★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏒
Trusted Business
Verified & Licensed
πŸ›‘οΈ
Virus Free Files
100% Safe Downloads
πŸ”’
Secure Payment
SSL Protected
⚑
Instant Delivery
Available Immediately

Terex Demag Crawler Crane CC2500-1 500 Ton Operation Manual PDF

$28.95

Terex Demag Crawler Crane CC2500-1 500 Ton Operation Manual – PDF DOWNLOAD

⚑
Instant PDF Download
Available immediately
πŸ’Ύ
Save to Your Device
Download & keep forever
πŸ›‘οΈ
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Terex Demag Crawler Crane CC2500-1 500 Ton Operation Manual – PDF DOWNLOAD

FILE DETAILS:

Terex Demag Crawler Crane CC2500-1 500 Ton Operation Manual – PDF DOWNLOAD

Language : English
Pages : 467
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Terex Demag Crawler Crane CC2500-1 500 Ton Operation Manual – PDF DOWNLOAD

Manufacturer’s Specifications 1
Foreword 1
Safety lnstructions
General
lntended Use
Operating Conditions and Computed Design of the Crane
General
Classification of the Crane
Classification of the Engines
Workplace Ergonomics
Load and Utilisation of the Crane
Required Amblent Conditions
Service Life
Standards and Calculation Regulations
Dangers to Air Traffic
Safety Regulations
Organisational Measures
Selection and Oualifications of Personnel
Particular Hazards
Electrical Energy
Gas, Dust, Steam, Smoke
Crushing / Collision
Snagging / Dragging
Crushing / Shearing
Danger Due to Slipping, Tripping, Falling
Comblnation of Hazards with Comblned Operation of
Two ог МогС Cranes
Operating Areas of Several Cranes Overlap
Several cranes raising Π° load together
Before Crane Operation
During Operation of the Crane
F ollowing Crane Operation
When AssemΠ«ing and Dismantling Crane Components
Hand Signals
General Hand Signals
Hand Signals for Working Movements
Hand Signals for Driving Movements
Power Supply F ailure
Structure of the Crawler-mounted Π‘Π³Π°ΠΏΠ΅
Overview
Superstructure
Undercarriage
Boom Variants
Technical Data
Drive Motor
Pump Distributor Gear
Hydraulic Pumps
Slew Gear
Winches
Control
Safety Equipment
Π‘Π°Π¬
Heater
Drive Gearbox (Undercarriage)
Safety-relevant Components
Ladders and cat walks
Headlights
Emergency Exit
Signs and Symbols
Signs in the Crane Operator’s Π‘Π°Π¬
Signs and Symbols ΠΎΠΏ the Superstructure
Safety Signs
Π‘Π³Π°ΠΏΠ΅ Operator’s Π‘Π°Π¬
Controls in the Crane Operator’s Π‘Π°Π¬
Control lever
Add-on console
General arrangement of construction consoles
Display- and operating elements ΠΎΠΏ the consoles
Display- and operating console LMI System
Display and operating console for monitoring of engine
Side panel
Side panel, seat console
Radio Remote Control
Moblle Control Panel for Emergency Control
Entering / leaving the саЬ
Tilting the саЬ
Adjustment of the crane operator’s seat
Engine and Drive
Safety and Emergency Operation Programme
General
Cooling System
Hydraulic Pumps
Checks Before Starting the Diesel Engine
Starting the Diesel Engine
Starting Procedure
Starting Aid
Π’ΠΎ Π¬Π΅ Observed Following Starting
Warming Up the Hydraulic System
Warming-up Procedure
Checks with the Diesel Engine Running
lnstructions fΠΎΠ³ Operation
Switching Off
Automatic Driving
Driving the Crawler-mounted Π‘Π³Π°ΠΏΠ΅
General
Main Driving Direction
Requirements for Road Surface Conditions
Regulations for Driving Operation
Controlling the Undercarriage
Control Movements
Control Movements for Tailing Operation
Options for Controlling the Driving Speed
Driving without Load ΠΎΠΏ the Horizontal and Angled
Road Surface
General
Driving without Load
Driving with Load ΠΎΠΏ Π° Horizontal and Graded Road Surface
General
Driving with Load ΠΎΠΏ Horizontal, Even Terrain
( 0 35 Slope)
Driving with Load ΠΎΠΏ lnclined, Even Territory
(u 0 35 incline)
Slewing and Braking the Superstructure
Speed Control
Slewing
Braking the Superstructure
Mechanical locking of the holding Π¬Π³Π°kΠ΅ in opened position
Operating the Safety Equipment
General
Display LLD System
General
Description of the Screen Displays and Function Keys
Opening Screen
Symbols “Main Menu of the Display and Operating Console
of the LLD System”
Symbol “Main Menu of the Display and Operating Console
of the Engine and Π‘Π³Π°nΠ΅ Operating System”
“System Settings”
Operating the LLD System
Switching Оп
Entering the Operating Mode
