOID VALVE........................................... 93
	STEERING UNIT................................................................. 95
		TECHNICAL DATA............................................................ 95
		OPERATION................................................................. 95
	LOADER VALVE.................................................................. 96
		2 SPOOL................................................................... 96
		3 SPOOL VALVE............................................................. 98
	BACKHOE CONTROL VALVE.........................................................100
		MECHANICAL CONTROL........................................................100
			INLET SECTION VIEWS A-A AND B-B.......................................101
			ARM SECTION VIEW C-C..................................................102
			SWING SECTION VIEW D-D................................................103
			LEFT OUTRIGGER SECTION VIEW E-E.......................................104
			RIGHT OUTRIGGER SECTION VIEW F-F......................................105
			BUCKET SECTION VIEW G-G...............................................106
			BOOM SECTION VIEW H-H.................................................107
			OUTLET SECTION VIEW J-J...............................................107
			TELESCOPIC ARM SECTION VIEW K-K.......................................108
			HAMMER SECTION VIEW L-L...............................................109
		EXCAVATOR CONTROL.........................................................110
			INLET SECTION VIEWS A-A AND B-B.......................................111
			ARM SECTION VIEW C-C..................................................112
			SWING SECTION VIEW D-D................................................113
			LEFT OUTRIGGER SECTION  VIEW E-E.....................................114
			RIGHT OUTRIGGER SECTION VIEW F-F......................................115
			BUCKET SECTION VIEW G-G...............................................116
			BOOM SECTION VIEW H-H.................................................117
			OUTLET SECTION VIEW J-J...............................................117
			TELESCOPIC ARM SECTION VIEW K-K.......................................118
			HAMMER SECTION VIEW L-L...............................................119
	CLSS..........................................................................120
		CHARACTERISTICS...........................................................120
		STRUCTURE.................................................................120
		OPERATING PRINCIPLES......................................................121
		UNLOADING VALVE...........................................................123
			FUNCTION..............................................................123
			OPERATION.............................................................123
		INTRODUCTION OF THE LS PRESSURE...........................................126
			OPERATION.............................................................126
		DELIVERY COMPENSATION.....................................................127
			INTRODUCTION..........................................................127
			OPERATION.............................................................127
		LIFD CONTROL SYSTEM.......................................................130
			FUNCTION..............................................................130
			OPERATION.............................................................130
		LS DECOMPRESSION VALVE....................................................131
			DESCRIPTION...........................................................131
			OPERATION.............................................................131
		PRESSURE CUT OFF VALVE....................................................132
			DESCRIPTION...........................................................132
			OPERATION.............................................................132
		PRIORITY VALVE............................................................133
			FUNCTION..............................................................133
	PPC JOYSTICK..................................................................134
		LEFT VALVE................................................................134
		RIGHT VALVE...............................................................135
	SOLENOID VALVE................................................................136
		DIFFERENTIAL LOCK - BACKHOE BOOM LOCK.....................................136
		PPC SUPPLY VALVE - ST2....................................................137
		PPC TELESCOPIC ARM........................................................138
		PPC HAMMER................................................................139
		PPC ARM AND HAMMER........................................................140
	LOADER CYLINDERS..............................................................141
		BOOM ARM..................................................................141
			CHARACTERISTICS.......................................................141
		BUCKET....................................................................142
			CHARACTERISTICS.......................................................142
		MP BUCKET.................................................................143
			CHARACTERISTICS.......................................................143
	BACKHOE CYLINDERS.............................................................144
		BOOM......................................................................144
			CHARACTERISTICS.......................................................144
		ARM.......................................................................145
			CHARACTERISTICS.......................................................145
		BUCKET....................................................................146
			CHARACTERISTICS.......................................................146
		TELESCOPIC ARM CYLINDER...................................................147
			CHARACTERISTICS.......................................................147
		SWING.....................................................................148
			CHARACTERISTICS.......................................................148
