Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3113630 – PDF DOWNLOAD
$29.95
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3113630 – PDF DOWNLOAD
Description
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3113630 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3113630 – PDF DOWNLOAD
Language : English
Pages : 400
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3113630 – PDF DOWNLOAD
Basic safety instructions:
- In principle, all the basic safety instructions from the Operating Instructions
GMK 4100L-1 are applicable. - Observe also all safety instructions and warnings on the truck crane!
Other applicable documents:
In addition to the information in this operating manual, all the instructions
in the following sections of the supplied Operating Instructions GMK 4100L-1
are also applicable:
– Intended use
– Improper use
– Organisational measures
– Personnel qualifications
Safety instructions for working with a lattice extension:
- This chapter contains additional safety instructions only for safe use of the lattice extensions
described in these operating instructions. - If there is a risk of falling when doing work on the truck crane, suitable equipment must be used
to prevent falling (e. g. ladder, lifting platform, auxiliary crane). - The lattice extensions are provided with brackets for positioning a ladder. Place the ladder
between the brackets, so it cannot slip off. - If despite using such equipment the risk of falling cannot be minimised you must protect yourself
and any assisting personnel by using fall arrest systems. - The points at which the fall arrest system can be attached to on the truck
crane are indicated by the symbol shown here.
TABLE OF CONTENTS:
Grove Crane GMK 4100L-1 Lattice Extension Operating Manual 3113630 – PDF DOWNLOAD
Additional page: Derricking cylinder positionson the swing-away lattice......................................... 3 Validity.................................................................................................... 3 Reason for the modification................................................................................. 3 When rigging theswing-away lattice......................................................................... 4 When rigging theISS........................................................................................ 5 1 About these operating instructions............................................................................ 33 1.1 Validity................................................................................................ 33 Validity of this operating manual....................................................................... 33 Prerequisites for installation and operation............................................................ 33 References to other operating manuals................................................................... 33 1.2 Terms used.............................................................................................. 34 2 Basic safety instructions..................................................................................... 37 2.1 Other applicable documents.............................................................................. 37 2.2 Safety instructions for working with a lattice extension................................................ 38 Working at heights...................................................................................... 38 Slinging................................................................................................ 38 Locks................................................................................................... 38 Rigging mode............................................................................................ 38 Two cranes.............................................................................................. 38 3 Operating elements............................................................................................ 39 3.1 On the lattice extension................................................................................ 39 3.1.1 Overview.......................................................................................... 39 3.1.2 Swing-away lattice control unit................................................................... 40 3.1.3 Drive for telescoping............................................................................. 40 3.1.4 Connection at rear................................................................................ 41 3.1.5 Connection in the centre.......................................................................... 41 3.1.6 Connection in front............................................................................... 42 3.2 In the crane cab........................................................................................ 43 3.2.1 Overview.......................................................................................... 43 3.2.2 On the CCS control unit........................................................................... 44 3.2.3 On the RCL control unit........................................................................... 47 Menu for entering rigging mode...................................................................... 47 Monitoring menu..................................................................................... 47 3.2.4 At the control console, right..................................................................... 48 3.3 On the hand-held control unit........................................................................... 49 3.3.1 Hand-held control connection...................................................................... 51 Connecting and removing the hand-held control....................................................... 51 4 Rigging work on the main boom................................................................................. 53 4.1 Hose drum............................................................................................... 53 4.1.1 Slinging points................................................................................... 53 4.1.2 Transport dimensions and weights.................................................................. 54 4.2 Rigging work on the hose drum........................................................................... 55 4.2.1 Fitting/removing the hose drum.................................................................... 55 Installation........................................................................................ 55 Removing............................................................................................ 56 4.2.2 Checking the locking device on the hose drum...................................................... 57 4.2.3 Positions of the hydraulic connections.......................................................... 58 Working with the lattice extension.................................................................. 58 Main boom operation................................................................................. 59 5 Swing-away lattice............................................................................................ 61 5.1 Notes on this chapter................................................................................... 61 5.2 Operations planning..................................................................................... 62 5.2.1 Assembly.......................................................................................... 62 5.2.2 Identification.................................................................................... 63 5.2.3 Slinging points................................................................................... 64 Section1 and section2............................................................................. 64 Section3........................................................................................... 64 Section combination................................................................................. 65 5.2.4 Transport dimensions and weights.................................................................. 66 5.2.5 Transport condition – removed..................................................................... 67 On the swing- away lattice.......................................................................... 68 On the main boom.................................................................................... 69 5.2.6 Transport condition – folded...................................................................... 