★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD

$29.95

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD

FILE DETAILS:

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD

Language : English
Pages : 416
Downloadable : Yes
File Type : PDF

DESCRIPTION:

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD

Important information:
About these operating instructions:
Validity of these Operating Instructions:
  • These operating instructions only apply to lattice extensions which were delivered by Deutsche
    GROVE GmbH.
  • In addition, for the operation of the truck crane with a lattice extension described in these
    operating instructions, all details in the included Operat- ing instructions for the GMK 7450 for
    which the lattice extension was deliv- ered, are applicable.

Prerequisites for assembly and operation:

The lattice extensions described in these operating instructions may only be operated together with
a GROVE truck crane GMK 7450 whose serial number is identical with the serial number that is marked
on the lattice extensions.

Safety instructions:

The operation of GMK 7450 with one of the lattice extensions described in these operating
instructions is subject to:
– the basic safety instructions to be found in the subsequent section Basic safety instructions
and
– the safety instructions contained in the supplied operating instructions of
GMK 7450.

TABLE OF CONTENTS:

Grove Crane GMK 7450 Lattice Extension Operating Instruction Manual 3112671 – PDF DOWNLOAD

Lattice extension operating instructions........................................................................  1
Additional pages: Slinging points...............................................................................  3
Additional page: Driving with rigged boom extension.............................................................  5
	16 m (53 ft) boom extension.................................................................................  6
	22 m (72 ft) boom extension.................................................................................  7
	28 m (92 ft) boom extension.................................................................................  8
	34 m (112 ft) boom extension................................................................................  9
	40 m (131 ft) boom extension................................................................................ 10
Luffing jib correction sheet ................................................................................... 11
	1 Luffing jib – Fall-back guard strut maintenance work...................................................... 11
		Invalidation of the description......................................................................... 11
		1.1 Luffing control arm with fall-back guard strut...................................................... 11
		1.2 Maintenance interval for the fall-back guard strut.................................................. 12
			GROVE- Part numbers................................................................................. 12
			1.2.1 Visual inspection............................................................................. 12
			1.2.2 Pressure test................................................................................. 12
1 Important information......................................................................................... 17
	1.1 About these operating instructions...................................................................... 17
	1.2 Basic safety instructions............................................................................... 18
		1.2.1 Warnings and symbols.............................................................................. 18
	1.3 Intended use............................................................................................ 19
	1.4 Organisational measures................................................................................. 21
	1.5 Personnel qualifications................................................................................ 23
	1.6 Safety instructions for truck crane work................................................................ 24
	1.7 Specifications in US units of measurement............................................................... 26
		1.7.1 Boom extension................................................................................... 26
		1.7.2 Luffing jib...................................................................................... 27
		1.7.3 Heavy load lattice extension...................................................................... 27
2 Additional operating and display elements..................................................................... 31
	2.1 Overview of the operating elements...................................................................... 31
		2.1.1 On the crane control display...................................................................... 31
		2.1.2 On the SLI display................................................................................ 33
		2.1.3 On the hand-held control.......................................................................... 34
	2.2 Brief description of the operating elements............................................................. 35
		2.2.1 On the crane control display...................................................................... 35
		2.2.2 On the SLI display................................................................................ 43
		2.2.3 On the hand-held control.......................................................................... 45
3 Transport measurements, weights and allocation of the lattice extension sections............................. 49
	3.1 Transport dimensions and weights........................................................................ 49
		3.1.1 Boom extension.................................................................................... 49
		3.1.2 Luffing jib....................................................................................... 50
		3.1.3 Heavy load lattice extension...................................................................... 51
	3.2 Assignment of the parts to luffing jibs................................................................. 53
		3.2.1 Parts for the different boom extensions........................................................... 53
		3.2.2 Parts for the different luffing jibs.............................................................. 55
		3.2.3 Parts for the different heavy load lattice extensions............................................. 57
4 Boom extension................................................................................................ 61
	4.1 Components and identification........................................................................... 61
	4.2 Possible combinations................................................................................... 65
	4.3 Slinging points......................................................................................... 71
	4.4 Checklists for rigging work............................................................................. 75
		4.4.1 CHECKLIST: Installing boom extension.............................................................. 75
		4.4.2 CHECKLIST: Removing the boom extension............................................................ 79
	4.5 Description of rigging work............................................................................. 83
		4.5.1 Pulling apart/pushing together intermediate sections.............................................. 83
		4.5.2 Truck crane rigging mode during installation of the boom extension............................... 87
		4.5.3 Establishing/disconnecting the connections for the hydraulic lock................................. 88
		4.5.4 Secure/release hydraulic lock..................................................................... 89
		4.5.5 Locking the foot section/releasing the lock....................................................... 92
		4.5.6 Handling the pins................................................................................. 94
		4.5.7 Installing/removing the boom extension sections................................................... 95
		4.5.8 Blocking the joint on the foot section............................................................ 99
		4.5.9 Removing/installing deflection sheave on the angle piece..........................................100
		4.5.10 Replacing deflection sheaves on the angle piece..................................................101
		4.5.11 Fold deflection sheaves up/down..................................................................102
