★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
⚡
Instant Delivery
Available Immediately
Sale!

CPD 2000 RCD Drilling Machine Instruction Manual – Serial 2012-004/005 – PDF

Original price was: $39.95.Current price is: $24.95.

Complete instruction manual for the CPD 2000 RCD Drilling Machine covering serial numbers 2012-004/005. Includes RCD drilling method, machine specifications, operating procedures, hydraulic diagrams, and the full Doosan PU126Ti engine operation and maintenance guide.

Buy now
⚡
Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

CPD 2000 RCD Drilling Machine Instruction Manual

This instruction manual covers the CPD 2000 Reverse Circulation Drilling (RCD) machine, specifically for serial numbers 2012-004 and 2012-005. It is the complete documentation set issued by CHANG-SHIN INT’L CO., LTD for the operation, drilling procedure, hydraulic system, and engine maintenance of this large-diameter drilling rig. The manual is written in English and spans 274 pages of technical content, including procedures, specifications, diagrams, and the full engine operations and maintenance guide.

File Details

  • Manual Type: Instruction / Operation & Maintenance Manual
  • Brand: CHANG-SHIN INT’L CO., LTD
  • Model: CPD 2000 (CPD-2000) RCD Drilling Machine
  • Serial Numbers: 2012-004 / 005
  • Equipment Type: Reverse Circulation Drilling (RCD) Machine
  • Engine Coverage: Doosan PU126Ti, DE12T, P126TI, P126TI-1, P126TI-II
  • Language: English
  • File Format: PDF
  • Page Count: 274 pages
  • Publisher: CHANG-SHIN INT’L CO., LTD (Ulsan, Korea) / Doosan Infracore

Chapters Covered

  • 1. R.C.D Drilling Method — Reverse circulation principle, casing pipe installation, cluster hammer & RCD cutter operation, air lifting process
  • 2. Machine Specification — Dimensions, weight, rotation speed, torque, thrust force, feed stroke, power pack, hydraulic system
  • 3. Operating Manual — Pre-checking, preliminary operation, test operation, normal operation guide, stoppage, daily check points, repair and checking standards, pressure control valve and flow control valve troubleshooting
  • 4. Drilling Operating — Engine panel, control panel, drilling speed control, drilling condition (cluster hammer / RCD cutter), air supply sequence
  • 5. Reference Drawings and Documents — Hydraulic diagram, lay out drawings, rotary head assembly drawings
  • 6. Operations and Maintenance Guide of the Engine — Safety regulations, general information, technical information, commissioning and operation, maintenance and care, checking and setting, operation tips, disassembly and reassembly of major components, maintenance of major components, special tool list
  • 7. Identification — Machine and component identification

What This Manual Provides

The CPD 2000 RCD Drilling Machine Instruction Manual is structured around the actual working sequence of a reverse circulation drilling job. It opens with the RCD method itself — how air lifting drives the circulation, why the casing pipe is installed before drilling, how the cluster hammer and RCD cutter break rock, and how water is poured into the casing to maintain continuous circulation. From there it moves into the machine specification and then into the operating manual, which is where the daily pre-checks, hydraulic circuit checks, oil level inspections, test operation routines, and normal operation guides are found.

The drilling operating chapter is particularly practical. It covers the engine panel layout, the full control panel function list — feed, rotation, rotation speed control, mast tilting, rotary head tilting, rod cartridge tilting, rod push, pile clamp, deck base tilting — and then explains how pull down and hold back pressures are calculated and applied. The manual gives the actual cylinder dimensions used in the pull down and hold back force formulas, and it spells out the recommended rotation speeds and W.O.B. ranges for both the cluster hammer and the RCD cutter. The air supply sequence is laid out step by step, from lifting the cluster off the hole bottom through to opening the second, third, and fourth ports, rotating the head, feeding down slowly, and monitoring flushing water flow.

For maintenance, the manual includes a daily checking table, a repair and checking standard table covering hydraulic oil, hydraulic pump, pressure gauges, pressure control valves, and flow control valves with inspection frequencies and maintenance standards. The pressure control valve and flow control valve troubleshooting sections give causes and remedies for common hydraulic faults. The disassembly cautions section covers safe handling of hydraulic components, including checking for residual pressure before loosening fittings, protecting disassembled parts from rust, and replacing O-rings and packing on reassembly.

Engine Coverage — Doosan PU126Ti and DE12T Series

A substantial part of the manual is the engine operations and maintenance guide, which covers the Doosan PU126Ti, DE12T, P126TI, P126TI-1, and P126TI-II engines. This section includes full mechanical specifications, valve timing, fuel system data, lubrication system data, cooling system data, electrical system data, and performance curves. It also includes the safety regulations for operating and maintaining the engine, the commissioning and break-in procedure, periodic inspection and maintenance schedules, valve clearance adjustment, injection timing adjustment, cylinder compression pressure testing, V-belt tension checking, turbocharger maintenance and clearance measurement, injection nozzle maintenance and testing, fuel injection pump data, and a special tool list.