		OUTRIGGER.................................................................149
			CHARACTERISTICS.......................................................149
		BOOM LOCK CYLINDER........................................................150
	FRONT WORK EQUIPMENT..........................................................151
	REAR WORK EQUIPMENT...........................................................153
	AIR CONDITIONING..............................................................155
20 TESTING, ADJUSTING AND TROUBLESHOOTING.........................................157
	STANDARD VALUE TABLES FOR ENGINE..............................................160
	STANDARD VALUE TABLES FOR CHASSIS.............................................162
	SPECIAL TOOLS.................................................................181
	ENGINE SPEED..................................................................183
		TIER I ENGINE.............................................................183
		TIER II ENGINE............................................................183
	VALVE CLEARANCE...............................................................184
		TIER I ENGINE.............................................................184
			ADJUSTING PROCEDURE...................................................184
			VALVE COVER INSTALLATION..............................................184
		TIER II ENGINE............................................................185
			ADJUSTING PROCEDURE...................................................185
	COMPRESSION PRESSURE..........................................................189
		TIER I ENGINE.............................................................189
		TIER II ENGINE............................................................190
	FUEL INJECTION TIMING.........................................................192
		TIER I ENGINE.............................................................192
		TIER II ENGINE............................................................193
	FAN BELT......................................................................196
		TENSION CHECK.............................................................196
		TENSION ADJUSTMENT........................................................196
	COMPRESSOR DRIVE BELT.........................................................197
		CHECKING TENSION..........................................................197
		TENSION ADJUSTMENT........................................................197
	ACCELERATOR PEDAL AND LEVER...................................................198
		ACCELERATOR PEDAL TRAVEL..................................................198
		ACCELERATOR LEVER TRAVEL..................................................199
	BRAKE PEDAL TRAVEL............................................................200
		TIER I ENGINE.............................................................200
			MASTER CYLINDER ROD ADJUSTMENT........................................200
			MICROSWITCHES ADJUSTMENT..............................................200
			CHECKING ADJUSTMENT...................................................200
		TIER II ENGINE............................................................201
			MASTER CYLINDER ROD...................................................201
			CHECKING ADJUSTMENT...................................................201
	BLEEDING AIR..................................................................202
		HYDRAULIC PUMP............................................................202
		CYLINDERS.................................................................202
		HYDRAULIC OIL TANK........................................................203
		HYDRAULIC OIL TANK PRESSURIZATION.........................................203
		WORK CIRCUITS.............................................................203
		BRAKE CIRCUIT.............................................................203
		CHECK BRAKE CIRCUIT.......................................................204
	HYDRAULIC CIRCUIT.............................................................205
		INTRODUCTION..............................................................205
		LOADER CONTROL VALVES.....................................................206
		BACKHOE CONTROLS STYLE VALVE..............................................207
		EXCAVATOR CONTROLS STYLE VALVE............................................209
	MAIN RELIEF VALVES............................................................211
		TESTING...................................................................211
			LOADER CONTROL VALVE (2 OR 3 SPOOL)...................................211
			BACKHOE CONTROL VALVE (6, 7 OR 8 SPOOLS)..............................211
		SETTING RELIEF PRESSURE...................................................211
	LOADER CIRCUIT RELIEF VALVES..................................................213
		TESTING PRESSURE..........................................................213
		SETTING PRESSURE..........................................................214
	BACKHOE CIRCUIT RELIEF VALVES.................................................215
		TESTING PRESSURE..........................................................215
		SETTING PRESSURE..........................................................216
	UNLOADING VALVE...............................................................217
		TESTING...................................................................217
		ADJUSTMENT................................................................217
	LOAD SENSING (LS) VALVE.......................................................218
		TESTING...................................................................218
		ADJUSTMENT................................................................218
	FLOW VALVE....................................................................219
	PRIORITY VALVE................................................................220
		TESTING...................................................................220
		CLEANING PRIORITY VALVE...................................................220
	STEERING SYSTEM...............................................................221
		TESTING...................................................................221
		SETTING...................................................................221