70 5.3 Checklists for rigging work............................................................................. 73 5.3.1 Overview.......................................................................................... 73 5.3.2 CHECKLIST: Installing the swing-away lattice – into the working position.......................... 75 5.3.3 CHECKLIST: Installing the swing-away lattice – into the transport position........................ 79 5.3.4 CHECKLIST: Removing the swing-away lattice – from the working position............................ 85 5.3.5 CHECKLIST: Removing the swing-away lattice – from the transport position.......................... 89 5.3.6 CHECKLIST: Rigging the swing-away lattice – into the working position............................. 95 5.3.7 CHECKLIST: Rigging the swing-away lattice – into the transport position...........................101 5.3.8 CHECKLIST: Subsequent necessary rigging work......................................................107 5.3.9 CHECKLIST: Preliminary unrigging work.............................................................109 5.4 Rigging work............................................................................................111 5.4.1 Securing the swing-away lattice with guide ropes..................................................111 5.4.2 Notes on the position of the telescoping cylinder.................................................112 5.4.3 Establishing/separating the rear connection.......................................................113 Connecting..........................................................................................113 Disconnecting.......................................................................................113 5.4.4 Establishing/releasing the centre connection......................................................114 Connecting..........................................................................................114 Disconnecting.......................................................................................114 5.4.5 Establishing/releasing the front connection.......................................................115 Connecting..........................................................................................115 Disconnecting.......................................................................................115 5.4.6 Making/disconnecting the slewing connection.......................................................116 Connecting..........................................................................................116 Disconnecting.......................................................................................116 5.4.7 Slewing cylinder into the telescoping/transport position..........................................117 5.4.8 Derricking cylinder positions.....................................................................118 Part 3 without head sheave..........................................................................118 Part 3 with head sheave.............................................................................119 5.4.9 Folding out/folding in the deflection sheave......................................................120 Folding out.........................................................................................120 Folding in..........................................................................................121 5.4.10 Establishing/disconnecting the hydraulic connections – Mainboom/swing-away lattice..............123 5.4.11 Establishing/disconnecting electrical connections................................................124 Connecting..........................................................................................124 Disconnecting.......................................................................................125 5.4.12 Relieving the connecting points..................................................................126 5.4.13 Swinging the swing-away lattice when rigging.....................................................127 When rigging inthe working position................................................................127 When rigging in the transport position..............................................................127 5.4.14 Connections on the left/right of the main boom head..............................................129 Establishing connections............................................................................129 Separating connections..............................................................................130 5.4.15 Retracting/extending section1...................................................................131 Prerequisite:.......................................................................................131 Retracting..........................................................................................131 Extending...........................................................................................134 5.4.16 Attaching/removing the hoist rope................................................................138 Fitting with swing-away lattices A and B............................................................138 Removing with swing-away lattices A and B...........................................................140 Possible reeving methods............................................................................141 5.4.17 Installing/removing the lifting limit switch.....................................................142 Installation........................................................................................142 Removing............................................................................................142 5.4.18 Installing/removing the anemometer and air traffic control light.................................143 Installation........................................................................................143 Removing............................................................................................143 5.4.19 Installing / removing the camera.................................................................144 Installation........................................................................................144 Removing............................................................................................144 5.4.20 Derricking the swing-away lattice for rigging work – hand-held control...........................145 5.4.21 Derricking the swing-away lattice for rigging work – Section3 control unit......................146 5.4.22 Main boom operation with a folded swing-away lattice – Necessary rigging work....................147 Before telescoping out..............................................................................147 After telescoping in................................................................................148 5.5 Operation with swing-away lattice.......................................................................149 5.5.1 Setting the RCL...................................................................................149 Input...............................................................................................149 Shutdown............................................................................................150 5.5.2 Derricking the main boom..........................................................................150 Slewing range of360...............................................................................150 5.5.3 Telescoping with rigged swing-away lattice........................................................151 Slewing range of360...............................................................................151 5.5.4 Derricking the swing-away lattice in operation....................................................151 Switching on the derricking gear...................................................................151 Raising and lowering................................................................................152 Switching off the derricking gear...................................................................152 5.5.5 Procedure if permissible wind speed is exceeded...................................................153 5.5.6 Information about the main boom operation when the swing- away lattice is folded/rigged...........154 Folded..............................................................................................154 In working position.................................................................................154 5.5.7 Instructions for turning loads over...............................................................155 5.6 