★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately

Skyjack SJ30 AJE SJ30 ARJE Articulating Boom Operating Manual 213213ABA – PDF DOWNLOAD

$27.95

Skyjack SJ30 AJE SJ30 ARJE Articulating Boom Operating Manual 213213ABA – PDF DOWNLOAD

SJ30 AJE & SJ30 ARJE: A300 000 001 & Above

โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Skyjack SJ30 AJE SJ30 ARJE Articulating Boom Operating Manual 213213ABA – PDF DOWNLOAD

FILE DETAILS:

Skyjack SJ30 AJE SJ30 ARJE Articulating Boom Operating Manual 213213ABA – PDF DOWNLOAD

Language : English
Pages : 110
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

Skyjack SJ30 AJE SJ30 ARJE Articulating Boom Operating Manual 213213ABA – PDF DOWNLOAD

SJ30 AJE & SJ30 ARJE: A300 000 001 & Above

About this Mobile Elevating
Work Platform (MEWP):
1.1 Read and Heed:
Skyjack is continuously improving and expanding product features on its equipment, therefore,
specifications and dimensions are subject to change without notice.
1.1-1 Mobile elevating work platform (MEWP) definition:
Mobile machine intended for moving persons, tools and material to working positions, consisting of
a work platform with controls, an extending structure and a chassis.
1.1-2 Purpose of equipment:
The Skyjack SJ30 AJE & SJ30 ARJE Electric Articulating Boom MEWPs are designed to move personnel,
tools and materials to working positions.
1.1-3 Use of equipment:
The MEWP is a highly maneuverable, mobile work station. Work platform elevation and elevated
driving must only be done on a firm, level surface. It can be driven over uneven terrain only when
the platform is fully lowered.
1.1-4 Manual:
The operating manual is considered a fundamental part of the MEWP. It is a very important way to
communicate necessary safety information to users and operators. A complete and legible copy of
this manual must be kept in the provided weather-resistant storage compartment on the MEWP at all
times.

1.1-5 Operator:

  • The operator must read and completely understand this operating manual, the safety panel label
    located on the platform, the limitations, operating procedures, operatorโ€™s responsibility for
    maintenance and all other warnings and instructions in this manual and on the MEWP.
  • Compare the labels on the MEWP with the labels found within this manual. If any labels are damaged
    or missing, replace them immediately.
  • Only trained and authorized personnel shall be permitted to operate a MEWP.
  • The operator must be familiar with the employerโ€™s work rules and related government regulations and
    be able to demonstrate the ability to understand and operate this make and model of MEWP in the
    presence of a qualified/competent person.

TABLE OF CONTENTS:

Skyjack SJ30 AJE SJ30 ARJE Articulating Boom Operating Manual 213213ABA – PDF DOWNLOAD