	BRAKE SYSTEM..................................................................222
		CIRCUIT AND BRAKE PUMP TEST...............................................222
		BRAKING GROUP LEAK TEST...................................................223
	ENGINE SPEED UNDER LOAD.......................................................224
		PREPARING THE MACHINE.....................................................224
		TORQUE CONVERTER STALL....................................................224
		TORQUE CONVERTER AND HYDRAULIC STALL......................................225
	POWER TRAIN GROUP.............................................................226
		PREPARING THE MACHINE.....................................................226
		CONVERTER OIL PRESSURE....................................................226
		CLUTCH PRESSURE...........................................................227
		ADDITIONAL PRESSURES......................................................227
	DIRECTIONAL CLUTCHES..........................................................228
		PREPARATION OF THE MACHINE................................................228
		TESTING...................................................................228
	RETURN TO DIG DEVICE..........................................................229
	HYDRAULIC DRIFT...............................................................230
		LOADER....................................................................230
			LIFT CYLINDER.........................................................230
			BUCKET CYLINDER.......................................................231
		BACKHOE...................................................................232
			BOOM CYLINDER.........................................................232
			ARM CYLINDER..........................................................232
			BUCKET CYLINDER.......................................................233
			OUTRIGGER TESTING.....................................................234
	AIR CONDITIONING UNIT.........................................................235
		TESTING THE WORKING TEMPERATURE...........................................235
		CHECKING THE UNIT.........................................................235
		EMPTYING THE AC UNIT......................................................236
	TROUBLESHOOTING GUIDE.........................................................238
		FRONT AXLE................................................................238
		REAR AXLE.................................................................243
		TRANSMISSION..............................................................248
30 REMOVAL AND INSTALLATION.......................................................251
	METHOD OF USING THIS MANUAL...................................................253
		REMOVAL OR INSTALLATION OF PARTS OR ASSEMBLIES............................253
	PRECAUTIONS DURING SERVICE OPERATIONS.........................................254
		REMOVAL PRECAUTIONS.......................................................254
		INSTALLATION PRECAUTIONS..................................................254
	SPECIAL TOOLS.................................................................255
		LISTING...................................................................255
		SKETCHES..................................................................257
	ENGINE COMPONENTS.............................................................260
	LOADER CYLINDER LOCK..........................................................261
		LOCKING PROCEDURES........................................................261
	STARTER.......................................................................262
		REMOVAL...................................................................262
		INSTALLATION..............................................................262
	ALTERNATOR....................................................................263
		REMOVAL...................................................................263
		INSTALLATION..............................................................263
	AC COMPRESSOR.................................................................264
		REMOVAL...................................................................264
		INSTALLATION..............................................................265
	INJECTION PUMP................................................................266
		TIER I ENGINE.............................................................266
		TIER II ENGINE............................................................269
	VALVE COVER...................................................................272
		TIER I ENGINE.............................................................272
		TIER II ENGINE............................................................272
	INJECTION NOZZLE..............................................................275
		TIER I ENGINE.............................................................275
		TIER II ENGINE............................................................276
	THERMOSTAT....................................................................278
		TIER I ENGINE.............................................................278
		TIER II ENGINE............................................................279
	COOLANT PUMP..................................................................280
		TIER I ENGINE.............................................................280
		TIER II ENGINE............................................................282
	TURBOCHARGER..................................................................285
		REMOVAL...................................................................285
		INSTALLATION..............................................................287
	CYLINDER HEAD.................................................................288
		TIER I ENGINE.............................................................288
		TIER II ENGINE............................................................292
	BATTERY DISCONNECT SWITCH.....................................................297
		REMOVAL...................................................................297
		INSTALLATION..............................................................297
