Atlas Copco Boomer L1 C & L2 C Rock Drilling Rig Operator Instructions Manual
$32.95 Original price was: $32.95.$19.95Current price is: $19.95.
Complete 136-page operator instructions manual for Atlas Copco Boomer L1 C, Rocket Boomer L1 C, Boomer L2 C and Rocket Boomer L2 C drilling rigs. Covers controls, driving, positioning, drilling, RCS control system, ABC Regular and ABC Total automation, extension drilling, Swellex pump, Safe Bolting System and climate unit. Document 9852 1689 01d, dated 2005-12.
Description
Atlas Copco Boomer L1 C & L2 C Operator Instructions Manual
This Atlas Copco Boomer L1 C & L2 C Rock Drilling Rig Operator Instructions Manual is the complete operator’s guide for the Boomer L1 C, Rocket Boomer L1 C, Boomer L2 C and Rocket Boomer L2 C drilling rigs. Published under document number 9852 1689 01d and dated 2005-12, this 136-page PDF covers every aspect of safe and efficient rig operation, from daily inspection routines through to advanced automated drilling with the ABC Total system. Whether you are operating a Boomer L1 C or L2 C in a tunnel or mining environment, this Atlas Copco Boomer L1 C & L2 C operator instructions manual gives you the manufacturer’s own procedures, control layouts and safety guidance in one document.
File Details
- Manual Type: Operator Instructions
- Brand: Atlas Copco
- Models Covered: Boomer L1 C, Rocket Boomer L1 C, Boomer L2 C, Rocket Boomer L2 C
- Document Number: 9852 1689 01d
- Date: 2005-12
- Language: English
- Page Count: 136
- File Format: PDF
Chapters Covered
- 1. Technical data — Boomer L1 C and Rocket Boomer L1 C specifications, Boomer L2 C and Rocket Boomer L2 C specifications, data plate content and location
- 2. Component locations — Main rig components for L1 C and L2 C
- 3. Application — General use and inappropriate use warnings
- 4. Daily inspection — General, checklist, daily maintenance, freeze prevention measures
- 5. Controls, driving — Overview of driver’s position, control column, control panel and functions, hydraulic panel and functions, electric control panel and functions, dual command for reeling units
- 6. Repositioning — Environment, before starting the diesel engine, diesel engine starting, before tramming, checking the brakes, repositioning safety and procedure, parking, operating jacks, booms and service platform, protective roof, cable reeling unit, hose reeling unit
- 7. Electrical system — Safety, electric cabinet (IEC, Australian, Canada, USA standards), lamps, buttons and switches, resetting emergency stop
- 8. Operator panel — Overview, screen buttons, keypads, drilling lever, positioning levers
- 9. Control system — RCS, operator menus, main menu, drilling menu, settings, statistics, angle indication/contour control, modules, levers, guards, event log, save log, startup, restarting, system monitoring, information symbols, text messages, ABC Total messages
- 10. Positioning — Boom and feeder, operator panel, safety, operating, diesel operation, boom activation, raising and slewing, slewing and inclining the feeder, rotation and feed extension, feed lookout cylinder and boom telescope, Safe Bolting alternatives, tramming position
- 11. Drilling — Environment, before drilling, connect to power supply, battery, mains power, RCS system, connect to water supply, checks, setting up the rig, drilling safety, collaring, full drilling, lock collaring, cease drilling, drilled hole, changing drill bit, check when drilling, breakdowns, rock drill, pressure and flow, hydraulic oil and lubrication oil, hoses and couplings, MWD logging, after drilling, freeze prevention measures
- 12. Service platform — Application, safety, operating from operator’s station, manoeuvring from the cage, emergency stop, emergency operation
- 13. ABC Regular — Introduction, working menus, preparation, settings, load drill plan/tunnel line/laser line, choose section number, navigation (Method A and Method C), edit laser
- 14. ABC Total — Introduction, barrier sensor, drill auto, semi-automatic, full auto, settings, statistics, status, information messages
- 15. Extension drilling — Equipment, key pads, operating, manual rod adding, RAS (Rod Adding System)
- 16. Swellex pump — H 1 pump, Swellex arm, system description, before installing a bolt, installing bolts
- 17. Safe Bolting System — Introduction, positioning to Safe Bolting mode, operating in Safe Bolting mode, emergency operation
- 18. Climate unit — General, control panel, tips for high ambient temperature and cab misting
This operator instructions manual goes well beyond a basic start-up guide. It walks you through the complete daily routine of a Boomer L1 C or L2 C rig, from pre-start inspection through to shutting down at the end of a shift. The control system chapter breaks down the RCS (Rig Control System) menus in detail, so you can navigate drilling parameters, settings, statistics and event logs with confidence. For rigs equipped with automation, the ABC Regular and ABC Total chapters explain contour control, navigation methods and automatic drilling sequences step by step. The electrical system chapter covers four different cabinet standards (IEC, Australian, Canada, USA), making this manual relevant across different regional configurations. Maintenance-focused operators will find the daily inspection checklist, freeze prevention measures and lubrication guidance particularly useful for keeping the rig in reliable condition.
