★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately
Sale!

JLG 1250AJP Aerial Platform Service and Maintenance Manual – 3121171 Rev S PDF Download

Original price was: $39.95.Current price is: $22.95.

Complete JLG 1250AJP Service and Maintenance Manual in PDF format. Covers all systems: chassis, turntable, boom, platform, hydraulics, JLG Control System, and electrical schematics. Document 3121171 Rev S, 788 pages.

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

JLG 1250AJP Service and Maintenance Manual – 3121171 Rev S

This is the complete JLG 1250AJP Service and Maintenance Manual, published under document number 3121171 Revision S. It is the comprehensive workshop reference for the 1250AJP aerial work platform, covering every major system on the machine from the chassis and turntable through the tower and main boom to the platform and its electronic controls. Whether you are performing routine maintenance, diagnosing a fault code, rebuilding a hydraulic cylinder, or calibrating the JLG Control System, this manual provides the procedures, specifications, and diagrams needed to complete the job correctly.

File Details

  • Manual Type: Service and Maintenance Manual
  • Brand: JLG
  • Model: 1250AJP
  • Document Number: 3121171
  • Revision: S (May 31, 2019)
  • Language: English
  • Page Count: 788
  • File Format: PDF

Chapters Covered

  • Section A – Introduction: Maintenance safety precautions, hydraulic system safety, general maintenance warnings
  • Section 1 – Specifications: Operating specifications and performance data, capacities, chassis specifications, tires, dimensional data, engine data (Caterpillar 3.4T, Deutz BF4M2011, Deutz TD2011L4, Deutz TCD2.9L4), torque requirements, major component weights, pressure settings, hydraulic oil specifications, lubrication and operator maintenance
  • Section 2 – General: Machine preparation, inspection and maintenance, pre-start inspection, pre-delivery and frequent inspection, annual machine inspection, preventative maintenance, service and guidelines, cleanliness, component removal and installation, disassembly and reassembly, pressure-fit parts, bearings, gaskets, bolt usage and torque application, hydraulic lines and electrical wiring, lubrication and information, cylinder drift test, pins and composite bearing repair guidelines, welding on JLG equipment
  • Section 3 – Chassis & Turntable: Tires and wheels, axle extension system, axle limit switch adjustment, drive system, steering control system, drive/steering speed control, traction control system, drive orientation system, ground control enable system, oscillating axle system, oscillating axle bleeding and lockout test, wheel drive assembly, drive hub (Rexroth, Bonfiglioli, Reggiana Riduttori), swing drive hub, swing drive, swing brake, swing motor, gear backlash procedure, swing drive lubrication, turntable bearing, swing speed proportioning, chassis tilt indicator system, rotary coupling, generator, cold weather package, engine (glow plugs, oil level, oil change, filters), Deutz EMR 2, bio fuel, Deutz turbocharger operation, CAT DGC diagnostic support and trouble code definitions, auxiliary power system, counterweight
  • Section 4 – Boom & Platform: Platform control enable system, transport position sensing system, beyond transport drive speed cutback, drive/steer boom function interlock (CE only), jib stow system, envelope control system, tower path control system, automatic main boom control system, electrical retrieval system, hydraulic retrieval system, controlled boom angle system, slow down system, dual capacity system, hydraulic system warm up, reduced platform heights, electronic platform leveling, platform support removal/installation, rotator removal/installation, main boom disassembly/assembly, tower boom installation and assembly, pin clamp installation, main boom transport angle switch, tower transport length switch, main boom transport length switches, dual capacity switches, tower telescope cylinder removal/installation, tower lift cylinder removal/installation, main lift cylinder removal/installation, main boom telescope cylinder removal/installation, powertrack maintenance, hose routing procedure, tower boom drift test, rotary actuator, bolt-on external fall arrest, SkyGuard
  • Section 5 – Hydraulics and Hydraulic Schematics: Lubricating O-rings in the hydraulic system, hydraulic connection assembly and torque specification, cylinder repair (disassembly, cleaning, inspection, assembly), counterbalance valve check, hydraulic tank, hydraulic return filter, enable valves, pressure setting procedure, drive pumps, function pump, drive and function pump start up, hydraulic schematics (8 sheets)
  • Section 6 – JLG Control System: Introduction, analyzer connection and use, changing access level, adjusting parameters, machine setup, machine personality settings and function speeds, machine orientation when setting speeds, CANbus communications, calibration instructions, system test, calibrating steer, calibrating drive, calibrating boom valves, LSS system, resetting the MSSO system, electronic platform leveling, calibrating platform level, calibrating tilt sensor, boom sensor calibration, boom control system violation, CANbus troubleshooting, load moment pin troubleshooting, diagnostic trouble code chart
  • Section 7 – Basic Electrical Information & Electrical Schematics: General, multimeter basics, applying silicone dielectric compound to electrical connections, dielectric grease application, AMP connector, Deutsch connectors, telematics gateway, electrical schematics (21 sheets), wiring harness installation

