Grove GMK 5150/5150L Lattice Extension Operation Manual 3302625 PDF
$29.95
Grove Crane GMK 5150 GMK 5150L Lattice Extension Operating Manual 3302625 – PDF DOWNLOAD
Description
Grove Crane GMK 5150 GMK 5150L Lattice Extension Operating Manual 3302625 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 5150 GMK 5150L Lattice Extension Operating Manual 3302625 – PDF DOWNLOAD
Language : English
Pages : 494
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane GMK 5150 GMK 5150L Lattice Extension Operating Manual 3302625 – PDF DOWNLOAD
Basic safety instructions:
In principle, all the basic safety instructions from the GMK5150 / GMK5150L Operating Instructions
are applicable.
Other applicable documents:
In addition to the information in this operating manual, all the instructions in the following
sections of the supplied GMK5150 / GMK5150L Operating Instructions are also applicable:
– Intended use
– Improper use
– Organisational measures
– Personnel qualifications GMK5150 / GMK5150L
Safety instructions for working with a lattice extension:
Working at heights:
- This chapter contains additional safety instructions only for safe use of the lattice extensions
described in these operating instructions. - If there is a danger of falling when doing work on the truck crane, suitable equipment must be used
to prevent falling (e. g. ladder, lifting platform, auxiliary crane). - The lattice extensions are provided with clamps for positioning a ladder. Place the ladder between
the clamps so it cannot slip off. - If despite using such equipment the risk of falling cannot be minimised you must protect yourself
and any assisting personnel by using fall arrest sys- tems. - The points at which the fall arrest system can be attached to on the truck
crane are indicated by the symbol shown here.
TABLE OF CONTENTS:
Grove Crane GMK 5150 GMK 5150L Lattice Extension Operating Manual 3302625 – PDF DOWNLOAD
1 About these operating instructions............................................................................ 7 1.1 Validity................................................................................................ 7 1.2 Terms used.............................................................................................. 8 2 Basic safety instructions..................................................................................... 11 2.1 Other applicable documents.............................................................................. 11 2.2 Safety instructions for working with a lattice extension................................................ 12 3 Operating elements............................................................................................ 15 3.1 On the lattice extension................................................................................ 15 3.1.1 Overview.......................................................................................... 15 3.1.2 Connection section 1 - section 2.................................................................. 16 3.1.3 Folded connection................................................................................. 16 3.1.4 Front connection.................................................................................. 17 3.1.5 Middle 2 connection............................................................................... 17 3.1.6 Middle 1 connection............................................................................... 18 3.1.7 Run-up rail....................................................................................... 18 3.1.8 Rear connection................................................................................... 19 3.1.9 Section2 control unit............................................................................ 20 3.2 In the crane cab........................................................................................ 21 3.2.1 Overview.......................................................................................... 21 3.2.2 On the CCS control unit........................................................................... 22 3.2.3 On the RCL control unit........................................................................... 23 3.2.4 At the control console, right..................................................................... 24 3.3 On the hand-held control................................................................................ 25 3.3.1 Hand-held control connection...................................................................... 27 3.4 Other operating elements................................................................................ 28 3.4.1 Rigging hook...................................................................................... 28 4 Rigging work on the main boom................................................................................. 31 4.1 Hose drum............................................................................................... 31 4.1.1 Slinging points................................................................................... 31 4.1.2 Transport dimensions and weights.................................................................. 32 4.2 Rigging work on the hose drum........................................................................... 33 4.2.1 Fitting/removing the hose drum.................................................................... 33 4.2.2 Checking the locking device on the hose drum...................................................... 35 4.2.3 Positions of the hydraulic connections.......................................................... 36 5 Swing-away lattice............................................................................................ 43 5.1 Notes on this chapter................................................................................... 43 5.2 Operations planning..................................................................................... 44 5.2.1 Assembly.......................................................................................... 44 5.2.2 Identification.................................................................................... 45 5.2.3 Slinging points................................................................................... 46 5.2.4 Transport dimensions and weights.................................................................. 48 5.2.5 Transport condition – removed..................................................................... 50 5.2.6 Transport condition – folded...................................................................... 54 5.3 Checklists for rigging work............................................................................. 59 5.3.1 Overview.......................................................................................... 