Komatsu PC2000-8 Hydraulic Excavator Operation & Maintenance Manual – Serial 20150 and Up
$44.95 Original price was: $44.95.$26.95Current price is: $26.95.
Complete Komatsu PC2000-8 Hydraulic Excavator Operation & Maintenance Manual covering serial 20150 and up. 519-page English PDF with operation, safety, maintenance procedures, specifications, attachments and the loading shovel section.
Description
Komatsu PC2000-8 Hydraulic Excavator Operation & Maintenance Manual – Serial 20150 and Up
This Komatsu PC2000-8 Hydraulic Excavator Operation & Maintenance Manual is the full Komatsu-issued document for machines from serial number 20150 and up. It combines the operator’s instructions for correct and safe use of the machine with the complete factory maintenance program, so the same file answers both “how do I run this machine” and “how do I keep it running”. The manual is delivered as a single PDF and covers the PC2000-8 hydraulic excavator plus, in the dedicated Section 7, the PC2000-8 loading shovel configuration.
File Details
- Manual Type: Operation & Maintenance Manual (OMM)
- Brand: Komatsu
- Model: PC2000-8 Hydraulic Excavator
- Serial Numbers Covered: 20150 and up
- Language: English
- Page Count: 519 pages
- File Format: PDF
- Document Number: PEN00340-01
- Publication Date: March 2009
Chapters Covered
The Komatsu PC2000-8 operation and maintenance manual follows the standard Komatsu structure — front matter, safety, operation, maintenance, specifications, attachments and options, plus a dedicated loading shovel section. The principal top-level and second-level contents are:
- Before Reading This Manual — How to use the manual, machine serial numbers, distributor details, SI units convention
- Safety Information — DANGER, WARNING, CAUTION and NOTICE signal words
- Introduction — Use of machine, directions of machine, visibility from operator’s seat, proximity and 12 m circumference visibility
- Product Information — Product identification number (PIN) plate, EPA engine number plate, service meter location, machine serial numbers and distributor record sheet
- Safety — Safety labels and their locations, general precautions common to operation and maintenance, precautions before starting operation, fire prevention, precautions when getting on or off the machine, protection against falling/flying/intruding objects, attachments and options, cab glass, running the engine inside a building, jobsite precautions, starting engine, operation, transportation, towing, lifting objects with the bucket, precautions before starting inspection and maintenance, precautions for inspection and maintenance
- Operation — Machine view illustrations, controls and gauges, detailed controls and gauges, monitoring system (basic check monitors, caution monitors, emergency monitors), switches inside the operator’s cab, switches inside the cab base room, switches outside of the machine, lamps inside the operator’s cab, control levers and pedals, door lock, emergency exit and escape hammer, handling emergency ladder, fire extinguisher, cap with lock, ashtray, cup holder, magazine box, hook, utility box, air conditioner controls, radio, auxiliary electric power, fuse, circuit breaker, controller, tool and can storage, handling grease pump and grease gun, accumulator, handling hydraulic ladder, VHMS-equipped machines
- Machine Operations and Controls — Walk-around checks, checks before starting (coolant, engine oil, fuel, hydraulic oil, PTO case oil, air cleaner, working lamps, electric wiring, horn), seat adjustment, rearview mirrors, seat belt, starting engine, after starting engine, breaking-in, engine warm up, hydraulic equipment warm up, stopping the engine (normal and emergency), machine operation, steering, swinging, work equipment controls, working mode, prohibited operations, general operation information, traveling on slopes, escape from mud, recommended applications, bucket replacement, parking machine, check before shut off engine, machine inspection after daily work, locking, transportation, cold weather operation, long term storage, troubles and actions, running out of fuel, phenomena that are not failures, towing, discharged battery, other trouble, electronic control system error codes (E03, E07, E10, E11, E14, E15, E0E)
- Maintenance Information — Outline of service, handling oil, fuel, coolant and performing oil clinic (KOWA), electric system maintenance, wear parts and wear parts list, recommended fuel, coolant and lubricant, recommended brands and quality, tightening torque specifications and list, safety critical parts and safety critical parts list
- Maintenance Schedule — Maintenance schedule chart, initial 100 hours, initial 500 hours, initial 4000 hours maintenance
- Maintenance Procedure — When required tasks (air cleaner element, cooling system cleaning, track shoe bolts, track tension, bucket teeth, window washer fluid, air conditioner, line filter, engine cooling seals, bleeding air from fuel and hydraulic circuits, releasing pressure in hydraulic circuit, additional water separator), every 250, 500, 1000, 2000, 4000, 5000 and 8000 hours
