★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately
Sale!

Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 – PDF

Original price was: $34.95.Current price is: $21.95.

Official Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 (April 2016) covering port entry, berthing, cargo unloading and emergency procedures for LNG carriers at the Świnoujście external port. 142-page PDF.

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3

The Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 is the controlling marine operations reference for the LNG Terminal in Świnoujście, Poland. Drawn up by Polskie LNG S.A. in cooperation with the Maritime University in Szczecin, this 142-page manual sets out the key terminal access procedures, approach procedures, mooring operations, cargo transfer sequences, connection drawings, compatibility procedures and legal notes that govern every LNG carrier call at the terminal. It is the document that masters, chief officers, loading masters, pilots, tug masters, mooring gangs, terminal operators and agents are expected to be familiar with before a vessel enters, berths, unloads, unberths and departs the Świnoujście external port.

File Details

  • Manual type: Marine Operations Manual (MOM)
  • Document number: PE-PP-10-1
  • Revision: Rev 2.3
  • Date: April 2016
  • Issued by: Polskie LNG S.A. (PLNG S.A.)
  • Developed in cooperation with: Maritime University in Szczecin
  • Language: English
  • Page count: 142
  • Format: PDF

IMAGES PREVIEW

Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 - PDF — PDF page 1 preview
Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 - PDF — PDF page 31 preview
Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 - PDF — PDF page 49 preview

Chapters Covered

  • A. Introduction — purpose, scope and legal basis of the Marine Operations Manual
  • B. Goal of this document — contractual and safety information for terminal users and masters
  • C. General information — terminal description, location, hydrometeorological conditions, charts and nautical publications, tug requirements, fire-fighting ship requirements, notification of arrival
  • D. Terminal safety regulations and policy — restricted access zone, consequences of breaching rules, health, safety and environmental rules, ISGOTT 5th edition references, visiting persons, drug and alcohol policy
  • E. Procedures of entry into the outer port in Świnoujście (PE-PP-10-1-1) — commercial port information, approach fairway and anchorages, communication with Maritime Administration, ship-terminal communication, SSI & Vessel Compatibility Study, tank and cargo system condition, pilot services, Master/Pilot Exchange checklist, FMBS conclusions
  • F. Berth approach, mooring and berthing procedures (PE-PP-10-1-2) — operational limits, maximum hydrometeorological conditions, mooring assistance, berth equipment, International Shore Connection, provisions, bunkering, repairs, ballast water, waste disposal, shore leave, winter preparation
  • G. Cargo operations (PE-PP-10-1-3) — unloading procedure and pre-discharge meeting, connection of unloading and BOG return arms, leak and pressure tests, preliminary CTMS measurement, BOG handling, Warm ESD test, arm cool-down, Cold ESD test, unloading commencement and control, cargo sampling, unloading completion, drainage and nitrogen purge, final CTMS measurement, disconnection, post-discharge documentation
  • H. Emergency procedures (PE-PP-10-1-4) — source regulations, emergency situations on the berth, emergency situations on the LNG tanker, detection by the ship, evacuation of the ship and the LNG unloading platform, emergency unberthing procedure PE-PP-10-1-7
  • I. List of contacts — Port Authority, VTS, Pilot Station, fire service, police, Border Guard, SAR, Port Rescue Service, ambulance
  • J. Appendices 1–14 — document list, Ship/Shore Safety Check List with filling instructions, pre-discharge meeting checklist, Safety Letter, Marine Operations Algorithm, Notification of Departure, Notification of Arrival, SSI current SIGTTO format, unloading arms work range, quick release hook and fender data, gangway tower and crane schematics, LNG carrier area evacuation route, jetty readiness checklist, hazardous zones around LNG carrier
  • K. Literature — ISGOTT, SIGTTO, OCIMF, IMO and industry reference standards

Across its chapters, the manual delivers a complete operational spine for an LNG carrier call: the pre-arrival notifications and compatibility screening, the tug and pilot requirements for entering the external port, the precise mooring sequence at the unloading berth, the full cargo transfer sequence from pre-discharge meeting through to post-discharge documentation, and the emergency procedures that bind the ship and terminal together in the event of fire, LNG leak, allision or uncontrolled movement. It also carries the supporting checklists, forms and technical drawings that make those procedures workable on the day.

What This Manual Enables

This is a working document for marine operations, not a casual read. It gives a ship’s master and a terminal loading master a shared, precise language for a high-risk interface: the operational limits of the terminal (carrier parameters, maximum hydrometeorological conditions, approach speed, berth heading), the exact tug composition required for entry, stay and departure, the berth equipment and its safe use, and the sequence of events that must be followed during LNG unloading. It also lays out the emergency procedures that apply to fire at the terminal, fire on the LNG tanker, LNG leaks from either side of the ship-shore interface, allision with the berth, and emergency unberthing with the quick release hooks.

Because LNG carrier operations are governed by strict compatibility and safety requirements, having the correct procedures and limits in front of the responsible officers matters. The Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 consolidates the terminal’s berth safe operating instruction and safe LNG unloading instruction into a single reference, alongside the checklists and forms that the ship and terminal must complete before, during and after a call.

Instant PDF Delivery

The manual is delivered as an instant PDF download after checkout — no shipping, no waiting. It can be opened on any device, searched on screen, and printed for the bridge, the cargo control room or the terminal office. Whether you are preparing a vessel for a first call at Świnoujście, refreshing the terminal’s marine procedures, or studying how an LNG receiving terminal structures its ship-shore interface, the Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 puts the complete operational reference in your hands immediately.

Reviews

There are no reviews yet.

Be the first to review “Polskie LNG Świnoujście Terminal Marine Operations Manual PE-PP-10-1 Rev 2.3 – PDF”

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order