59 5.3.2 CHECKLIST: Installing the swing-away lattice – into the operating position........................ 61 5.3.3 CHECKLIST: Installing the swing-away lattice – into the transport position........................ 67 5.3.4 CHECKLIST: Removing the swing-away lattice – from the operating position.......................... 72 5.3.5 CHECKLIST: Removing the swing-away lattice – from the transport position.......................... 78 5.3.6 CHECKLIST: Rigging the swing-away lattice 1.8 + 9.4 m (5.9+30.8 ft) – in the operating po....... 82 5.3.7 CHECKLIST: Rigging the swing-away lattice 1.8 + 16.0 m (5.9+52.5 ft) – in the operating p....... 87 5.3.8 CHECKLIST: Rigging the swing-away lattice 1.8 + 9.4 m (5.9+30.8 ft) – in the transport po....... 92 5.3.9 CHECKLIST: Rigging the swing-away lattice 1.8 + 16.0 m (5.9+52.5 ft) – in the transport p....... 98 5.3.10 CHECKLIST: Further rigging work..................................................................105 5.4 Rigging work............................................................................................107 5.4.1 Notes on the position of the telescoping cylinder.................................................107 5.4.2 Secure the swing-away lattice with guide rope.....................................................108 5.4.3 Reeving/unreeving the rigging rope................................................................109 5.4.4 Establishing/separating the Rear connection.......................................................110 5.4.5 Establishing/separating the Middle1 connection...................................................111 5.4.6 Establishing/disconnecting the Front connection...................................................112 5.4.7 Folding the run-up rail out/in....................................................................114 5.4.8 Establishing/separating the slewing connection....................................................115 5.4.9 Establishing/separating the connection between the main boom/section4............................117 5.4.10 Establishing/separating connections between lattice extension sections – during installati.......119 5.4.11 Section1/section2 – Establish/separate the right-hand connection...............................125 5.4.12 Section1/section2 – Establish/separate the left-hand connection................................126 5.4.13 Section1/section2 – Establishing/separating the Folded connection..............................128 5.4.14 Swinging the swing-away lattice..................................................................129 5.4.15 Slewing section1................................................................................130 5.4.16 Establishing/disconnecting the hydraulic connection – Main boom/swing-away lattice...............131 5.4.17 Establishing/disconnecting electrical connections – swingaway lattice...........................132 5.4.18 Fold the deflection sheaves in/out on section2 and section4....................................143 5.4.19 Folding the deflection sheaves on section3 into the operating position/transport position.......145 5.4.20 Attaching/removing the hoist rope................................................................146 5.4.21 Installing / removing the lifting limit switch...................................................148 5.4.22 Installing / removing the anemometer and air traffic control light...............................150 5.4.23 Installing / removing the camera.................................................................152 5.4.24 Derricking cylinder positions....................................................................154 5.4.25 Derricking the swing-away lattice for rigging work – hand-held control...........................155 5.4.26 Derricking the swing-away lattice – Section2 control unit.......................................156 5.4.27 Setting the angle – with an auxiliary crane......................................................157 5.4.28 Setting the angle – without the auxiliary crane.................................................158 5.5 Operation with swing-away lattice.......................................................................165 5.5.1 Setting the RCL...................................................................................165 5.5.2 Derricking the main boom..........................................................................166 5.5.3 Telescoping with rigged swing-away lattice........................................................166 5.5.4 Derricking the swing-away lattice in operation....................................................167 5.5.5 Procedure if permissible wind speed is exceeded...................................................168 5.5.6 Information about the main boom operation when the swing- away lattice is folded/rigged...........169 5.5.7 Instructions for turning loads over...............................................................170 5.6 Maintenance.............................................................................................171 5.6.5 Description of maintenance work...................................................................172 5.7 Finding and eliminating malfunctions....................................................................178 5.7.1 Troubleshooting table.............................................................................178 6 Boom extension................................................................................................181 6.1 Notes on this chapter...................................................................................181 6.2 Operations planning.....................................................................................183 6.2.1 Assembly..........................................................................................183 6.2.2 Identification....................................................................................186 6.2.3 Slinging points...................................................................................187 6.2.4 Transport dimensions and weights..................................................................188 6.2.5 Transport condition...............................................................................188 6.3 Checklists for rigging work.............................................................................189 6.3.1 Overview..........................................................................................189 6.3.2 CHECKLIST: Installing the boom extension..........................................................190 6.3.3 CHECKLIST: Removing the boom extension............................................................195 6.4 Description