★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112271 – PDF DOWNLOAD

$28.95

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112271 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112271 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112271 – PDF DOWNLOAD

Language : English
Pages : 332
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112271 – PDF DOWNLOAD

Important information:
1.1 About these operating instructions:
All the lattice extensions described in these operating instructions can be obtained as additional
equipment.

Validity of these Operating Instructions:

  • These operating instructions only apply to lattice extensions which were de- livered by Deutsche
    GROVE GmbH.
  • In addition, for the operation of the truck crane with a lattice extension de- scribed in these
    operating instructions, all details in the included Operating instructions for the GMK 7450 for
    which the lattice extension was delivered, are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in these operating instructions may only be operated together with
a GROVE truck crane GMK 7450 whose serial num- ber is identical with the serial number that is
marked on the lattice extensions.

Safety instructions:

The operation of GMK 7450 with one of the lattice extensions described in these operating
instructions is subject to:
– the basic safety instructions to be found in the subsequent section Basic safety instructions
and
– the safety instructions contained in the supplied operating instructions of
GMK 7450.

TABLE OF CONTENTS:

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112271 – PDF DOWNLOAD

Operating instructions lattice extension................................................................................  1
1 Important information.................................................................................................  7
	1.1 About these operating instructions..............................................................................  7
		Validity of these Operating Instructions........................................................................  7
		Prerequisites for assembly and operation........................................................................  7
		Safety instructions.............................................................................................  7
		Reference to other operating instructions.......................................................................  7
	1.2 Basic safety instructions.......................................................................................  8
		1.2.1 Warnings and symbols......................................................................................  8
	1.3 Intended use....................................................................................................  9
	1.4 Organisational measures......................................................................................... 11
	1.5 Personnel qualifications........................................................................................ 13
	1.6 Safety instructions for truck crane work........................................................................ 14
	1.7 Specifications in US units of measurement....................................................................... 16
		1.7.1 Boom extension........................................................................................... 16
		1.7.2 Luffing jib.............................................................................................. 17
		1.7.3 Heavy load lattice extension.............................................................................. 17
2 Transport measurements, weights and allocation of the lattice extension sections...................................... 21
	2.1 Transport dimensions and weights................................................................................ 21
		2.1.1 Boom extension............................................................................................ 21
		2.1.2 Luffing jib............................................................................................... 22
		2.1.3 Heavy load lattice extension.............................................................................. 23
	2.2 Assignment of the parts to luffing jibs......................................................................... 25
		2.2.1 Parts for the different boom extensions................................................................... 25
		2.2.2 Parts for the different luffing jibs...................................................................... 27
		2.2.3 Parts for the different heavy load lattice extensions..................................................... 29
3 Boom extension........................................................................................................ 33
	3.1 Components and identification................................................................................... 33
		Components...................................................................................................... 33
		Identification.................................................................................................. 34
		Foot section.................................................................................................... 34
		Intermediate sections.......................................................................................... 35
		Reducing piece.................................................................................................. 35
		Head section.................................................................................................... 36
		Angle piece..................................................................................................... 36
	3.2 Possible combinations........................................................................................... 37
		Without angle offset.......................................................................................... 37
		With angle offset............................................................................................... 40
	3.3 Slinging points................................................................................................. 43
	3.4 Checklists for rigging work..................................................................................... 47
		3.4.1 CHECKLIST: Installing boom extension...................................................................... 47
		3.4.2 CHECKLIST: Removing the boom extension.................................................................... 51
	3.5 Description of rigging work..................................................................................... 55
		3.5.1 Pulling apart/pushing together intermediate sections...................................................... 55
			Folding up/folding out holders.............................................................................. 55
			Pulling apart intermediate sections......................................................................... 56
			Pushing in boom sections.................................................................................... 57
		3.5.2 Truck crane rigging mode during installation of the boom extension....................................... 59
		3.5.3 Establishing/disconnecting the connections for the hydraulic lock......................................... 60
			Establish connections...................................................................................... 60
			Disconnecting connections................................................................................... 60
		3.5.4 Secure/release hydraulic lock............................................................................. 61
			Execution withlevers....................................................................................... 62
			Version with locking bar.................................................................................... 63
				• Push the locking bar (1) on the handle (2) down....................................................... 63
				• Push the locking bar (1) on the handle (2) up......................................................... 63
		3.5.5 Locking the foot section/releasing the lock............................................................... 64
			Locking the foot section.................................................................................... 64
				• Bring the lever (2) on the changeover valve to horizontal position, for the top pin................... 64
			Releasing the lock.......................................................................................... 65
				• Bring the lever (2) on the changeover valve to horizontal position, for the top pin................... 65
		3.5.6 Handling the pins......................................................................................... 66
