Description
Liebherr Mobile Crane LTM1350-6.1 Operations Manual Sn 071350
FILE DETAILS:
Liebherr Mobile Crane LTM1350-6.1 Operations Manual Sn 071350
Language: English
Size: 27.3 MB
Pages: 1901
Format: PDF
Downloadable: YES
Serial No : 071350
DESCRIPTION:
Liebherr Mobile Crane LTM1350-6.1 Operations Manual Sn 071350
FOREWORD:
General:
This crane was built according to the state of technology and recognized safety technical regulations. Despite that, dangers to body and life for the user and / or third persons or damage to the crane and / or other material assets can occur. This crane may only be used:
- Β in impeccable technical condition.
- Β for destined use.
- Β by trained personnel, which acts in a safety and danger conscious way.
- Β when no safety relevant problems are present.
- Β when no modifications were made on the crane.
- Any problems, which could affect safety must be fixed immediately.
Modifications on the crane may only be made with written approval by LiebherrβWerk Ehingen GmbH.
Data recording device:
This crane is equipped with a data recording device. Among others, the following data is recorded:
- Β Date and time of day
- Β Entered configuration of the crane
- Β Actual load
- Β Percentage of utilization of the crane
- Β Working radius
- Β Main boom angle, luffing jib angle
- Β Total telescopic boom length, length of each telescopic section
- Β Every actuation of bypass devices
- The recorded data can be read with a respective software.
TABLE OF CONTENTS:
Liebherr Mobile Crane LTM1350-6.1 Operations Manual Sn 071350
Operating instructionsΒ Β Β Β Β Β Β Β 1
1 00 Description of craneΒ Β Β Β Β Β 27
1 01 TerminologyΒ Β Β Β Β Β Β Β Β 28
1 Crane componentsΒ Β Β Β Β Β Β Β 29
1 02 Product descriptionΒ Β Β Β Β Β Β 36
1 Crane chassisΒ Β Β Β Β Β Β 37
2 Crane superstructureΒ Β Β Β Β Β 38
3 Auxiliary equipmentΒ Β Β Β Β Β Β 39
1 03 Technical dataΒ Β Β Β Β Β Β 41
1 DimensionsΒ Β Β Β Β Β Β Β Β 43
2 Suspension path and inclineΒ Β Β Β Β 43
3 StabilizersΒ Β Β Β Β Β Β Β 43
4 TiresΒ Β Β Β Β Β Β Β Β 44
5 Workplace-related emission valueΒ Β Β Β Β 44
6 VibrationsΒ Β Β Β Β Β Β Β Β 44
7 Rope diameterΒ Β Β Β Β Β Β 45
8 WeightsΒ Β Β Β Β Β Β Β 45
9 SpeedsΒ Β Β Β Β Β Β Β 54
10 Hoisting heightsΒ Β Β Β Β Β Β Β 55
2 00 SafetyΒ Β Β Β Β Β Β Β 63
2 01 Traffic regulationsΒ Β Β Β Β Β Β 64
1 Traffic regulationsΒ Β Β Β Β Β Β 65
2 01 10 General traffic regulationsΒ Β Β Β Β Β Β 66
1 General traffic regulationsΒ Β Β Β Β 67
2 01 20 National traffic regulationsΒ Β Β Β Β Β 69
1 National traffic regulationsΒ Β Β Β Β Β Β 71
2 02 Break-in instructionsΒ Β Β Β Β Β 72
1 Break-in instructionsΒ Β Β Β Β Β 73
2 03 Job planningΒ Β Β Β Β Β Β Β 74
1 Planning crane operationΒ Β Β Β Β Β Β 75
2 04 General safety technical guidelinesΒ Β Β Β Β Β Β 76
