Relion REG670 Generator Protection Commissioning Manual Version 2.2 IEC – 1MRK502073-UEN
$44.95 Original price was: $44.95.$26.95Current price is: $26.95.
Hitachi Energy commissioning manual for the Relion REG670 generator protection IED, Version 2.2 IEC. Document 1MRK502073-UEN, Revision N, March 2024. Covers start-up, ICT calibration and commissioning of ROTIPHIZ and STTIPHIZ injection protection, secondary injection testing of every protection function, SPA/IEC, LON, IEC 61850 and IEEE C37.118/1344 communication verification, directionality checks, maintenance and troubleshooting.
Description
The Relion REG670 Generator Protection Commissioning Manual Version 2.2 IEC is the field document that takes a REG670 generator protection IED from a cold, un-energised cubicle to a fully verified protection scheme ready for service. Published by Hitachi Energy under document ID 1MRK502073-UEN, Revision N, dated March 2024, and covering product version 2.2, this is the working reference for protection engineers, commissioning technicians, system engineers and maintenance personnel dealing with REG670 installations. The chapters are organised in the chronological order in which the IED should actually be commissioned, so the manual can be followed step by step at site or used selectively during service and maintenance work.
File Details
- Manual type: Commissioning manual
- Brand: Hitachi Energy
- Product series: Relion 670 series
- Model: REG670 generator protection IED
- Product version: 2.2 IEC
- Document ID: 1MRK502073-UEN
- Revision: N
- Issue date: March 2024
- Language: English
- Page count: 360
- File format: PDF
Chapters Covered
- Introduction โ this manual, intended audience, product documentation set, document revision history, related documents, symbols and conventions, IEC 61850 Edition 1 / Edition 2 / Edition 2.1 mapping
- Safety information โ symbols on the product, warnings, caution signs, note signs
- Available functions โ main protection functions, back-up protection functions, control and monitoring functions, communication, basic IED functions, local HMI functions
- Starting up โ factory and site acceptance testing, commissioning checklist, checking the power supply, energizing the IED, energizing REX060, setting up communication between PCM600 and the IED, writing an application configuration, checking CT circuits, checking VT circuits, RTXP test switch, binary input/output circuits, optical connections
- Configuring the IED and changing settings โ overview, configuring analog CT inputs, supervision of input/output modules
- Sensitive rotor earth fault protection, injection based ROTIPHIZ and the Injection Commissioning Tool โ commissioning process, ICT initial set-up, redundant scheme, installation, calibration, reference impedance definition and analysis of ICT logfiles, second harmonic crossing block, automatic lockout reset, disturbance recording analysis, troubleshooting of the ERROR output, laboratory and FAT tests
- 100% stator earth fault protection, injection based STTIPHIZ and the Injection Commissioning Tool โ installation, calibration, selection of the calibration resistance, OpenCircLim and OPICRC, reference impedance acquisition RefZ1 to RefZ10, third harmonic crossing block, lockout reset, MCB and fuse checks at the SIT LV side, troubleshooting, laboratory and FAT test set-ups
- Establishing connection and verifying the SPA/IEC communication โ SPA settings, IEC settings, verifying communication, fiber optic loop, optical budget calculation
- Establishing connection and verifying the LON communication โ communication via the rear ports, the LON protocol, hardware and software modules, optical budget calculation
- Establishing connection and verifying the IEC 61850 communication โ setting the station communication, verifying the communication, redundant IEC 61850-8-1 verification
- Establishing connection and verifying the IEEE C37.118/1344 communication โ PMU report and configuration, TCP/UDP client communication, verifying TCP and UDP, optical budget for PMUโPDC
- Testing IED operation โ test requirements, preparing the IED to verify settings, activating test mode, connecting test equipment, releasing the function to be tested, verifying analog primary and secondary measurement, testing protection functionality, forcing of binary input/output signals
- Testing functionality by secondary injection โ differential protection (T2WPDIF, T3WPDIF, HZPDIF, GENPDIF, REFPDIF), impedance protection (ZMHPDIS, ZMFPDIS, ZMFCPDIS, PSPPPAM, OOSPPAM, LEXPDIS, ZGVPDIS), current protection (PHPIOC, OC4PTOC, EFPIOC, EF4PTOC, NS4PTOC, SDEPSDE, TRPTTR, CCRBRF, BRPTOC, CCPDSC, GUPPDUP, GOPPDOP, NS2PTOC, AEGPVOC, VRPVOC, GSPTTR, GRPTTR, APPTEF), voltage protection (UV2PTUV, OV2PTOV, ROV2PTOV, OEXPVPH, VDCPTDV, STEFPHIZ), frequency protection (SAPTUF, SAPTOF, SAPFRC, FTAQFVR), multipurpose protection (CVGAPC), secondary system supervision, control, logic, monitoring, metering, station communication and remote communication
- Checking the directionality โ overview and testing the directionality of the distance protection
- Commissioning and maintenance of the fault clearing system โ commissioning tests, periodic maintenance tests, visual inspection, secondary injection, alarm test, self supervision check, trip circuit check, measurement of service currents, restoring
- Troubleshooting โ checking the self supervision signals, fault tracing, internal fault indications, using front-connected PC, diagnosing the IED status via the LHMI hint menu, hardware re-configuration, repair instruction and repair support
- Glossary
Read as a whole, the REG670 commissioning manual gives a technician the complete sequence for bringing a generator protection terminal into service. It starts with a commissioning checklist and power supply verification, moves through energisation and PCM600 communication set-up, and then walks through the wiring checks โ CT circuits, VT circuits, RTXP test switch use, binary input and output circuits, and optical connections โ before going into setting configuration and the injection based protection functions. The secondary injection chapter is the technical heart of the document: it explains, function by function, how to measure operating limits of set values, verify re-trip and back-up trip times, check directional lines, confirm the pole slip, out-of-step, loss of excitation and under-impedance characteristics, and validate alarm, start and trip outputs against the configured logic. Every test instruction identifies the settings, the expected service values and the output signals that should appear or should not appear.