		3.5.7 Installing/removing the boom extension sections........................................................... 67
			Checks before installation/ removal......................................................................... 67
			Connecting pins............................................................................................ 67
			Installation................................................................................................ 68
			Removal..................................................................................................... 69
		3.5.8 Blocking the joint on the foot section.................................................................... 71
		3.5.9 Removing/installing deflection sheave on the angle piece.................................................. 72
		3.5.10 Replacing deflection sheaves on the angle piece.......................................................... 73
			• Sling the deflection sheave to the safety roller (1)..................................................... 73
			• Release the retaining pins and remove both pins (2) from the lower brackets (4)........................... 73
			• Lock the deflection sheave in this position with both pins (2)............................................ 73
		3.5.11 Fold deflection sheaves up/down.......................................................................... 74
			Folding down the deflection sheave......................................................................... 74
			Folding up the deflection sheave........................................................................... 74
			Folding support roller on the foot section.................................................................. 75
				• Release the retaining pin and remove the pins (1) from the connection points (4)...................... 75
				• Release the retaining pin and remove the pin (1) from the bore hole (3)............................... 75
				• Fold the support roller (2) upwards................................................................... 75
				• Insert the pin (1) into the connecting points (4) and secure it with the retaining pin................ 75
		3.5.12 Setting the angle position of the boom extension......................................................... 76
			Set angle position of 25................................................................................... 77
			Set angle position of 3.................................................................................... 77
		3.5.13 Changing the lifting limit switch and anemometer......................................................... 78
			Changing the lifting limit switch........................................................................... 78
			Changing anemometer........................................................................................ 79
		3.5.14 Electric connection to the foot section/main boom........................................................ 80
			Establishing a connection................................................................................... 80
			Detaching the connection.................................................................................... 81
		3.5.15 Electric connection to the head section/foot section..................................................... 81
			Connecting cable............................................................................................ 81
			Establishing a connection................................................................................... 82
			Detaching the connection.................................................................................... 83
		3.5.16 Placing and reeving hoist rope........................................................................... 84
			Possible reeving methods................................................................................... 86
	3.6 Working with the boom extension................................................................................. 89
		3.6.1 Telescoping with rigged boom extension.................................................................... 90
		3.6.2 Crane movements........................................................................................... 91
		3.6.3 SLI Overriding............................................................................................ 91
			+........................................................................................................... 91
		3.6.4 Influence of the wind during operating with boom extension................................................ 92
	3.7 Driving with rigged crane and boom extension................................................................... 95
		3.7.1 Driving route............................................................................................. 95
		3.7.2 Position of the boom and the axle load.................................................................... 96
			12 m (39 ft) boom extension................................................................................. 98
			18 m (59ft) boom extension................................................................................. 99
			24 m (79ft) boom extension.................................................................................100
			30 m (98ft) boom extension.................................................................................101
			36 m (118ft) boom extension................................................................................102
			42 m (138ft) boom extension................................................................................103
			46 m (151ft) boom extension................................................................................104
			52 m (170ft) boom extension................................................................................105
			58 m (190ft) boom extension................................................................................106
			64 m (210ft) boom extension................................................................................107
			70 m (230ft) boom extension................................................................................108
			46 m (151ft) boom extension................................................................................109
			52 m (170ft) boom extension................................................................................110
			58 m (190ft) boom extension................................................................................111
			64 m (210ft) boom extension................................................................................112
			70 m (230ft) boom extension................................................................................113
		3.7.3 Driving the rigged crane..................................................................................114
			Checking the superstructure lock............................................................................114
				4.......................................................................................................114
			Retracting the outrigger...................................................................................114
			Switching over the suspension locking system................................................................114
			Driving.....................................................................................................115
			Supporting the truck crane.................................................................................116
			If necessary, rig the counterweight sections................................................................116
	3.8 Boom extension maintenance......................................................................................117
		3.8.1 Maintenance plans.........................................................................................117
			M 1 maintenance plan:.......................................................................................117
		3.8.2 Lubricant table...........................................................................................118
		3.8.3 Maintenance work..........................................................................................118
			Notes on cleaning work......................................................................................118
			Lubricating connecting pins.................................................................................118
4 Luffing jib...........................................................................................................121
	4.1 Additional operating and display elements in the cranecab.....................................................121
		4.1.1 Additional symbol in main menu............................................................................121
		4.1.2 Luffing jib submenu.......................................................................................122