Complete PDF Bookmark Tree

Complete Bookmarks

The complete bookmarks in the “CPD 2000 RCD Drilling Machine Instruction Manual – Serial 2012-004/005 – PDF” are as follows:

DE12T Operation & Maintenance Manualp. 32
FOREWORDp. 33
CONTENTSp. 34
1. Safety Regulationsp. 36
1.1. General Notesp. 36
1.2. Regulations Designed to Prevent Accidentsp. 36
1.3. Regulations Designed to Prevent Damage to Engine and Premature Wearp. 37
1.4. Regulations Designed to Prevent Pollutionp. 38
1.5. Notes on Safety in Handling Used Engine Oilp. 38
2. General Informationp. 40
2.1. Engine Assemblyp. 40
2.2. Engine Specificationp. 44
3. Technical Informationp. 45
3.1. Engine Model and Serial Numberp. 45
3.2. Engine Typep. 46
3.3. Engine Timingp. 47
3.4. Valvesp. 47
3.5. Lubrication Systemp. 48
3.6. Air Cleanerp. 49
3.7. Fuel Systemp. 49
3.8. Cooling Systemp. 52
3.9. V-belt Tension Check and Adjustp. 55
3.10. Turbochargerp. 55
3.11. Electrical Equipmentp. 56
4. Commissioning and Operationp. 58
4.1. Preparationp. 58
4.2. Breaking-inp. 58
4.3. Inspections after Startingp. 60
4.4. Operation in Winter Timep. 60
4.5. Tuning the Enginep. 61
5. Maintenance and Carep. 62
5.1. Periodical Inspection and Maintenancep. 62
5.2. Lubrication Systemp. 62
5.3. Cooling Systemp. 65
5.4. Air Intake Systemp. 68
5.5. Fuel Systemp. 70
5.6. Injection Nozzle Maintenance (by authorized specialist personnel)p. 73
5.7. Turbochargerp. 74
6. Checking and Settingp. 76
6.1. Adjustment of Valve Clearancep. 76
6.2. Adjustment of Injection Timingp. 78
6.3. Cylinder Compression Pressurep. 79
6.4. V-beltsp. 80
7. Operation Tipp. 82
7.1. Periodic Inspection Cyclep. 82
7.2. Trouble Shootingp. 83
7.3. Causes and Remediesp. 90
8. General Informationp. 93
8.1. General Repair Instructionsp. 93
8.2. Engine Characteristicsp. 94
9. Disassembly and Reassembly of Major Componentsp. 95
9.1. Disassemblyp. 95
9.2. Inspectionp. 108
9.3. Reassemblyp. 126
9.4. Breaking-inp. 147
10. Maintenance of Major Componentsp. 148
10.1. Cooling Systemp. 148
10.2. Lubricating Systemp. 152
10.3. Fuel Injection Pumpp. 156
10.4. Turbochargerp. 190
11. Special Tool Listp. 198
Appendixp. 200

The engine section is written for the technician who will actually be adjusting valves, timing injection, testing compression, or servicing the turbocharger. It includes the torque values for cylinder head bolts, connecting rod bearing cap bolts, crankshaft main bearing cap bolts, flywheel fixing bolts, and injection pump components, along with the tightening sequences and angle-torque procedures where applicable.

Hydraulic and Mechanical Diagrams

The reference drawings include a full hydraulic diagram for the CPD-2000, showing the pump configuration, valve blocks, rotary head circuit, feed circuit, mast tilting, rotary head tilting, rod cartridge tilting, rod push, pile clamp, and deck base tilting circuits with pressure settings. The lay out drawings show the machine from multiple angles with dimensions, and the rotary head assembly drawings provide sectioned views of the rotary head for maintenance reference.

Who This Manual Is For

This CPD 2000 RCD Drilling Machine Instruction Manual is for the operator, drilling supervisor, maintenance technician, or workshop that services the CPD 2000 RCD rig. It covers the complete machine — the drilling method, the hydraulic controls, the drilling parameters, the engine, and the maintenance schedule. Because the manual is tied to serial numbers 2012-004 and 2012-005, it is directly applicable to those two machines, but the procedures and specifications apply to the CPD 2000 model generally.

Why This Manual Matters

RCD drilling is a large-diameter method where the air lifting circulation, the casing pipe, the cluster hammer or RCD cutter, and the pull down / hold back pressures all have to be balanced correctly. If the drilling speed is too high in soft ground, the tool can flounder. If the pull down force is wrong for the rock condition, the cutter wears unevenly or the hole deviates. If the air supply sequence is not followed, the hammer can jam or the flushing water can stop. The manual gives the specific pressure calculations, speed ranges, and step-by-step sequences that keep the drilling operation stable. On the maintenance side, the hydraulic system runs at 250 bar operating pressure and up to 350 bar maximum, so correct troubleshooting of the pressure control and flow control valves is essential to avoid damage to the pumps, motors, and cylinders. The engine section covers the Doosan PU126Ti and DE12T series with the torque values, clearances, and adjustment procedures needed to keep the power pack reliable.

IMAGES PREVIEW

CPD 2000 RCD Drilling Machine Instruction Manual - Serial 2012-004/005 - PDF — PDF page 1 preview
CPD 2000 RCD Drilling Machine Instruction Manual - Serial 2012-004/005 - PDF — PDF page 5 preview
CPD 2000 RCD Drilling Machine Instruction Manual - Serial 2012-004/005 - PDF — PDF page 23 preview

Instant PDF Delivery

The manual is delivered as an instant PDF download after payment. There is no shipping, no waiting for a physical book, and no customs delay. The file can be opened on a workshop computer, a laptop, a tablet, or a phone, and any page can be printed for use at the machine. Whether you are setting up the CPD 2000 for a new hole, troubleshooting a hydraulic fault, adjusting the engine valves, or ordering the right spare part from the specification tables, this manual gives you the reference material in a searchable, printable PDF format.

Reviews

There are no reviews yet.

Be the first to review “CPD 2000 RCD Drilling Machine Instruction Manual – Serial 2012-004/005 – PDF”

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
🛒
Recently Purchased
🕒 verified order