★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 6220-L Driving Operating Instructions Manual 3112290 – PDF DOWNLOAD

$33.95

Grove Crane GMK 6220-L Driving Operating Instructions Manual 3112290 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 6220-L Driving Operating Instructions Manual 3112290 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 6220-L Driving Operating Instructions Manual 3112290 – PDF DOWNLOAD

Language : English
Pages : 876
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 6220-L Driving Operating Instructions Manual 3112290 – PDF DOWNLOAD

Intended use:

  • The truck crane GMK 6220-L is constructed in accordance with the latest technology and the
    recognized safety regulations. Nevertheless, personal injury to the operator or a third party as
    well as damage to the crane and other property may occur during use.
  • The truck crane may only be modified with the consent of the manufacturer.
  • The truck crane GMK 6220-L may only be used when in excellent working condition and for its
    intended purpose, and with due attention to safe oper- ation and any possible hazards.
    Malfunctions that may affect safe operation are to be corrected immedi- ately.
  • The GMK 6220-L truck crane may only be operated at temperatures of between –25 to +40 °C unless
    fitted with the appropriate special equipment.
  • The GMK 6220-L truck crane may only be used for the vertical lifting of loads, in the authorized
    rigging modes and using a hook block that is reeved to the hoist rope. The weight and centre of
    distribution of the loads must be known. Any other use of the crane is not considered to represent
    intended use.
  • The manufacturer is not liable for damage resulting from the improper or unauthorized use of the
    GMK 6220-L truck crane. The user shall take full responsibility for any such use.

Intended use also entails the following:

– Observing the complete crane documentation consisting of the operating instructions, the lifting
capacity table, the outrigger pressure table and the safety manual
– Adhering to the inspection and maintenance requirements specified in
the maintenance manual.

IMAGES PREVIEW OF THE MANUAL:

TABLE OF CONTENTS:

Grove Crane GMK 6220-L Driving Operating Instructions Manual 3112290 – PDF DOWNLOAD

Additional Pages SLI override...................................................................................  3
1 Overview...................................................................................................... 19
	1.1 Vehicle identification.................................................................................. 19
	1.2 EC Conformity Declaration............................................................................... 23
	1.3 Overview and contents of the truck crane user information............................................... 25
		1.3.1 Operating instructions............................................................................ 25
		1.3.2 Lattice extension operating instructions.......................................................... 26
		1.3.3 Maintenance manual................................................................................ 26
		1.3.4 Lifting capacity tables........................................................................... 27
		1.3.5 Outrigger pressure tables......................................................................... 27
		1.3.6 Safety manual..................................................................................... 27
		1.3.7 Circuit diagrams.................................................................................. 27
		1.3.8 Spare parts list.................................................................................. 28
	1.4 Instructions for using this documentation............................................................... 29
		1.4.1 How are the operating instructions laid out?...................................................... 29
		1.4.2 How are the pages of the operating instructions formatted?........................................ 30
		1.4.3 How can I find the necessary information quickly and easily?...................................... 31
			Example of cross- reference usage................................................................... 32
			How to use the index................................................................................ 37
		1.4.4 Definition of positional references............................................................... 37
			Basic rule.......................................................................................... 37
			Buttons and switches................................................................................ 37
		1.4.5 Conversion table for US measurements.............................................................. 38
2 Basic safety instructions for crane operators................................................................. 41
	2.1 Warnings and symbols.................................................................................... 41
	2.2 Intended use............................................................................................ 43
	2.3 Organizational measures................................................................................. 45
	2.4 Personnel qualifications................................................................................ 47
	2.5 Safety instructions that apply to truck crane driving................................................... 49
	2.6 Safety instructions for truck crane work................................................................ 51
3 Information for operations planning........................................................................... 55
	3.1 Safety instructions..................................................................................... 55
		3.1.1 Intended use...................................................................................... 55
		3.1.2 Organizational measures........................................................................... 55
		3.1.3 Personnel qualifications.......................................................................... 56
	3.2 Operations planning..................................................................................... 57
		3.2.1 Prerequisites for operations planning............................................................. 57
		3.2.2 Information for operations planning contained in the user information............................ 58
4 Description of the truck crane – Vehicle section.............................................................. 61
	4.1 Overview of the operating and display elements.......................................................... 61
		4.1.1 Vehicle overview.................................................................................. 61
		4.1.2 Driver's cab overview............................................................................. 64
			Overhead in the driver's cab........................................................................ 67
		4.1.3 Front instrument panel............................................................................ 68
			Left................................................................................................ 68
			Middle.............................................................................................. 70
			Right............................................................................................... 72
		4.1.4 Side instrument panel............................................................................. 76
			For the transmission............................................................................... 78
			Auxiliary water heater with timer................................................................... 79
			Auxiliary air heater................................................................................ 80
		4.1.5 Switch boxes for outrigger box locking pin........................................................ 81
	4.2 Functional description of the display and operating elements............................................ 83
		4.2.1 On the instrument panels.......................................................................... 83
			Vehicle engine...................................................................................... 83
			Automatic transmission.............................................................................. 84
			Transfer case....................................................................................... 87
			Axle drive.......................................................................................... 89
			Brakes.............................................................................................. 90
			Suspension.......................................................................................... 91
			Hydraulic system.................................................................................... 93
			Steering............................................................................................ 94
			Electronics......................................................................................... 95
			Level adjustment system............................................................................. 97
			Heating system for driver's cab..................................................................... 98
			Auxiliary water heating system......................................................................100
			Auxiliary air heater................................................................................101
			Air-conditioning system.............................................................................102
			Cab lighting........................................................................................103
			Other operating elements............................................................................103
		4.2.2 Other operating elements for the vehicle section..................................................105
			Keys................................................................................................105
			Doors...............................................................................................105
			Windows.............................................................................................106
			Access ladders......................................................................................108
			Ladders.............................................................................................108
			Vehicle engine diagnostics plug.....................................................................110
			Fire extinguisher...................................................................................110
			Folding berth.......................................................................................111
5 Vehicle engine................................................................................................115
	5.1 Starting/turning off the vehicle engine.................................................................115
		5.1.1 CHECKLIST: Starting the vehicle engine............................................................115
		5.1.2 CHECKLIST: In winter..............................................................................118
		5.1.3 Checks prior to starting vehicle engine...........................................................119
			Checking the hydraulic system's shut-off valves.....................................................119
			Switching on the battery master switch..............................................................119
			Pre-checking the oil level in the automatic transmission............................................120
			Checking coolant level..............................................................................121
			Checking the hydraulic oil level....................................................................122