		4.1.3 Function of the operating and display elements in the luffing jib submenu.................................124
			%...........................................................................................................124
			&...........................................................................................................124
			(...........................................................................................................125
			!...........................................................................................................126
			$...........................................................................................................126
			"...........................................................................................................126
			#...........................................................................................................127
			*...........................................................................................................129
			,...........................................................................................................129
			-...........................................................................................................130
	4.2 Components and identification...................................................................................131
		Components......................................................................................................131
		Identification..................................................................................................132
		Foot section....................................................................................................132
		Long intermediate sections......................................................................................133
		Reducing piece..................................................................................................133
		Head section....................................................................................................134
		Luffing control arm.............................................................................................134
		Angle piece.....................................................................................................135
	4.3 Possible combinations...........................................................................................137
		Without angle offset...........................................................................................137
		With angle offset...............................................................................................139
	4.4 Slinging points.................................................................................................141
	4.5 Checklists for rigging work.....................................................................................145
		4.5.1 CHECKLIST: Rigging luffing jib............................................................................145
			(...........................................................................................................148
			&...........................................................................................................151
			%...........................................................................................................151
		4.5.2 CHECKLIST: Luffing jib removal............................................................................152
			%...........................................................................................................152
			&...........................................................................................................152
			(...........................................................................................................153
	4.6 Description of rigging work.....................................................................................159
		4.6.1 Pulling apart/pushing together intermediate sections......................................................159
			Folding up/folding out holders..............................................................................159
			Pulling apart intermediate sections.........................................................................160
			Pushing in boom sections....................................................................................161
		4.6.2 Rigging mode of the truck crane when mounting the luffing jib............................................163
		4.6.3 Installing/disassembling luffing control arm..............................................................164
			Installation................................................................................................164
			Disassembly.................................................................................................167
		4.6.4 Establishing/disconnecting the connections for the hydraulic lock.........................................170
			Establish connections......................................................................................170
			Disconnecting connections...................................................................................170
		4.6.5 Secure/release hydraulic lock.............................................................................171
			Execution withlevers.......................................................................................172
			Version with locking bar....................................................................................173
				• Push the locking bar (1) on the handle (2) down.......................................................173
				• Push the locking bar (1) on the handle (2) up.........................................................173
		4.6.6 Locking the foot section/releasing the lock...............................................................174
			Locking the foot section....................................................................................174
				• Align the foot section (1) in such a way that the top connection points (5) are flush.................174
				• Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................174
				• Press button (3) on the operating panel and extend top pins completely................................174
				• Lower the foot section (1) with the auxiliary crane to a position where the lower locking point.......174
				• Bring the lever (2) on the changeover valve to vertical position, for the lower pins..................174
				• Press button (3) on the operating panel and extend lower pins completely..............................174
				• Secure the hydraulic lock; àp.451................................................................174
			Releasing the lock..........................................................................................175
				• Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................175
		4.6.7 Raising/placing the luffing jib...........................................................................176
			Raising the luffingjib....................................................................................176
			Setting down the luffing control arm.......................................................................177
			Raising/folding in railing..................................................................................177
		4.6.8 Manual control............................................................................................178
			Connecting the hand-held control............................................................................178
			Starting the crane engine with the hand-held control........................................................179
				p.......................................................................................................179
			Moving the hoisting gear....................................................................................179
				A B.....................................................................................................179
			Turning off crane engine with the hand-held control.........................................................180
				Q.......................................................................................................180
			Removing the hand-held control..............................................................................180
		4.6.9 Separating/joining catcher 2 and raising cylinder.........................................................181
			Separating catcher 2 and the raising cylinder...............................................................181
			Connecting catcher 2 and raising cylinder...................................................................182
		4.6.10 Reeving the auxiliary hoist rope to the upper hookblock.................................................183