- Specifications — Operating weight, bucket capacity, engine, engine horsepower, overall length, height, width, track width, cab height, tail swing radius, track length, tumbler center distance, minimum ground distance, travel speed, swing speed and working ranges
- Attachments and Options — General precautions for safety, attachment guide and work equipment combinations, front guard, handling fuel quick charge, handling service center (draining and adding lubricant and coolant from the service panel), handling jump start receptacle, ORBCOM controller
- Loading Shovel (Section 7) — Machine view illustrations, explanation of components (bottom dump switches), operation of work equipment, precautions during operation, excavator work, precautions when disassembling, transportation, maintenance (every 10 hours greasing), specification, wear parts list, combination of work equipment
Between its covers the manual handles the full operating envelope of the PC2000-8: the 728 kW (976 HP) Komatsu SAA12V140E-3 diesel engine, the 3,400-litre fuel tank, the 130-litre engine oil refill capacity, the hydraulic tank, the PTO case, the swing machinery cases and the final drive cases on each side. Every fluid, filter, breather, strainer and grease point in the machine has a maintenance item in the schedule, and each scheduled task is written out as a step-by-step procedure with the required tools, tightening torques and safety precautions.
What the Komatsu PC2000-8 Operation & Maintenance Manual Gives You
Because this is the combined operation and maintenance manual rather than a separate operator’s booklet and a separate service binder, the reader has the whole picture in one file. The monitoring system chapter walks through every monitor icon, the correct reading for each gauge, and the exact temperature or pressure at which each caution or emergency monitor lights up — including the auto-deceleration behaviour, the auto-low-idle logic, the PTO oil temperature warnings and the ECO gauge target range. The error-code table (E03 through E0E) tells the technician what each machine-monitor fault means and what to do about it before any disassembly starts.
The maintenance chapter is where the Komatsu PC2000-8 operation and maintenance manual really earns its keep. It lists the wear parts with part numbers and the interval at which each is replaced. It gives the recommended engine oil, powertrain oil and supercoolant specifications with the ambient temperature ranges each covers, and the mixing ratios for the AF-NAC supercoolant. It provides the tightening torque tables for metric bolts and hydraulic hose fittings, and a separate safety critical parts list with the two-year or 4,000-hour, 5,000-hour and 8,000-hour replacement intervals for fuel hoses, aftercooler hoses, high-pressure piping clamps, injector nozzle tips, the emergency escape rope ladder and the seat belt.
The hydraulic circuit section covers the procedure for bleeding air from the pumps, the travel motors, the swing holding brake circuit, the idler cushion circuit, the pilot selector valve circuit and the main valve pilot piping, and the method for releasing internal pressure in the hydraulic circuit before any pipe or hose is opened. For the PC2000-8 specifically, the manual also documents the idler cushion (hydraulic cushion) cylinder and grease cylinder adjustment, since track tension on this machine uses both.
Who This Manual Is For
The Komatsu PC2000-8 operation & maintenance manual suits the operator who needs the correct checks before each shift, and equally the field service technician or shop mechanic who carries out the scheduled maintenance program. It works for fleet owners running PC2000-8 excavators in mining, quarry and heavy civil applications, for plant hire companies that service their own machines, and for anyone who needs to keep the equipment in specification between major overhauls. Because the loading shovel configuration is also included, owners running the shovel version get the additional bottom dump cylinder, front bucket and shovel-specific operating precautions in the same file.
Buy the Komatsu PC2000-8 Operation & Maintenance Manual
This Komatsu PC2000-8 operation and maintenance manual PDF is delivered instantly after payment — no shipping, no waiting for a paper binder to arrive. It opens on any laptop, tablet or phone, and every page can be printed for the workshop or the machine cab. Having the correct Komatsu procedures, torque figures, fluid specifications and safety precautions to hand is what separates a repair that lasts from one that causes a repeat failure, and it is what keeps a 200-tonne mining excavator running safely in the hands of the operator and the maintenance crew.
IMAGES PREVIEW
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

Komatsu PC80MR-3 Hydraulic Excavator Shop Manual PDF Download

SANY BHL75 BHL95 SLB95 Backhoe Loader Maintenance Manual PDF Download

Grove GMK 5130-2 All-Terrain Mobile Crane Maintenance Manual (2011) - 3 112 751 en




Reviews
There are no reviews yet.