			Checking the engine oil level.......................................................................122
			Topping up engine oil...............................................................................123
		5.1.4 Refuelling........................................................................................124
		5.1.5 Starting the vehicle engine.......................................................................125
			Switching on the ignition...........................................................................125
			Starting the vehicle engine........................................................................127
		5.1.6 Checks after the engine has been started..........................................................129
			Checking instruments................................................................................129
			Checking the oil level in the automatic transmission...............................................130
		5.1.7 Turning off the vehicle engine....................................................................135
		5.1.8 Emergency stop via the air intake inhibitor.......................................................136
			Switching on the air intake inhibitor...............................................................136
			Manually disconnecting the air intake inhibitor.....................................................137
6 Driving the truck crane.......................................................................................141
	6.1 Checks on the truck crane before driving................................................................141
		6.1.1 CHECKLIST: condition of the truck crane for on-road driving.......................................141
		6.1.2 Checking the condition of the truck crane.........................................................147
			Checking the reservoir of the windscreen washing system.............................................147
			Warning plates for vehicle width....................................................................147
			Checking the tyres..................................................................................148
			Checking the electrical system.....................................................................148
			Checking the mirror setting.........................................................................149
			Checking the compressed air and brake systems.......................................................149
			Checking the suspension............................................................................151
			Checking on-road level..............................................................................151
			Checking the transverse differential locks.........................................................152
			Checking the drive of the second axle line/longitudinal differential locks..........................152
			Checking the transfer case..........................................................................152
			Checking the steering locks.........................................................................152
			Checking warning lamp for Main boom not set down....................................................153
		6.1.3 Adjusting the seat and the steering column........................................................154
			Adjusting the driver's seat.........................................................................154
			Adjusting the steering column.......................................................................154
		6.1.4 Trip recorder.....................................................................................155
			Inserting the 24-hour disc in the trip recorder.....................................................155
	6.2 General operation.......................................................................................157
		6.2.1 Operating the automatic transmission..............................................................157
			Switching on........................................................................................157
			Changing the driving modes.........................................................................158
			Selecting the driving direction....................................................................158
			Selecting highest gear/starting gear................................................................159
			Starting............................................................................................160
			Driving and changing gears..........................................................................160
			Shifting the transmission to neutral position.......................................................162
			Changing the driving direction.....................................................................163
			Stopping............................................................................................163
			On roller-type dynamometer..........................................................................163
		6.2.2 Monitoring the control instruments while driving..................................................165
		6.2.3 Driving downhill..................................................................................169
			Engine retarder.....................................................................................169
			Preselecting gears..................................................................................170
		6.2.4 Driving uphill....................................................................................171
		6.2.5 Tempomat..........................................................................................171
			Switching on the Tempomat...........................................................................172
			Driving with the Tempomat...........................................................................172
			Switching off the Tempomat..........................................................................173
			Eddy current retarder...............................................................................173
		6.2.6 Parking the truck crane...........................................................................175
			Applying the parking brake.........................................................................175
			Automatic transmission in neutral position..........................................................175
			Turning off the vehicle engine......................................................................175
			Securing the truckcrane against rolling............................................................175
			Switch off the battery master switch if the truck crane is idle for a longer period of time.........176
			Securing the truck crane against unauthorised use...................................................176
	6.3 Off-road driving........................................................................................177
		6.3.1 Off-road gear.....................................................................................178
			Engaging the off- road gear.........................................................................178
			Deactivating the off-road gear......................................................................178
		6.3.2 Drive of the second axle line/longitudinal differential locks.....................................180
			Switching on drive/longitudinal differential locks..................................................180
			Switching off drive/longitudinal differential locks.................................................181
		6.3.3 Transverse differential locks in all driven axle lines............................................182
			Switching on thetransverse differential locks.....................................................182
			Switching of the transverse differential locks......................................................183
		6.3.4 Level adjustment system...........................................................................184
			Activating the level adjustment system..............................................................184
			Raising or lowering the entire truck crane..........................................................185
			Tilting the truck crane lengthwise or crosswise.....................................................186
			Bringing the truck crane to On-road level...........................................................187
			Deactivating the level adjustment system............................................................187
		6.3.5 Freeing an immobilized truck crane................................................................188
			Freeing the truck crane without external assistance.................................................188
			Towing free to the rear.............................................................................189
			Towing free to thefront............................................................................189
	6.4 Separate steering.......................................................................................191
		6.4.1 Switching to separate steering mode...............................................................193
		6.4.2 Steering axle lines with separate steering........................................................194
			All-wheel steering..................................................................................194
			Crab travel mode....................................................................................194
		6.4.3 Switching off separate steering and locking the steering..........................................195
			Locking the steering in straight ahead position.....................................................195
			Locking in other positions..........................................................................196
		6.4.4 Matching steering angle...........................................................................197
	6.5 Heating and ventilation.................................................................................199
		6.5.1 Heating in the driver's cab.......................................................................199
			Adjusting the air vents.............................................................................200
			Ventilating the driver's cab........................................................................200
		6.5.2 Auxiliary water heating system....................................................................201
			Preheating the vehicle engine.......................................................................201
			Preheating the driver's cab.........................................................................201
			Switching on the auxiliary heater...................................................................202
			Switching off the auxiliary heater..................................................................203
		6.5.3 Auxiliary water heating system with timer.........................................................204
			Preheating the vehicle engine.......................................................................204
			Preheating the driver's cab.........................................................................204
			Switching on the auxiliary heater...................................................................205
			Switching off the auxiliary heater..................................................................206
			Setting the time and weekday........................................................................206
			Saving the automatic heating start................................................................207
			Setting the automatic heating duration............................................................208
			Switching the automatic heating start on/off........................................................208
			Setting the remaining time..........................................................................209