IMAGES PREVIEW

JLG 1250AJP Aerial Platform Service and Maintenance Manual - 3121171 Rev S PDF Download — PDF page 1 preview
JLG 1250AJP Aerial Platform Service and Maintenance Manual - 3121171 Rev S PDF Download — PDF page 26 preview
JLG 1250AJP Aerial Platform Service and Maintenance Manual - 3121171 Rev S PDF Download — PDF page 117 preview

This JLG 1250AJP service manual is the factory workshop reference used by professional technicians to service and repair the 1250AJP aerial platform. The manual opens with critical safety precautions that must be observed during any maintenance task, then moves into complete specifications for the machine including operating data, capacities, dimensional data, engine data for all equipped engine variants, torque requirements, component weights, and pressure settings. The hydraulic oil specifications section covers viscosity grades for different operating temperature ranges, including Mobil DTE 10 Excel 32, UCon Hydrolube HP-5046, Mobil EAL H 46, Mobil EAL 46, Quintolubric 888-46, Mobilfluid 424, and Exxon Univis HVI 26. A detailed lubrication and operator maintenance section with diagrams identifies every grease point, filter, and fluid check on the machine.

The chassis and turntable section provides procedures for the axle extension system, steering control system (conventional two-wheel, crab, and coordinated modes), traction control, drive orientation, oscillating axle bleeding and lockout testing, wheel drive assembly removal and installation, and complete disassembly and assembly procedures for all three drive hub variants: Rexroth, Bonfiglioli, and Reggiana Riduttori. The swing drive section includes roll and leak testing, motor control valve disassembly, motor and brake disassembly, hub-shaft disassembly, carrier disassembly, and complete assembly procedures with exploded view diagrams. The turntable bearing section covers mounting bolt condition checks, bearing wear measurement, bearing removal and installation, and torque sequences.

The engine section covers the Caterpillar 3.4T, Deutz BF4M2011, Deutz TD2011L4, and Deutz TCD2.9L4 diesel engines with specifications, glow plug operation, oil level checking, oil and filter changes, fuel filter replacement, and fuel strainer cleaning. The Deutz EMR 2 engine management system section provides connector pin identifications, fault codes, and troubleshooting. The CAT DGC diagnostic support section provides detailed diagnostic trouble code definitions with troubleshooting flow charts for the CAT 3.4 engine ECM.

The boom and platform section is extensive, covering the platform control enable system, transport position sensing system, envelope control system, tower path control, automatic main boom control, electrical and hydraulic retrieval systems, controlled boom angle system, slow down system, dual capacity system, hydraulic warm up, reduced platform heights, and electronic platform leveling. Complete removal and installation procedures are provided for the platform support, rotator, main boom, tower boom, tower telescope cylinder, tower lift cylinder, main lift cylinder, and main boom telescope cylinder. The pin clamp installation procedure, powertrack maintenance, hose routing, tower boom drift test, rotary actuator rebuild, bolt-on external fall arrest, and SkyGuard operation and diagnostics are all covered with detailed instructions and illustrations.

