Description
Ammann AFW 150-2 Asphalt Paver, Wheeled Hatz 1B50E EU Stage V, U.S. EPA Tier 4f Workshop Manual SN 3004327 – PDF DOWNLOAD
FILE DETAILS:
Ammann AFW 150-2 Asphalt Paver, Wheeled Hatz 1B50E EU Stage V, U.S. EPA Tier 4f Workshop Manual SN 3004327 – PDF DOWNLOAD
Language : English
Pages : 242
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:
Ammann AFW 150-2 Asphalt Paver, Wheeled Hatz 1B50E EU Stage V, U.S. EPA Tier 4f Workshop Manual SN 3004327 – PDF DOWNLOAD
ContentsΒ Β Β 4
1 IntroductionΒ Β Β 9
2 Safety measures and instructionsΒ Β 13
2 1Safety rulesΒ Β Β 14
2 2Environmental and hygiene principlesΒ Β 17
2 3Fire preventionΒ Β Β 18
3 Machine descriptionΒ Β Β 19
4 Specification manualΒ Β Β 25
4 1Basic dataΒ Β Β 26
4 2Dimensional drawing of the machineΒ Β 28
4 3Technical dataΒ Β Β 30
4 4Machine gradeability and lateral static stability of the machineΒ 32
5 Specification of operating fluidsΒ Β 35
5 1Engine oilΒ Β Β 36
5 2FuelΒ Β Β 37
5 3Hydraulic oilΒ Β Β 37
5 4Anti-adherent solutionΒ Β 37
5 5Liquid gasΒ Β Β 38
5 6Lubricating greaseΒ Β Β 38
5 7FluidsΒ Β Β 39
6 Lubrication and maintenance chartΒ Β 41
7 EngineΒ Β Β 45
7 1Description of engine basic elementsΒ Β 46
7 2Technical data of the manufacturerΒ Β 48
7 3Engine diagnosticsΒ Β Β 49
7 3 1Measuring glow plug resistanceΒ Β 49
7 3 2Measuring glow plug power supplyΒ Β 49
7 3 3Measuring temperature sensorΒ Β 50
7 3 4Measuring lubricating oil pressure switchΒ Β 51
7 3 5Measuring engine speedΒ Β 52
7 4Dismounting the charging controllerΒ Β 53
7 5Mounting the charging controllerΒ Β 54
7 6Dismounting the engineΒ Β 55
7 7Mounting the engineΒ Β Β 60
8 SteeringΒ Β Β 65
8 1Description of basic elementsΒ Β 66
8 2Technical data of the manufacturerΒ Β 67
8 3DiagnosticsΒ Β Β 67
8 4Replacement of the gear pumpΒ Β 68
8 5 Dismounting the steering linear hydraulic motorΒ Β 70
8 6 Mounting the steering linear hydraulic motorΒ Β 72
8 7Dismounting the steering unitΒ Β 73
8 8Removal of the hydraulic tankΒ Β 74
8 9Mounting the hydraulic tankΒ Β 76
8 10Adjustment of the front wheel turning angle indicatorΒ 77
9 TravelΒ Β Β 79
9 1Description of basic elementsΒ Β 80
9 2DiagnosticsΒ Β Β 83
9 2 1Measuring the brake switchΒ Β 83
9 2 2Measuring the brake valve electromagnet Y7Β Β 84
9 2 3Measuring the refilling pressureΒ Β 85
9 2 4Measuring the maximum pressure for forward and reverse travelΒ 86
9 2 5Measuring the resistance of the electromagnet coilΒ Β 88
9 3Removal of the travel pumpΒ Β 88
9 4Dismounting the hydraulic motor and travel gearboxΒ Β 90
9 5Mounting the hydraulic motor and travel gearboxΒ Β 92
10 Gear pumpΒ Β Β 95
10 1Description of basic elementsΒ Β 96
10 2DiagnosticsΒ Β Β 98
10 2 1Measuring the pressure of the belt conveyor and augerΒ 98
10 2 2Measuring the screed lifting pressureΒ Β 99
10 2 3Measuring the screed extension pressureΒ Β 100
10 2 4Measuring the maximum vibrator pressureΒ Β 101
10 2 5Measuring the vibration frequencyΒ Β 102
10 3 Dismounting the gear pumpΒ Β 103
10 4Dismounting the vibration unitsΒ Β 104
10 5Hydraulic system switchboardΒ Β 106
10 5 1Description of basic elementsΒ Β 106
11 CoolingΒ Β Β 109
11 1Description of basic elementsΒ Β 110
11 2Cooling diagnosticsΒ Β 110
11 2 1Fan testΒ Β Β 110
11 2 2Temperature sensorΒ Β 110
11 3Dismounting the coolerΒ Β 111
11 4Mounting the coolerΒ Β 113
12 ScreedΒ Β Β 117
12 1Dismounting the screed lifting cylinderΒ Β 118
12 2Replacement of linear hydraulic motors for screed extensionΒ 120