		6.5.4 Auxiliary air heater with timer...................................................................211
			Switching on the auxiliary heater...................................................................211
			Regulating the temperature..........................................................................212
			Switching off the auxiliary heater..................................................................212
			Setting the remaining time..........................................................................213
	6.6 Air-conditioning system.................................................................................215
		6.6.1 Switching on......................................................................................215
		6.6.2 Switching off.....................................................................................215
		6.6.3 Air conditioning..................................................................................216
			How to use the air conditioning effectively.........................................................216
			Dehumidifying the air in the driver's cab...........................................................217
	6.7 Roof ventilator.........................................................................................217
	6.8 Towing a trailer........................................................................................219
		Effects on the axle loads...............................................................................219
		Coupling the trailer....................................................................................220
		Connecting the supply lines.............................................................................221
		Removing supply lines...................................................................................222
		Uncoupling the trailer..................................................................................222
		Test position of the parking brake when towing a trailer................................................224
7 Driving modes and rigging for on-road driving.................................................................227
	7.1 Driving modes...........................................................................................229
		Information on the axle loads...........................................................................229
		7.1.1 Information on how to use the tables..............................................................230
		7.1.2 Tables for maximum axle load of 12 t - without ROB................................................231
			For tyres 14.00R25................................................................................231
			For tyres 16.00R25................................................................................232
			For tyres 20.5R25.................................................................................232
		7.1.3 Tables for maximum axle load of 12 t – with ROB...................................................233
			For tyres 14.00R25................................................................................233
			For tyres 16.00R25................................................................................234
			For tyres 20.5R25.................................................................................235
	7.2 Rigging work for driving with a trailer.................................................................237
		7.2.1 Switching on the slewing gear freewheel...........................................................238
			Prerequisites.......................................................................................238
		7.2.2 Switching on boom floating position...............................................................240
			Setting the main boom down on the trailer...........................................................240
		7.2.3 Switching on boom pre-tensioning..................................................................242
	7.3 Rigging the outrigger beams.............................................................................245
		Equipment...............................................................................................245
		7.3.1 CHECKLIST: Removing the outrigger beams...........................................................246
		7.3.2 CHECKLIST: Installing outrigger beams.............................................................248
		7.3.3 Preparing the truck crane for the removal/installation............................................251
			Prerequisites for installation/ removal.............................................................251
			Preparing the truck crane...........................................................................251
		7.3.4 Removing/attaching outrigger pads.................................................................252
			Removing outrigger pads............................................................................252
			Attaching outrigger pads...........................................................................253
		7.3.5 Disconnecting/establishing the hydraulic connection...............................................253
			Disconnecting thehydraulic connection.............................................................254
			Establishing thehydraulic connection..............................................................255
		7.3.6 Disconnecting/establishing the electrical connection for the outrigger pressure display...........256
		7.3.7 Transport position/operating position of the holding angle........................................257
		7.3.8 Locking/releasing the extension cylinder locking pin..............................................258
			Releasing the locking pin...........................................................................258
			Locking the extension cylinder......................................................................259
		7.3.9 Pulling out/reinserting outrigger beams...........................................................260
			Pulling out outrigger beams........................................................................260
			Inserting outrigger beams..........................................................................262
		7.3.10 Transporting the outrigger beams/outrigger pads..................................................264
	7.4 Rigging the rear outrigger box (ROB)....................................................................265
		7.4.1 CHECKLIST: Removing the outrigger box.............................................................265
		7.4.2 CHECKLIST: Installing the outrigger box...........................................................268
		7.4.3 Preparing the truck crane for the removal/installation............................................270
			Preparing for removal...............................................................................270
			Preparing for installation/ assembly................................................................270
		7.4.4 Crane movements when installing and removing......................................................271
			Prerequisites.......................................................................................271
			Before installation.................................................................................271
			After removal.......................................................................................271
		7.4.5 Slinging points on the rear outrigger box (ROB)...................................................272
		7.4.6 Establishing/disconnecting the electrical connection..............................................273
		7.4.7 Disconnecting/establishing the hydraulic connection...............................................274
			Establishing thehydraulic connection..............................................................274
			Disconnecting thehydraulic connection.............................................................274
		7.4.8 Attaching/removing the outrigger box with the truck crane.........................................275
			Removing the outrigger box.........................................................................276
			Attaching the outrigger box........................................................................276
		7.4.9 Locking the outrigger box to the carrier and unlocking it again...................................277
			Locking the outrigger box..........................................................................277
			Releasing the locking pins..........................................................................277
			Extending and retracting the pins...................................................................278
		7.4.10 Establishing/disconnecting the pneumatic connection..............................................278
		7.4.11 Slewing with the rear outrigger box (ROB) removed................................................279
			Prerequisites for slewing...........................................................................279
		7.4.12 Transportation on a separate vehicle.............................................................280
		7.4.13 Setting down the main boom on a trailer with the rear outrigger box (ROB) removed...............281
			Bracing the truck crane.............................................................................281
			Setting down the main boom..........................................................................282
	7.5 Rigging the main boom...................................................................................283
		Additional equipment required...........................................................................283
		7.5.1 CHECKLIST: Removing the main boom.................................................................284
			Prerequisites.......................................................................................284
			Removing the main boom..............................................................................284
		7.5.2 CHECKLIST: Installing the main boom...............................................................287
			Prerequisites.......................................................................................287
			Installing the main boom............................................................................287
		7.5.3 Rigging work with the auxiliary crane.............................................................290
			Lifting the main boom from the turntable............................................................291
			Lifting the main boom to the turntable..............................................................292
		7.5.4 Establishing/disconnecting the hydraulic connection to thelattice extension (additional eq.......292
			Disconnecting thehydraulic connection.............................................................293
			Establishing thehydraulic connection..............................................................293
		7.5.5 Pulling device on the main boom pivot pin.........................................................294
			Pin-type keepers on foot section....................................................................294
			Hydraulic connection...............................................................................295
			Retracting/ extending pins..........................................................................296
		7.5.6 Locking pin on derricking cylinder head eyelet....................................................297
			Operating the lifting equipment....................................................................297
			Retracting/ extending pins..........................................................................299
		7.5.7 Hydraulic connections on the main boom............................................................300
			Removing/replacing guide plates.....................................................................301