The hydraulics section begins with O-ring lubrication procedures, then provides complete hydraulic connection assembly and torque specifications for NPTF, BSPT, JIC, SAE, ORFS, MBTL, MBTS, BH, ORB, MPP, MFF, BSPP, and flange connections. Cylinder repair procedures cover disassembly, cleaning, inspection, and assembly with torque specifications for cylinder heads and tapered bushings. The pressure setting procedure covers the function pump, main valve bank, frame valve bank, and platform valve bank with specific pressure values for swing, main telescope, axle extend/retract, steer left/right, platform level up/down, and jib up/down. Drive pump troubleshooting, charge pressure relief valve adjustment, mechanical centering, hydraulic centering, high pressure relief valve adjustment, and charge pump removal and inspection are all detailed. The function pump section covers sealing the drive shaft, complete unit disassembly and assembly, adjustments, tightening torques, and pump control disassembly for cleaning. Eight hydraulic schematic sheets provide the complete hydraulic circuit diagrams.

The JLG Control System section is the electronic brain of the machine, and this manual provides complete coverage of the analyzer, machine setup, personality settings, function speeds, CANbus communications, and calibration procedures. The calibration instructions cover steering, drive, boom valves, platform level crack points, tilt sensor, and the complete boom sensor calibration procedure with all positions. The system test function is described for both platform and ground station testing. The LSS (Load Sensing System) section covers the diagnostic menu, calibration procedure, testing and evaluation, and troubleshooting. The MSSO reset procedure, electronic platform leveling fault warnings and responses, CAN errors, platform level and jib valve operation, platform level calibration, tilt sensor calibration, and boom sensor calibration are all covered in detail. The diagnostic trouble code chart provides a comprehensive list of fault codes with descriptions and checks.

Complete PDF Bookmark Tree

Complete Bookmarks

The complete bookmarks in the “JLG 1250AJP Aerial Platform Service and Maintenance Manual – 3121171 Rev S PDF Download” are as follows:

312171_S_1250AJP_JLG_Servicep. 1
Section A. Introduction – Maintenance Safety Precautionsp. 3
A Generalp. 3
B Hydraulic System Safetyp. 3
C Maintenancep. 3
Table of Contentsp. 5
List of Figuresp. 13
List of Tablesp. 19
Section 1. Specificationsp. 21
1.1 Operating Specifications & Performance Datap. 21
1.2 Capacitiesp. 21
1.3 Chassis Specificationsp. 21
1.4 Tiresp. 21
1.5 Dimensional Datap. 22
1.6 Engine Datap. 22
Caterpillar 3.4Tp. 22
Deutz BF4M2011p. 22
Deutz TD2011L4p. 22
Deutz TCD2.9L4p. 23
1.7 Torque Requirementsp. 23
1.8 Major Component Weightsp. 23
1.9 Pressure Settingsp. 23
1.10 Hydraulic Oilp. 24
1.11 Lubrication & Operator Maintenancep. 27
Section 2. Generalp. 41
2.1 Machine Preparation, Inspection, and Maintenancep. 41
Generalp. 41
Preparation, Inspection, and Maintenancep. 41
Pre-Start Inspectionp. 41
Pre-Delivery Inspection and Frequent Inspectionp. 41
Annual Machine Inspectionp. 41
Preventative Maintenancep. 41
2.2 Service and Guidelinesp. 42
Generalp. 42
Safety and Workmanshipp. 42
Cleanlinessp. 42
Components Removal and Installationp. 42
Component Disassembly and Reassemblyp. 43
Pressure-Fit Partsp. 43
Bearingsp. 43
Gasketsp. 43
Bolt Usage and Torque Applicationp. 43
Hydraulic Lines and Electrical Wiringp. 43
Hydraulic Systemp. 43
Lubricationp. 44
Batteryp. 44
Lubrication and Servicingp. 44
2.3 Lubrication and Informationp. 44
Hydraulic Systemp. 44
Hydraulic Oilp. 44
Changing Hydraulic Oilp. 44
Lubrication Specificationsp. 44
2.4 Cylinder Drift Testp. 45
Theoryp. 45
Cylinder Leakage Testp. 45
Cylinder Thermal Driftp. 45
2.5 Pins and Composite Bearing Repair Guidelinesp. 46
2.6 Welding on JLG Equipmentp. 46
Do the Following When Welding on JLG Equipmentp. 46
Do NOT Do the Following When Welding on JLG Equipmentp. 46
Section 3. Chassis & Turntablep. 53
3.1 Tires & Wheelsp. 53
Tire Inflationp. 53
Tire Damagep. 53
Tire Replacementp. 53
Wheel and Tire Replacementp. 53
Wheel Installationp. 54
3.2 Axle Extension Systemp. 55
3.3 Axle Limit Switch Adjustment Procedurep. 55
3.4 Drive Systemp. 56
3.5 Steering Control Systemp. 56
3.6 Drive/Steering Speed Controlp. 57
3.7 Traction Control Systemp. 57
3.8 Drive Orientation Systemp. 57
3.9 Ground Control Enable Systemp. 57
3.10 Oscillating Axle Systemp. 66
3.11 Oscillating Axle Bleeding Procedure and Lockout Testp. 66
Lockout Cylinder Bleedingp. 66
Oscillating Axle Lockout Testp. 67
3.12 Wheel Drive Assemblyp. 68
Removalp. 68
Installationp. 68
3.13 Drive Hub – If Equipped With Rexrothp. 69
Disassemblyp. 69
Cover Disassemblyp. 69
First Stage Planetary (7) Disassemblyp. 69
Second Stage Planet Gears (1) Disassemblyp. 69
First Stage Planetary (7) Assemblyp. 70
End Cover Unit (8) Assemblyp. 70
Final Assemblyp. 70
Initial Start-up And After Repairsp. 70
Oil Change Interval-Gear Drivep. 70
3.14 Drive Hub – If Equipped With Bonfigliolip. 73
Product Identificationp. 73
Hydraulic Motor Installationp. 73
Installation of the Wheel Drive on the Machinep. 73
Start Up and Running Inp. 73
General Informationp. 74
Gearbox Disengagementp. 76
Maintenance Informationp. 78
Disassembly Informationp. 79
Disassemblyp. 79
Inspection of Partsp. 88
Assemblyp. 88
Final Test and Reinstallationp. 98
3.15 Drive Hub – If Equipped With Reggiana Riduttorip. 103
Symbol Nomenclaturep. 103
Toolsp. 103
Disassemblyp. 108
Assemblyp. 112
3.16 Swing Drive Hubp. 119
Removalp. 119
Assembly/Disassemblyp. 119
Installationp. 119
3.17 Swing Drivep. 120
Roll and Leak Testingp. 120
Tightening and Torquing Boltsp. 120
Motor Control Valve Disassemblyp. 121
Motor and Brake Disassemblyp. 122
Main Disassemblyp. 123
Hub-Shaft Disassemblyp. 124