		4.6.11 Preparing for rigging the upper hook block...............................................................185
			Before mounting the foot section............................................................................185
			After mounting the foot section.............................................................................186
		4.6.12 Securing the upper hook block on the luffing control arm.................................................186
			Release the securing device on the upper hook block.........................................................186
			Pull the upper hook block towards the luffing control arm...................................................187
			Locking the upper hook block...............................................................................188
		4.6.13 Removing the upper hook block from the luffing control arm...............................................190
			Releasing the locking pin...................................................................................190
			Pull the upper hook block towards the catcher...............................................................192
			Secure the upper hook block in the catcher..................................................................192
		4.6.14 Connecting pins – holders and handling...................................................................193
			Holders.....................................................................................................193
				Handling the pins.......................................................................................193
		4.6.15 Replacing the intermediate sections on the foot section..................................................194
			Prerequisites...............................................................................................194
			When rigging................................................................................................195
			When unrigging..............................................................................................196
		4.6.16 Installing/disassembling boom sections and rear pendant links............................................197
			Mounting....................................................................................................197
				• Sling the previously mounted boom section (1) using an auxiliary crane................................198
				• Raise the luffing jib until the bearing points (2) in the lower chord align...........................198
			Removal.....................................................................................................199
				• Release the connections (2) on both sides in the lower chord..........................................200
				• Lower the luffing jib using the auxiliary crane until the released boom section (1) is touching.......200
				• Repeat the procedure until only one boom section (1) is left on the intermediate section(2)..........200
				• Lift the luffing jib and lock the hinge (2) on the foot section.......................................200
				• Dismantle the last boom section (1)...................................................................200
			Transport protection rear pendant link....................................................................201
		4.6.17 Hinge lock in the foot section...........................................................................202
			Releasing the hinge lock...................................................................................202
			Locking the hinge...........................................................................................203
		4.6.18 Replacing deflection sheaves on the angle piece..........................................................205
			• Sling the deflection sheave to the safety roller (1).....................................................205
			• Release the retaining pins and remove both pins (2) from the lower brackets (4)...........................205
			• Lock the deflection sheave in this position with both pins (2)............................................205
		4.6.19 Fold deflection sheaves up/down..........................................................................206
			Folding down the deflection sheave.........................................................................206
			Folding up the deflection sheave...........................................................................206
			Folding support roller on the foot section..................................................................207
				• Release the retaining pin and remove the pins (1) from the connection points (4)......................207
				• Release the retaining pin and remove the pin (1) from the bore hole (3)...............................207
				• Fold the support roller (2) upwards...................................................................207
				• Insert the pin (1) into the connecting points (4) and secure it with the retaining pin................207
		4.6.20 Setting the angle position of the luffing jib............................................................208
			Set angle position of 22...................................................................................209
			Set angle position of 0....................................................................................209
		4.6.21 Changing the lifting limit switch and anemometer.........................................................210
			Changing the lifting limit switch...........................................................................210
			Changing anemometer........................................................................................211
		4.6.22 Electric connection to the foot section/main boom........................................................212
			Establishing a connection...................................................................................212
			Detaching the connection....................................................................................213
		4.6.23 Electric connection to the head section/foot section.....................................................213
			Connecting cable............................................................................................213
			Establishing a connection...................................................................................214
			Detaching the connection....................................................................................215
		4.6.24 Placing and reeving hoist rope...........................................................................216
			Possible reeving methods...................................................................................217
		4.6.25 Opening the luffing jib submenu..........................................................................219
			0...........................................................................................................219
		4.6.26 Telescoping with the luffing jib.........................................................................220
			Prerequisites...............................................................................................220
			è...........................................................................................................220
			0...........................................................................................................220
			• Press the button beside the symbol Telescopic extension operating mode (2) once. The indicator ...........220
			Telescopic extension with teleautomation....................................................................221
			Telescoping with semi-automatic.............................................................................223
				%.......................................................................................................223
				0.......................................................................................................223
				$.......................................................................................................223
				$.......................................................................................................224
		4.6.27 Derricking luffing jib when rigging......................................................................225
			Prerequisites...............................................................................................225
				0.......................................................................................................225
				• Press the button beside the symbol Rigging operating mode (4) once. The indicator lamp in the s.......225
					$...................................................................................................225
					$...................................................................................................226