	COUNTERWEIGHT.................................................................298
		REMOVAL...................................................................298
		INSTALLATION..............................................................298
	RADIATOR OIL COOLERS..........................................................299
		REMOVAL...................................................................299
		INSTALLATION..............................................................301
	AC CONDENSOR..................................................................302
		REMOVAL...................................................................302
		INSTALLATION..............................................................303
	MUFFLER.......................................................................304
		REMOVAL...................................................................304
		INSTALLATION..............................................................304
	EXHAUST STACK.................................................................305
		REMOVAL...................................................................305
		INSTALLATION..............................................................305
	ENGINE HOOD...................................................................306
		REMOVAL...................................................................306
		INSTALLATION..............................................................306
	CAB...........................................................................307
		TIER I ENGINE.............................................................307
		TIER II ENGINE............................................................311
	AC AND HEATER.................................................................316
		REMOVAL...................................................................316
		INSTALLATION..............................................................317
	FUEL TANK.....................................................................318
		REMOVAL...................................................................318
		INSTALLATION..............................................................319
	HYDRAULIC TANK................................................................320
		REMOVAL...................................................................320
		INSTALLATION..............................................................321
	ENGINE AND TRANSMISSION.......................................................322
		REMOVAL...................................................................322
		INSTALLATION..............................................................327
	PISTON PUMP...................................................................329
		REMOVAL...................................................................329
		INSTALLATION..............................................................330
	TRANSMISSION..................................................................331
		REMOVAL...................................................................331
		INSTALLATION..............................................................334
		DISASSEMBLY...............................................................335
		REASSEMBLY................................................................383
	TORQUE CONVERTER..............................................................427
		REMOVAL...................................................................427
		INSTALLATION..............................................................428
	STEERING VALVE................................................................429
		REMOVAL...................................................................429
		INSTALLATION..............................................................430
	COLUMN CONTROL SWITCHES.......................................................431
		REMOVAL...................................................................431
		INSTALLATION..............................................................432
	MASTER BRAKE CYLINDER.........................................................433
		REMOVAL...................................................................433
		INSTALLATION..............................................................433
	LOADER CONTROL VALVE..........................................................435
		REMOVAL...................................................................435
		INSTALLATION..............................................................436
	2WD FRONT AXLE................................................................437
		REMOVAL...................................................................437
		INSTALLATION..............................................................438
		DISASSEMBLY...............................................................438
	4WD FRONT AXLE................................................................448
		REMOVAL...................................................................448
		INSTALLATION..............................................................449
		DISASSEMBLY...............................................................449
		REASSEMBLY................................................................458
	REAR AXLE.....................................................................474
		REMOVAL...................................................................474
		INSTALLATION..............................................................475
		DISASSEMBLY...............................................................475
		REASSEMBLY................................................................490
	LOADER CYLINDERS..............................................................509
		BOOM......................................................................509
		BUCKET....................................................................513
		INSTALLATION..............................................................514
		MP BUCKET CYLINDER........................................................518
	FRONT EQUIPMENT...............................................................524
		BUCKET....................................................................524
		BOOM......................................................................525