			Establishing thehydraulic connection..............................................................301
			Disconnecting thehydraulic connection.............................................................302
		7.5.8 Electrical connections on the main boom...........................................................303
		7.5.9 Checks following main boom installation...........................................................304
			Hydraulic system check..............................................................................304
			Checking the electrical system......................................................................305
		7.5.10 Before on-road driving...........................................................................307
			Securing the derricking cylinder for on-road driving................................................307
			Transporting the main boom..........................................................................307
		7.5.11 Derricking cylinder pressure relief..............................................................308
			Switching on pressure relief........................................................................308
			Switching off pressure relief.......................................................................309
	7.6 Installing/removing the auxiliary hoist.................................................................311
		7.6.1 Slinging points and transport.....................................................................311
			Slinging points.....................................................................................311
			Transportation......................................................................................312
		7.6.2 Installing the auxiliary hoist....................................................................313
			Removing pin- type keeper and pins..................................................................313
			Attach the auxiliary hoist to the main hoist........................................................313
			Locking the auxiliary hoist........................................................................314
			Establishing hydraulic and electrical connections...................................................314
		7.6.3 Removing the auxiliary hoist......................................................................315
		7.6.4 Permitted applications for the auxiliary hoist....................................................316
			Replacement for the main hoist......................................................................316
			Alternating operation with themain and auxiliary hoists..........................................317
8 Malfunctions on the carrier...................................................................................321
	8.1 Emergency stop device on carrier........................................................................321
		Turning off the vehicle engine..........................................................................321
	8.2 What to do in the event of a breakdown in road traffic..................................................323
	8.3 Towing the truck crane..................................................................................325
		8.3.1 Towing in the event of engine or transmission damage..............................................326
			Towing the truck crane out of the danger area.......................................................326
			Compressed-air supply in the event of engine failure................................................327
			Electric power supply...............................................................................327
			Transmission........................................................................................328
			Vehicle engine......................................................................................328
			Parking brake.......................................................................................328
			Mechanically releasing the parking brake...........................................................329
			Towing procedure....................................................................................330
			Removing mechanical locking from all spring-loaded brake cylinders.................................330
			Tow starting........................................................................................330
	8.4 Wheels..................................................................................................331
		8.4.1 Wheel change......................................................................................331
			Removing a damaged wheel...........................................................................331
			Removing the wheel from thespare wheel holder......................................................332
			Installing a damaged wheel on thespare wheel holder................................................333
			Installing the spare wheel..........................................................................334
		8.4.2 Filling the tyres yourself........................................................................335
			Connecting the inflator hose........................................................................335
			Filling the tyres...................................................................................336
			Removing the tyre inflator hose.....................................................................336
	8.5 Fuses on the carrier....................................................................................337
		Information on replacing fuses..........................................................................337
		8.5.1 Fuses in the driver's cab.........................................................................338
		8.5.2 Fuses in the battery box..........................................................................341
	8.6 Finding and eliminating malfunctions....................................................................343
		8.6.1 Vehicle engine malfunctions.......................................................................343
		8.6.2 Malfunctions in automatic transmission............................................................345
		8.6.3 Transfer case malfunctions........................................................................346
		8.6.4 Malfunctions on the differential locks............................................................347
		8.6.5 Service brake malfunctions........................................................................348
		8.6.6 Steering malfunctions.............................................................................349
		8.6.7 Malfunctions on the outriggers....................................................................350
		8.6.8 Malfunctions in the suspension locking system.....................................................350
		8.6.9 Malfunctions in the level adjustment system.......................................................350
	8.7 Procedure in the event of malfunctions..................................................................351
		8.7.1 Switching fan thermostats to emergency operation..................................................351
		8.7.2 Procedure in the event of malfunctions in the automatic transmission.............................352
			Error detection.....................................................................................352
			Effect of the errors................................................................................352
			Reading error codes.................................................................................353
		8.7.3 Emergency operation of the solenoid valves for the outriggers.....................................355
		8.7.4 Emergency operation of separate steering..........................................................358
			Putting the steering into on-road driving mode......................................................359
9 Technical information for the carrier.........................................................................363
	9.1 Dimensions and weights of the truck crane...............................................................364
		9.1.1 Dimensions of the truck crane.....................................................................364
			Dimensions when driving on public roads.............................................................365
		9.1.2 Dimensions and weights of removable parts.........................................................366
			Spare wheel (additional equipment)..................................................................366
			Main boom...........................................................................................366
			Outriggers..........................................................................................366
	9.2 Carrier technical data..................................................................................367
		Vehicle engine..........................................................................................367
		Manual transmission....................................................................................367
		Transfer case...........................................................................................367
		Axle lines..............................................................................................367
		Steering................................................................................................367
		Tyres...................................................................................................368
		Vehicle's electrical system.............................................................................368
		Tools...................................................................................................368
		Outriggers..............................................................................................369
		Driving speeds..........................................................................................370
		Climbing ability........................................................................................370
		Turning circle radiuses................................................................................371
10 Index........................................................................................................375
	A...........................................................................................................377
	B...........................................................................................................378
	C...........................................................................................................378
	D...........................................................................................................380
	E...........................................................................................................380
	F...........................................................................................................381
	H...........................................................................................................382
	I...........................................................................................................383
	K...........................................................................................................383
	L...........................................................................................................383
	M...........................................................................................................384
	O...........................................................................................................384
	P...........................................................................................................385
	R...........................................................................................................386