Injection Based Protection and the ICT Workflow
Two full sections are dedicated to the injection based functions that make the REG670 distinctive. The ROTIPHIZ section covers sensitive rotor earth fault protection and the STTIPHIZ section covers 100% stator earth fault protection, and both are built around the Injection Commissioning Tool inside PCM600. The manual explains how to install REX060 and REX061 or REX062, how to run the three measurement steps of the calibration, how to select a suitable calibration resistance, how to interpret the checks performed by ICT at the end of calibration, and how to test the measurement using known test resistances with the generator at standstill. It then explains how to acquire reference impedances from ICT logfiles captured across a complete sequence of generator operating conditions โ standstill, start-up, synchronisation, loaded operation, shutdown โ and how to compare those logfiles against disturbance recordings and event lists to define the settings, blocking logic and switching times.
Communication, Directionality and Maintenance
Separate sections cover establishing and verifying SPA/IEC, LON, IEC 61850 and IEEE C37.118/1344 communication, including optical budget calculations for each link type. A dedicated directionality chapter explains how to compare the direction indication reported by the distance protection against the actual power flow measured by external equipment. The commissioning and maintenance section sets out periodic test cycles, alarm testing, self-supervision checks, trip circuit checks and measurement of service currents, and the troubleshooting section explains how to read the self-supervision signals, use the LHMI hint menu, and re-configure hardware after modules are added, removed or moved.
What This Manual Lets You Do
- Work through a REG670 commissioning from the checklist to the final trip test without leaving the document
- Configure analog CT inputs, I/O module supervision and the application configuration correctly before energising
- Install, calibrate and commission the ROTIPHIZ rotor earth fault and STTIPHIZ 100% stator earth fault injection based protection functions using ICT
- Verify every protection function by secondary injection and confirm measured operating values against the settings
- Bring up and verify SPA, IEC 60870-5-103, LON, IEC 61850 and IEEE C37.118/1344 communication links
- Check directionality of the distance protection after the object is energised
- Run periodic maintenance tests, self-supervision checks, trip circuit checks and service current measurements
- Diagnose internal failures and warning conditions from the self-supervision signals and the LHMI hint menu
Why the Correct Commissioning Reference Matters
Generator protection sits between a high-value machine and the network, and a REG670 that has been set, wired or tested incorrectly is worse than no protection at all. The procedure, the setting value and the test point all matter: a phase-to-phase test point one step outside the zone boundary, a reference impedance switched at the wrong operating condition, or a blocking time shorter than the transient it is meant to cover will all produce a scheme that behaves unpredictably in service. This manual gives the correct procedure for each of those decisions in the manufacturer’s own wording, so that measured values can be compared against the expected values, settings can be validated against site conditions, and every test result can be recorded as part of the commissioning evidence for the station.
IMAGES PREVIEW
Instant PDF Delivery
The Relion REG670 Generator Protection Commissioning Manual is supplied as a PDF download. There is no shipping, no waiting for a courier and no physical book to lose in the cubicle โ the file is available immediately after payment and can be opened on a laptop, tablet or phone at the panel, printed page by page for a test record, or kept on a shared drive for the whole commissioning team. Because the chapters follow the order in which the IED is actually commissioned, the same file can be used on the first SAT and again years later for a periodic maintenance test.



Reviews
There are no reviews yet.