1 GeneralΒ Β Β Β Β Β Β Β 77
2 Emergency exitΒ Β Β Β Β Β Β 85
3 Checking the rigging and fastening pointsΒ Β Β Β Β Β 89
4 Personal protective equipmentΒ Β Β Β Β Β Β 91
5 Use of single-stranded height safety equipment, illustration 1Β Β Β 97
6 Use of double-stranded height safety equipment, illustration 2Β Β Β 97
7 Securing the assembly personnel against fallingΒ Β Β Β Β 97
8 Rescuing the assembly personnelΒ Β Β Β Β Β 99
9 DocumentationΒ Β Β Β Β Β Β 99
10 IdentificationΒ Β Β Β Β Β 99
11 Requirements for the crane operatorΒ Β Β Β Β Β 99
12 Selecting the location, illustrations 1 to 3Β Β Β Β Β Β 105
13 Slopes and excavations, illustrations 4 and 5Β Β Β Β Β 108
14 Permissible ground pressuresΒ Β Β Β Β Β 108
15 SupportingΒ Β Β Β Β Β Β Β 113
16 Checking the safety measuresΒ Β Β Β Β Β 114
17 Endangering air trafficΒ Β Β Β Β Β 114
18 GroundingΒ Β Β Β Β Β Β Β 114
19 Consideration of wind conditionsΒ Β Β Β Β Β Β 115
20 Working in the vicinity of transmittersΒ Β Β Β Β Β 125
21 Dangers when working together with several cranesΒ Β Β 127
22 Hand signals for guidanceΒ Β Β Β Β 128
23 Crane operation with a loadΒ Β Β Β Β Β Β 135
24 Lifting of personnelΒ Β Β Β Β Β Β Β 138
25 Crane operation in case of thunderstormsΒ Β Β Β Β 139
26 Safety notes for external power feed (100 V AC to 400 V AC)Β Β Β 139
27 Welding work on the loadΒ Β Β Β Β Β 140
28 Interruption of crane operationΒ Β Β Β Β 141
29 Resumption of crane operationΒ Β Β Β Β Β 142
30 Ending crane operationΒ Β Β Β Β Β Β 142
31 Turning / driving in reverseΒ Β Β Β Β Β 143
32 Parking the vehicleΒ Β Β Β Β Β 143
33 Safety guidelines for laddersΒ Β Β Β Β Β 147
2 05 Signs on the craneΒ Β Β Β Β Β Β 154
1 Warning signsΒ Β Β Β Β Β Β 155
2 Command and prohibition signsΒ Β Β Β Β Β 159
3 Notice signsΒ Β Β Β Β Β Β 163
2 06 Antifall guards on the craneΒ Β Β Β Β Β Β 170
1 Personal protective equipmentΒ Β Β Β Β Β 171
2 Fall arrest equipment and ladder on the boomΒ Β Β Β 173
3 Fall protection equipment on the crane superstructureΒ Β Β Β 179
4 Fall arrest equipment and ladder on the counterweight frameΒ Β Β Β 183
5 Fall protection equipment on counterweightsΒ Β Β Β 185
6 Fall protection equipment on the TY-guyingΒ Β Β Β Β 187
7 Fall protection equipment and ladder on the TN/TF-adapterΒ Β Β Β Β 189
8 Fall protection equipment on the TF-adapterΒ Β Β Β 191
9 Fall protection equipment and ladder on the N-assembly unitΒ Β Β Β 195
10 Retaining ropes as fall protection equipmentΒ Β Β Β Β Β 199
2 07 Access to the craneΒ Β Β Β Β Β Β 206
1 Components on the craneΒ Β Β Β Β Β Β 207
2 Ascent and descent on the crane chassisΒ Β Β Β Β Β 211
3 Walking and stepping surfacesΒ Β Β Β Β Β 223
2 10 General safety technical notes for driving with dollyΒ Β Β Β Β 224
