Komatsu PC8000 Hydraulic Mining Shovel General Assembly Procedure Manual 2004 – PDF Download
$59.95 Original price was: $59.95.$39.95Current price is: $39.95.
Complete General Assembly Procedure for the Komatsu PC8000 Hydraulic Mining Shovel. Covers undercarriage, superstructure, boom, attachments, hydraulics, electrical, fire suppression and commissioning. 156-page PDF, Edition 01/2004.
Description
Komatsu PC8000 General Assembly Procedure Manual
This Komatsu PC8000 General Assembly Procedure manual is the complete field assembly guide for the hydraulic mining shovel, covering every stage from unloading and crawler assembly through to pre-commissioning checks. Published in 2004, it remains the definitive reference for assembling this 715-tonne-class mining shovel on site, with step-by-step procedures, lifting guidance, torque values, component weights and detailed illustrations. Whether you are erecting a new machine, disassembling for transport, or planning a major component swap, this PC8000 assembly manual provides the exact sequence and specifications required.
File Details
- Manual Type: General Assembly Procedure
- Brand: Komatsu Mining Germany
- Model: PC8000 Hydraulic Mining Shovel
- Language: English
- Page Count: 156
- File Format: PDF
- Document Reference: PC8000AS rev 02.doc
- Edition: 01/2004
Chapters Covered
The manual is organised into 34 numbered assembly procedures, grouped into logical major sections.
- 1โ5: Undercarriage Assembly
- 6โ8: Slew Ring and Superstructure Assembly
- 9โ10: Boom and Cylinder Preassembly
- 11โ14: Counterweight, Fuel Tank and Operator Cab
- 15โ18: Hydraulic Tank, Coolers and Access Structures
- 19โ21: Muffler, Air Filters, Crane and Lubrication Stations
- 22โ24: Electrical Harnesses and Hydraulic Hose Connections
- 25โ28: Bucket Cylinders, Stick and Boom Hose Connections
- 29โ32: Pre-checks, Stick Cylinders, Pin Seals and Bucket Assembly
- 33โ34: Fire Suppression System and Commissioning Checks
Undercarriage Assembly (Procedures 1โ5)
Detailed instructions for mounting crawler segments to the side frames, assembling the undercarriage, fitting the cable reel unit, mounting final drives, closing the chains, and installing the auxiliary weight. Includes pin orientation guidance, track tensioning procedures, and torque tables for M20 and M24 fasteners.
Slew Ring and Superstructure (Procedures 6โ8)
Covers mounting the slew ring underneath the superstructure platform, assembling the platform onto the undercarriage, and installing the prime drive unit. Includes slew ring bolt torque determination, backlash adjustment references, and drive unit alignment specs.
Boom, Stick and Attachment (Procedures 9โ10, 25โ26, 30โ32)
Preassembly of boom and stick cylinders, mounting the boom, installing bucket cylinders, mounting the stick, and assembling the Bullclam bucket or backhoe attachment. Includes pin seal mounting procedures with inner and outer seal diagrams.
Counterweight, Fuel Tank and Cab (Procedures 11โ14)
Mounting the counterweight, fuel tank or main switch cabinet, cab support, and operator cab. Includes cable transfer element installation for sealing the cab support, and cab air cleaner mounting.
Hydraulic and Cooling Systems (Procedures 15โ16, 23โ24, 27โ28)
Mounting the hydraulic oil tank and hydraulic oil coolers, installing hose connections on the tank and coolers, HP hoses between filters and main valve blocks, and filling the hydraulic tank. Includes bleeding procedures for main pumps, gear pumps and axial piston pumps.
Electrical and Fire Suppression (Procedures 22, 33)
Connection of cable harnesses to the X-boards with terminal assignment tables, plus assembly and testing of the Checkfire MP-N and SC-N fire detection, actuation and suppression systems. Includes electrical connection points and testing procedures.
Pre-checks and Commissioning (Procedures 29, 34)
Pre-checks prior to first engine start, including fluid levels, bleeding procedures, valve positions for track tensioning, and initial start-up guidance. Final checks and adjustments prior to commissioning cover hydraulic, electric, pre-heating, EBL and ECS system tests.
Specifications, Weights and Torque Data
The manual includes a comprehensive packing list with component weights and dimensions, basic measurements for transport planning, and full torque tables for metric standard and fine threads. SAE flange assembly torque examples are also provided, covering M12 through M20 fasteners. These specifications are essential for safe lifting, rigging and assembly on site.
Your Complete PC8000 Assembly Resource
This Komatsu PC8000 General Assembly Procedure manual gives your service team the exact sequence, torque values, lifting points and safety requirements to assemble the shovel correctly the first time. From positioning the first crawler segment to the final commissioning checks, every procedure is laid out with clear illustrations, component weights and tool requirements. The included manpower and time schedule helps you plan the assembly window accurately, while the safety warnings throughout ensure your team works to Komatsu’s own field standards.
Whether you are a Komatsu dealer, a mine maintenance planner, or an independent heavy equipment specialist, this PC8000 assembly PDF is the single most important document for getting the machine from transport configuration to working condition. It also serves as an invaluable reference for disassembly, since the manual states that disassembly follows the reverse order of assembly.
IMAGES PREVIEW
Delivered as an instant PDF download, the manual is available immediately after purchase. No shipping, no waiting, no physical media. Read it on any device โ laptop, tablet or smartphone โ and print the pages you need for the workshop floor. This is the complete, unabridged assembly procedure for the Komatsu PC8000, ready to support your next project.
What Our Customers Say
๐ Related Products
Discover more professional manuals for your equipment




Reviews
There are no reviews yet.