	S...........................................................................................................386
	T...........................................................................................................387
	U...........................................................................................................389
	V...........................................................................................................389
	W...........................................................................................................389
11 Description of the crane section of the truck crane..........................................................411
	11.1 Overview of the operating and display elements.........................................................411
		11.1.1 Overview of the crane section....................................................................411
		11.1.2 Crane cab overview...............................................................................414
		11.1.3 Instrument panel.................................................................................416
			Front instrumentpanel...............................................................................416
			Auxiliary water heater with timer...................................................................422
			Auxiliary air heater with timer.....................................................................423
			Controls and fittings behind the crane operator's seat.............................................431
		11.1.4 Left-hand control panel..........................................................................432
		11.1.5 Right-hand control panel.........................................................................433
		11.1.6 Control lever assignment.........................................................................434
			Version 1 (standard)...............................................................................434
			Version 2 (additional equipment)...................................................................435
		11.1.7 Switch box for operating the outriggers..........................................................436
		11.1.8 Counterweight hoist switch unit..................................................................437
		11.1.9 Switch box for electronic level..................................................................438
	11.2 Functional description of the display and operating elements...........................................439
		11.2.1 Working with the crane...........................................................................439
			Crane engine........................................................................................439
			Outriggeroperation..................................................................................440
			Counterweight hoisting gear and lock................................................................442
			Crane control.......................................................................................444
			Main hoist..........................................................................................446
			Auxiliary hoist.....................................................................................447
			Slewing gear........................................................................................448
			Derricking gear.....................................................................................449
			Telescoping mechanism...............................................................................450
			Safe load indicator.................................................................................455
			Input elements with displays........................................................................455
			Display elements....................................................................................459
			Hydraulic system....................................................................................462
			Electrics...........................................................................................462
			Other operating elements...........................................................................463
			Switch box for electronic level.....................................................................465
			Crane cab electronic level.........................................................................466
			Crane cab heating...................................................................................467
			Auxiliary water heater with timer...................................................................467
			Auxiliary air heater with timer.....................................................................469
			Air-conditioning system version 1...................................................................470
			Air-conditioning system version 2...................................................................471
			Houselock...........................................................................................471
			Anemometer..........................................................................................472
		11.2.2 Other operating elements in the crane cab........................................................473
			Doors, keys, windows...............................................................................473
			Fire extinguisher...................................................................................475
			Cab lighting........................................................................................475
			Crane engine diagnostics plug......................................................................476
	11.3 Functional description of safety devices...............................................................477
		11.3.1 Safe load indicator (SLI)........................................................................477
		11.3.2 Lowering limit switch............................................................................478
		11.3.3 Lifting limit switch.............................................................................479
			Overriding the lifting limit switch shutdown........................................................480
		11.3.4 Dead man's switch and seat contact switch........................................................481
Additional Pages SLI override...................................................................................395
12 Crane engine.................................................................................................485
	12.1 Starting/turning off the crane engine..................................................................485
		12.1.1 CHECKLIST: Starting the crane engine.............................................................485
		12.1.2 CHECKLIST: In winter.............................................................................487
		12.1.3 Inspections prior to starting the crane engine...................................................488
			Checking the shut- off valve in the hydraulic system................................................488
			Switching on the battery master switch..............................................................488
			Checking the coolant level.........................................................................489
			Checking the hydraulic oil level....................................................................490
			Checking the oil level in the crane engine..........................................................490
			Topping up engine oil...............................................................................491
			Refuelling..........................................................................................492
		12.1.4 Starting the crane engine........................................................................493
			Switching on the ignition...........................................................................493
			Starting the crane engine...........................................................................494
		12.1.5 Inspections after starting the crane engine......................................................496
			Checking instruments...............................................................................496
	12.2 Turning off the crane engine...........................................................................499
		12.2.1 Emergency shut-off using the air intake inhibitor................................................500
			Switching on the air intake inhibitor...............................................................500
			Manually disconnecting the air intake inhibitor.....................................................501
13 Crane operation..............................................................................................505
	13.1 Checking the truck crane before working with thecrane.................................................505
		13.1.1 CHECKLIST: With rigged truck crane...............................................................505
		13.1.2 Adjusting the crane operator's seat..............................................................509
		13.1.3 Checking the condition of the truck crane........................................................510
			Checking the reservoir of the windscreen washing system...........................................510
			Visual inspection of the entire crane...............................................................510
			Checking the position of the hoist ropes............................................................511
			Electrical system...................................................................................511
		13.1.4 Checking the safety devices......................................................................512
			Safe load indicator.................................................................................512
			Lifting limit switch................................................................................512
			Dead man's switch system............................................................................513
			Crane control emergency stop circuit................................................................513
		13.1.5 Preheating the hydraulic oil.....................................................................514
			When the oil temperature is between –15 C and 0 C:...............................................514
			When the oil temperature is under –15 C :.........................................................514
		13.1.6 Superstructure lock..............................................................................515
			Removing the lock...................................................................................516
			Engaging the lock...................................................................................516
		13.1.7 Houselock........................................................................................517
			Switching on the houselock..........................................................................517
			Switching off the houselock.........................................................................518
		13.1.8 Adjusting the mirrors............................................................................519
	13.2 Operating the safe load indicator (SLI)................................................................521
		13.2.1 Switching on the SLI.............................................................................522
			Switching on........................................................................................522
			Lamp test on the SLI................................................................................524
			Brightness of the displays..........................................................................524
		13.2.2 Enter rigging mode...............................................................................525
			Entering the SLI code...............................................................................526
