Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 2084730 – PDF DOWNLOAD
$28.95
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 2084730 – PDF DOWNLOAD
Description
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 2084730 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 2084730 – PDF DOWNLOAD
Language : English
Pages : 256
Downloadable : Yes
File Type : PDF
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 2084730 – PDF DOWNLOAD
Intended use:
- The truck crane GMK 7450 is constructed in accordance with the latest technology
and the recognized safety regulations. Nevertheless, personal injury
to the operator or a third party as well as damage to the crane and other
property may occur during use. - The truck crane may only be modified with the consent of the manufacturer.
- The truck crane GMK 7450 may only be used when in excellent working condition
and for its intended purpose, and with due attention to safe operation
and any possible hazards. - Malfunctions that may affect the safe operation of the unit are to be corrected
immediately. - The GMK 7450 truck crane may only be operated at temperatures of between
–25 and +40 °C if it is not equipped with the relevant special equipment. - The GMK 7450 truck crane may only be used to vertically lift loads in the authorized
rigging modes using a hook block that is reeved to the hoist rope. - The weight and centre of distribution of the loads must be known. Any other
use of the crane is not considered to represent intended use. - The manufacturer is not liable for damage resulting from the improper or
unauthorized use of the truck crane GMK 7450. The user shall take full responsibility
for any such use.
Intended use also entails
– Observing the complete crane documentation consisting of the operating
instructions, the lifting capacity table, the outrigger pressure table and the
safety manual
– Observing the inspection and maintenance requirements specified in the
Maintenance manual.
TABLE OF CONTENTS:
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 2084730 – PDF DOWNLOAD
Operating instructions lattice extension................................................................................ 1 1 Important information................................................................................................. 7 1.1 About these operating instructions.............................................................................. 7 Validity of these Operating Instructions........................................................................ 7 Prerequisites for assembly and operation........................................................................ 7 Safety instructions............................................................................................. 7 Reference to other operating instructions....................................................................... 7 1.2 Basic safety instructions....................................................................................... 8 1.2.1 Warnings and symbols...................................................................................... 8 1.3 Intended use.................................................................................................... 9 1.4 Organisational measures......................................................................................... 11 1.5 Personnel qualifications........................................................................................ 13 1.6 Safety instructions for truck crane work........................................................................ 14 1.7 Specifications in US units of measurement....................................................................... 16 1.7.1 Boom extension........................................................................................... 16 1.7.2 Luffing jib.............................................................................................. 17 2 Transport measurements, weights and allocation of the lattice extension sections...................................... 21 2.1 Transport dimensions and weights................................................................................ 21 2.1.1 Boom extension............................................................................................ 21 2.1.2 Luffing jib............................................................................................... 22 2.2 Assignment of the parts to luffing jibs......................................................................... 23 2.2.1 Parts for the different boom extensions................................................................... 23 2.2.2 Parts for the different luffing jibs...................................................................... 25 3 Boom extension........................................................................................................ 29 3.1 Components and identification................................................................................... 29 Components...................................................................................................... 29 Identification.................................................................................................. 30 Foot section.................................................................................................... 30 Intermediate sections........................................................................................... 31 Reducing piece.................................................................................................. 31 Head piece...................................................................................................... 32 Angle piece..................................................................................................... 32 3.2 Possible combinations........................................................................................... 33 Without angle offset........................................................................................... 33 With angle offset............................................................................................... 36 Fußstück............................................................................................................ 33 3.3 Slinging points................................................................................................. 39 3.4 Checklists for rigging work..................................................................................... 43 3.4.1 CHECKLIST: Installing boom extension...................................................................... 43 3.4.2 CHECKLIST: Removing the boom extension.................................................................... 47 3.5 Description of rigging work..................................................................................... 51 3.5.1 Pulling apart/pushing together intermediate sections...................................................... 51 Folding up/folding out holders.............................................................................. 51 Pulling apart intermediate sections......................................................................... 52 Pushing in boom sections.................................................................................... 53 3.5.2 Truck crane rigging mode during installation of the boom extension....................................... 55 3.5.3 Hydraulic locking of the foot section..................................................................... 56 Mounting the foot section.................................................................................. 56 Removing the foot section.................................................................................. 58 3.5.4 Handling the pins......................................................................................... 59 3.5.5 Installing/removing the boom extension sections........................................................... 60 Checks before installation/ removal......................................................................... 60 Attachpins................................................................................................. 60 Installation................................................................................................ 61 Removal..................................................................................................... 62 3.5.6 Blocking the joint on the foot section.................................................................... 64 3.5.7 Angle piece............................................................................................... 65 Inclining angle piece to 25................................................................................ 66 Angle section at a 3 angle................................................................................. 66 3.5.8 Deflection sheave......................................................................................... 67 Folding up the deflection sheave............................................................................ 67 Folding up the deflection sheave............................................................................ 67 3.5.9 Changing the lifting limit switch and anemometer.......................................................... 68 3.5.10 Electric connection to the foot section/main boom........................................................ 69 Establishing a connection................................................................................... 