★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
๐Ÿข
Trusted Business
Verified & Licensed
๐Ÿ›ก๏ธ
Virus Free Files
100% Safe Downloads
๐Ÿ”’
Secure Payment
SSL Protected
โšก
Instant Delivery
Available Immediately
Sale!

Daewoo Doosan Mega 300-IIIShop Manual 2023-7105E โ€“ PDF DOWNLOAD

Original price was: $90.00.Current price is: $29.95.

Daewoo Doosan Mega 300-IIIShop Manual 2023-7105E โ€“ PDF DOWNLOAD

Serial Number 0001 and Up

โšก
Instant PDF Download
Available immediately
๐Ÿ’พ
Save to Your Device
Download & keep forever
๐Ÿ›ก๏ธ
Antivirus Scanned
100% virus-free
๐ŸŒ
Trusted Worldwide
175,000+ customers

Description

Daewoo Doosan Mega 300-IIIShop Manual 2023-7105E โ€“ PDF DOWNLOAD

DESCRIPTION:

Daewoo Doosan Mega 300-IIIShop Manual 2023-7105E โ€“ PDF DOWNLOAD

  • Daewoo reserves the right to improve our products in a continuing process to provide the best possible product to the market place. These improvements can be implemented at any time with no obligation to change materials on previously sold products.
  • It is recommended that consumers periodically contact their distributors for recent documentation on purchased equipment. This documentation may include attachments and optional equipment that is not available in your machineโ€™s package.
  • Please call your distributor for additional items that you may require. Illustrations used throughout this manual are used only as a representation of the actual piece of equipment, and may vary from the actual item.

General Safety Essentials Accessory Applications

The wheel loader has been designed primarily for moving earth with a bucket. For use as a grapple or for other object handling, contact Daewoo. Liftingwork applications are permitted in approved lift configuration, to rated capacity only, with no sideloading (unless prohibited by local regulation). DO NOT use the machine for activities for which it was not intended. DO NOT use the bucket for lifting work, unless lift slings are used in the approved configuration. Working in rough terrain, use of an accessory hydraulic hammer (breaker), demolition applications, or other hazardous operation may require installation of additional protective structures to safeguard the operator.

Static Tipping Load

The machine can lift a maximum of 14,500 kg (31,967 lb) with the bucket in the Straight Ahead position, and a maximum of 12,000 kg (26,455 lb) with the bucket in the Fully Turned position. Hooks and slings must be attached to an eye that is in the center of the bucket. All lifts must be made with the machine standing on a firm and level surface. Loads must be balanced and supported evenly. Use taglines to keep the load steady if wind conditions and large surface area are a problem. Work crew hand signals, individual tasks and safe procedures should all be universally understood before the lift is made.

NOTE

Before using the wheel loader to make lifts, check the statutes at all levels of government that might have jurisdiction. Some governing bodies may require that all heavy lifting be done with a crane that is specifically designed for making lifts. When making lifts, always follow all instructions, guidelines, and restrictions for Safe Lifting in the Operation and Maintenance and Shop Manuals.

Locations of Safety Labels

Always keep these labels clean. If they are lost or damaged, attach them again or replace them with a new label. Make sure replacement parts have current labels. There are other labels in addition to the safety labels that follow so handle them in the same way. Safety labels may be available in languages other than English. To find out what labels are available, contact your Daewoo distributor

TABLE OF CONTENTS:

Daewoo Doosan Mega 300-IIIShop Manual 2023-7105E โ€“ PDF DOWNLOAD

SAFETY
To the Operator of a Daewoo Wheel Loader 1-1
Basic Wheel Loader Operating Safety 1-1
General Safety Essentials 1-1
Locations of Safety Labels 1-2
Summary of Safety Precautions for Lifting 1-5
Operation 1-7
Equipment 1-1 o
Maintenance 1-11
Shipping and Transportation 1-13
SPECIFICATIONS
Component Locations 2-1
General Specifications 2-2
Excavator Engine Specifications 2-3
Engine Performance Curves 2-4
Working Range and Dimensions 2-5
Working Capacities 2-7
Approximate Weight of Workload Materials 2-8
INSPECTION, MAINTENANCE AND ADJUSTMENT
Preventive Maintenance 3-1
Safety Precautions 3-1
Maintenance Intervals 3-2
Table of Recommended Lubricants 3-3
Inspection and Maintenance 3-4
Daily or Every 1 O Operating Hours 3-7
Weekly or Every 50 Operating Hours 3-1 O
Every 250 Operating Hours 3-12
Every 500 Operating Hours 3-13
Every 1,000 Operating Hours 3-13
Every 1,500 Operating Hours 3-18
Annually or Every 2,000 Operating Hours 3-18
Severe Conditions Maintenance 3-20
General Maintenance 3-21
Check Hydraulic Pressures 3-22
Tires and Wheels 3-25
Electrical System 3-26
Bolt Torque Chart 3-27
Long Term Storage 3-28
TORQUE CONVERTER AND TRANSMISSION
Drive Train 4-1
Transmission 4-2
Transmission Troubleshooting 4-5
Control Valve 4-7
Second Gear Valve 4-12
Transmission WG-180 Control Valve 4-18
Transmission Disassembly 4-21
Transmission Assembly 4-42
Power Disengagement Gearbox 4-82
Differential Type Output Gearing 4-87
WK Torque Converter 4-98
WK Converter Clutch Valve 4-109
POWER STEERING
Power Steering System 5-1
Steering System Troubleshooting 5-5
Steering Unit 5-6
Priority Valve 5-19
AXLES
Front and Rear Axles 6-1
Axle Troubleshooting 6-2
Front Axle Housing 6-3
Axle Differential 6-4
Planetary Gear Set 6-7
Parking Brake 6-9
Rear Axle 6-11
Brake System 6-13
HYDRAULIC SYSTEM
Hydraulic Circuits Description 7-1
Hydraulic Pump 7-3
Hydraulic Circuits and Components 7-18
Manually Controlled Pilot Valve 7-23
Automatic Bucket Return-to-Dig System 7-24
Automatic Boom Kick-out System 7-25
Automatic Boom Float System 7-25
Hydraulic Cylinders 7-27
Accumulator 7-40
Hydraulic System Schematic 7-45
ENGINE
Engine Specifications (D2366T) 8-1
Valve Adjustment Sequence 8-2
Engine Cylinder Compression Test 8-2
Wear Limits of Major Engine Components 8-2
Engine Oil Pump Overhaul and Rebuilding 8-7
Fuel Injection Pump Installation, Alignment and Timing 8-9
Cylinder Head Bolt Torque Requirements 8-11
ELECTRICAL SYSTEM
Electrical Schematic 9-1
24 Volt Operation 9-1
Wiring Color Code for Electrical Schematic Diagrams 9-1
Engine Start Circuit 9-2
Engine Stop Motor 9-4
Engine Intake Preheat Circuit 9-6
Windshield Wiper Circuit 9-8
Electrical System Schematic 9-11
INDEX 10-1
ii
DAEWOO DOOSAN MEGA 300-IIISHOP MANUAL 2023-7105E โ€“ PDF DOWNLOAD:

IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:

  • This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
  • You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
  • Need any other service / repair / parts manual, please feel free to contactย [email protected]ย . We still have 50,000 manuals unlisted

S.M

What Our Customers Say

โ˜…โ˜…โ˜…โ˜…โ˜… Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    ๐Ÿ›’
    Recently Purchased
    ๐Ÿ•’ verified order