			Entering reeving values.............................................................................528
			Entering individual components......................................................................530
		13.2.3 Checks to be carried out before crane operation..................................................533
		13.2.4 Displays during crane operation..................................................................535
			Continuous displays................................................................................535
			Optional displays...................................................................................537
		13.2.5 SLI early warning................................................................................539
		13.2.6 SLI shutdown.....................................................................................540
			Shutdown due to overload............................................................................540
		13.2.7 Error message....................................................................................541
		13.2.8 SLI override.....................................................................................542
		13.2.9 Displaying and entering the time and date........................................................543
			Display.............................................................................................543
			Input...............................................................................................544
	13.3 Crane work with main boom..............................................................................545
		13.3.1 External influences when working with the crane..................................................545
			Horizontal alignment...............................................................................545
			Safe distances......................................................................................545
			Effect of wind on crane operation...................................................................546
			Anemometer..........................................................................................546
			Permissible wind load...............................................................................547
			Earthing the load...................................................................................547
		13.3.2 Slewing ranges permitted for working with the crane..............................................549
			360 slewing range..................................................................................549
			Working position 0 to the rear.....................................................................549
		13.3.3 Hoisting gear....................................................................................550
			Main hoist..........................................................................................550
			Auxiliary hoist.....................................................................................553
		13.3.4 Derricking gear..................................................................................555
		13.3.5 Slewing gear.....................................................................................557
			Slewing gear holding brake..........................................................................557
			Slewing.............................................................................................557
			Slewing speed.......................................................................................558
			Tracking the slewing gear..........................................................................558
			Maximum permitted slewing speed.....................................................................559
		13.3.6 Telescoping mechanism............................................................................561
			Structure of the chapter............................................................................561
			Description of operating principle.................................................................562
			Main boom fixed length, intermediate length, telescoping length...................................563
			Telescoping.........................................................................................565
			Notes on telescoping sequence.......................................................................567
			Inspection before telescoping for the first time....................................................567
			Control lever functions............................................................................568
			Example of a telescoping procedure..................................................................570
			Checking initial position...........................................................................571
			Unlocking telescoping cylinder......................................................................574
			Extending/retracting the telescoping cylinder and locking...........................................576
			Unlocking telescopic section........................................................................579
			Telescoping a telescopic section to a fixed length and locking it...................................581
			Telescoping the telescopic section to an intermediate length........................................585
			Locking the telescopic section......................................................................586
			Automatic telescoping..............................................................................587
			Example of telescoping with teleautomation..........................................................590
			Lowering the main boom for maintenance..............................................................591
			Telescoping main boom into horizontal position......................................................592
		13.3.7 High-speed mode..................................................................................593
		13.3.8 Menus on the crane control display...............................................................594
			The menu Statusdisplay.............................................................................594
			Menu Telescoping display and teleautomation.........................................................598
			Menu Power unit speeds/Critical load control.......................................................598
			Access emergency operation menu.....................................................................602
			Display of an error message.........................................................................603
		13.3.9 Setting a constant engine speed..................................................................605
		13.3.10 Critical load control...........................................................................606
		13.3.11 Inclining the crane cab.........................................................................607
		13.3.12 Cooling the hydraulic oil.......................................................................608
			Standard oil cooler.................................................................................608
			Additional oil cooler...............................................................................608
		13.3.13 Possible combinations of operations.............................................................609
		13.3.14 Operation of the directional working area spotlights............................................610
			Switching on/off....................................................................................610
			Swivelling..........................................................................................610
	13.4 Driving with a rigged crane............................................................................611
		13.4.1 Route............................................................................................611
		13.4.2 Rigging mode and axle loads......................................................................612
			Main boom positions................................................................................612
		13.4.3 Driving the rigged crane.........................................................................614
			Locking the superstructure and engaging the slewing gear holding brake.............................614
			Retracting the outriggers...........................................................................614
			Switching over the suspension locking system........................................................614
			Switching on separate steering mode................................................................615
			Driving.............................................................................................616
			Extending the outriggers...........................................................................616
	13.5 Work interruption......................................................................................617
		13.5.1 During short work interruptions..................................................................617
		13.5.2 During work interruptions of more than 8 hours...................................................617
	13.6 Heating and ventilation................................................................................619
		13.6.1 Heating the crane cab............................................................................619
			Adjusting the air vents.............................................................................620
			Ventilating the crane cab...........................................................................620
		13.6.2 Auxiliary water heater...........................................................................621
			Preheating the crane engine.........................................................................621
			Preheating the crane cab............................................................................621
			Switching on the auxiliary heater...................................................................622
			Switching off the auxiliary heater..................................................................623
		13.6.3 Auxiliary water heater with timer................................................................624
			Preheating the crane engine.........................................................................624
			Preheating the crane cab............................................................................624
			Switching on the auxiliary heater...................................................................625
			Switching off the auxiliary heater..................................................................626
			Setting the time and weekday........................................................................626
			Saving the automatic heatingstart................................................................627
			Setting the automatic heating duration............................................................628
			Switching the automatic heating start on/off........................................................628
			Setting the remaining time..........................................................................629
		13.6.4 Auxiliary air heater with timer..................................................................630
			Switching on the auxiliary heater...................................................................630
			Regulating the temperature..........................................................................631
			Switching off the auxiliary heater..................................................................631
			Setting the remaining time..........................................................................632
	13.7 Air-conditioning system................................................................................633