1 Travel operation with dollyΒ Β Β Β Β Β Β 225
3 00 Crane chassis operationΒ Β Β Β Β Β Β 235
3 01 Operating and control instruments on the crane chassisΒ Β Β Β 236
1 General operating elementsΒ Β Β Β Β 237
2 Operating elements DTCO trip recorder*Β Β Β Β 241
3 Operating elements on camera – monitor*Β Β Β Β Β Β 243
4 KeyboardΒ Β Β Β Β Β Β 245
5 Display unitΒ Β Β Β Β Β Β 249
6 Grounding the mobile craneΒ Β Β Β Β 255
3 02 Before starting to travelΒ Β Β Β Β Β 256
1 General checks before starting to travelΒ Β Β Β Β Β 257
2 Work station – Driver’s cabΒ Β Β Β Β Β Β 265
3 03 Axle suspension systemΒ Β Β Β Β Β Β Β 274
1 Crane vehicle axles suspendedΒ Β Β Β Β Β 275
2 Crane vehicle axles blockedΒ Β Β Β Β Β Β 279
3 Level regulationΒ Β Β Β Β Β Β Β 283
3 04 Travel operationΒ Β Β Β Β Β Β Β 294
1 Driving conditions of the craneΒ Β Β Β Β 295
2 Starting and stopping the engineΒ Β Β Β Β 297
3 DrivingΒ Β Β Β Β Β Β 303
4 Differential locksΒ Β Β Β Β Β Β 343
5 SteeringΒ Β Β Β Β Β Β 349
3 05 Crane at the job siteΒ Β Β Β Β Β 355
1 GeneralΒ Β Β Β Β Β Β 357
2 The BluetoothΒ Terminal (BTT)Β Β Β Β Β Β 365
3 Supporting from the crane operator’s cabΒ Β Β Β Β Β 401
4 Before leaving the jobsiteΒ Β Β Β Β 421
3 07 Towing the craneΒ Β Β Β Β Β Β Β 422
1 TowingΒ Β Β Β Β Β Β Β 423
3 80 Transport of crane and crane componentsΒ Β Β Β 424
1 Transporting the craneΒ Β Β Β Β Β Β 425
2 Transporting the TY-guyingΒ Β Β Β Β 433
4 00 Operation of crane superstructureΒ Β Β Β Β Β Β 439
4 01 Operating and control instruments on the crane superstructureΒ Β Β 440
1 Operating and control instrumentsΒ Β Β Β Β Β Β 441
2 Operating elements on camera – monitor*Β Β Β Β Β Β 445
3 Operating elements on control consolesΒ Β Β Β 447
4 Operating elements in the side consoleΒ Β Β Β 475
5 Operating elements on the operating and control unit (BKE)Β Β Β Β 477
6 Operating elements on the control panelΒ Β Β Β Β Β 485
4 02 LICCON computer systemΒ Β Β Β Β Β Β Β 486
1 GeneralΒ Β Β Β Β Β Β 487
2 LICCON computer system boot upΒ Β Β Β Β Β 489
3 Operating elements of the LICCON computer systemΒ Β Β Β 491
4 βSet upβ programΒ Β Β Β Β Β Β Β 495
5 βCrane operationβ programΒ Β Β Β Β Β 513
6 βTelescopingβ programΒ Β Β Β Β Β Β Β 581
7 The βWorking range limitationβ program*Β Β Β Β Β Β 585
8 The βSupport force monitoringβ program*Β Β Β Β Β Β 587
9 The settings window βSpeed reduction master switchβΒ Β Β Β Β 593
10 βTele guying* β programΒ Β Β Β Β Β 601
11 Power-Save and Stand-by mode in the LICCON computer systemΒ Β Β Β 609
4 03 Crane start up and taking the crane out of serviceΒ Β Β Β 616
1 Checks before start upΒ Β Β Β Β Β Β 617
2 Work station – Crane operator’s cabΒ Β Β Β Β Β 623
3 Preheating the hydraulic oil with the Hydraulic oil preheating*Β Β Β Β 641
4 Starting and stopping the superstructure engineΒ Β Β Β Β 645