Carrier Disassemblyp. 125
Hub-Shaft Sub-Assemblyp. 126
Carrier Sub-Assemblyp. 127
Main Assemblyp. 129
Motor and Brake Assemblyp. 131
Motor Control Valve Assemblyp. 132
3.18 Swing Brakep. 135
Pre-Installation Checksp. 135
Installationp. 136
Maintenancep. 136
Disassemblyp. 136
Examinationp. 136
Assemblyp. 136
3.19 Swing Motorp. 139
Disassembly and inspectionp. 139
Assemblyp. 146
One Piece Stator Constructionp. 152
3.20 Procedure For Setting Gear Backlashp. 154
3.21 Swing Drive Lubricationp. 155
3.22 Turntable Bearingp. 157
Turntable Bearing Mounting Bolts Condition Checkp. 157
Turntable Bearing Wear Measurementp. 158
Turntable Bearing Removalp. 163
Turntable Bearing Installationp. 163
3.23 Swing Speed Proportioningp. 166
3.24 Chassis Tilt Indicator Systemp. 166
3.25 Rotary Couplingp. 167
3.26 Generatorp. 170
Every 250 hoursp. 170
Every 500 hoursp. 170
Overload Protectionp. 171
Inspecting Brushes, Replacing Brushes, and Cleaning Slip Ringsp. 171
3.27 Cold Weather Packagep. 173
3.28 Enginep. 173
Glow Plugsp. 173
Checking Oil Levelp. 173
Changing Engine Oilp. 174
Changing Oil Filterp. 175
Replacing Fuel Filter or Pre-Filterp. 176
Cleaning Fuel Strainer (D2011 L03 Only)p. 176
Removalp. 178
Installationp. 181
3.29 Deutz EMR 2 (SN 87575 to Present)p. 182
3.30 Bio Fuel in Deutz Enginesp. 195
Generalp. 195
Bio Fuelp. 195
Biological Contamination In Fuelsp. 196
3.31 Deutz Turbocharger Operationp. 197
Operating Practicesp. 197
3.32 CAT DGC Diagnostic Support And Trouble Code Definitionsp. 245
List of Abbreviations in this Sectionp. 247
Diagnostic Trouble Codesp. 248
CANp. 248
MIL Outputp. 248
DTC 116- ECT Higher Than Expected Stage 1p. 249
DTC 117- ECT/CHT Low Voltagep. 250
DTC 118- ECT/CHT High Voltagep. 251
DTC 122- TPS1 Signal Voltage Lowp. 253
DTC 123- TPS1 Signal Voltage Highp. 255
DTC 217- ECT Higher Than Expected 2p. 257
DTC 219- RPM Higher Than Max Allowed Governed Speedp. 258
DTC 336- Crank Signal Input Noisep. 259
DTC 337- Loss of Crank Input Signalp. 261
DTC 521- Oil Pressure Sender/Switch High Pressurep. 262
DTC 524- Oil Pressure Lowp. 263
DTC 562- Battery Voltage (VBat) Lowp. 265
DTC 563- Battery Voltage (VBat) Highp. 267
DTC 601- Microprocessor Failure – FLASHp. 269
DTC 604- Microprocessor Failure – RAMp. 271
DTC 606- Microprocessor Failure – COPp. 273
DTC 642- 5 Volt External Low Voltagep. 275
DTC 643- 5 Volt External High Voltagep. 276
DTC 1612- Microprocessor Failure – RTI 1p. 277
DTC 1613- Microprocessor Failure – RTI 2p. 278
DTC 1614- Microprocessor Failure – RTI 3p. 280
DTC 1615- Microprocessor Failure – A/Dp. 282
DTC 1616- Microprocessor Failure – interruptp. 284
DTC 1625- CAN J1939 Shutdown Requestp. 286
DTC 1626- CAN J1939 Transmit (Tx) Faultp. 287
DTC 1627- CAN J1939 Receive (Rx) Faultp. 288
DTC 1628- CAN Address Conflict Failurep. 289
DTC 1629- J1939 TSC1 Message Receipt Lossp. 291
DTC 1652- TPS1 Loss of Communicationsp. 292
DTC 2111- Unable to Reach Lower TPSp. 293
DTC 2112- Unable to Reach Higher TPSp. 295
DTC 9999- Throttle Actuator Failsafe Spring Failurep. 296
DTC to SPN/FMI Tablep. 296
3.33 Auxiliary Power Systemp. 298
3.34 Counterweightp. 298
Section 4. Boom & Platformp. 301
4.1 Platform Control Enable Systemp. 301
4.2 Transport Position Sensing Systemp. 301
4.3 Beyond Transport – Drive Speed Cutback Systemp. 301
4.4 Drive/Steer – Boom Function Interlock System (CE ONLY)p. 301
4.5 Jib Stow Systemp. 302
4.6 Envelope Control Systemp. 302
4.7 Tower Path Control Systemp. 303
4.8 Automatic Main Boom Control Systemp. 303
4.9 Electrical Retrieval Systemp. 308
4.10 Hydraulic Retrieval Systemp. 308
4.11 Controlled Boom Angle Systemp. 308