					$...................................................................................................226
		4.6.28 Derricking main boom with installed luffing jib..........................................................227
			Derricking between –1.2 to 82.............................................................................227
			(...........................................................................................................227
			Derricking between 82 and 60..............................................................................228
				%.......................................................................................................228
		4.6.29 Bringing the luffing jib into working position...........................................................229
			Raising luffing jib.........................................................................................229
				(.......................................................................................................229
				• Slowly carry out the Lift auxiliary hoist movement, in order to raise the luffing control arm.........229
			Telescoping to fixed length................................................................................230
				&.......................................................................................................230
			Lowering to working position................................................................................230
		4.6.30 Preparing the luffing jib for unrigging..................................................................231
	4.7 Operation with the luffing jib..................................................................................235
		%...............................................................................................................235
		4.7.1 Crane movements...........................................................................................236
			9...........................................................................................................236
		4.7.2 Working range and shutdowns..............................................................................237
			$...........................................................................................................237
			$...........................................................................................................238
		4.7.3 SLI shutdown..............................................................................................238
			* +.........................................................................................................238
		4.7.4 The effect of wind when operating with the luffing jib....................................................239
		4.7.5 Troubleshooting and remedy................................................................................241
	4.8 Driving with rigged crane and rigged luffing jib...............................................................243
		4.8.1 Driving route.............................................................................................243
		4.8.2 Rigging modes for moving and axle loads...................................................................244
			&...........................................................................................................246
			%...........................................................................................................246
			Notes on the tables.........................................................................................247
			25 m (82 ft) luffing jib....................................................................................247
			31 m (102 ft) luffing jib...................................................................................248
			37 m (121 ft) luffing jib...................................................................................248
			43 m (141 ft) luffing jib...................................................................................249
			49 m (161 ft) luffing jib...................................................................................249
			55 m (180 ft) luffing jib...................................................................................250
			61 m (200 ft) luffing jib...................................................................................250
			67 m (220 ft) luffing jib...................................................................................251
			73 m (240 ft) luffing jib...................................................................................251
		4.8.3 Driving the rigged crane..................................................................................253
			Checking the superstructure lock............................................................................253
				4.......................................................................................................253
			Retracting the outrigger...................................................................................253
			Switching over the suspension locking system................................................................253
			Driving.....................................................................................................254
			Supporting the truck crane.................................................................................255
			If necessary, rig the counterweight sections................................................................255
	4.9 Luffing jib maintenance.........................................................................................257
		4.9.1 Maintenance plans.........................................................................................257
			M 1 maintenance plan........................................................................................257
			M 3 maintenance plan........................................................................................257
			Maintenance schedule Y 2....................................................................................258
			Maintenance schedule Y 5....................................................................................258
			Maintenance schedule Y 10...................................................................................258
		4.9.2 Lubricant table...........................................................................................259
		4.9.3 Maintenance work..........................................................................................260
			Notes on cleaning work......................................................................................260
				Lubricating connecting pins.............................................................................260
		4.9.4 Fall-back guard strut maintenance work....................................................................261
			Equipment required.........................................................................................261
			Test connections............................................................................................262
			Nitrogen pressure...........................................................................................262
				• Connect the filling hose (3) to the nitrogen bottle...................................................264
				• Bleed the filling hose. To do this, open the relief valve (2) and the valve at the nitrogen bot.......264
			Oil pressure................................................................................................266
		4.9.5 Required inspections for the fall-back guard strut........................................................268
5 Heavy load lattice extension..........................................................................................271
	5.1 Components and identification...................................................................................271
		Components......................................................................................................271
		Identification..................................................................................................272
	5.2 Possible combinations...........................................................................................275
	5.3 Slinging points.................................................................................................277
	5.4 Rigging the heavy load lattice extension........................................................................279
		5.4.1 CHECKLIST: Rigging the heavy load lattice extension.......................................................279
		5.4.2 CHECKLIST: Unrigging the heavy load lattice extension.....................................................282
	5.5 Description of rigging work.....................................................................................285
		5.5.1 Truck crane rigging mode during installation of the heavy load lattice extension.........................285