5 Hooking / unhooking the rope lock on the transport retainerΒ Β Β Β 653
6 LICCON computer system after engine startΒ Β Β Β Β 665
4 04 Safety equipmentΒ Β Β Β Β Β Β Β 668
1 GeneralΒ Β Β Β Β Β Β 669
2 Quick test Crane geometryΒ Β Β Β Β Β 669
3 Quick test Overload protectionΒ Β Β Β Β Β 669
4 LICCON computer systemΒ Β Β Β Β Β Β 670
5 Safety devices on the craneΒ Β Β Β Β Β Β 675
4 05 Crane operationΒ Β Β Β Β Β 686
1 GeneralΒ Β Β Β Β Β Β 687
2 LICCON computer systemΒ Β Β Β Β Β Β 695
3 LuffingΒ Β Β Β Β Β Β 697
4 Lifting / loweringΒ Β Β Β Β Β Β 705
5 TurningΒ Β Β Β Β Β Β 719
6 TelescopingΒ Β Β Β Β Β Β Β 727
4 06 Rope reevingΒ Β Β Β Β Β Β Β 744
1 Wire ropes and rope end connectionsΒ Β Β Β Β Β 745
2 Reeving in the hoist rope with the assembly winch*Β Β Β 747
3 Reeving the hook block in and outΒ Β Β Β Β Β Β 751
4 Securing and removing the load hook*Β Β Β Β Β 757
5 Attaching / removing the hoist limit switch weightΒ Β Β 761
6 Assembling / disassembling the wedge lockΒ Β Β Β Β 765
7 Crane operation with auxiliary block* on the telescopic boomΒ Β Β 767
8 Rope reevingΒ Β Β Β Β Β Β 767
4 07 CounterweightΒ Β Β Β Β Β Β 768
1 GeneralΒ Β Β Β Β Β Β 769
2 Assembly of counterweightΒ Β Β Β Β Β 787
3 Disassembly of counterweightΒ Β Β Β Β Β Β 801
4 08 Working with a loadΒ Β Β Β Β Β Β 812
1 Technical safety instructions for working with a loadΒ Β Β Β 813
2 Checks before starting to work with the craneΒ Β Β Β Β Β 814
3 Crane movement – TelescopingΒ Β Β Β Β Β Β 815
4 Taking on a loadΒ Β Β Β Β Β Β Β 817
5 Crane operationΒ Β Β Β Β Β Β Β 821
4 15 Reeving plansΒ Β Β Β Β Β Β 823
1 GeneralΒ Β Β Β Β Β Β 825
2 Reeving the auxiliary ropeΒ Β Β Β Β 827
3 Reeving plansΒ Β Β Β Β Β Β 831
4 20 Procedure for shut off of crane movementsΒ Β Β Β Β Β 852
1 GeneralΒ Β Β Β Β Β Β 853
2 Instructions for resuming crane movements for cranes with CE markΒ Β Β 855
3 Instructions for resuming crane movements for cranes without CE markΒ Β 889
5 00 EquipmentΒ Β Β Β Β Β Β Β Β 923
5 01 Safety technical notes for assembly and disassemblyΒ Β Β 924
1 Checking the retaining elementsΒ Β Β Β Β 925
2 Rope pulleysΒ Β Β Β Β Β Β 925
3 Checking the ropesΒ Β Β Β Β Β Β 925
4 Control measuresΒ Β Β Β Β Β Β Β 926
5 Dangerous conditions without shut offΒ Β Β Β Β 928
6 Transporting componentsΒ Β Β Β Β Β Β 929
7 Pneumatic springs for assembly support of componentsΒ Β Β Β Β 929
8 Manual rope winches for assembly support of componentsΒ Β Β Β 929
9 WeightsΒ Β Β Β Β Β Β 930
10 Guy rodsΒ Β Β Β Β Β Β Β Β 930
11 Auxiliary guyingΒ Β Β Β Β Β Β 931
12 Bypassing the overload protectionΒ Β Β Β Β Β 931
13 Bypassing the hoist top shut offΒ Β Β Β Β Β Β 933
14 Assembly / disassemblyΒ Β Β Β Β Β Β 935
15 Erection / take downΒ Β Β Β Β Β Β Β 966