4.12 Slow Down Systemp. 309
4.13 Dual Capacity Systemp. 309
4.14 Hydraulic System Warm Upp. 309
4.15 Reduced Platform Heightsp. 309
4.16 Electronic Platform Levelingp. 310
4.17 Platformp. 310
Support Removalp. 310
Support Installationp. 311
4.18 Rotatorp. 314
Removalp. 314
Installationp. 314
4.19 Main Boomp. 315
Disassemblyp. 315
Assemblyp. 316
4.20 Tower Boomp. 324
Installation and Assemblyp. 324
Pin Clamp Installation Procedurep. 341
4.21 Main Boom Transport Angle Switchp. 360
Analyzer Readingsp. 360
Possible Faultsp. 361
4.22 Tower Transport Length Switchp. 361
Analyzer Readingsp. 361
Possible Faultsp. 363
4.23 Main Boom Transport Length Switchesp. 363
Analyzer Readingsp. 363
Possible Faultsp. 364
4.24 Dual Capacity Switchesp. 364
Analyzer Readingsp. 364
Possible Faultsp. 365
4.25 Tower Telescope Cylinderp. 368
Removalp. 368
Installationp. 372
4.26 Tower Lift Cylinderp. 374
Removalp. 374
Installationp. 378
4.27 Main Lift Cylinderp. 382
Removalp. 382
Installationp. 385
4.28 Main Boom Telescope Cylinderp. 386
Removalp. 386
Installationp. 390
4.29 Powertrack Maintenancep. 392
One Piece Bracket Maintenancep. 392
Two Piece Bracket Maintenancep. 394
Snap Rings and Screwsp. 395
4.30 Hose Routing Procedurep. 401
4.31 Electronic Platform Levelingp. 401
Descriptionp. 401
Normal Operationp. 401
4.32 Tower Boom Drift Testp. 403
4.33 Rotary Actuatorp. 405
Theory of Operationp. 405
Required Toolsp. 405
Disassemblyp. 408
Inspectionp. 412
Assemblyp. 412
Greasing Thrust Washersp. 417
Installing Counterbalance Valvep. 417
Testing the Actuatorp. 417
Bleeding After Installationp. 419
4.34 Bolt-on External Fall Arrestp. 420
Inspection Before Usep. 420
Installationp. 421
4.35 Skyguardp. 423
Operationp. 423
Function Testp. 423
Diagnostics & Troubleshootingp. 424
Section 5. Hydraulics And Hydraulic Schematicsp. 425
5.1 Lubricating O-Rings in the Hydraulic Systemp. 425
Cup and Brushp. 425
Dip Methodp. 426
Spray Methodp. 426
Brush-on Methodp. 426
5.2 Hydraulic Connection Assembly and Torque Specificationp. 427
Tapered Thread Typesp. 427
Straight Thread Types, Tube and Hose Connectionsp. 427
Straight Thread Types, Port Connectionsp. 428
Flange Connection Typesp. 428
Tightening Methodsp. 428
Assembly And Torque Specificationsp. 429
Assembly Instructions for American Standard Pipe Thread Tapered (NPTF) Connections.p. 430
Assembly Instructions for British Standard Pipe Thread Tapered (BSPT) Connectionsp. 431
Assembly Instructions for 37° (JIC) Flare Fittingsp. 432
Assembly Instructions for 45° SAE Flare Fittingsp. 436
Assembly Instructions for O-Ring Face Seal (ORFS) Fittingsp. 438
Assembly Instructions for DIN 24° Flare Bite Type Fittings (MBTL and MBTS)p. 440
Assembly Instructions for Bulkhead (BH) Fittingsp. 442
Assembly Instructions for O-Ring Boss (ORB) Fittingsp. 446
Assembly Instructions for Adjustable Port End Metric (MFF) Fittingsp. 454
Assembly Instructions for Metric ISO 6149 (MPP) Port Assembly Stud Endsp. 462
Assembly instructions for Adjustable Port End (BSPP) Fittingsp. 464
Assembly Instructions for Flange Connections: (FL61 and FL62)p. 472
Double Wrench Methodp. 475
FFWR and TFFT Methodsp. 476
Adjustable Stud End Assemblyp. 476
O-ring Installation (Replacement)p. 477
5.3 Cylinder Repairp. 478
Disassemblyp. 478
Cleaning and Inspectionp. 507
Assemblyp. 509
5.4 Counterbalance Valve Checkp. 513
5.5 Hydraulic Tankp. 514
5.6 Hydraulic Return Filterp. 515
5.7 Enable Valvesp. 536
Removalp. 536
Installationp. 536
Air Purge Procedure for Non-Calibrated Machinesp. 537
Air Purge Procedure for Calibrated Machinesp. 537
5.8 Pressure Setting Procedurep. 538