of the rigging work.........................................................................201 6.4.1 Section5 – Folding out/folding in the deflection sheave..........................................201 6.4.2 Section5/main boom – Establish/separate the connection...........................................202 6.4.3 Section5/main boom – Establish/separate the electrical connections...............................203 6.4.4 Section5/main boom – Establish/separating the hydraulic connection...............................205 6.4.5 Section5/section5 – Establish/separate the connection...........................................206 6.4.6 Section5/section5 – Establish/separate the electrical connections...............................207 6.4.7 Section5/section5 – Establish/separating the hydraulic connection...............................209 6.4.8 Section4 – Folding out/folding in the deflection sheave..........................................210 6.4.9 Section2 – Folding out/folding in the deflection sheave..........................................211 6.4.10 Section4/section5 – Establishing/separating the connection.....................................212 6.4.11 Section4/section5 – Establishing/separating the electrical connections.........................213 6.4.12 Section4/section5 – Establishing/separating the hydraulic connection...........................215 6.4.13 Section5 – Fitting/removing the hoist rope......................................................216 6.5 Operation with boom extension...........................................................................217 6.5.1 Setting the RCL...................................................................................217 6.5.2 Derricking, telescoping the main boom.............................................................218 6.5.3 Procedure if permissible wind speeds are exceeded.................................................219 6.5.4 Instructions for turning loads over...............................................................219 6.6 Maintenance.............................................................................................221 6.6.3 Description of maintenance work...................................................................222 7 Integral heavy load lattice extension (ISS) 1.8+2.0m/9.8 + 2.0m (5.9 + 6.6ft/32.2 + 6.6ft)..............225 7.1 Operations planning.....................................................................................226 7.1.1 Assembly..........................................................................................226 7.1.2 Identification....................................................................................227 7.1.3 Slinging points...................................................................................228 7.1.4 Transport dimensions and weights..................................................................229 7.1.5 Transport condition – removed.....................................................................229 7.1.6 Transport condition – folded......................................................................231 7.2 Checklists for rigging work.............................................................................233 7.2.1 Overview..........................................................................................233 7.2.2 CHECKLIST: ISS Installing 1.8 + 2.0m (5.9 + 6.6 ft) – into the working position..................234 7.2.3 CHECKLIST: ISS Removing 1.8 + 2.0m (5.9 + 6.6 ft) – from the working position....................237 7.2.4 CHECKLIST: Rigging ISS 1.8 + 2.0m (5.9 + 6.6 ft) – into the working position.....................241 7.2.5 CHECKLIST: Rigging ISS 1.8 + 2.0m (5.9 + 6.6 ft) – into the transport position...................245 7.2.6 CHECKLIST: Rigging ISS 1.8 + 2.0m (5.9 + 6.6 ft) from the swing-away lattice – into the wo.......250 7.2.7 CHECKLIST: Rigging ISS 1.8 + 2.0m (5.9 + 6.6 ft) from the swing-away lattice – into the tr.......254 7.2.8 CHECKLIST: ISS Installing 9.8 + 2.0m (32.2 + 6.6 ft).............................................259 7.2.9 CHECKLIST: ISS Removing 9.8 + 2.0m (32.2 + 6.6 ft)...............................................263 7.2.10 CHECKLIST: Further rigging work..................................................................267 7.3 Rigging work............................................................................................269 7.3.1 Securing sections with a guide rope...............................................................269 7.3.2 Establishing/separating the Middle 2 connection...................................................270 7.3.3 Installing/removing section4.....................................................................272 7.3.4 Establishing/separating connections between section4 and section2...............................274 7.3.5 Connecting/disconnecting the electrical connections – section4/main boom.........................277 7.3.6 Connecting/disconnecting the hydraulic connections – section4 / main boom........................279 7.3.7 Folding out / folding in the deflection sheave on section4.......................................280 7.3.8 Folding out / folding in the head sheave on section4.............................................281 7.3.9 Fitting/removing the hoist rope – section4.......................................................282 7.3.10 Possible reeving methods on the heavy load lattice extension.....................................283 7.3.11 Connecting/disconnecting the electrical connections – section4/section2........................285 7.3.12 Installing / removing the lifting limit switch...................................................287 7.3.13 Installing / removing the anemometer and air traffic control light...............................288 7.3.14 Installing / removing the camera.................................................................290 7.3.15 Folding out / folding in the deflection sheave on section5......................................291 7.3.16 Section5/main boom – Establish/separate the connection..........................................292 7.3.17 Connecting/disconnecting the electrical connections – section5/main boom........................293 7.3.18 Connecting/disconnecting the hydraulic connections – section5 / main boom.......................295 7.3.19 Installing/removing section4 on section5.......................................................296 7.3.20 Connection/disconnecting the electrical connections between section4 and section5..............297 7.3.21 Connection/disconnecting the hydraulic connection between section4 and section5................299 7.3.22 Positioning/removing the hoist rope – section5 and section4....................................300 7.3.23 Derricking cylinder