Maintenance.............................................................................................157 5.6.5 Description of maintenance work...................................................................159 Pins................................................................................................159 Connections.........................................................................................160 Rollers.............................................................................................161 Hydraulic cylinder..................................................................................162 Joints..............................................................................................163 Chain drive.........................................................................................164 5.7 Finding and eliminating malfunctions....................................................................169 5.7.1 Troubleshooting table.............................................................................169 5.7.2 Swing-away lattice emergency operation............................................................171 Before telescoping out..............................................................................171 Retract.............................................................................................173 After telescoping in...............................................................................173 6 Boom extension................................................................................................175 6.1 Operations planning.....................................................................................175 6.1.1 Assembly..........................................................................................175 6.1.2 Identification....................................................................................176 Section4...........................................................................................176 6.1.3 Slinging points...................................................................................177 Section4...........................................................................................177 6.1.4 Transport dimensions and weights..................................................................178 6.1.5 Transport condition...............................................................................178 Section4...........................................................................................178 6.2 Checklists for rigging work.............................................................................179 6.2.1 Overview..........................................................................................179 6.2.2 CHECKLIST: Installing the boom extension..........................................................180 6.2.3 CHECKLIST: Removing the boom extension............................................................184 6.3 Description of the rigging work.........................................................................189 6.3.1 Folding the deflection sheave out/in – section4..................................................189 6.3.2 Mounting section4 to the main boom / removing it from the main boom..............................190 6.3.3 Making/breaking the electrical connections – section4 / mainboom................................191 6.3.4 Making/breaking the hydraulic connections– section4 / mainboom..................................193 6.3.5 Connecting/disconnecting the electrical connections – section4/swing-away lattice................194 6.3.6 Connecting/disconnecting the hydraulic connections – section4/swing-away lattice.................196 6.3.7 Installing/removing the swing-away lattice to/from section4......................................197 6.3.8 Attaching/removing the hoist rope.................................................................198 Possible reeving methods............................................................................200 6.4 Operation with boom extension...........................................................................201 6.4.1 Setting the RCL...................................................................................201 Input...............................................................................................201 Shutdown............................................................................................202 6.4.2 Derricking, telescoping the main boom.............................................................202 Slewing range of360...............................................................................202 6.4.3 Procedure if permissible wind speed is exceeded...................................................203 6.4.4 Instructions for turning loads over...............................................................203 6.5 Maintenance.............................................................................................204 6.5.3 Description of maintenance work...................................................................205 7 Heavy load lattice extension (SLS) 2.0m (6.6ft).............................................................207 7.1 Operations planning.....................................................................................207 7.1.1 Assembly..........................................................................................207 7.1.2 Identification....................................................................................208 Section6...........................................................................................208 7.1.3 Slinging points...................................................................................209 Section6...........................................................................................209 7.1.4 Transport dimensions and weights..................................................................210 7.1.5 Transport condition...............................................................................210 Section6...........................................................................................210 7.2 Checklists for rigging work.............................................................................213 7.2.1 Overview..........................................................................................213 7.2.2 CHECKLIST: Installing SLS 2.0m (6.6 ft) – in working position....................................214 7.2.3 CHECKLIST: Installing SLS 2.0m (6.6 ft) – in transport position..................................217 7.2.4 CHECKLIST: Removing SLS 2.0m (6.6 ft) – in working position......................................218 7.2.5 CHECKLIST: Removing SLS 2.0m (6.6 ft) – in transport position....................................221 7.2.6 CHECKLIST: Rigging SLS 2.0m (6.6 ft) – in working position.......................................223 7.2.7 CHECKLIST: Rigging SLS 2.0m (6.6 ft) – in transport position.....................................227 7.3 Rigging work............................................................................................229 7.3.1 Mounting section6 to the main boom / removing it from the main boom..............................229 Installing..........................................................................................229 Removing............................................................................................230 7.3.2 Moving section6 into the working position / transport position...................................232 In working position.................................................................................232 In transport position...............................................................................234 7.3.3 Making/breaking the electrical connections – section6 / mainboom................................236 Connecting..........................................................................................236 Disconnecting.......................................................................................236 7.3.4 Positioning/removing the hoist rope – section6...................................................237 7.3.5 Possible reeving methods on the heavy load lattice extension......................................238 7.3.6 Installing / removing the lifting limit switch and anemometer.....................................240 Lifting limit switch................................................................................240 Anemometer..........................................................................................241 7.3.7 Installing / removing the camera..................................................................241 