5 03 Fixed lattice jib – TFΒ Β Β Β Β Β Β Β 968
1 GeneralΒ Β Β Β Β Β Β 969
2 Assembly of fixed lattice jib with auxiliaryΒ Β Β Β 981
3 Electrical connectionsΒ Β Β Β Β Β Β 995
4 Mechanically adjust the angle of the lattice jibΒ Β Β Β 999
5 Erecting the boomΒ Β Β Β Β Β Β 1003
6 Taking the boom downΒ Β Β Β Β Β Β Β 1005
7 Changing the mechanical lattice jib to 0°     1007
8 Disassembly of the fixed lattice jibΒ Β Β Β Β 1009
5 04 Luffing lattice jib -TNΒ Β Β Β Β Β Β 1020
1 GeneralΒ Β Β Β Β Β Β 1021
2 Assembly of luffing lattice jibΒ Β Β Β Β 1031
3 ErectionΒ Β Β Β Β Β Β Β Β 1069
4 Crane operationΒ Β Β Β Β Β Β Β 1081
5 Take downΒ Β Β Β Β Β Β Β 1083
6 Disassembly of the luffing lattice jibΒ Β Β Β Β Β 1091
5 05 Telescopic boom, guyed – TYΒ Β Β Β Β Β Β 1108
1 GeneralΒ Β Β Β Β Β Β 1109
2 Procedure with installed TY-guyingΒ Β Β Β Β Β 1113
3 Removing / installing the receptacles of the TY-framesΒ Β Β 1117
4 Assembly of TY-guyingΒ Β Β Β Β Β Β 1119
5 Crane operation in operating mode TYΒ Β Β Β Β 1145
6 Disassembly of TY-guyingΒ Β Β Β Β Β 1147
5 06 Luffing lattice jib, guyedΒ Β Β Β Β 1160
1 GeneralΒ Β Β Β Β Β Β 1161
2 Assembly of guyed luffing lattice jibΒ Β Β Β 1169
3 ErectionΒ Β Β Β Β Β Β Β Β 1175
4 Crane operationΒ Β Β Β Β Β Β Β 1199
5 Take downΒ Β Β Β Β Β Β Β 1203
6 Disassembly of the guyed luffing lattice jibΒ Β Β Β Β Β 1217
5 07 Fixed lattice jib, guyedΒ Β Β Β Β Β 1220
1 GeneralΒ Β Β Β Β Β Β 1221
2 Assembly of guyed fixed lattice jibΒ Β Β Β Β 1223
3 Crane operationΒ Β Β Β Β Β Β Β 1227
4 Taking the boom downΒ Β Β Β Β Β Β Β 1229
5 Disassembly of guyed fixed lattice jibΒ Β Β Β Β Β 1231
5 09 Winch 2Β Β Β Β Β Β Β 1234
1 GeneralΒ Β Β Β Β Β Β 1235
2 Assembly winch 2Β Β Β Β Β Β Β 1237
3 Pinning the TN-control winchΒ Β Β Β Β Β 1241
4 Disassembly winch 2Β Β Β Β Β Β 1245
5 10 Boom nose – telescopic boomΒ Β Β Β Β Β Β 1250
1 GeneralΒ Β Β Β Β Β Β 1251
2 Assembly of boom noseΒ Β Β Β Β Β Β 1251
3 Removal of the boom noseΒ Β Β Β Β Β 1257
5 14 Telescopic boom disassembly/assembly, luffing cylinder on the crane superstructureΒ Β 1260
1 GeneralΒ Β Β Β Β Β Β 1261
2 Disassembly of telescopic boomΒ Β Β Β Β 1263
3 Assembling the telescopic boomΒ Β Β Β Β 1269
5 15 Telescopic boom disassembly/assembly, luffing cylinder on the telescopic boomΒ Β 1276
1 GeneralΒ Β Β Β Β Β Β 1277
2 Disassembly of telescopic boomΒ Β Β Β Β 1279
3 Assembling the telescopic boomΒ Β Β Β Β 1287
5 17 Sliding beam disassembly/assemblyΒ Β Β Β Β Β Β 1296
1 GeneralΒ Β Β Β Β Β Β 1297
2 Disassembly of the sliding beamsΒ Β Β Β Β Β Β 1299
3 Installation of the sliding beamsΒ Β Β Β Β Β 1301
5 19 Hook blocksΒ Β Β Β Β Β Β Β 1302
1 Minimum required hook block weightΒ Β Β Β Β Β 1303
2 Procedure in case of slack ropeΒ Β Β Β Β 1306
3 Hook block overviewΒ Β Β Β Β Β 1309