Menu-Guided Operating Mode Selection
Setting the Configuration Programs fΠΎΠ³ Π‘Π³Π°nΠ΅ AssemΠ«y
Configuration program “RG0”
Configuration program “SMAB1”
Configuration program “SMAB2”
Configuration operation
Entering the Reeving Number
Synchronous Display
Operating Range Limits
Switching Оп
Setting up the Various Limits
Load ΠΎΠΏ Two Hooks (2-Hook-Operation)
Display of the ground pressure
Load Monitoring AssemΠ«y
Tilt Display
TrouΠ«eshooting
Bridging the Load Limit Device
Bridging the Shut-Off Function fΠΎΠ³ Movements Which
Reduce the Load Moment
Bridging the Shut-Off Function fΠΎΠ³ all Movements
Fault code tΠ°Π«Π΅
Working with the Π‘Π³Π°ΠΏΠ΅ Equipment
Simultaneous сгаnС movements
Operating Hoist 1 (Н1)
General
Preparing for Operation
Operation at Normal Speed
Operation at High Speed
Operating Hoist 2 (Н2)
General
Preparing for Operation
Operation at Normal Speed
Operation at High Speed
Crane Operation with DouΠ«e Hook Block, Hoist 1 and
Hoist 2 in ComЬined Operation
Preparing fΠΎΠ³ Operation
Operation at Normal Speed
Operation at High Speed
Operating the Derricking GΠ΅Π°Π³ (Π•)
General
Operation of the Derricking GΠ΅Π°Π³ (Π•) fΠΎΠ³ Configuration
Operation (when Erecting and Lowering Π° Boom
Comblnation)
Operation at Normal Speed
Operation at High Speed
Simultaneous Operation of Derricking GΠ΅Π°Π³ (Π•) and
Luffing GΠ΅Π°Π³ 1 (W1)
Operating the Derricking GΠ΅Π°Π³ (Π•) during Π‘Π³Π°ΠΏΠ΅ Operation
Operation at Normal Speed
Operation at High Speed
Simultaneous Operation of Derricking GΠ΅Π°Π³ (Π•) and
Hoist 1 (Н1)
Operating Range of the Main Boom
Operating Luffing GΠ΅Π°Π³ 1 (W1 = ΠžΠ•)
General
Operation of the Luffing GΠ΅Π°Π³ 1 (W1) fΠΎΠ³ Configuration
(fΠΎΠ³ Erecting and Lowering Π° Boom Comblnation)
Operation at Normal Speed
Operation at High Speed
Simultaneous Operation of Luffing GΠ΅Π°Π³ 1 (W1) and
Luffing GΠ΅Π°Π³ 2 (W2)
Simultaneous Operation of Luffing GΠ΅Π°Π³ “W1” and
Derricking GΠ΅Π°Π³ “Π•”
Operating Luffing GΠ΅Π°Π³ 1 (W1) during Π‘Π³Π°ΠΏΠ΅ Operation
Simultaneous Operation of Luffing GΠ΅Π°Π³ 1 (W1) and
Hoist 2 (Н2)
Operating Range of the Fly Jib
Operating Luffing GΠ΅Π°Π³ 2 (W2 = ΠžΠ•)
General
Operation of the Luffing GΠ΅Π°Π³ 2 (W2) fΠΎΠ³ Configuration
(fΠΎΠ³ Erecting and Lowering Π° Boom Comblnation)
Operation at Normal Speed
Operation at High Speed
Simultaneous Operation of Luffing GΠ΅Π°Π³ 1 (W1) and
Luffing GΠ΅Π°Π³ 2 (W2)
Simultaneous Operation of Luffing GΠ΅Π°Π³ “W2” and
Derricking GΠ΅Π°Π³ “Π•”
Operating Luffing GΠ΅Π°Π³ 2 (W2) during Π‘Π³Π°ΠΏΠ΅ Operation
Operation at Normal Speed
Operation at High Speed
Simultaneous Operation of Luffing GΠ΅Π°Π³ 2 (W2) and
Hoist GСаг 1 (Н1)
Operating Range of the Main Boom
Operating the Reeving Winch
General
Operation
Working lnstructions
Positioning the Π‘Π³Π°ΠΏΠ΅
Wind Speeds – Dynamic Pressure
General
Π‘Π³Π°ΠΏΠ΅ under Load (Π‘Π³Π°ΠΏΠ΅ Operation)
Working with the Superlift
Description of the Superlift
Modus operandi
Safety instructions fΠΎΠ³ working with the Superlift
Operating the сгапС without the Superlift counterweight
Operating the сгапС with the Superlift counterweight
With standard Superlift equipment
With vΠ°Π³iΠ°Π«Π΅ Superlift equipment
Operating the Heating and Ventilation
Operating the Heating
Controls
Operating the Аiг Conditioning Equipment
Controls
Parking the Π‘Π³Π°ΠΏΠ΅
Wind Speeds
Lowering the Boom System
Radio Remote Control
General
Preparations fΠΎΠ³ AssemΠ«y using the Radio Remote Control
Tabular Collation of the AssemΠ«y Procedures
AssemΠ«y Procedures ΠΎΠΏ the Superstructure
AssemΠ«y Procedures ΠΎΠΏ the Chassis
AssemΠ«y Procedures ΠΎΠΏ the Counterweight Dolly
AssemΠ«ing the Counterweight (GGW)
Adjustment of Crossbar Hoist Cylinder (Superlift)
Adjustment of the Winch fΠΎΠ³ Vario Superlift
AssemΠ«y Procedures in Case of Radio Remote
Control F ailure
Tabular Collation of the AssemΠ«y Procedures in case of
Radio Remote Control F ailure
AssemΠ«y Procedures ΠΎΠΏ the Superstructure
AssemΠ«y Procedures ΠΎΠΏ the Chassis (UW)
AssemΠ«y Procedures ΠΎΠΏ the Counterweight Dolly (GW)
AssemΠ«ing the Counterweight (GGW)
Adjustment of Crossbar Hoist Cylinder (Superlift)
Adjustment of the Winch fΠΎΠ³ Vario Superlift

S.V 07/24

What Our Customers Say

β˜…β˜…β˜…β˜…β˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    πŸ›’
    Recently Purchased
    πŸ•’ verified order