12 3Basic setting of the screedΒ Β 122
12 4Replacement of the friction platesΒ Β 125
12 4 1Front frameΒ Β Β 126
12 4 2Rear framesΒ Β Β 129
13 Screed gas heatingΒ Β Β 133
13 1Gas system diagramΒ Β Β 134
13 2Ignition processΒ Β Β 135
13 3DiagnosticsΒ Β Β 137
13 3 1Gas equipment tightness checkΒ Β 137
13 4Reducing valveΒ Β Β 139
13 5Gas hosesΒ Β Β 139
13 6Gas manifoldΒ Β Β 139
13 6 1Gas manifold replacementΒ Β 139
13 7Screed heating burnerΒ Β 141
13 7 1Screed heating burner replacementΒ Β 141
13 7 2Cleaning the gas burner nozzleΒ Β 142
13 7 3Gas flame adjustmentΒ Β 144
13 7 4Test of burner ignitionΒ Β 145
13 8Gas supply solenoid valvesΒ Β 147
13 8 1Valve cleanliness inspectionΒ Β 147
13 8 2Measuring resistance of the coils of gas supply valve electromagnets 148
13 8 3Measuring power supply of the coils of gas supply valve electromagnets 149
13 9Ignition unitsΒ Β Β 150
13 9 1Measuring resistance on the ignition unitΒ Β 150
13 9 2Voltage measurement on the cable harness of ignition unitsΒ 151
13 10High-voltage cablesΒ Β 152
13 11Spark plugsΒ Β Β 152
13 11 1Spark plug function testΒ Β 152
13 11 2Spark plug check procedureΒ Β 153
13 12Temperature sensorΒ Β 154
14 Belt conveyors and augersΒ Β 155
14 1Replacement of the hydraulic motor for driving the augers and the belt conveyor 156
14 2Dismounting the belt conveyor chainΒ Β 159
14 3Mounting the belt conveyor chainΒ Β 163
14 4Setting the belt conveyor chain sagΒ Β 167
14 5Dismounting the belt conveyor chain driveΒ Β 169
14 6Dismounting the auger chainΒ Β 172
14 7Replacement of the drive switch of augers and belt conveyorΒ 175
14 7 1Measuring the belt conveyor drive switch S7Β Β 176
14 8Dismounting the driving gear wheel of augersΒ Β 177
14 9Replacement of consumablesΒ Β 178
14 9 1Belt conveyor chain guide plateΒ Β 178
14 9 2 Cover platesΒ Β Β 184
15 WiringΒ Β Β 185
15 1Description of basic componentsΒ Β 186
15 1 2Central earthing points X6 and x7Β Β 187
15 2DiagnosticsΒ Β Β 188
15 2 1List of error codes displayed on the displayΒ Β 188
15 2 2Fuse boxΒ Β Β 191
15 2 3 Diagnostics socketΒ Β 192
15 2 3 1Measuring of the CAN BUS data busΒ Β 193
15 2 3 1 1Measuring voltage of the CAN BUS data busΒ Β 193
15 2 3 1 2Measuring resistance of the CAN BUS data busΒ Β 193
15 2 4Communication with the control unit A2 by means of Bodas β service 3 5 194
15 2 4 1Connecting the machine to PCΒ Β 194
15 2 4 2Uploading and deleting errorsΒ Β 197
15 2 4 3Check of parametersΒ Β 198
15 2 5Display measurementΒ Β 199
15 2 6Foot switch measurementΒ Β 200
15 2 7Travel controller measurementΒ Β 201
15 2 8Paving speed selector measurementΒ Β 203
15 3CalibrationΒ Β Β 206
15 3 1Connecting the machine to PCΒ Β 206
15 3 2Calibration of the travel controller and the paving speed selector 207
15 3 3Travel pump calibrationΒ Β 212
15 4Control unit A2Β Β Β 219
15 4 1Connector of the control unitΒ Β 220
15 4 2Dismounting the control unit A2Β Β 221
15 5Display unitΒ Β Β 222
15 5 1Dismounting the displayΒ Β 222
15 6Travel controllerΒ Β Β 224
15 6 1Dismounting the travel controller A4Β Β 224
15 7Paving speed selectorΒ Β 226
15 7 1Dismounting the paving speed selectorΒ Β 226
15 8BatteryΒ Β Β 228
16 AppendicesΒ Β Β 229
16 1Machine wiring diagramΒ Β 230
16 2Machine hydraulic system diagramΒ Β 236
16 2 1Measuring points of the hydraulic circuitΒ Β 238
16 3Screed gas heating system diagramΒ Β 239
Need help? Contact: [email protected]
S.V