7.3.8 Setting the angle.................................................................................242 7.4 Operating the heavy load lattice extension..............................................................243 7.4.1 Setting the RCL...................................................................................243 Input...............................................................................................243 Shutdown............................................................................................243 7.4.2 Derricking, telescoping the main boom.............................................................244 Slewing range of360...............................................................................244 7.4.3 Procedure if permissible wind speeds are exceeded.................................................245 7.4.4 Instructions for turning loads over...............................................................245 7.5 Maintenance.............................................................................................247 7.5.3 Description of maintenance work...................................................................248 8 Integral heavy load lattice extension (ISS) 3.3/11.3m (10.8/37.0)ft)........................................249 8.1 Operations planning.....................................................................................250 8.1.1 Assembly..........................................................................................250 8.1.2 Identification....................................................................................251 Section3...........................................................................................251 Section4...........................................................................................251 8.1.3 Slinging points...................................................................................252 Section3...........................................................................................252 Section4...........................................................................................252 8.1.4 Transport dimensions and weights..................................................................253 8.1.5 Transport condition...............................................................................253 Section3...........................................................................................253 Section4...........................................................................................254 8.2 Checklists for rigging work.............................................................................255 8.2.1 Supervision.......................................................................................255 8.2.2 CHECKLIST: Installing the ISS 3.3 m (10.8 ft) – in working position...............................256 8.2.3 CHECKLIST: Remove the ISS 3.3m (10.8 ft) – from the working position.............................260 8.2.4 CHECKLIST: Swing the ISS 3.3m (10.8 ft) away from the swing-away lattice – rig it in worki.......264 8.2.5 CHECKLIST: Rigging the ISS 3.3m (10.8 ft) from the swing-away lattice – in transport position....271 8.2.6 CHECKLIST: Installing the ISS 11.3m (37.0ft)....................................................276 8.2.7 CHECKLIST: Removing the ISS 11.3m (37.0ft)......................................................281 8.3 Rigging work............................................................................................287 8.3.1 Releasing the connections – section3/section2...................................................287 From the working position...........................................................................287 On the ground.......................................................................................288 8.3.2 Locking the connection – section3/section2......................................................291 From the working position...........................................................................291 On the ground.......................................................................................293 8.3.3 Installing/removing section3.....................................................................296 8.3.4 Establishing/parting the slewing connection.......................................................297 Establishing........................................................................................297 Disconnecting.......................................................................................297 8.3.5 Locking/releasing connections – section 3/main boom...............................................298 Establishing connections............................................................................298 Separating connections..............................................................................299 8.3.6 Making/breaking the electrical connections – section3 / mainboom................................300 8.3.7 Making/breaking the hydraulic connections – section3 / mainboom.................................302 8.3.8 Folding the deflection sheave out/in – section3..................................................303 Folding out.........................................................................................303 Folding in..........................................................................................303 8.3.9 Swinging the ISS when rigging.....................................................................305 When rigging into the working position..............................................................305 When rigging in the transport position..............................................................305 8.3.10 Tilt cylinder in the telescoping/transport position..............................................307 8.3.11 Derricking cylinder positions....................................................................308 8.3.12 Derricking cylinder positions....................................................................308 8.3.13 Folding out / folding in the head sheave on section3............................................311 8.3.14 Attaching/removing the hoist rope................................................................312 ISS 3.3m (10.8ft).................................................................................312 ISS 11.3m (37.0ft)................................................................................313 8.3.15 Possible reeving methods.........................................................................315 8.3.16 Installing / removing the lifting limit switch...................................................317 Installation........................................................................................317 Removing............................................................................................317 8.3.17 Installing / removing the anemometer and air traffic control light...............................318 Installation........................................................................................318 Removing............................................................................................319 8.3.18 Installing / removing the camera.................................................................320 8.3.19 Folding out / folding in the deflection sheave on section4......................................321 8.3.20 Mounting section4 to the main boom / removing it from the main boom.............................322 8.3.21 Making/breaking the electrical connections – section4 / mainboom...............................324 8.3.22 Making the electrical connections between section3 and section2................................326 8.3.23 Making/breaking the hydraulic connections – section4 / mainboom................................328 8.3.24 Installing/removing section3 on section4.......................................................329 8.3.25 Making the electrical connections between section4 and section3................................330 8.3.26 Establishing/parting the hydraulic connection – section4/ section3.............................332 8.3.27 Derricking the ISS for rigging work – hand-held control..........................................333 8.3.28 Derricking the ISS for rigging work – Section3 control unit.....................................334 8.4 ISS, derricking.........................................................................................335 Switching on the derricking gear.......................................................................335 Raising and lowering....................................................................................335 