69 Detaching the connection.................................................................................... 70 3.5.11 Electric connection to the head section/foot section..................................................... 70 Connecting cable............................................................................................ 70 Establishing a connection................................................................................... 71 Detaching the connection.................................................................................... 72 3.5.12 Reeve the hoist rope..................................................................................... 73 Possible reeving methods................................................................................... 75 3.6 Working with the boom extension................................................................................. 77 Crane movements................................................................................................. 78 SLI Overriding.................................................................................................. 78 +........................................................................................................... 78 Influence of the wind during operating with boom extension...................................................... 79 3.6.1 Telescoping with rigged boom extension.................................................................... 81 3.7 Driving with rigged crane and boom extension................................................................... 83 3.7.1 Driving route............................................................................................. 83 3.7.2 Position of the boom and the axle load.................................................................... 84 12 m (39 ft) boom extension................................................................................. 86 18 m (59ft) boom extension................................................................................. 87 24 m (79ft) boom extension................................................................................. 88 30 m (98ft) boom extension................................................................................. 89 36 m (118ft) boom extension................................................................................ 90 42 m (138ft) boom extension................................................................................ 91 46 m (151ft) boom extension................................................................................ 92 52 m (170ft) boom extension................................................................................ 93 58 m (190ft) boom extension................................................................................ 94 64 m (210ft) boom extension................................................................................ 95 70 m (230ft) boom extension................................................................................ 96 46 m (151ft) boom extension................................................................................ 97 52 m (170ft) boom extension................................................................................ 98 58 m (190ft) boom extension................................................................................ 99 64 m (210ft) boom extension................................................................................100 70 m (230ft) boom extension................................................................................101 3.7.3 Driving the rigged crane..................................................................................102 Checking the superstructure lock............................................................................102 4.......................................................................................................102 Retracting the outrigger...................................................................................102 Switching over the suspension locking system................................................................102 Driving.....................................................................................................103 Supporting the truck crane.................................................................................104 If necessary, rig the counterweight sections................................................................104 3.8 Boom extension maintenance......................................................................................105 3.8.1 Maintenance plans.........................................................................................105 M 1 maintenance plan:.......................................................................................105 3.8.2 Lubricant table...........................................................................................106 3.8.3 Maintenance work..........................................................................................106 Notes on cleaning work......................................................................................106 Lubricating connecting pins.................................................................................106 4 Luffing jib...........................................................................................................109 4.1 Additional operating and display elements in the cranecab.....................................................109 4.1.1 Additional symbol in main menu............................................................................109 4.1.2 Luffing jib submenu.......................................................................................110 4.1.3 Function of the operating and display elements in the luffing jib submenu.................................112 %...........................................................................................................112 &...........................................................................................................112 (...........................................................................................................113 !...........................................................................................................114 $...........................................................................................................114 "...........................................................................................................114 #...........................................................................................................115 *...........................................................................................................117 ,...........................................................................................................117 -...........................................................................................................118 4.2 Components and identification...................................................................................119 Components......................................................................................................119 Identification..................................................................................................120 Foot section....................................................................................................120 Long intermediate sections......................................................................................121 Reducing piece..................................................................................................121 Head piece......................................................................................................122 Luffing control arm.............................................................................................122 Angle piece.....................................................................................................123 4.3 Possible combinations...........................................................................................125 Without angle offset...........................................................................................125 With angle offset...............................................................................................127 4.4 Slinging points.................................................................................................129 4.5 Checklists for rigging work.....................................................................................133 4.5.1 CHECKLIST: Rigging luffing jib............................................................................133 (...........................................................................................................136 &...........................................................................................................139 %...........................................................................................................139 4.5.2 CHECKLIST: Luffing jib removal............................................................................140 %...........................................................................................................140 &...........................................................................................................140 (...........................................................................................................141 4.6 Description of rigging work.....................................................................................145 