4 Installing a double hook block for single operationΒ Β Β Β Β 1311
5 Installing a double hook block for parallel operationΒ Β Β Β 1321
6 Single hook blocksΒ Β Β Β Β Β 1333
5 24 Luffing cylinder removal / installation with auxiliary craneΒ Β Β 1340
1 GeneralΒ Β Β Β Β Β Β 1341
2 Removal of luffing cylinderΒ Β Β Β Β Β Β 1343
3 Installation of luffing cylinderΒ Β Β Β Β Β Β 1349
5 27 Erection and take-down chartsΒ Β Β Β Β Β 1354
1 Minimum rope reeving and minimum hook block weightΒ Β Β Β Β 1355
2 Erection and take-down charts for TN operationΒ Β Β Β Β 1355
3 Erection and take-down charts for TN operationΒ Β Β Β Β 1358
4 Erection and take-down charts for TYVEN operationΒ Β Β 1360
5 Erection and take-down charts for TYVEN operationΒ Β Β 1362
6 Erection and take-down charts for TYVEN operationΒ Β Β 1364
5 31 BluetoothΒ Terminal (BTT)Β Β Β Β Β Β 1366
1 Display / operating element BluetoothΒ TerminalΒ Β Β Β 1367
2 Placing the BluetoothΒ Terminal back in its fittingΒ Β Β Β Β 1381
3 The BluetoothΒ Terminal (BTT) removed from its charging cradleΒ Β Β Β 1387
4 Operation of the BluetoothΒ Terminal (BTT)Β Β Β Β 1415
5 42 Auxiliary jibΒ Β Β Β Β Β Β 1420
1 GeneralΒ Β Β Β Β Β Β 1421
2 Assembly of auxiliary jib 1 3 mΒ Β Β Β Β 1425
3 Disassembly of the auxiliary jib 1 3 mΒ Β Β Β Β Β 1431
5 51 TN/TF adapterΒ Β Β Β Β Β Β 1434
1 GeneralΒ Β Β Β Β Β Β 1435
2 Assembly of TN/TF-adapterΒ Β Β Β Β 1435
3 Disassembly of the TN/TF-adapterΒ Β Β Β Β Β Β 1439
5 53 Telescopic boom extension with eccentricΒ Β Β Β Β Β 1440
1 GeneralΒ Β Β Β Β Β Β 1441
2 Assembly of eccentricΒ Β Β Β Β Β Β 1441
3 Removal of the eccentricΒ Β Β Β Β Β 1451
5 61 Pulley cartΒ Β Β Β Β Β Β Β 1458
1 GeneralΒ Β Β Β Β Β Β 1459
6 00 Additional equipmentΒ Β Β Β Β Β Β Β 1463
6 01 Heater / engine preheating / Air conditioning system DriverΒs cabΒ Β Β 1464
1 Heating the driver’s cabΒ Β Β Β Β Β 1465
2 Maintaining the engine independent heaterΒ Β Β Β Β 1487
6 02 Heater / engine preheating / Air conditioning system Crane operatorΒs cabΒ Β 1489
1 Heating the crane cabΒ Β Β Β Β Β Β 1491
2 Menu βClimate control settingsβΒ Β Β Β Β 1491
3 Maintaining the engine independent heaterΒ Β Β Β Β 1533
6 04 Support beam monitoring / sliding beam monitoringΒ Β Β Β 1535
1 GeneralΒ Β Β Β Β Β Β 1537
2 Support basesΒ Β Β Β Β Β 1537
3 Working with the LICCON sliding beam monitoring*Β Β Β Β 1538
6 05 Emergency take-downΒ Β Β Β Β Β 1540
1 Emergency controlΒ Β Β Β Β Β Β 1541
7 00 Service and maintenanceΒ Β Β Β Β Β 1547
7 01 Maintenance and service – GeneralΒ Β Β Β Β Β Β 1548
1 Liebherr ServiceΒ Β Β Β Β Β Β 1549
2 General specificationsΒ Β Β Β Β Β Β 1549
3 Cleaning and care of the craneΒ Β Β Β Β 1550
4 Measures for work interruption or transportΒ Β Β Β 1551
5 Maintenance work on the crane superstructure or boomΒ Β Β Β 1551