		4.5.12 Setting the angle position of the boom extension.................................................104
		4.5.13 Changing the lifting limit switch and anemometer.................................................106
		4.5.14 Electric connection to the foot section/main boom................................................108
		4.5.15 Electric connection to the head section/foot section.............................................109
		4.5.16 Placing and reeving hoist rope...................................................................112
	4.6 Working with the boom extension.........................................................................117
		4.6.1 Operating the SLI.................................................................................118
		4.6.2 SLI Overriding....................................................................................122
		4.6.3 Crane movements...................................................................................122
		4.6.4 Telescoping with rigged boom extension............................................................123
		4.6.5 Influence of the wind during operating with boom extension........................................124
	4.7 Driving with rigged crane and boom extension...........................................................127
		4.7.1 Driving route.....................................................................................127
		4.7.2 Position of the boom and the axle load............................................................128
		4.7.3 Driving the rigged crane..........................................................................146
	4.8 Boom extension maintenance..............................................................................149
		4.8.1 Cleaning..........................................................................................149
		4.8.2 Maintenance plan M 1..............................................................................149
		4.8.3 Lubricating pins..................................................................................150
		4.8.4 Lubricating the pins in the lower hinge...........................................................151
5 Luffing jib...................................................................................................155
	5.1 Components and identification...........................................................................155
	5.2 Possible combinations...................................................................................161
	5.3 Slinging points.........................................................................................165
	5.4 Checklists for rigging work.............................................................................169
		5.4.1 CHECKLIST: Rigging luffing jib....................................................................169
		5.4.2 CHECKLIST: Luffing jib removal....................................................................176
	5.5 Description of rigging work.............................................................................183
		5.5.1 Pulling apart/pushing together intermediate sections..............................................183
		5.5.2 Rigging mode of the truck crane when mounting the luffing jib....................................187
		5.5.3 Installing/disassembling luffing control arm......................................................188
		5.5.4 Establishing/disconnecting the connections for the hydraulic lock.................................194
		5.5.5 Secure/release hydraulic lock.....................................................................195
		5.5.6 Locking the foot section/releasing the lock.......................................................198
		5.5.7 Raising/placing the luffing jib...................................................................200
		5.5.8 Hand-held control.................................................................................202
		5.5.9 Separating/joining catcher 2 and raising cylinder.................................................203
		5.5.10 Reeving the auxiliary hoist rope to the upper hookblock.........................................205
		5.5.11 Preparing for rigging the upper hook block.......................................................207
		5.5.12 Securing the upper hook block on the luffing control arm.........................................208
		5.5.13 Removing the upper hook block from the luffing control arm.......................................212
		5.5.14 Connecting pins – holders and handling...........................................................215
			Handling the pins...................................................................................215
		5.5.15 Replacing the intermediate sections on the foot section..........................................216
		5.5.16 Installing/disassembling boom sections and rear pendant links....................................219
		5.5.17 Hinge lock in the foot section...................................................................224
		5.5.18 Replacing deflection sheaves on the angle piece..................................................227
		5.5.19 Fold deflection sheaves up/down..................................................................228
		5.5.20 Setting the angle position of the luffing jib....................................................230
		5.5.21 Changing the lifting limit switch and anemometer.................................................232
		5.5.22 Electric connection to the foot section/main boom................................................234
		5.5.23 Electric connection to the head section/foot section.............................................235
		5.5.24 Placing and reeving hoist rope...................................................................238
		5.5.25 Opening the luffing jib submenu..................................................................241
		5.5.26 Telescoping with the luffing jib.................................................................242
			Prerequisites.......................................................................................242
		5.5.27 Derricking luffing jib when rigging..............................................................247
		5.5.28 Derricking main boom with installed luffing jib..................................................249
			Derricking between –1.2 to 82.....................................................................249
		5.5.29 Bringing the luffing jib into working position...................................................251
		5.5.30 Preparing the luffing jib for unrigging..........................................................253
	5.6 Operation with the luffing jib..........................................................................257
		5.6.1 Operating the SLI.................................................................................258
		5.6.2 SLI shutdown......................................................................................263
		5.6.3 Crane movements...................................................................................264
		5.6.4 Working range and shutdowns......................................................................265
		5.6.5 The effect of wind when operating with the luffing jib............................................267
	5.7 Driving with rigged crane and rigged luffing jib.......................................................269
		5.7.1 Driving route.....................................................................................269
		5.7.2 Rigging modes for moving and axle loads...........................................................270
		5.7.3 Driving the rigged crane..........................................................................279
	5.8 Luffing jib maintenance.................................................................................283
		5.8.1 Cleaning..........................................................................................283
		5.8.2 Maintenance plan M 1..............................................................................284
		5.8.3 Maintenance plan M 3..............................................................................284
		5.8.4 Maintenance plan Y 2..............................................................................284
		5.8.5 Maintenance plan Y 5..............................................................................285
		5.8.6 Maintenance plan Y 10.............................................................................285
		5.8.7 Checking the nitrogen pressure and oil pressure in the fall-back guard strut for correct op.......286
		5.8.8 Required inspections for the fall-back guard strut................................................293