	BACKHOE CONTROL VALVE.........................................................528
		BACKHOE CONTROL...........................................................528
		INSTALLATION..............................................................529
		EXCAVATOR CONTROLS........................................................529
	PPC CONTROLS..................................................................533
		PPC VALVE.................................................................533
		SUPPORT RELEASE CABLES....................................................534
		SUPPORT RETURN GAS SPRING.................................................537
		SOLENOID VALVE............................................................539
		SERVO CONTROL FEED VALVE..................................................540
	BACKHOE CYLINDERS.............................................................541
		BOOM......................................................................541
		INSTALLATION..............................................................541
		ARM.......................................................................547
		BUCKET....................................................................551
		INSTALLATION..............................................................552
		TELESCOPIC ARM............................................................556
		OUTRIGGERS................................................................561
		SWING.....................................................................567
		BOOM LOCK.................................................................571
	BACKHOE WORK EQUIPMENT........................................................573
		BOOM TO BUCKET............................................................573
		BUCKET....................................................................574
		STANDARD ARM..............................................................575
		TELESCOPIC ARM............................................................576
		INNER ARM.................................................................577
		INNER ARM GUIDES..........................................................578
		BOOM......................................................................579
		SWING BRACKET.............................................................580
		OUTRIGGERS................................................................581
90 OTHER..........................................................................583
	HYDRAULIC CIRCUIT.............................................................585
		STANDARD CONTROLS FOR WB140-2N SHEET 1 OF 2...............................585
		STANDARD CONTROLS FOR WB140-2N SHEET 2 OF 2...............................587
		STANDARD CONTROLS FOR WB150-2N SHEET 1 OF 2...............................589
		STANDARD CONTROLS FOR WB150-2N SHEET 2 OF 2...............................591
		PPC SYSTEM FOR WB140-2N SHEET 1 OF 3......................................593
		PPC SYSTEM FOR WB140-2N SHEET 2 OF 3......................................595
		PPC SYSTEM FOR WB140-2N SHEET 3 OF 3......................................597
		PPC SYSTEM FOR WB150-2N SHEET 1 OF 3......................................599
		PPC SYSTEM FOR WB150-2N SHEET 2 OF 3......................................601
		PPC SYSTEM FOR WB150-2N SHEET 3 OF 3......................................603
	ELECTRICAL....................................................................605
		CAB WIRING SCHEMATIC SHEET 1 OF 5.........................................605
		CAB WIRING SCHEMATIC SHEET 2 OF 5.........................................607
		CAB WIRING SCHEMATIC SHEET 3 OF 5.........................................609
		CAB WIRING SCHEMATIC SHEET 4 OF 5.........................................611
		CAB WIRING SCHEMATIC SHEET 5 OF 5.........................................613
		LEGEND FOR CAB WIRING SCHEMATIC...........................................615
		CANOPY WIRING SCHEMATIC SHEET 1 OF 5......................................617
		CANOPY WIRING SCHEMATIC SHEET 2 OF 5......................................619
		CANOPY WIRING SCHEMATIC SHEET 3 OF 5......................................621
		CANOPY WIRING SCHEMATIC SHEET 4 OF 5......................................623
		CANOPY WIRING SCHEMATIC SHEET 5 OF 5......................................625
		LEGEND FOR CANOPY WIRING SCHEMATIC........................................627
		TIER I ENGINE HARNESS.....................................................629
		TIER II ENGINE HARNESS....................................................631
		LEGEND FOR TIER I AND II ENGINE HARNESSES.................................633
		FRONT HARNESS.............................................................635
		LEGEND FOR FRONT HARNESS..................................................637
		LATERAL HARNESS AND SIDE DASHBOARD........................................639
			TIER I ENGINE SHEET 2 OF 2............................................641
			LEGEND FOR TIER I ENGINE LATERAL AND SIDE DASH BOARD HARNESS..........643
			TIER II ENGINE SHEET 1 OF 2...........................................645
			TIER II ENGINE SHEET 2 OF 2...........................................647
			LEGEND FOR TIER II ENGINE LATERAL SIDE DASH BOARD HARNESS.............649
		PPC FRAME AND SIDE DASH BOARD HARNESS.....................................651
			SIDE DASH BOARD HARNESS...............................................653
			LEGEND FOR PPC FRAME AND SIDE DASH BOARD HARNESS......................655
		WORK LIGHT HARNESS........................................................657
		FUSE AND RELAY PANEL......................................................659
			LEGEND FOR FUSE AND RELAY PANEL.......................................659

KOMATSU WB140-2N WB150-2N BACKHOE LOADER SHOP MANUAL CEBM012701 – PDF DOWNLOAD:

IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:

  • This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
  • Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.

2 reviews for Komatsu WB140-2N WB150-2N Backhoe Loader Shop Manual CEBM012701 – PDF DOWNLOAD

  1. 5 out of 5

    Logan Ty

    Becky was very helpful and prompt assisting with the download.

  2. 4 out of 5

    Reginald Kenzo

Add a review

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order