6 Maintenance and inspection guidelinesΒ Β Β Β 1552
7 02 Maintenance intervals – Crane chassisΒ Β Β Β Β 1557
1 Crane chassis maintenance and inspection scheduleΒ Β Β 1559
7 03 Maintanance intervals – Crane superstructureΒ Β Β Β 1567
1 Crane superstructure maintenance and inspection scheduleΒ Β Β Β Β 1569
7 04 Maintenance guidelines – Crane chassisΒ Β Β Β 1578
1 Diesel engineΒ Β Β Β Β Β 1579
2 Fuel systemΒ Β Β Β Β Β Β 1585
3 Urea system*Β Β Β Β Β Β Β 1589
4 Fuel container*Β Β Β Β Β Β Β Β 1591
5 Automatic transmission with torque converter couplingΒ Β Β Β 1593
6 Transfer gearΒ Β Β Β Β Β 1601
7 Hydraulic systemΒ Β Β Β Β Β Β 1603
8 Air dryer for Compressed air and brake systemΒ Β Β Β Β 1613
9 Tires / wheelsΒ Β Β Β Β Β Β Β 1613
10 AxlesΒ Β Β Β Β Β Β 1615
11 Wheel alignmentΒ Β Β Β Β Β Β 1617
12 Tilting the driver’s cabΒ Β Β Β Β 1619
13 Electrical system – LightingΒ Β Β Β Β Β 1619
7 05 Maintenance guidelines – Crane superstructureΒ Β Β Β Β Β 1622
1 Diesel engineΒ Β Β Β Β Β 1623
2 Urea system*Β Β Β Β Β Β Β 1631
3 Pump distributor gearΒ Β Β Β Β Β Β 1635
4 Hydraulic systemΒ Β Β Β Β Β Β 1637
5 Slewing ring connectionΒ Β Β Β Β Β 1645
6 Central lubrication systemΒ Β Β Β Β Β Β 1647
7 Hoist gear 1 and 2, illustration 1Β Β Β Β Β Β 1655
8 Assembly winch, illustration 2Β Β Β Β Β 1657
9 TY-guyingΒ Β Β Β Β Β Β Β 1659
10 Securing the crane operator’s cab for maintenance work*Β Β Β Β Β 1661
11 Slewing gearΒ Β Β Β Β Β 1663
12 Air drier Compressed air systemΒ Β Β Β Β Β Β 1665
13 Electrical system – LightingΒ Β Β Β Β Β 1665
14 Telescopic boomΒ Β Β Β Β Β Β 1667
7 06 Fill quantities, lubrication chartΒ Β Β Β Β Β 1670
1 Fill quantitiesΒ Β Β Β Β Β Β Β 1671
2 Lubrication scheduleΒ Β Β Β Β Β Β Β 1671
7 07 Service fluids and lubricantsΒ Β Β Β Β Β 1672
1 Specified service items and lubricants for Liebherr cranesΒ Β Β Β 1673
7 15 Procedure in case of problemsΒ Β Β Β Β Β 1681
1 Procedure to follow in case of a problemΒ Β Β Β Β 1683
2 Carrying out error diagnosticsΒ Β Β Β Β 1689
3 Measures in clear problem casesΒ Β Β Β Β 1695
4 Measures for defective componentsΒ Β Β Β Β Β 1704
8 00 Inspections of cranesΒ Β Β Β Β Β Β 1715
8 01 Periodic crane inspectionsΒ Β Β Β Β 1716
1 GeneralΒ Β Β Β Β Β Β 1717
2 Inspection of carrying crane structures, especially steel structuresΒ Β Β Β 1718
3 Inspection of tires and disk wheelsΒ Β Β Β Β 1791
4 Inspecting the hoist and luffing winchesΒ Β Β Β Β 1793
5 Inspecting load hooksΒ Β Β Β Β Β Β 1805
6 Inspecting the rope feed mechanics in the telescopic boomΒ Β Β Β 1805
7 Inspection of locking system of telescopic boomΒ Β Β Β 1807
8 Inspection of retaining ropes and anchor pointsΒ Β Β Β 1809
9 Inspection of membrane accumulatorΒ Β Β Β Β Β 1811
10 Inspection of relapse cylindersΒ Β Β Β Β Β Β 1812