Set Up of the Function Pumpp. 538
Adjustments made at the Main Valve Bankp. 539
Adjustments Made at the Frame Valve Bankp. 543
Adjustments Made at the Platform Valve Bankp. 547
5.9 Drive Pumpsp. 548
Troubleshooting Procedurep. 548
Charge Pressure Relief Valve Adjustmentp. 551
Mechanical Centering of Pumpp. 552
Hydraulic Centering of Control Modulesp. 552
High Pressure Relief Valve Adjustmentsp. 553
Removal and inspection of charge pumpp. 553
Routine Maintenancep. 554
Removal and Installation of Shaft Sealp. 556
5.10 Function Pumpp. 558
Spare Partsp. 558
Sealing the Drive Shaftp. 559
Disassembly and Assembly of the Complete Unitp. 560
Assemblyp. 563
Adjustmentsp. 564
Tightening Torquesp. 564
Pump Control Disassembly For Cleaningp. 566
5.11 Drive & Function Pump Start Upp. 567
Start-Up Procedurep. 567
Section 6. JLG Control Systemp. 579
6.1 Introductionp. 579
Connect the JLG Control System Analyzerp. 580
Using the Analyzerp. 580
Changing Access Level of Hand Held Analyzerp. 581
Adjusting Parameters Using Hand Held Analyzerp. 582
Machine Setupp. 582
6.2 Machine Personality Settings and Function Speedsp. 591
6.3 Machine Orientation When Setting Speedsp. 595
Test Notesp. 595
6.4 CANbus Communicationsp. 596
6.5 Calibration Instructionsp. 597
Chassis Pin Module Functionp. 607
BLAM Pin Module Functionp. 608
6.6 System Testp. 622
Test from the Platformp. 622
Test from the Ground Stationp. 625
6.7 Calibrating Steerp. 630
6.8 Calibrating Drivep. 633
6.9 Calibrating Boom Valvesp. 636
6.10 LSS Systemp. 639
Diagnostic Menup. 640
Calibration Procedurep. 641
Testing & Evaluationp. 646
Troubleshootingp. 647
6.11 Resetting The MSSO Systemp. 648
6.12 Electronic Platform Levelingp. 650
Platform Leveling Fault Warningp. 650
Fault Responsep. 650
CAN Errorsp. 651
Additional Platform and Jib Valvesp. 651
6.13 Calibrating Platform Levelp. 652
STEP 1: SETTING THE PLATFORM VALVE MINIMUMSp. 652
STEP 2: BLEEDING THE PLATFORM VALVESp. 653
STEP 3: CALIBRATING THE PLATFORM LEVEL UP AND DOWN VALVE CRACKPOINTSp. 653
6.14 Calibrating Tilt Sensorp. 655
6.15 Boom Sensor Calibrationp. 656
General Notes:p. 656
Step 1 – Position 1p. 657
Step 2 – Position 2p. 658
Step 3 – Position 3p. 659
Step 4 – Position 4p. 660
Step 5 – Position 5p. 661
Step 6 – Position 6p. 662
Step 7 – Position 7p. 663
Step 8 – Position 8p. 664
Step 9 – Position 9p. 665
Step 10 – Position 10p. 666
Step 11 – Position 11p. 667
6.16 Boom Control System (BCS) Violationp. 668
“UNLOCK BOOM” Calibration Procedurep. 668
6.17 CANbus Troubleshootingp. 718
CANbus Communication Failurep. 724
Load Moment Pin Troubleshootingp. 737
Section 7. Basic Electrical Information & Electrical Schematicsp. 741
7.1 Generalp. 741
7.2 Multimeter Basicsp. 741
Groundingp. 741
Backprobingp. 741
Min/Maxp. 741
Polarityp. 741
Scalep. 741
Voltage Measurementp. 741
Resistance Measurementp. 742
Continuity Measurementp. 742
Current Measurementp. 743
7.3 Applying Silicone Dielectric Compound to Electrical Connectionsp. 743
7.4 Dielectric Grease Applicationp. 744
Installationp. 744
AMP Mate-N-Lokp. 744
AMP Fastonp. 744
AMP Micro-Fitp. 744
AMP Mini Fit Jrp. 744
Mini Fit Srp. 745
DIN Connectorsp. 745
Exceptionsp. 745
7.5 AMP Connectorp. 746
Applying Silicone Dielectric Compound to AMP Connectorsp. 746
Assemblyp. 746
Disassemblyp. 748
Wedge Lockp. 748
Service – Voltage Readingp. 748
7.6 Deutsch Connectorsp. 750
DT/DTP Series Assemblyp. 750
DT/DTP Series Disassemblyp. 750
HD30/HDP20 Series Assemblyp. 751
HD30/HDP20 Series Disassemblyp. 751
7.7 Telematics Gatewayp. 752
Telematics-Ready (TCU) Plugp. 752
7.8 Electrical Schematicsp. 765