		13.7.1 Version 1........................................................................................633
			Switching on........................................................................................633
			Switching off.......................................................................................634
		13.7.2 Version 2........................................................................................634
		13.7.3 Air conditioning.................................................................................635
			How to use the air conditioning effectively.........................................................635
			Dehumidifying the crane cab air.....................................................................635
14 Rigging work.................................................................................................639
	14.1 Checklists for rigging work for crane operation with main boom.........................................639
		14.1.1 CHECKLIST: Rigging...............................................................................639
		14.1.2 CHECKLIST: Unrigging.............................................................................643
	14.2 Choosing a suitable site...............................................................................647
		14.2.1 Load bearing capacity of the ground and the outriggers...........................................647
		14.2.2 Safe distance from banks and pits................................................................650
		14.2.3 Earthing the truck crane.........................................................................651
			Earthing the truck crane............................................................................651
		14.2.4 Safe distance from electrical lines..............................................................652
	14.3 Rigging work after driving with a trailer..............................................................655
		14.3.1 Switch off slewing gear freewheel................................................................656
			Before slewing......................................................................................657
		14.3.2 Switching off the boom floating position.........................................................658
		14.3.3 Switching off boom pre-tensioning................................................................658
	14.4 Outriggers.............................................................................................661
		14.4.1 CHECKLIST: Extending the outriggers..............................................................661
		14.4.2 CHECKLIST: Retracting the outriggers.............................................................663
		14.4.3 Outrigger span...................................................................................665
			Outrigger span 8.70x8.50m........................................................................666
			Outrigger span 8.70x6.00m........................................................................666
			Outrigger span 8.70x2.68m........................................................................667
			Outrigger span 8.70x8.50/2.4m....................................................................668
		14.4.4 Preparing the outrigger..........................................................................669
			Levelling the truck crane...........................................................................669
			Locking the suspension.............................................................................669
			Safety for on-road driving..........................................................................669
			Safety during crane operation.......................................................................670
		14.4.5 Extending/Retracting the outrigger beams.........................................................671
			Extending the outrigger beams......................................................................671
			Retracting the outrigger beams......................................................................675
		14.4.6 Moving the outrigger pads into working/driving position..........................................676
			Moving the outrigger pads into working position.....................................................676
			Moving the outrigger pads into driving position....................................................677
		14.4.7 Extending/retracting the outrigger cylinders....................................................678
			Extending outrigger cylinders......................................................................678
			Retracting outrigger cylinders......................................................................680
		14.4.8 Checking the alignment of the truck crane........................................................681
			On the carrier......................................................................................681
			In the crane cab....................................................................................683
		14.4.9 Levelling the truck crane on outriggers..........................................................685
			If the main boom is on the boom rest................................................................685
			If the main boom is raised..........................................................................685
		14.4.10 Outrigger pressure indicator....................................................................685
			On the carrier......................................................................................686
			In the crane cab....................................................................................687
	14.5 Counterweight..........................................................................................689
		14.5.1 Counterweight sections and identification........................................................689
			Counterweight parts.................................................................................689
			Identification......................................................................................689
		14.5.2 Counterweight combinations.......................................................................691
		14.5.3 Slinging points on the counterweight parts.......................................................696
		14.5.4 CHECKLIST: Rigging the counterweight.............................................................697
			Unrigging counterweight............................................................................697
		14.5.5 CHECKLIST: Unrigging counterweight...............................................................700
			Unrigging counterweight............................................................................700
		14.5.6 Setting down the counterweight sections..........................................................702
			5.4 t base plate oncounterweight platform..........................................................702
			Stacking counterweight sections.....................................................................703
		14.5.7 Establishing/Disconnecting hydraulic connection..................................................704
			Establishing the hydraulic connection...............................................................704
			Disconnecting thehydraulic connection.............................................................705
		14.5.8 Assembling the counterweight version.............................................................707
		14.5.9 3.5 t counterweight section......................................................................712
			Equipping with installation rods (additional equipment).............................................712
			3.5 t counterweight section 3.5t counterweight section.............................................713
		14.5.10 Extending/Retracting the lifting cylinders of the 5.4 t base plate or raising/lowering th.......714
			Retracting lifting cylinders........................................................................715
			Retracting lifting cylinders........................................................................716
		14.5.11 Locking/unlocking the counterweight to the turntable............................................716
			Hasp positions......................................................................................717
			Safety valve........................................................................................717
			Locking the counterweight..........................................................................718
			Unlocking the counterweight.........................................................................718
		14.5.12 Rigging 3.75t counterweight sections...........................................................719
		14.5.13 Rigging 3t counterweight blocks................................................................720
		14.5.14 Slewing with the rigged counterweight...........................................................721
	14.6 Rigging work on the main boom..........................................................................723
		14.6.1 Hook block on the bumper.........................................................................723
			Picking up the hook block from the bumper...........................................................723
			Attaching the hook block to the bumper..............................................................724
		14.6.2 Hook block on a separate vehicle.................................................................725
			Picking up the hook block...........................................................................725
			Setting down the hook block.........................................................................726
		14.6.3 Reeving and unreeving the hoist rope.............................................................729
			Rope end clamp......................................................................................729
			Installing/Removing front rope grab.................................................................731
			Positioning the hoist rope..........................................................................732
		14.6.4 Possible reeving methods on the main boom........................................................737
		14.6.5 Installing/Removing the lifting limit switch.....................................................741
			Installing the lifting limit switch................................................................741
			Removing the lifting limit switch...................................................................745
		14.6.6 Locking/Unlocking the lifting limit switch.......................................................747
			Locking.............................................................................................747
			Unlocking...........................................................................................748
		14.6.7 Installing/Removing the anemometer...............................................................749
			Installing the anemometer...........................................................................749
			Removing the anemometer.............................................................................750
		14.6.8 Installing/Removing the air traffic control light................................................751
			Holder..............................................................................................751
			Installing..........................................................................................751
			Removing............................................................................................753
		14.6.9 Rigging heavy duty equipment.....................................................................755
			Heavy duty equipment parts.........................................................................755
			Equipment required..................................................................................755