positions....................................................................302 7.4 ISS, derricking.........................................................................................303 7.5 Operation with the ISS..................................................................................305 7.5.1 Setting the RCL...................................................................................305 7.5.2 Derricking, telescoping the main boom.............................................................307 7.5.3 Procedure if permissible wind speeds are exceeded.................................................308 7.5.4 Instructions for turning loads over...............................................................308 7.6 Maintenance.............................................................................................309 7.6.5 Description of maintenance work...................................................................310 8 Heavy load lattice extension (SLS) 2.0m/10.0m (6.6ft/32.8ft)..............................................317 8.1 Operations planning.....................................................................................317 8.1.1 Assembly..........................................................................................317 8.1.2 Identification....................................................................................318 8.1.3 Slinging points...................................................................................319 8.1.4 Transport dimensions and weights..................................................................320 8.1.5 Transport condition...............................................................................321 8.2 Checklists for rigging work.............................................................................323 8.2.1 Overview..........................................................................................323 8.2.2 CHECKLIST: SLS Installing 2.0m (6.6 ft) – into the working position..............................324 8.2.3 CHECKLIST: SLS Installing 2.0m (6.6 ft) – into the transport position............................327 8.2.4 CHECKLIST: SLS Removing 2.0m (6.6 ft) – from the working position................................328 8.2.5 CHECKLIST: SLS Removing 2.0m (6.6 ft) – from transport position..................................331 8.2.6 CHECKLIST: SLS Rigging 2.0m (6.6 ft) – into the working position.................................333 8.2.7 CHECKLIST: SLS Rigging 2.0m (6.6 ft) – into the transport position...............................336 8.2.8 CHECKLIST: SLS Installing 10.0m (32.8 ft)........................................................339 8.2.9 CHECKLIST: SLS Removing 10.0m (32.8 ft)..........................................................343 8.3 Description of the rigging work.........................................................................347 8.3.1 Section6/main boom– Establish/separate the connection in the working position....................347 8.3.2 Section6/main boom – Establish/separate the connection in the transport position.................349 8.3.3 Bringing section6 from the transport position into the working position..........................351 8.3.4 Bringing section6 into the transport position....................................................352 8.3.5 Section6/main boom – Establish/separate the electrical connections...............................353 8.3.6 Section6 – Setting the angle.....................................................................355 8.3.7 Section6 – Fitting/removing the hoist rope.......................................................356 8.3.8 Possible reeving methods on the heavy load lattice extension......................................357 8.3.9 Installing / removing the lifting limit switch....................................................359 8.3.10 Installing / removing the anemometer and air traffic control light...............................360 8.3.11 Installing / removing the camera.................................................................362 8.3.12 Section5 – Folding out/folding in the deflection sheave.........................................363 8.3.13 Section5/main boom – Establish/separate the connection..........................................364 8.3.14 Section5/main boom – Establish/separate the electrical connections..............................365 8.3.15 Section6/section5 – Establishing/separating the connection.....................................367 8.3.16 Section6/section5 – Establishing/separating the electrical connections.........................368 8.3.17 Section6/section5 – Fitting/removing the hoist rope............................................370 8.4 Operation with the heavy load lattice extension.........................................................373 8.4.1 Setting the RCL...................................................................................373 8.4.2 Derricking, telescoping the main boom.............................................................375 8.4.3 Procedure if permissible wind speeds are exceeded.................................................376 8.4.4 Instructions for turning loads over...............................................................376 8.5 Maintenance.............................................................................................377 8.5.4 Description of maintenance work...................................................................378 9 Auxiliary single-sheave boom top1............................................................................383 9.1 Operations planning.....................................................................................383 9.1.1 Identification....................................................................................383 9.1.2 Slinging points...................................................................................384 9.1.3 Transport dimensions and weights..................................................................385 9.1.4 Transport condition...............................................................................385 9.2 Description of the rigging work.........................................................................387 9.2.1 Moving the auxiliary single-sheave boom top into the operating position...........................387 9.2.2 Moving the auxiliary single-sheave boom top into the transport position...........................389 9.2.3 Installing/removing a folded up auxiliary single-sheave boomtop..................................391 9.2.4 Attaching/removing the hoist rope.................................................................392 9.2.5 Installing / removing the lifting limit switch and anemometer.....................................394 