The electrical section covers multimeter basics including grounding, backprobing, min/max, polarity, scale, voltage measurement, resistance measurement, continuity measurement, and current measurement. The section on applying silicone dielectric compound to electrical connections explains where to apply and where not to apply dielectric grease. AMP connector and Deutsch connector assembly and disassembly procedures are provided with detailed illustrations. The telematics gateway section provides the TCU plug pinout and describes the data available through the telematics device. Twenty-one electrical schematic sheets provide the complete electrical circuit diagrams, and wiring harness installation sheets show the physical routing of harnesses throughout the machine.

What This Manual Enables You to Do

With this JLG 1250AJP service and maintenance manual, you can perform every scheduled maintenance task, diagnose and repair hydraulic and electrical faults, rebuild cylinders and drive hubs, calibrate the JLG Control System, and service the engine and drivetrain. The manual provides the exact torque values, pressure settings, clearances, and adjustment procedures that JLG specifies, ensuring that repairs are done correctly and safely. The hydraulic schematics and electrical schematics allow you to trace circuits and understand how systems interact. The diagnostic trouble code charts help you quickly identify fault conditions and determine the correct corrective action. The calibration procedures ensure that after repairs or component replacement, the machine’s control system is properly calibrated for safe operation.

This manual is essential for any technician responsible for maintaining a JLG 1250AJP. Without the correct specifications and procedures, there is a risk of improper repair, machine damage, or unsafe operation. The detailed illustrations, exploded views, and step-by-step instructions remove the guesswork from maintenance and repair.

Delivered as an instant PDF download, this manual can be saved to your computer, tablet, or smartphone and printed as needed. There is no shipping delay and no physical book to wait for. You can search the document, zoom in on diagrams, and print only the pages you need for the job at hand.

Reviews

There are no reviews yet.

Be the first to review “JLG 1250AJP Aerial Platform Service and Maintenance Manual – 3121171 Rev S PDF Download”

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order