11 Inspection of the safety controls on the relapse cylindersΒ Β Β 1812
12 Inspecting the cable pulleysΒ Β Β Β Β Β 1812
13 Inspecting the function of the overload protectionΒ Β Β Β Β 1813
14 Inspecting the roller slewing ring connectionΒ Β Β Β Β 1813
15 Inspecting the mounting of the load bearing equipmentΒ Β Β 1813
16 Inspection of the tele extension with eccentric, illustration 1Β Β Β 1815
17 Inspection of change over pulleys, illustration 2Β Β Β Β Β 1815
18 Inspecting the oil and fuel reservoirsΒ Β Β Β Β Β 1815
19 Inspection of the auxiliary reeving winch, towing winch and spare wheel winchΒ 1815
20 AppendixΒ Β Β Β Β Β Β Β 1816
8 04 Inspection of crane wire ropesΒ Β Β Β Β Β 1826
1 IntroductionΒ Β Β Β Β Β Β 1827
2 Wire ropeΒ Β Β Β Β Β Β Β 1827
3 Operating behavior of steel ropesΒ Β Β Β Β Β 1833
4 Condition of equipment that is functionally associated with the ropeΒ Β Β Β 1834
5 Rope inspection logΒ Β Β Β Β Β 1834
6 Rope storage and markingΒ Β Β Β Β Β 1834
7 Wire ropes and rope end connectionsΒ Β Β Β Β 1834
8 Twisting caused by stretching in rotation-resistant ropes and its remedyΒ Β 1839
9 Appendix 1Β Β Β Β Β Β Β Β 1843
10 Appendix 2Β Β Β Β Β Β Β 1845
11 Appendix 3Β Β Β Β Β Β Β 1847
12 Appendix 4Β Β Β Β Β Β Β 1847
8 07 Inspection of pneumatic brake system for disk brakesΒ Β Β Β Β 1850
1 GeneralΒ Β Β Β Β Β Β 1851
2 Visual inspectionΒ Β Β Β Β Β Β 1851
3 Function and performance testΒ Β Β Β Β Β 1851
4 Internal inspection of the wheel brakeΒ Β Β Β Β Β 1853
8 12 Inspection of safety switching on the relapse supportsΒ Β Β Β 1857
1 Luffing lattice jibΒ Β Β Β Β Β 1859
8 14 Inspection of accumulator pressure in relapse cylinderΒ Β Β Β 1864
1 Checking the accumulator pressure in relapse cylinderΒ Β Β Β 1865
8 15 Inspection and maintenance of guy rodsΒ Β Β Β 1866
1 GeneralΒ Β Β Β Β Β Β 1867
2 Repeat inspection of guy rodsΒ Β Β Β Β Β 1867
9 00 General notesΒ Β Β Β Β Β Β Β Β 1869
9 02 Supplementary service workΒ Β Β Β Β 1870
1 Checks before start upΒ Β Β Β Β Β Β 1871
2 Repair and maintenance tasksΒ Β Β Β Β Β 1871
3 Important service tasksΒ Β Β Β Β Β 1871
4 Maintenance notes for replacement partsΒ Β Β Β Β Β 1872
5 Recommendations for travel operationΒ Β Β Β Β 1872
6 Disposal of fuels and lubricantsΒ Β Β Β Β Β Β 1872
7 TiresΒ Β Β Β Β Β Β Β 1872
90 00 AppendixΒ Β Β Β Β Β Β Β 1881
90 01 Foreword to appendixΒ Β Β Β Β Β Β Β 1882
1 PrefaceΒ Β Β Β Β Β Β 1885
90 05 Update confirmationΒ Β Β Β Β Β 1886
1 Update confirmationΒ Β Β Β Β Β 1887
2 Customer informationΒ Β Β Β Β Β Β Β 1887
IndexΒ Β Β Β Β Β Β Β 1889
LIEBHERR MOBILE CRANE LTM1350-6.1 OPERATIONS MANUAL SN 071350 – PDF DOWNLOAD:
IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us atΒ heydownloadss @gmail.comΒ . We may surprise you with a nice offer