			Rigging heavy duty equipment........................................................................756
			Unrigging heavy duty equipment......................................................................759
			Reevings with heavy duty equipment.................................................................761
15 Malfunctions on the superstructure...........................................................................765
	15.1 Emergency stop devices on the superstructure...........................................................765
		Switching off the crane engine..........................................................................765
		Emergency stop switch for Crane control.................................................................766
	15.2 Procedure in the event of a malfunction while working with the crane...................................767
		Load cannot be lowered..................................................................................767
	15.3 Fuses on the superstructure............................................................................769
		Information on replacing fuses..........................................................................769
		15.3.1 Fuses at the front of the crane cab..............................................................770
		15.3.2 Fuses in the battery box.........................................................................774
		15.3.3 Fuses for the SLI................................................................................775
	15.4 Finding and eliminating malfunctions...................................................................777
		15.4.1 Malfunctions on the crane engine.................................................................777
		15.4.2 Malfunctions on the main hoist...................................................................778
		15.4.3 Malfunctions on the auxiliary hoist..............................................................780
		15.4.4 Malfunctions on the derricking gear..............................................................782
		15.4.5 Malfunctions in the telescoping mechanism........................................................784
		15.4.6 Malfunctions on the slewing gear.................................................................786
		15.4.7 Malfunctions on locking pin/counterweight hoist..................................................787
		15.4.8 Malfunctions in the hydraulic system/hydraulic oil cooler........................................788
		15.4.9 Malfunctions on the crane control................................................................788
		15.4.10 Malfunctions on the SLI.........................................................................789
			General malfunctions...............................................................................789
			Error messages onthe SLI control unit..............................................................790
			Table – error messages..............................................................................792
		15.4.11 Emergency retraction operation..................................................................794
			Check prior to each emergency operation.............................................................794
			Retraction procedures...............................................................................795
			Mechanical emergency operation......................................................................796
			Hydraulic emergency operation.......................................................................798
	15.5 Crane control error messages...........................................................................811
		15.5.1 Error messages concerning control units..........................................................811
		15.5.2 Error messages concerning power units............................................................812
			Finding a defective part............................................................................813
			Determining the area of error.......................................................................814
			Error causes and effects............................................................................815
		15.5.3 Telescoping error messages.......................................................................817
		15.5.4 Changing the connections in the control units....................................................818
			Connections and control units.......................................................................818
			Unrigging truck crane with defective control unit...................................................818
			Inserting and removing connections.................................................................821
		15.5.5 Control lever emergency program..................................................................822
			Indication on thedisplay...........................................................................822
			Executing emergency program.........................................................................823
		15.5.6 Emergency operation submenu......................................................................824
			Retracting in the event of an error on the length indicator.........................................825
			Retracting in the event of an error on the proximity switch.........................................828
			Table for approaching the locking points............................................................829
		15.5.7 “Enter telescoping after emergency operation” menu...............................................830
	15.6 Hydraulic emergency stop on the superstructure according to ZH1/461....................................833
		15.6.1 Important instructions for hydraulic emergency operation.........................................833
		15.6.2 Operating principle and accessories..............................................................835
		15.6.3 Connecting the transformer.......................................................................836
		15.6.4 Switching emergency operation on/off.............................................................838
		15.6.5 Establishing the hydraulic circuits required.....................................................839
			Establishing connections on the connector field.....................................................839
			Additional switches for hoist and slewing gear......................................................840
		15.6.6 Carrying out emergency operation.................................................................841
			“Move hoist” emergency operation...................................................................841
			“Move derricking gear” emergency operation..........................................................842
			“Move slewing gear” emergency operation.............................................................842
		15.6.7 After emergency operation........................................................................843
16 Technical information for the superstructure.................................................................847
	16.1 Dimensions and weights.................................................................................847
		16.1.1 Maximum lifting capacity.........................................................................847
			DIN/ ISO/ EN........................................................................................847
			ANSI B 30.5 (85%)...................................................................................847
		16.1.2 Guaranteed value specifications..................................................................847
		16.1.3 Dimensions and weights of the truck crane........................................................848
			Dimensions when driving on public roads.............................................................849
		16.1.4 Dimensions and weights of removable parts........................................................850
			Counterweight parts.................................................................................850
			Hook blocks and hook tackle.........................................................................851
			Auxiliary hoist.....................................................................................851
			Main boom...........................................................................................852
			1) Width without add-on parts approx. 1.3 mHeavy dutyequipment.....................................852
			Counterweight combinations..........................................................................852
	16.2 Technical data for the superstructure..................................................................853
		Crane engine............................................................................................853
		Crane's electrical system...............................................................................853
		Main hoist..............................................................................................853
		Auxiliary hoist (additional equipment)..................................................................854
		Slewing gears...........................................................................................854
		Derricking gear.........................................................................................854
		Main boom...............................................................................................854
		Operating speeds and times without a load...............................................................855
17 Index........................................................................................................859
	A...........................................................................................................861
	B...........................................................................................................862
	C...........................................................................................................862
	D...........................................................................................................864
	E...........................................................................................................864
	F...........................................................................................................865
	H...........................................................................................................866
	I...........................................................................................................867
	K...........................................................................................................867
	L...........................................................................................................867
	M...........................................................................................................868
	O...........................................................................................................868
	P...........................................................................................................869
	R...........................................................................................................870
	S...........................................................................................................870
	T...........................................................................................................871
	U...........................................................................................................873
	V...........................................................................................................873
	W...........................................................................................................873

Contact us: [email protected]

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order