9.3 Operation with the auxiliary single-sheave boom top1...................................................397 9.3.1 Setting the RCL...................................................................................397 9.3.2 Procedure if permissible wind speeds are exceeded.................................................398 9.3.3 Instructions for turning loads over...............................................................398 9.4 Maintenance.............................................................................................399 9.4.3 Description of maintenance work...................................................................400 10 Auxiliary single-sheave boom top2...........................................................................403 10.1 Operations planning....................................................................................403 10.1.1 Identification...................................................................................403 10.1.2 Slinging points..................................................................................404 10.1.3 Transport dimensions and weights.................................................................405 10.1.4 Transport condition..............................................................................405 10.2 Description of the rigging work........................................................................407 10.2.1 Moving the auxiliary single-sheave boom top into the operating position..........................407 10.2.2 Moving the auxiliary single-sheave boom top into the transport position..........................409 10.2.3 Installing/removing a folded up auxiliary single-sheave boom top.................................411 10.2.4 Connect/disconnect electrical connection for the marker lights...................................413 10.2.5 Attaching/removing the hoist rope................................................................414 10.2.6 Installing / removing the lifting limit switch and anemometer....................................415 10.3 Operation with the auxiliary single-sheave boom top2..................................................417 10.3.1 Setting the RCL..................................................................................417 10.3.2 Procedure if permissible wind speeds are exceeded................................................418 10.3.3 Instructions for turning loads over..............................................................418 10.4 Maintenance............................................................................................419 10.4.3 Description of maintenance work..................................................................420 11 Turning loads over...........................................................................................423 11.1 Setting the RCL........................................................................................424 11.2 Turning a load over....................................................................................425 12 Driving with a rigged crane..................................................................................429 12.1 Safety instructions....................................................................................429 12.2 Driving path...........................................................................................430 12.3 Permissible rigging modes and axle loads – GMK5150.....................................................431 12.3.1 Swing-away lattice...............................................................................432 12.3.2 Boom extension...................................................................................438 12.3.3 Integral heavy load lattice extension............................................................448 12.3.4 Heavy load lattice extension 2.0m/10m (6.6ft/32.8ft).........................................452 12.3.5 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2........................456 12.4 Permissible rigging modes and axle loads – GMK5150L....................................................457 12.4.1 Swing-away lattice...............................................................................458 12.4.2 Boom extension...................................................................................464 12.4.3 Integral heavy load lattice extension............................................................470 12.4.4 Heavy load lattice extension 2.0m/10m (6.6ft/32.8ft).........................................474 12.4.5 Auxiliary single-sheave boom top 1 and auxiliary single-sheave boom top 2........................478 12.5 Before driving.........................................................................................479 12.6 While driving..........................................................................................479 12.7 After driving..........................................................................................479 13 Index........................................................................................................483 A...........................................................................................................485 B...........................................................................................................485 D...........................................................................................................486 H...........................................................................................................487 I...........................................................................................................488 L...........................................................................................................489 M...........................................................................................................489 O...........................................................................................................489 P...........................................................................................................489 R...........................................................................................................489 S...........................................................................................................490 T...........................................................................................................491
Customer Support: [email protected]
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK4100 4100-L 5095 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK 5200 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD

Grove GMK 3055 Operating Instruction Manual Part 1 (Driving) - PDF DOWNLOAD