Section 1 โ€“ About this Mobile Elevating Work Platform (MEWP)...............................  9
	1.1  Read and Heed.....................................................................  9
		1.1-1 Mobile elevating work platform (MEWP) definition.............................  9
		1.1-2 Purpose of equipment.........................................................  9
		1.1-3 Use of equipment.............................................................  9
		1.1-4 Manual.......................................................................  9
		1.1-5 Operator.....................................................................  9
		1.1-6 Service policy and warranty..................................................  9
		1.1-7 Ownership of machine.........................................................  9
		1.1-8 Optional accessories.........................................................  9
		1.1-9 Scope of this manual......................................................... 10
	1.2  Major Assemblies.................................................................. 11
		1.2-1 Base......................................................................... 11
		1.2-2 Turret....................................................................... 11
		1.2-3 Boom assembly................................................................ 11
		1.2-4 Platform..................................................................... 11
	1.3  Serial Number Nameplate........................................................... 13
	1.4  Responsibility for Maintenance.................................................... 13
		1.4-1 Operatorโ€™s responsibility for maintenance.................................... 13
		1.4-2 Maintenance and inspection schedule.......................................... 13
		1.4-3 Ownerโ€™s inspections.......................................................... 13
Section 2 โ€“ Operator Safety................................................................ 15
	2.1  Electrocution Hazard.............................................................. 15
	2.2  Safety Precautions................................................................ 16
	2.3  Fall Protection................................................................... 18
	2.4  Jobsite Inspection................................................................ 19
Section 3 โ€“ Familiarization................................................................ 21
	3.1  Component Identification.......................................................... 22
	3.2  Manual Storage Box................................................................ 23
	3.3  Control Functions................................................................. 23
		3.3-1 Main power connectors........................................................ 23
		3.3-2 Footswitch................................................................... 23
		3.3-3 Base control console......................................................... 24
		3.3-4 Platform control console..................................................... 25
	3.4  Features and Devices.............................................................. 27
		3.4-1 Lowered travel position and elevated travel position ........................ 27
		3.4-2 Drive speedDrive directionTilt switch........................................ 28
		3.4-5 Function restrictions when tilted............................................ 28
		3.4-6 Platform load sensing system................................................. 28
		3.4-7 Overload status.............................................................. 29
		3.4-8 Brake system................................................................. 30
		3.4-9 Secondary guarding electrical (SGE).......................................... 30
		3.4-10 All motion alarm............................................................ 30
		3.4-11 AC outlet on platform....................................................... 30
		3.4-12 Pothole protection.......................................................... 31
	3.5  Optional Equipment and Attachments................................................ 32
		3.5-1 Work light (if equipped)..................................................... 32
		3.5-2  Flashing amber light (if equipped).......................................... 32
		3.5-3 1000W/120V AC inverterโ€ฏ(if equipped)......................................... 33
		3.5-4 Elevate telematics - access control unit (if equipped)....................... 34
Section 4 โ€“ Pre-operation.................................................................. 37
	4.1  Operatorโ€™s Responsibility......................................................... 37
	4.2  Visual & Daily Maintenance Inspections............................................ 38
		4.2-1 Labels....................................................................... 38
		4.2-2 Electrical................................................................... 38
		4.2-3 Limit switches............................................................... 38
		4.2-4 Hydraulic.................................................................... 38
		4.2-5 Base......................................................................... 39
		4.2-6 Control compartment.......................................................... 41
		4.2-7 Motor/Hydraulic compartment.................................................. 42
		4.2-8 Platform assembly............................................................ 43
		4.2-9 Boom assembly................................................................ 44
		4.2-10 Optional equipment/attachments.............................................. 45
	4.3  Function Tests.................................................................... 46
		4.3-1 Testing main power connectors................................................ 46
		4.3-2 Base control console......................................................... 47
		4.3-3 Testing base emergency stop light and base emergency stop button............. 47
		4.3-4 Testing function enable switch and all boom functions........................ 47
		4.3-5 Testing platform self-leveling............................................... 48
		4.3-6  Testing emergency power..................................................... 48
		4.3-7  Testing base/off/platform switch............................................ 49
		4.3-8  Platform control console.................................................... 50
		4.3-9 Testing secondary guarding electrical (SGE).................................. 50
		4.3-10 Testing platform emergency stop light and platform emergency stop button.... 52
		4.3-11 Testing footswitch.......................................................... 52
		4.3-12 Testing steering............................................................ 52
		4.3-13 Testing driving function.................................................... 52
		4.3-14 Testing driving speed....................................................... 53
		4.3-15 Verifying load sensing module self-check.................................... 53
		4.3-16 Testing emergency power..................................................... 54
		4.3-17 Testing horn................................................................ 54
		4.3-18 Testing brakes.............................................................. 54
		4.3-19 Testing manual platform leveling............................................ 54
	4.4  Operatorโ€™s Checklist.............................................................. 55
Section 5 โ€“ Operation...................................................................... 57
	5.1  Start Operation................................................................... 58
		5.1-1 Activating base control console.............................................. 58
		5.1-2 Rotating platform using base control console................................. 58
		5.1-3 Rotating turret using base control console................................... 58
		5.1-4 Moving jib up and down using base control console............................ 58
		5.1-5 Rotating jib using base control console...................................... 58
		5.1-6 Moving riser up and down using base control console.......................... 58
		5.1-7 Raising or lowering main boom using base control console..................... 59
		5.1-8 Extending or retracting fly boom using base control console.................. 59
		5.1-9 Leveling platform manually using base control console........................ 59
		5.1-10 Operating using emergency power switch at base control console.............. 59
		5.1-11 Activating platform control console......................................... 59
		5.1-12 Driving forward or reverse using platform control console................... 60
		5.1-13 Steering using platform control console..................................... 60
		5.1-14 Moving jib up and down using platform control console....................... 60
		5.1-15 Rotating jib using platform control console................................. 60
		5.1-16 Moving riser up and down using platform control console..................... 60
		5.1-17 Extending or retracting fly boom using platform control console............. 60
		5.1-18 Rotating platform using platform control console............................ 60
		5.1-19 Leveling platform using platform control console............................ 60
		5.1-20 Raising or lowering main boom using platform control console................ 60
		5.1-21 Sounding horn............................................................... 61
		5.1-22 Rotating turret using platform control console.............................. 61
		5.1-23 Operating with emergency power switch at platform control console........... 61
		5.1-24 Shutdown procedure.......................................................... 61
		5.1-25 Inverterโ€ฏ(if equipped)...................................................... 61
Section 6 โ€“ Additional Procedures.......................................................... 63
	6.1  Emergency Lowering Procedure...................................................... 63
	6.2  Chassis Tilt Recovery............................................................. 64
		6.2-1 Platform uphill.............................................................. 64
		6.2-2 Platform downhill............................................................ 64
	6.3  Winching and Towing Procedure..................................................... 65
		6.3-1 Releasing brakes manually.................................................... 66
	6.4  Loading/Unloading................................................................. 67
		6.4-1 Loading and tie-down......................................................... 67
		6.4-2 Lifting...................................................................... 68
	6.5  Battery Maintenance............................................................... 69
		6.5-1 Battery service procedure.................................................... 69
		6.5-2 Battery charging operation................................................... 69
		6.5-3 Charging state LED........................................................... 70
Section 7 โ€“ Technical Drawings and Specifications.......................................... 71
	7.1  Technical Diagrams................................................................ 72
	7.2  Standard and Optional Equipment................................................... 76
	7.3  Ownerโ€™s Annual Inspection Record.................................................. 77
	7.4  Specifications and Features-A..................................................... 78
	7.5  Specifications and Features-B..................................................... 79
	7.6  Tire/Wheel Specifications......................................................... 79
	7.7  Maximum Platform Capacities....................................................... 79
	7.8  Floor Loading Pressure............................................................ 80
		7.8-1 Locally concentrated pressure (LCP).......................................... 81
		7.8-2 Overall uniform pressure (OUP)............................................... 81
Section 8 โ€“ Labels......................................................................... 83
	8.1  SJ30 AJE & SJ30 ARJE Labels....................................................... 84
		8.1-1 Control side................................................................. 84
		8.1-2 Front side................................................................... 91
		8.1-3 Top view..................................................................... 93
		8.1-4 Platform views............................................................... 94
		8.1-5 Motor/Hydraulic side.........................................................100
		8.1-6 Rear side....................................................................105
Section 9 โ€“ Unique Skyjack Features........................................................107

Contact us: [email protected]

https://vimeo.com/876676478?share=copy

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have :ย heydownloadss @gmail.com

S.V

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    ๐Ÿ›’
    Recently Purchased
    ๐Ÿ•’ verified order