		5.5.2 Establishing/disconnecting the connections for the hydraulic lock.........................................286
			Establish connections......................................................................................286
			Disconnecting connections...................................................................................286
		5.5.3 Secure/release hydraulic lock.............................................................................287
			Secure lock................................................................................................287
				• Push the locking bar (1) on the handle (2) down.......................................................287
			Release pins...............................................................................................287
				• Push the locking bar (1) on the handle (2) up.........................................................287
		5.5.4 Locking the adapter/releasing the lock....................................................................288
			Locking the adapter.........................................................................................288
				• Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................288
			Releasing the lock..........................................................................................289
				• Bring the lever (2) on the changeover valve to horizontal position, for the top pin...................289
		5.5.5 Connecting pins – holders and handling....................................................................290
			Holders.....................................................................................................290
			Handling the pins...........................................................................................290
		5.5.6 Installing/removing head section and angle piece..........................................................291
			Installing..................................................................................................291
			Removal.....................................................................................................292
		5.5.7 Replacing deflection sheaves on the angle piece...........................................................293
			• Sling the deflection sheave to the safety roller (1).....................................................293
			• Release the retaining pins and remove both pins (2) from the upper brackets (4)...........................293
		5.5.8 Fold deflection sheaves up/down...........................................................................294
			Folding down the deflection sheave.........................................................................294
			Folding up the deflection sheave...........................................................................294
		5.5.9 Setting the angle position of the heavy load lattice extension............................................295
			Set angle position of 42...................................................................................296
			Set angle position of 20...................................................................................296
		5.5.10 Changing the lifting limit switch and anemometer.........................................................297
			Changing the lifting limit switch...........................................................................297
			Changing anemometer........................................................................................298
		5.5.11 Establishing/disconnecting the electrical connection.....................................................299
			Locking/unlocking the cable drum............................................................................299
			Establish/terminate connection..............................................................................300
		5.5.12 Placing and reeving hoist rope...........................................................................301
			Possible reeving methods...................................................................................302
	5.6 Operation with the heavy load lattice extension.................................................................305
		5.6.1 Enter components for heavy load lattice extension on the SLI..............................................305
		5.6.2 Telescoping with rigged heavy load lattice extension......................................................306
		5.6.3 Crane movements...........................................................................................307
		5.6.4 SLI shutdown..............................................................................................307
			+...........................................................................................................307
		5.6.5 Wind effect when operating the heavy load lattice extension...............................................308
	5.7 Turning loads with the heavy load lattice extension.............................................................309
		5.7.1 Prerequisites.............................................................................................309
		5.7.2 Set SLI for turning the load..............................................................................310
			Entering a reeving..........................................................................................310
			Set the SLI to the auxiliary hoist..........................................................................311
		5.7.3 Turning a load............................................................................................312
	5.8 Driving with rigged crane and rigged heavy load lattice extension..............................................315
		5.8.1 Driving route.............................................................................................315
		5.8.2 Position of the boom and the axle load....................................................................316
			4 m (13 ft)-heavy load lattice extension....................................................................318
			7.5 m (25 ft) heavy load lattice extension..................................................................319
		5.8.3 Driving the rigged crane..................................................................................320
			Checking the superstructure lock............................................................................320
				4.......................................................................................................320
			Retracting the outrigger...................................................................................320
			Switching over the suspension locking system................................................................320
			Driving.....................................................................................................321
			Supporting the truck crane.................................................................................322
			If necessary, rig the counterweight sections................................................................322
6 Index.................................................................................................................325
	B...................................................................................................................327
	C...................................................................................................................328
	D...................................................................................................................328
	H...................................................................................................................328
	I...................................................................................................................328
	L...................................................................................................................329
	M...................................................................................................................330
	P...................................................................................................................330
	R...................................................................................................................330
	S...................................................................................................................330
	T...................................................................................................................330

IMAGES PREVIEW OF THE MANUAL:

Customer Support: [email protected]

PLEASE NOTE:

  • This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
  • The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
  • Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer

S.V 

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order