Technical Specifications Covered
The manual includes the manufacturer’s technical data tables for both rig families. For the Boomer L1 C and Rocket Boomer L1 C: length 13.8–16.1 m, width 2.21 m, height with protective roof 2.27–2.97 m, height with cab 3.00 m (std) or 2.80–3.25 m (option), weight 17–19 tonnes, installed diesel engine power 115 kW, max longitudinal inclination 14 degrees, ambient temperature range 0 to +40 degrees C, noise level at operator’s station 80 dB(A), radiated acoustic power 121.9 dB(A), and vibration level below 0.5 m/s². For the Boomer L2 C and Rocket Boomer L2 C: width 2.9 m with side platforms, height with protective roof 2.4–3.1 m, height with cab 3.1 m (std) or 2.90–3.35 m (option), weight 24–30 tonnes, and the same 115 kW diesel engine power rating. Electric power capacity, voltage and frequency are listed on the rig’s data plate.
Operator Panel and Control System Detail
A substantial portion of the manual is dedicated to the operator panel and the RCS control system. You get full explanations of the screen buttons, keypads, drilling lever functions and positioning levers, including the specific roles of each button on the left and right button units. The control system chapter covers the main menu, drilling direct selection menu, settings menu, statistics menu, angle indication and contour control menus, modules menu, levers menu, guards menu, event log and save log functions. System monitoring is explained through information symbols, text messages and general messages, with a dedicated table of ABC Total messages and their causes and actions. This level of detail means you can troubleshoot faults using the same on-screen information the rig displays, rather than guessing at what a warning symbol means.
Why This Atlas Copco Boomer Operator Manual Matters
Operating a Boomer L1 C or L2 C without the manufacturer’s instructions is a risk not worth taking. This manual gives you the exact control layouts, safety warnings and operating sequences that Atlas Copco designed for these rigs. From correctly activating a boom and positioning the feeder to understanding the RCS control system’s drilling menus and interpreting warning symbols, every procedure is documented in clear, step-by-step language with supporting illustrations.
For maintenance and troubleshooting, the daily inspection checklist helps you catch faults early, while the electrical system chapter supports fault-finding across multiple cabinet standards. The MWD logging section explains how to activate and interpret Measure While Drilling data for rock characterisation. If your rig has the Safe Bolting System, the extension drilling equipment or a Swellex pump, those chapters are included too. The service platform chapter covers both operator-station control and cage-mounted control, with emergency stop and emergency operation procedures.
Complete Bookmarks
The complete bookmarks in the “Atlas Copco Boomer L1 C & L2 C Rock Drilling Rig Operator Instructions Manual” are as follows:
+Safetyp. 3
+Operator’s instructionsp. 7
+1. Technical datap. 13
+Data platep. 14
+2. Component locationsp. 16
+3. Applicationp. 17
+4. Daily inspectionp. 18
+5. Controls, drivingp. 20
+6. Repositioningp. 30
+Checking the brakesp. 32
+Repositioningp. 33
+Operating jacks, etc.p. 34
+Cable reeling unitp. 35
+Hose reeling unitp. 37
+7. Electrical systemp. 39
+Electric cabinet, IEC standardp. 39
+Electric cabinet, Australian standardp. 41
+Electric cabinet, Canadap. 43
+Electric cabinet, USAp. 45
+8. Operator panelp. 47
+9. Control systemp. 56
+Operator menusp. 56
+D2 Settingsp. 59
+System monitoringp. 68
+Text messagesp. 70
+10. Positioningp. 76
+Operator panelp. 77
+Operatingp. 78
+11. Drillingp. 84
+Before drillingp. 84
+Connect to power supplyp. 84
+Drillingp. 87
+Changing drill bitp. 90
+Check when drillingp. 91
+MWD loggingp. 93
+After drillingp. 95
+12. Service platformp. 97
+Operating from the operator's stationp. 98
+Operatingp. 99
+Manoeuvring from the cagep. 100
+Operatingp. 101
+Emergency stopp. 102
+13. ABC Regularp. 104
+Operatingp. 104
+Settingsp. 107
+Navigationp. 109
+14. ABC Totalp. 114
+Operatingp. 114
+Drill autop. 114
+Semi-automaticp. 115
+Full autop. 116
+Settingsp. 116
+15. Extension drillingp. 121
+Operatingp. 123
+Manual rod addingp. 123
+RASp. 125
+16. Swellex pumpp. 128
+Before installing a boltp. 129
+Installing boltsp. 130
+17. Safe Bolting Systemp. 133
+Operatingp. 133
+18. Climate unitp. 135
+Tipp. 136
IMAGES PREVIEW
This Atlas Copco Boomer L1 C & L2 C operator instructions manual is delivered as an instant PDF download. No shipping, no waiting. Open it on any laptop, tablet or smartphone at the rig, in the workshop or on site. Print the pages you need for quick reference. With 136 pages of manufacturer-authored content covering every major system and procedure, this is the reference every Boomer L1 C or L2 C operator should have on hand.
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

DEVELON DX85R-7 / DX89R-7 Excavator Operation & Maintenance Manual PDF Download

Komatsu SAA6D114E-3 Diesel Engine Shop Manual PDF Download

Komatsu PC80MR-3 Hydraulic Excavator Shop Manual PDF Download




Reviews
There are no reviews yet.