6 Heavy load lattice extension..................................................................................297
	6.1 Components and identification...........................................................................297
	6.2 Possible combinations...................................................................................301
	6.3 Slinging points.........................................................................................303
	6.4 Rigging the heavy load lattice extension................................................................305
		6.4.1 CHECKLIST: Rigging the heavy load lattice extension...............................................305
		6.4.2 CHECKLIST: Unrigging the heavy load lattice extension.............................................308
	6.5 Description of rigging work.............................................................................311
		6.5.1 Truck crane rigging mode during installation of the heavy load lattice extension.................311
		6.5.2 Establishing/disconnecting the connections for the hydraulic lock.................................312
		6.5.3 Secure/release hydraulic lock.....................................................................313
		6.5.4 Locking the adapter/releasing the lock............................................................314
		6.5.5 Connecting pins – holders and handling............................................................316
		6.5.6 Installing/removing head section and angle piece..................................................317
		6.5.7 Replacing deflection sheaves on the angle piece...................................................319
		6.5.8 Fold deflection sheaves up/down...................................................................320
		6.5.9 Setting the angle position of the heavy load lattice extension....................................321
		6.5.10 Changing the lifting limit switch and anemometer.................................................323
		6.5.11 Establishing/disconnecting the electrical connection.............................................325
		6.5.12 Placing and reeving hoist rope...................................................................327
	6.6 Operation with the heavy load lattice extension.........................................................331
		6.6.1 Operating the SLI.................................................................................331
		6.6.2 SLI shutdown......................................................................................336
		6.6.3 Crane movements...................................................................................336
		6.6.4 Telescoping with rigged heavy load lattice extension..............................................337
		6.6.5 Wind effect when operating the heavy load lattice extension.......................................338
	6.7 Turning loads with the heavy load lattice extension.....................................................339
		6.7.1 Prerequisites.....................................................................................339
		6.7.2 Set SLI for turning the load......................................................................340
		6.7.3 Turning a load....................................................................................342
	6.8 Driving with rigged crane and rigged heavy load lattice extension......................................345
		6.8.1 Driving route.....................................................................................345
		6.8.2 Position of the boom and the axle load............................................................346
		6.8.3 Driving the rigged crane..........................................................................350
7 Rigging winch (additional equipment)..........................................................................355
	7.1 Overview................................................................................................355
	7.2 Hand-held control.......................................................................................356
	7.3 Pulling the hoist rope to the head......................................................................357
	7.4 Pulling the hoist rope to the upper hook block..........................................................365
	7.5 Rigging work............................................................................................371
		7.5.1 For operation of the rigging winch................................................................371
		7.5.2 Support roller on the turntable...................................................................374
		7.5.3 Deflection sheave on the auxiliary hoist..........................................................375
		7.5.4 Rigging on the foot section.......................................................................376
		7.5.5 Guide sheaves.....................................................................................380
		7.5.6 On the angle piece................................................................................381
		7.5.7 On the head.......................................................................................382
		7.5.8 Rope connector....................................................................................383
	7.6 Maintenance of the rigging winch........................................................................387
		7.6.1 Maintenance plan M 3..............................................................................387
		7.6.2 Lubrication of the bearings.......................................................................388
		7.6.3 Greasing the driving pinions......................................................................388
		7.6.4 Checking the condition of the rigging rope........................................................389
		7.6.5 Changing the rigging rope.........................................................................390
8 Malfunctions..................................................................................................395
	8.1 Notes on troubleshooting................................................................................395
	8.2 Finding and eliminating malfunctions....................................................................397
		8.2.1 Boom extension and heavy load lattice extension...................................................397
		8.2.2 Luffing jib.......................................................................................397
	8.3 SLI malfunctions........................................................................................401
		8.3.1 Table of lattice extension error codes............................................................402
		8.3.2 Checking SLI lines and connections................................................................403
9 Index.........................................................................................................407
	B...........................................................................................................409
	C...........................................................................................................410
	D...........................................................................................................410
	F...........................................................................................................410
	H...........................................................................................................410
	I...........................................................................................................411
	L...........................................................................................................411
	M...........................................................................................................412
	O...........................................................................................................412
	P...........................................................................................................412
	R...........................................................................................................412
	S...........................................................................................................413
	T...........................................................................................................413

IMAGES PREVIEW OF THE MANUAL:

Need help? Contact: [email protected]

PLEASE NOTE:

  • This is the SAME MANUAL used by the dealerships to diagnose your vehicle
  • No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
  • Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
  • So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com

S.V

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order