4.6.1 Pulling apart/pushing together intermediate sections......................................................145 Folding up/folding out holders..............................................................................145 Pulling apart intermediate sections.........................................................................146 Pushing in boom sections....................................................................................147 4.6.2 Rigging mode of the truck crane when mounting the luffing jib............................................149 4.6.3 Installing/disassembling luffing control arm..............................................................150 Installation................................................................................................150 Disassembly.................................................................................................153 4.6.4 Hydraulic locking of the foot section.....................................................................156 Mounting the foot section..................................................................................156 Removing the foot section..................................................................................158 4.6.5 Raising/placing the luffing jib...........................................................................160 Raising the luffingjib....................................................................................160 Setting down the luffing control arm.......................................................................161 Raising/folding in railing..................................................................................161 4.6.6 Manual control............................................................................................162 Connecting the hand-held control............................................................................162 Starting the crane engine with the hand-held control........................................................163 p.......................................................................................................163 Moving the hoisting gear....................................................................................163 A B.....................................................................................................163 Turning off crane engine with the hand-held control.........................................................164 Q.......................................................................................................164 Removing the hand-held control..............................................................................164 4.6.7 If necessary, reeve the auxiliary hoist rope to the upper hookblock......................................165 4.6.8 Preparing for rigging the upper hook block................................................................167 Before mounting the foot section............................................................................167 After mounting the foot section.............................................................................167 4.6.9 Securing the upper hook block on the luffing control arm..................................................168 Release the securing device on the upper hook block.........................................................168 Pull the upper hook block towards the luffing control arm...................................................168 Locking the upper hook block...............................................................................169 4.6.10 Removing the upper hook block from the luffing control arm...............................................171 Releasing the locking pin...................................................................................171 Pull the upper hook block towards the catcher...............................................................172 Secure the upper hook block in the catcher..................................................................172 4.6.11 Connecting pins – holders and handling...................................................................173 Holders.....................................................................................................173 Handling the bolts......................................................................................173 4.6.12 Replacing the intermediate sections on the foot section..................................................174 Prerequisites...............................................................................................174 When rigging................................................................................................175 When unrigging..............................................................................................176 4.6.13 Installing/disassembling jib sections and suspension bars................................................177 Mounting....................................................................................................177 • Sling the previously mounted boom section (1) using an auxiliary crane................................178 • Raise the luffing jib until the bearing points (2) in the lower chord align...........................178 Removal.....................................................................................................179 • Release the connections (2) on both sides in the lower chord..........................................180 • Lower the luffing jib using the auxiliary crane until the released boom section (1) is touching.......180 • Repeat the procedure until only one boom section (1) is left on the intermediate section(2)..........180 • Lift the luffing jib and lock the hinge (2) on the foot section.......................................180 • Dismantle the last boom section (1)...................................................................180 Transport protection rear pendant link....................................................................181 4.6.14 Hinge lock in the foot section...........................................................................182 Releasing the hinge lock...................................................................................182 Locking the hinge...........................................................................................183 4.6.15 Setting the angle position...............................................................................184 Inclining angle piece to 22................................................................................185 Inclining angle piece to 0.................................................................................185 4.6.16 Deflection sheaves.......................................................................................186 Folding up the deflection sheave...........................................................................186 Folding up the deflection sheave...........................................................................186 4.6.17 Changing the lifting limit switch and anemometer.........................................................187 Anemometer removing.........................................................................................187 Connecting the lifting limit switch and anemometer..........................................................188 4.6.18 Electric connection to the foot section/main boom........................................................188 Establishing a connection...................................................................................188 Detaching the connection....................................................................................189 4.6.19 Electric connection to the head section/foot section.....................................................189 Connecting cable............................................................................................189 Establishing a connection...................................................................................190 Detaching the connection....................................................................................191 4.6.20 Reeve the hoist rope.....................................................................................192 Possible reeving methods...................................................................................194 4.6.21 Opening the luffing jib submenu..........................................................................197 0...........................................................................................................197 4.6.22 Telescoping with the luffing jib.........................................................................198 Prerequisites...............................................................................................198 è...........................................................................................................198 0...........................................................................................................198 • Press the button beside the symbol Telescopic extension operating mode (2) once. The indicator ...........198 Telescopic extension with teleautomation....................................................................199 Telescoping with semi-automatic.............................................................................201 %.......................................................................................................201 0.......................................................................................................201 $.......................................................................................................201 $.......................................................................................................202 4.6.23 Derricking luffing jib when rigging......................................................................203 Prerequisites...............................................................................................203 0.......................................................................................................203 • Press the button beside the symbol Rigging operating mode (4) once. The indicator lamp in the s.......203 $...................................................................................................203 $...................................................................................................204 $...................................................................................................204 4.6.24 Derricking main jib with installed luffing jib...........................................................205 Derricking between –1,2 to 82.............................................................................205 (...........................................................................................................205 Derricking between 82 and 60..............................................................................206 %.......................................................................................................206 4.6.25 Bringing the luffing jib into working position...........................................................207 Raising luffing jib.........................................................................................207 (.......................................................................................................207 • Slowly carry out the Lift auxiliary hoist movement, in order to raise the luffing control arm.........207 Telescoping to fixed length................................................................................208 &.......................................................................................................208 Lowering to working position................................................................................208 4.6.26 Preparing the luffing jib for unrigging..................................................................209 4.7 Operation with the luffing jib..................................................................................213 %...............................................................................................................213 4.7.1 Crane movements...........................................................................................214 9...........................................................................................................214 4.7.2 Working range and shutdowns..............................................................................215 $...........................................................................................................215 $...........................................................................................................216 4.7.3 SLI shutdown..............................................................................................216 * +.........................................................................................................216 4.7.4 The effect of wind when operating with the luffing jib....................................................217 4.7.5 Troubleshooting and remedy................................................................................219 4.8 Driving with rigged crane and rigged luffing jib...............................................................221 4.8.1 Driving route.............................................................................................221 4.8.2 Rigging modes for moving and axle loads...................................................................222 Notes on the tables.........................................................................................225 25 m (82 ft)-Luffing jib....................................................................................225 31 m (102 ft) luffing jib...................................................................................226 37 m (121 ft) luffing jib...................................................................................226 43 m (141 ft) luffing jib...................................................................................227 49 m (161 ft) luffing jib...................................................................................227 55 m (180 ft) luffing jib...................................................................................228 61 m (200 ft) luffing jib...................................................................................228 67 m (220 ft) luffing jib...................................................................................229 73 m (240 ft) luffing jib...................................................................................229 4.8.3 Driving the rigged crane..................................................................................231 Checking the superstructure lock............................................................................231 Retracting the outrigger....................................................................................231 Switching over the suspension locking system................................................................231 Driving.....................................................................................................232 Supporting the truck crane.................................................................................233 If necessary, rig the counterweight sections................................................................233 4.9 Luffing jib maintenance.........................................................................................235 4.9.1 Maintenance plans.........................................................................................235 M 1 maintenance plan........................................................................................235 M 3 maintenance plan........................................................................................235 Maintenance schedule Y 2....................................................................................236 Maintenance schedule Y 5....................................................................................236 Maintenance schedule Y 10...................................................................................236 4.9.2 Lubricant table...........................................................................................237 4.9.3 Maintenance work..........................................................................................238 Notes on cleaning work......................................................................................238 Lubricating connecting pins.............................................................................238 4.9.4 Backstop maintenance work.................................................................................239 Equipment required.........................................................................................239 Test connections............................................................................................240 Nitrogen pressure...........................................................................................240 • Connect the filling hose (3) to the nitrogen bottle...................................................242 • Bleed the filling hose. To do this, open the relief valve (2) and the valve at the nitrogen bot.......242 Oil pressure................................................................................................244 4.9.5 Required inspections for the fall-back guard strut........................................................246 5 Index.................................................................................................................249 B...................................................................................................................251 C...................................................................................................................251 D...................................................................................................................251 I...................................................................................................................252 L...................................................................................................................252 M...................................................................................................................253 P...................................................................................................................253 S...................................................................................................................253
Customer Support: [email protected]
https://vimeo.com/874334812?share=copy
PLEASE NOTE:
- This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
- You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
- Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK4075-1 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK 5220 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK4075 Operating Instructions Working Range Limiter Manual - PDF DOWNLOAD
