Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD
$29.95
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD
Description
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD
FILE DETAILS:
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD
Language : English
Pages : 416
Downloadable : Yes
File Type : PDF
DESCRIPTION:
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD
About these operating instructions:
- These operating instructions only apply to lattice extensions which were delivered by Deutsche
GROVE GmbH. - In addition, for the operation of the truck crane with a lattice extension described in these
operating instructions, all details in the included Operat- ing instructions for the GMK 7450 for
which the lattice extension was deliv- ered, are applicable.
Prerequisites for assembly and operation:
The lattice extensions described in these operating instructions may only be operated together with
a GROVE truck crane GMK 7450 whose serial number is identical with the serial number that is marked
on the lattice extensions.
Safety instructions:
The operation of GMK 7450 with one of the lattice extensions described in these operating
instructions is subject to:
– the basic safety instructions to be found in the subsequent section Basic safety instructions
and
– the safety instructions contained in the supplied operating instructions of
GMK 7450.
TABLE OF CONTENTS:
Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD
Lattice extension operating instructions........................................................................ 1 Additional pages: Slinging points............................................................................... 3 Additional page: Driving with rigged boom extension............................................................. 5 16 m (53 ft) boom extension................................................................................. 6 22 m (72 ft) boom extension................................................................................. 7 28 m (92 ft) boom extension................................................................................. 8 34 m (112 ft) boom extension................................................................................ 9 40 m (131 ft) boom extension................................................................................ 10 Luffing jib correction sheet ................................................................................... 11 1 Luffing jib – Fall-back guard strut maintenance work...................................................... 11 Invalidation of the description......................................................................... 11 1.1 Luffing control arm with fall-back guard strut...................................................... 11 1.2 Maintenance interval for the fall-back guard strut.................................................. 12 GROVE- Part numbers................................................................................. 12 1.2.1 Visual inspection............................................................................. 12 1.2.2 Pressure test................................................................................. 12 1 Important information......................................................................................... 17 1.1 About these operating instructions...................................................................... 17 1.2 Basic safety instructions............................................................................... 18 1.2.1 Warnings and symbols.............................................................................. 18 1.3 Intended use............................................................................................ 19 1.4 Organisational measures................................................................................. 21 1.5 Personnel qualifications................................................................................ 23 1.6 Safety instructions for truck crane work................................................................ 24 1.7 Specifications in US units of measurement............................................................... 26 1.7.1 Boom extension................................................................................... 26 1.7.2 Luffing jib...................................................................................... 27 1.7.3 Heavy load lattice extension...................................................................... 27 2 Additional operating and display elements..................................................................... 31 2.1 Overview of the operating elements...................................................................... 31 2.1.1 On the crane control display...................................................................... 31 2.1.2 On the SLI display................................................................................ 33 2.1.3 On the hand-held control.......................................................................... 34 2.2 Brief description of the operating elements............................................................. 35 2.2.1 On the crane control display...................................................................... 35 2.2.2 On the SLI display................................................................................ 43 2.2.3 On the hand-held control.......................................................................... 45 3 Transport measurements, weights and allocation of the lattice extension sections............................. 49 3.1 Transport dimensions and weights........................................................................ 49 3.1.1 Boom extension.................................................................................... 49 3.1.2 Luffing jib....................................................................................... 50 3.1.3 Heavy load lattice extension...................................................................... 51 3.2 Assignment of the parts to luffing jibs................................................................. 53 3.2.1 Parts for the different boom extensions........................................................... 53 3.2.2 Parts for the different luffing jibs.............................................................. 55 3.2.3 Parts for the different heavy load lattice extensions............................................. 57 4 Boom extension................................................................................................ 61 4.1 Components and identification........................................................................... 61 4.2 Possible combinations................................................................................... 65 4.3 Slinging points......................................................................................... 71 4.4 Checklists for rigging work............................................................................. 75 4.4.1 CHECKLIST: Installing boom extension.............................................................. 75 4.4.2 CHECKLIST: Removing the boom extension............................................................ 79 4.5 Description of rigging work............................................................................. 83 4.5.1 Pulling apart/pushing together intermediate sections.............................................. 83 4.5.2 Truck crane rigging mode during installation of the boom extension............................... 87 4.5.3 Establishing/disconnecting the connections for the hydraulic lock................................. 88 4.5.4 Secure/release hydraulic lock..................................................................... 89 4.5.5 Locking the foot section/releasing the lock....................................................... 92 4.5.6 Handling the pins................................................................................. 94 4.5.7 Installing/removing the boom extension sections................................................... 95 4.5.8 Blocking the joint on the foot section............................................................ 99 4.5.9 Removing/installing deflection sheave on the angle piece..........................................100 4.5.10 Replacing deflection sheaves on the angle piece..................................................101 4.5.11 Fold deflection sheaves up/down..................................................................102 4.5.12 Setting the angle position of the boom extension.................................................104 4.5.13 Changing the lifting limit switch and anemometer.................................................106 4.5.14 Electric connection to the foot section/main boom................................................108 4.5.15 Electric connection to the head section/foot section.............................................109 4.5.16 Placing and reeving hoist rope...................................................................112 4.6 Working with the boom extension.........................................................................117 4.6.1 Operating the SLI.................................................................................118 4.6.2 SLI Overriding....................................................................................122 4.6.3 Crane movements...................................................................................122 4.6.4 Telescoping with rigged boom extension............................................................123 4.6.5 Influence of the wind during operating with boom extension........................................124 4.7 Driving with rigged crane and boom extension...........................................................127 4.7.1 Driving route.....................................................................................127 4.7.2 Position of the boom and the axle load............................................................128 4.7.3 Driving the rigged crane..........................................................................146 4.8 Boom extension maintenance..............................................................................149 4.8.1 Cleaning..........................................................................................149 4.8.2 Maintenance plan M 1..............................................................................149 4.8.3 Lubricating pins..................................................................................150 4.8.4 Lubricating the pins in the lower hinge...........................................................151 5 Luffing jib...................................................................................................155 5.1 Components and identification...........................................................................155 5.2 Possible combinations...................................................................................161 5.3 Slinging points.........................................................................................165 5.4 Checklists for rigging work.............................................................................169 5.4.1 CHECKLIST: Rigging luffing jib....................................................................169 5.4.2 CHECKLIST: Luffing jib removal....................................................................176 5.5 Description of rigging work.............................................................................183 5.5.1 Pulling apart/pushing together intermediate sections..............................................183 5.5.2 Rigging mode of the truck crane when mounting the luffing jib....................................187 5.5.3 Installing/disassembling luffing control arm......................................................188 5.5.4 Establishing/disconnecting the connections for the hydraulic lock.................................194 5.5.5 Secure/release hydraulic lock.....................................................................195 5.5.6 Locking the foot section/releasing the lock.......................................................198 5.5.7 Raising/placing the luffing jib...................................................................200 5.5.8 Hand-held control.................................................................................202 5.5.9 Separating/joining catcher 2 and raising cylinder.................................................203 5.5.10 Reeving the auxiliary hoist rope to the upper hookblock.........................................205 5.5.11 Preparing for rigging the upper hook block.......................................................207 5.5.12 Securing the upper hook block on the luffing control arm.........................................208 5.5.13 Removing the upper hook block from the luffing control arm.......................................212 5.5.14 Connecting pins – holders and handling...........................................................215 Handling the pins...................................................................................215 5.5.15 Replacing the intermediate sections on the foot section..........................................216 5.5.16 Installing/disassembling boom sections and rear pendant links....................................219 5.5.17 Hinge lock in the foot section...................................................................224 5.5.18 Replacing deflection sheaves on the angle piece..................................................227 5.5.19 Fold deflection sheaves up/down..................................................................228 5.5.20 Setting the angle position of the luffing jib....................................................230 5.5.21 Changing the lifting limit switch and anemometer.................................................232 5.5.22 Electric connection to the foot section/main boom................................................234 5.5.23 Electric connection to the head section/foot section.............................................235 5.5.24 Placing and reeving hoist rope...................................................................238 5.5.25 Opening the luffing jib submenu..................................................................241 5.5.26 Telescoping with the luffing jib.................................................................242 Prerequisites.......................................................................................242 5.5.27 Derricking luffing jib when rigging..............................................................247 5.5.28 Derricking main boom with installed luffing jib..................................................249 Derricking between –1.2 to 82.....................................................................249 5.5.29 Bringing the luffing jib into working position...................................................251 5.5.30 Preparing the luffing jib for unrigging..........................................................253 5.6 Operation with the luffing jib..........................................................................257 5.6.1 Operating the SLI.................................................................................258 5.6.2 SLI shutdown......................................................................................263 5.6.3 Crane movements...................................................................................264 5.6.4 Working range and shutdowns......................................................................265 5.6.5 The effect of wind when operating with the luffing jib............................................267 5.7 Driving with rigged crane and rigged luffing jib.......................................................269 5.7.1 Driving route.....................................................................................269 5.7.2 Rigging modes for moving and axle loads...........................................................270 5.7.3 Driving the rigged crane..........................................................................279 5.8 Luffing jib maintenance.................................................................................283 5.8.1 Cleaning..........................................................................................283 5.8.2 Maintenance plan M 1..............................................................................284 5.8.3 Maintenance plan M 3..............................................................................284 5.8.4 Maintenance plan Y 2..............................................................................284 5.8.5 Maintenance plan Y 5..............................................................................285 5.8.6 Maintenance plan Y 10.............................................................................285 5.8.7 Checking the nitrogen pressure and oil pressure in the fall-back guard strut for correct op.......286 5.8.8 Required inspections for the fall-back guard strut................................................293 6 Heavy load lattice extension..................................................................................297 6.1 Components and identification...........................................................................297 6.2 Possible combinations...................................................................................301 6.3 Slinging points.........................................................................................303 6.4 Rigging the heavy load lattice extension................................................................305 6.4.1 CHECKLIST: Rigging the heavy load lattice extension...............................................305 6.4.2 CHECKLIST: Unrigging the heavy load lattice extension.............................................308 6.5 Description of rigging work.............................................................................311 6.5.1 Truck crane rigging mode during installation of the heavy load lattice extension.................311 6.5.2 Establishing/disconnecting the connections for the hydraulic lock.................................312 6.5.3 Secure/release hydraulic lock.....................................................................313 6.5.4 Locking the adapter/releasing the lock............................................................314 6.5.5 Connecting pins – holders and handling............................................................316 6.5.6 Installing/removing head section and angle piece..................................................317 6.5.7 Replacing deflection sheaves on the angle piece...................................................319 6.5.8 Fold deflection sheaves up/down...................................................................320 6.5.9 Setting the angle position of the heavy load lattice extension....................................321 6.5.10 Changing the lifting limit switch and anemometer.................................................323 6.5.11 Establishing/disconnecting the electrical connection.............................................325 6.5.12 Placing and reeving hoist rope...................................................................327 6.6 Operation with the heavy load lattice extension.........................................................331 6.6.1 Operating the SLI.................................................................................331 6.6.2 SLI shutdown......................................................................................336 6.6.3 Crane movements...................................................................................336 6.6.4 Telescoping with rigged heavy load lattice extension..............................................337 6.6.5 Wind effect when operating the heavy load lattice extension.......................................338 6.7 Turning loads with the heavy load lattice extension.....................................................339 6.7.1 Prerequisites.....................................................................................339 6.7.2 Set SLI for turning the load......................................................................340 6.7.3 Turning a load....................................................................................342 6.8 Driving with rigged crane and rigged heavy load lattice extension......................................345 6.8.1 Driving route.....................................................................................345 6.8.2 Position of the boom and the axle load............................................................346 6.8.3 Driving the rigged crane..........................................................................350 7 Rigging winch (additional equipment)..........................................................................355 7.1 Overview................................................................................................355 7.2 Hand-held control.......................................................................................356 7.3 Pulling the hoist rope to the head......................................................................357 7.4 Pulling the hoist rope to the upper hook block..........................................................365 7.5 Rigging work............................................................................................371 7.5.1 For operation of the rigging winch................................................................371 7.5.2 Support roller on the turntable...................................................................374 7.5.3 Deflection sheave on the auxiliary hoist..........................................................375 7.5.4 Rigging on the foot section.......................................................................376 7.5.5 Guide sheaves.....................................................................................380 7.5.6 On the angle piece................................................................................381 7.5.7 On the head.......................................................................................382 7.5.8 Rope connector....................................................................................383 7.6 Maintenance of the rigging winch........................................................................387 7.6.1 Maintenance plan M 3..............................................................................387 7.6.2 Lubrication of the bearings.......................................................................388 7.6.3 Greasing the driving pinions......................................................................388 7.6.4 Checking the condition of the rigging rope........................................................389 7.6.5 Changing the rigging rope.........................................................................390 8 Malfunctions..................................................................................................395 8.1 Notes on troubleshooting................................................................................395 8.2 Finding and eliminating malfunctions....................................................................397 8.2.1 Boom extension and heavy load lattice extension...................................................397 8.2.2 Luffing jib.......................................................................................397 8.3 SLI malfunctions........................................................................................401 8.3.1 Table of lattice extension error codes............................................................402 8.3.2 Checking SLI lines and connections................................................................403 9 Index.........................................................................................................407 B...........................................................................................................409 C...........................................................................................................410 D...........................................................................................................410 F...........................................................................................................410 H...........................................................................................................410 I...........................................................................................................411 L...........................................................................................................411 M...........................................................................................................412 O...........................................................................................................412 P...........................................................................................................412 R...........................................................................................................412 S...........................................................................................................413 T...........................................................................................................413
IMAGES PREVIEW OF THE MANUAL:

Need help? Contact: [email protected]
PLEASE NOTE:
- This is the SAME MANUAL used by the dealerships to diagnose your vehicle
- No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
- Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
- So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Grove GMK 5200 Operating Instructions Manual Part 1 (Driving) - PDF DOWNLOAD

Grove GMK4075 Operating Instructions Lattice Extension Manual - PDF DOWNLOAD

Grove GMK 6200-1 Operating Instructions Manual Part 1 (Carrier) - PDF DOWNLOAD