Switching off the derricking gear.......................................................................336 8.5 Operation with the ISS..................................................................................337 8.5.1 Setting the RCL...................................................................................337 Input...............................................................................................337 Shutdown............................................................................................338 8.5.2 Derricking, telescoping the main boom.............................................................339 Slewing range of360...............................................................................339 8.5.3 Procedure if permissible wind speeds are exceeded.................................................340 8.5.4 Instructions for turning loads over...............................................................340 8.6 Maintenance.............................................................................................341 8.6.5 Description of maintenance work...................................................................343 Pins................................................................................................343 Rollers.............................................................................................345 Hydraulic cylinder..................................................................................346 Joints..............................................................................................347 9 Auxiliary single-sheave boom top..............................................................................349 9.1 Operations planning.....................................................................................349 9.1.1 Identification and slinging points................................................................349 9.1.2 Transport dimensions and weights..................................................................350 9.1.3 Transport condition...............................................................................350 9.2 Rigging work............................................................................................351 9.2.1 Moving the auxiliary single-sheave boom top into the working position.............................351 9.2.2 Moving the auxiliary single-sheave boom top into the transport position...........................354 9.2.3 Installing/removing a folded up auxiliary single-sheave boom top..................................357 9.2.4 Attaching and removing the hoist rope.............................................................359 Possible reeving methods............................................................................359 9.2.5 Installing / removing the lifting limit switch and anemometer.....................................361 Lifting limit switch................................................................................361 Anemometer..........................................................................................362 9.2.6 Installing / removing the camera..................................................................362 9.3 Operation with the auxiliary single-sheave boom top.....................................................363 9.3.1 Setting the RCL...................................................................................363 Input...............................................................................................363 Shutdown............................................................................................363 9.3.2 Procedure if permissible wind speeds are exceeded.................................................364 9.3.3 Instructions for turning loads over...............................................................364 9.4 Maintenance.............................................................................................365 9.4.3 Description of maintenance work...................................................................366 10 Turning loads over...........................................................................................367 Prerequisites...............................................................................................367 10.1 Setting the RCL........................................................................................368 Entering the reeving....................................................................................368 Switching over to the auxiliary hoist...................................................................368 10.2 Turning a load over....................................................................................369 11 Driving with a rigged crane..................................................................................371 11.1 Safety instructions....................................................................................371 11.2 Route..................................................................................................372 11.3 Permissible rigging modes and axle loads...............................................................373 Information about the tables............................................................................373 11.3.1 Swing-away lattice...............................................................................374 Swing-away lattice 1.7 + 9.4m (5.6 + 30.8ft)......................................................374 Swing-away lattice 1.7 + 15.9m (5.6 + 52.2ft).....................................................376 11.3.2 Boom extension...................................................................................378 Boom extension 9.7+ 9.4m (31.8 + 30.8ft)..........................................................378 Boom extension 9.7+ 15.9m (31.8 + 52.2ft).........................................................380 11.3.3 Heavy load lattice extension (SLS)...............................................................382 Heavy load lattice extension 0.46m + 1.46 m (0.6ft + 4.8 ft)......................................382 11.3.4 Heavy load lattice extension (ISS)...............................................................384 Heavy load lattice extension 1.7m + 1.6m (5.6ft + 5.2ft)........................................384 Heavy load lattice extension 9.7m + 1.6m (26.6ft + 5.2ft).......................................386 11.3.5 Auxiliary single-sheave boom top.................................................................388 11.4 Before driving.........................................................................................389 11.5 Whilst driving.........................................................................................389 11.6 After driving..........................................................................................389 12 Index........................................................................................................391 A...........................................................................................................393 B...........................................................................................................393 D...........................................................................................................394 H...........................................................................................................394 I...........................................................................................................395 L...........................................................................................................396 M...........................................................................................................396 O...........................................................................................................396 P...........................................................................................................396 R...........................................................................................................396 S...........................................................................................................396 T...........................................................................................................397
Questions? Email us: [email protected]
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK 5220 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD

Grove GMK 3055 Operating Instruction Manual Part 1 (Driving) - PDF DOWNLOAD

Grove GMK4075 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD
