★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

Santal PDM2 Seedlings Planter 2 Repair Time Schedule Manual – PDF DOWNLOAD

Original price was: $68.95.Current price is: $25.95.

Santal PDM2 Seedlings Planter 2 Repair Time Schedule Manual – PDF DOWNLOAD

Buy now
โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Santal PDM2 Seedlings Planter 2 Repair Time Schedule Manual – PDF DOWNLOAD

DESCRIPTION:

Santal PDM2 Seedlings Planter 2 Repair Time Schedule Manual – PDF DOWNLOAD

PRESENTAะขION AND USE :

This LABOR TIME TABLE was developed to facilitate the understanding of the times paid in warranty but also accurately identify, through codes, defects that caused failures in the components, analyzing the efficiency of the workshop technical personnel and to advise ะพะฟ the collection of labor from the customer. The Labor Time ะขะฐะซะต is divided in chapters that represent groups of components, such as, for example: platform, etc. Each chapter is divided into units that represent parts of these groups. The units are described with ะฐ generic title, ะฐ specific title and other drawings showing the parts. lt also has 6 columns of information that are: ltem, Group, Failure Code, Hours and Notes.

Item: This column associates the information with the exploded drawing.
Group: Represented ะฌัƒ letters and numbers, which associate the various parts of the chapter. The groups are independent among the chapters.
Failure Code: Number used to represent the failure in ะฐ certain component.
Hours: Expresses the number of hours required for the operation.
Notes: Field which describes general information of procedure, location and distinct times ะฌัƒ product.

TIME:

The times listed in this puะซication are the result of ะฐ careful study of each operation. They represent the time spent ะฌัƒ ะฐ trained technician with average skill to perform the task, using standard and special tools. ln them are not included displacements and expenses to the location where the equipment is. The times also include the difficulties encountered ะพะฟ the machines used and are based ะพะฟ the methods and recommendations for the use of special tools, which are described in the Service Manuals.
ln the times of this tะฐะซะต are included the following activities:
1 . AII the operations such as removal of lids, use of jacks, separation,
pauses, oil drainage and replacement, and parts cleaning.
2. Drive the machine inside and outside the workshop or to better
locate it ะพะฟ the farm.
3. Receive instructions, read bulletins and service manuals.
4. Do routine diagnostics.
5. Receive and deliver special tools at the warehouse of tools.
6. Withdrawal of appropriate parts from the warehouse of parts.
7. Bring information to the office staff.
8. Final check.
9. Needs of the mechanic and effects of fatigue.
1 ะž. Washing the machine.

TABLE OF CONTENTS:

Santal PDM2 Seedlings Planter 2 Repair Time Schedule Manual – PDF DOWNLOAD

Cabin 10
Rear platform 20
Electrical System 30
Frontal part 40
Rear Axle 50
Bucket 60
Fertilization System 70
Mat 80
Feeder set 90
lnsecticide System 100
Hydraulic 11 ะž

Need help? Contact: [email protected]

IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:

  • This is the SAME exact manual used by your dealers to fix your vehicle.
  • The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
  • Any queries / doubts regarding your purchase, please feel free to contactย [email protected]

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
๐Ÿ›’
Recently Purchased
๐Ÿ•’ verified order