★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Linkbelt 130LX Crawler Excavators Service Manual – PDF DOWNLOAD

$30.95

Linkbelt 130LX Crawler Excavators Service Manual – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Linkbelt 130LX Crawler Excavators Service Manual – PDF DOWNLOAD

FILE DETAILS:

Linkbelt 130LX Crawler Excavators Service Manual – PDF DOWNLOAD

Language : English
Pages : 590
Downloadable : Yes
File Type : PDF

 

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Linkbelt 130LX Crawler Excavators Service Manual – PDF DOWNLOAD

GENERAL INFORMATION
Cleaning
Clean all metal parts except bearings, in a suitable cleaning solvent or by steam cleaning. Do not use caustic soda for steam cleaning. After cleaning, dry and put oil on all parts. Clean oil passages with compressed air. Clean bearings in a suitable cleaning solvent. Dry the bearings completely and put oil on the bearings.
Inspection
Check all parts when the parts are disassembled. Replace all parts that have wear or damage. Small scoring or grooves can be removed with a hone or crocus cloth. Complete a visual inspection for indications of wear, pitting and the replacement of parts necessary to prevent early failures.
Bearings
Check bearings for easy action. If bearings have a loose fit or rough action, replace the bearing. Wash bearings with a suitable cleaning solvent and permit to air dry. DO NOT DRY BEARINGS WITH COMPRESSED AIR.
Needle Bearings
Before you press needle bearings in a bore always remove any metal protrusions in the bore or edge of the bore. Before you press bearings into position, put petroleum jelly on the inside and outside diameter of the bearings.
Gears
Check all gears for wear and damage. Replace gears that have wear or damage.
Oil Seals, O-rings and Gaskets
Always install new oil seals, O-rings and gaskets. Put petroleum jelly on seals and O-rings.
Shafts
Check all shafts that have wear or damage. Check the bearing and oil seal surfaces of the shafts for damage.
Service Parts
Always install genuine Link-Belt service parts. When ordering refer to the Parts Catalog for the correct part number of the genuine Link-Belt replacement items. Failures due to the use of other than genuine Link- Belt replacement parts are not covered by warranty.
Lubrication
Only use the oils and lubricants specified in the Operator’s or Service Manuals. Failures due to the use of non-specified oils and lubricants are not covered by warranty.

TABLE OF CONTENTS:

Linkbelt 130LX Crawler Excavators Service Manual – PDF DOWNLOAD

GENERAL INFORMATION................................................................................................  5
	Safety, General Information....................................................................................  5
	General Specifications......................................................................................... 13
ENGINE............................................................................................................. 37
	Removal and Installation of the Engine......................................................................... 37
	Radiator and Oil-Cooler........................................................................................ 43
FUEL SYSTEM........................................................................................................ 49
	Removal and Installation of the Fuel Tank...................................................................... 49
ELECTRICAL SYSTEM.................................................................................................. 55
	Electrical System, Electrical and Electronic Troubleshooting................................................... 55
	Inspection and Maintenance of Batteries and Connecting a Booster Battery.......................................145
	Main Electronic Control Box Engine Electronic Control Box......................................................155
UNDERCARRIAGE......................................................................................................159
	Removal and Installation of the Tracks Set.....................................................................159
	Removal and Installation of a Set of Rubber Tracks.............................................................171
	Upper and Lower Rollers........................................................................................177
	Sprocket.......................................................................................................195
	Idler Wheel and Tension Shock Absorber.........................................................................199
DRIVE TRAIN........................................................................................................219
	Drive Motor and Final Drive Transmission Removal and Installation..............................................219
	Drive Motor and Final Drive Transmission Disassembly and Assembly..............................................225
	Removal and Installation of theSwing Reduction Gear............................................................261
	Disassembly and Assembly of the Swing Reduction Gear...........................................................269
UPPERSTRUCTURE HYDRAULICS..........................................................................................279
	Depressurizing and Decontaminating the Hydraulic System, Use of the Vacuum Pump and Bleeding the Components....279
	Specifications, Troubleshooting, Checks and Hydraulic Pressure Settings........................................289
	Hydraulic Sump Tank Removal and Installation...................................................................317
	Main and Pilot Pumps, Removal and Installation.................................................................323
	Main Hydraulic Control Valve, Removal and Installation.........................................................333
	Attachment Cylinders, Removal and Installation.................................................................339
	Rotating Joint, Removal and Installation.......................................................................359
	Swing Motor, Removal and Installation..........................................................................363
	Main Hydraulic Control Valve, Removal and Installation.........................................................369
	Attachment Cylinders, Disassembly and Assembly.................................................................401
	Hand Joystick Control, Disassembly and Assembly................................................................427
	Foot Joystick Control, Disassembly and Assembly................................................................439
	Six Stack Solenoid Valve, Disassembly and Assembly.............................................................445
	Cushion Control, Disassembly and Assembly......................................................................451
	Hose Burst Check Valve.........................................................................................459
	Rotating Joing, Disassembly and Assembly.......................................................................471
	Swing Motor, Disassembly and Assembly..........................................................................479
	Hydraulic Functions............................................................................................503
UPPERSTRUCTURE.....................................................................................................537
	Upperstructure, Turntable and Counterweight....................................................................537
	Boom, Arm and Bucket...........................................................................................551
	Seat and Safety Belt...........................................................................................563
	Cab and Cab Equipment..........................................................................................571

Contact us: [email protected]

https://vimeo.com/892187910?share=copy

S.S

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order