★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

CAT Bucyrus 30MB3 MAINTENANCE MANUAL BI643655 – PDF DOWNLOAD

$27.95

CAT Bucyrus 30MB3 MAINTENANCE MANUAL BI643655 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

CAT Bucyrus 30MB3 MAINTENANCE MANUAL BI643655 – PDF DOWNLOAD 

FILE DETAILS:

CAT Bucyrus 30MB3 MAINTENANCE MANUAL BI643655 – PDF DOWNLOAD 

Language : English
Pages : 233
Downloadable : Yes
File Type : PDF

IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:

CAT Bucyrus 30MB3 MAINTENANCE MANUAL BI643655 – PDF DOWNLOAD 

  • The 30MB3 miner is a radio-controlled drum-type continuous miner with appropriate weight balance, cutting and loading power to enable the productive mining of coal and other soft mineral in seams ranging from 1,900mm up to 4, 000mm thick.
  • The machine is mounted on crawler tracks that provide full mobility and sharp turning radius in both bord and pillar and long wall development mining plans. The ranging cutting head mines material from the solid face using a chainless rotating drum, and a CLA-type gathering head with high speed conveyor efficiently moves mined material to a haulage system behind the miner.
  • The machine’s weight and balance is designed to mine most efficiently by either sumping into the face at the top or bottom of the seam, and ripping material to the bottom or top of the seam.
  • The above figure shows a general arrangement of major mechanical components. A full description of the various major sub-systems of the 30MB3 follows.

TABLE OF CONTENTS:

CAT Bucyrus 30MB3 MAINTENANCE MANUAL BI643655 – PDF DOWNLOAD 

Machine Description – 30MB3..................................  7
	General..................................................  7
	Specifications...........................................  7
	Machine Weights..........................................  8
Component Layout.............................................  9
	Top View.................................................  9
	Right Hand View.......................................... 10
	Left Hand View........................................... 11
	Main Chassis............................................. 12
	Cutting Head Assembly.................................... 12
	Gathering Head Assembly.................................. 14
	Conveyor Assembly........................................ 15
	Traction Drive System.................................... 16
	Hydraulic System - CLA................................... 18
	Machine Hydraulic Layout................................. 19
	Drill Rigs............................................... 21
	Rib Protection........................................... 21
	Articulating Temporary Roof Support - ATRS............... 22
	Bolting, Mining and Maintenance Modes.................... 23
	Water System............................................. 24
	Machine Water Component Layout........................... 26
Defects and Hazards.......................................... 28
Safety & Maintenance Practices............................... 28
	Safety Procedures........................................ 28
	Isolation Procedures..................................... 29
Auger Safety Stops........................................... 32
Conveyor Stop................................................ 34
General Maintenance.......................................... 35
	Maintenance and the Continuous Miner..................... 35
Torques...................................................... 36
	Duo-Cone Seals........................................... 37
	Mating Pairs............................................. 37
	Handling................................................. 37
	Housing Preparation...................................... 37
	Seal Preparation......................................... 37
	Approved Assembly Lubricants*............................ 38
	Installation Process..................................... 38
	Final Assembly........................................... 38
Maintenance Guidelines....................................... 39
Bearing and Gears............................................ 41
	Bearing Assembly Methods................................. 41
	Assembly Methods......................................... 42
	Micronized Graphite for Bearing Assembly................. 42
	Drivers for Bearing Cups and Cones....................... 42
	Heating Bearings......................................... 42
	Heating in Oil........................................... 42
	Induction Heating........................................ 43
	Freezing/Shrinking Bearing Cups.......................... 43
	Tapered Rolling Bearing Adjustment....................... 43
	Thermal Expansion........................................ 43
	Torque for Zero End Play................................. 44
	Bevel Gear Adjustment.................................... 45
Lockwiring Fasteners......................................... 46
	Single Wire.............................................. 46
	Wired In Pairs........................................... 46
Special Fasteners............................................ 46
Self-Locking Screws.......................................... 47
	Installation Recommendations............................. 47
Locknuts..................................................... 48
	Installation Recommendations............................. 48
Component Substitution....................................... 48
Safety Maintenance........................................... 49
General Description.......................................... 49
Removal of Cutting Drums..................................... 52
	Pull In Drum Removal..................................... 53
	Pull In Drum Assembly.................................... 55
	Drive Drum Removal....................................... 56
	Drive Drum Assembly...................................... 58
	Intermediate Drum Removal RH and LH...................... 60
		Intermediate Drum Removal RH......................... 60
Removal of Pull In Assembly Complete......................... 61
Intermediate Drum Removal LH................................. 64
	Intermediate Drum Assembly RH and LH..................... 68
	Install Complete Pull In Assembly........................ 69
	Centre Drum Removal...................................... 72
	Centre Drum Assembly..................................... 74
Removal of Cutting Motor Clutches ........................... 76
	Clutch Assembly.......................................... 79
	Removal of Cutter Head Gear Case......................... 80
	Reinstall Cutter Head Gear Case.......................... 84
	Removal of Cutter Motor.................................. 86
	Installation of Cutter Motor............................. 88
	Removal of the Cutter Head Input Gear Case............... 90
	Installation of Cutter Head Input Gear Case.............. 91
Removal of the Cutting Head Support from the Main Frame...... 92
Installation of Cutting Head Assembly to the Main Frame...... 96
GATHERING HEAD ASSEMBLY...................................... 98
 General Description ........................................ 98
Removal and Replacing Gathering Head Shear Shaft............. 99
Conveyor Chain Disassembly...................................102
Removal of Foot Shaft and Centrifugal Loading Arms (CLAs)....104
	Removing the Centrifugal Loading Arms (CLAs).............105
	Re-Fitting the Centrifugal Loading Arms (CLAs)...........107
Removal of the Drive Motor Input Gear Case and CLA Pot.......108
Reassembly of Gathering Head Gear Cases......................112
Removal of the Gathering Head from the Main Frame............114
Installation of the Gathering Head...........................120
CONVEYOR ASSEMBLY............................................123
General Description..........................................123
Conveyor Chain Removal.......................................124
Conveyor Chain Installation..................................126
Removal of the Conveyor Assembly from the Miner..............128
Installation of the Conveyor Assembly........................132
Removal of Discharge Conveyor................................133
Installation of Discharge Conveyor...........................136
Removal of Tail Roller.......................................137
	Re-Fitting of Tail Roller................................139
TRACTION SYSTEM..............................................140
General Description..........................................140
Removal of the Tram Drive Gear Case Assembly.................141
Installation of the Tram Drive Gear Case Assembly............145
Removal of a Tram Drive Motor................................148
Installation of a Tram Motor.................................150
Crawler Chain Removal........................................151
Crawler Chain Installation...................................155
Crawler Take-Up Roller Removal...............................158
Crawler Take-Up Roller Installation..........................159
Stablising Shoe Assembly.....................................160
	Stabiliser Cylinder Removal..............................160
	Stabiliser Cylinder Installation.........................162
Stabiliser Shoe Removal......................................163
Cutterhead Raise and Lower Cylinder..........................165
	Cutter Head Cylinder Removal.............................166
	Cutter Head Cylinder Installation........................167
Gathering Head Raise and Lower Cylinder......................168
	Gathering Head Cylinder Removal..........................169
	Gathering Head Cylinder Installation.....................170
Conveyor Raise and Lower Cylinder............................171
	Conveyor Raise Cylinder Removal..........................172
	Conveyor Raise Cylinder Installation.....................173
Conveyor Swing Cylinder......................................175
	Conveyor Swing Cylinder Removal..........................176
	Conveyor Swing Cylinder Installation.....................177
Plow Cylinders...............................................178
	Plow Cylinder Removal....................................179
	Plow Cylinder Installation...............................180
Conveyor Take-Up Cylinders...................................181
	Conveyor Take-up Cylinder Removal........................182
	Conveyor Take-up Cylinder Installation...................183
TRS Raise and Lower Cylinder.................................184
	TRS Cylinder Removal.....................................185
Servicing and Maintenance....................................187
Top View Lubrication.........................................188
Left Hand Side Lubrication...................................189
Right Hand Side Lubrication..................................190
Lubrication Chart............................................191
Lubrication – Gear Oil.......................................192
	Tram Gear Cases..........................................192
		Cutter Head Input Gear Cases.........................194
	Gathering Head (POT) Gear Cases..........................195
	Gathering Head Input Gear Cases..........................196
	Traction Idler Roller....................................197
Greasing.....................................................198
Tram Brakes..................................................198
Filters......................................................198
	Left Hand Filters........................................198
	Right Hand Filters.......................................199
Chain Adjustments............................................200
	Crawler Track Chain Adjustment...........................200
	Conveyor Chain Adjustment................................201
Maintenance Mode.............................................203
	Check and Fill Hydraulic Oil Reservoir...................203
	Hydraulic Oil Power Fill.................................204
	Gear Case Oil Power Fill.................................206
Repair or Replace Water Sprays...............................207
Machine Cutting Picks........................................208
HYDRAULIC COMPONENTS ASSEMBLY ...............................209
Description..................................................209
Mechanical...................................................210
Hydraulic Pump Installation..................................213
Removal and Replacement of Pump Drive Motor..................215
	Pump Drive Motor Removal.................................216
	Pump Drive Motor Installation............................217
Hydraulics...................................................218
Hydraulic Pump...............................................220
	Power Cut Off Control – D................................221
	Load Sensing Control – S.................................221
Valve Bank Information.......................................221
Adjustments..................................................222
	Conveyor Tension and Tramming Brake Coolant..............222
	Main Relief Valve (Main valve bank inlet) - OPTIONAL.....222
Water Reticulation...........................................222
	General..................................................222
	Circuit 1 (Right Side)...................................223
	Circuit 2 (Left Side)....................................223
Tramming.....................................................224
Water Sprays.................................................224
Flow Switches................................................226
Pumps........................................................226
Traction.....................................................227
Cutters......................................................228
Conveyor.....................................................228
Event Monitor................................................229
	Fault Log inside Event Monitor...........................230
Main Control Case Indicators.................................231
Water Troubleshooting Guide..................................232
Service......................................................233

Need help? Contact: [email protected]

https://vimeo.com/890254885?share=copy

S.S

 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order