Description
Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005
This Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005 provides extensive maintenance information for the aircraft lighting systems grouped under ATA Chapter 33. The material covers lighting used in the flight compartment, passenger compartment, service and maintenance areas, on the exterior of the aircraft, and throughout the emergency lighting system. It is structured as a working aircraft maintenance reference, combining system description and operation sections with component-location information, operational tests, removal and installation tasks, adjustments, inspections, safety precautions, and illustrated maintenance figures.
The chapter is particularly detailed because the Regional Jet lighting system is divided into many independent circuits and individual components. Procedures identify applicable circuit breakers, electrical connectors, access areas, lighting control panels, power units, dimmers, transformers, relays, lamps, switches, signs, battery packs, inverters, chargers, and emergency-light assemblies. Aircraft effectivity is stated throughout the chapter where configurations differ, allowing maintenance personnel to determine which procedure and component arrangement applies to the aircraft being serviced.
File Details
- Manual type: Aircraft Maintenance Manual – ATA Chapter 33 Lights
- Aircraft: Canadair Regional Jet
- Chapter: 33 – Lights
- Language: English
- Page count: 1294 pages
- File format: PDF
- Effective date: Dec 10/2005
Lighting System Maintenance Coverage
The Canadair Regional Jet Chapter 33 Lights manual begins with an overall description of how the aircraft lighting circuits are arranged and powered. It explains the relationship between the AC and DC buses and the lighting circuits and identifies the principal lighting groups used throughout the aircraft. This provides the system-level background needed before working on individual lights, panels, dimmers, transformers, relays, signs, or emergency-light components.
Flight-compartment coverage includes panel floodlighting, integral panel lighting, display and control-panel illumination, map and chart-holder lights, standby-compass lighting, and floor floodlights. The chapter identifies where these components are installed and how their brightness controls operate. For the panel floodlighting system, for example, the manual includes component-location illustrations, a simplified electrical schematic, an operational test, and removal and installation procedures for the individual panel floodlights.
The passenger-compartment section is extensive and deals with the lighting encountered by passengers and cabin crew. It covers ceiling and sidewall illumination, reading lights, flight-attendant and boarding lights, passenger information signs, lavatory lighting, and galley lighting. Power units, dimmers, relays, switches, lamp assemblies, and control panels are treated as separate maintenance subjects where required. Many of these procedures contain aircraft-effectivity statements because equipment configuration varies between aircraft.
Service and maintenance lighting is also included. This part of the Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights addresses lighting used in cargo, avionics, equipment, and wheel-well areas during servicing or maintenance operations. Exterior-lighting coverage then moves to the systems required for ground operation, flight visibility, inspection, and collision avoidance, including landing, taxi/recognition, navigation, wing inspection, anticollision, beacon, stair, and logo lights.
The emergency-lighting portion includes the normal Chapter 33 system description together with individual emergency-light components. Floor-track lights, emergency battery packs, charger assemblies, inverters, lighted exit signs, ceiling and floor-level emergency floodlights, and exterior emergency lights are covered through dedicated maintenance subjects. This gives technicians a single chapter for both the normal aircraft lighting equipment and the emergency illumination system.
Chapters Covered
- 33-00-00 – Lighting System
- Description and operation
- Flight-compartment lighting
- Passenger-compartment lighting
- Service and maintenance lighting
- Exterior lighting
- Emergency lighting
- 33-10-00 – Flight Compartment Lighting System
- Panel floodlighting system
- Panel integral lighting
- Miscellaneous lighting system
- Panel floodlights
- Overhead-panel lighting power supplies and dimmers
- Instrument-lighting and center-pedestal lighting panels
- Floor floodlights, map-reading lights, lighted chart holders, and standby-compass light dimmer
- 33-20-00 – Passenger Compartment Lighting
- Passenger compartment ceiling and sidewall lights
- Ceiling and sidewall light power units and relays
- Reading lights and reading-light switches
- Flight-attendant call lights and switches
- Dome, flight-attendant, and boarding lights
- Flight-attendant and boarding-light dimmers and inverters
- Flight-attendant control panels
- Lighted passenger, lavatory, galley, and windscreen ordinance signs
- Passenger sign/emergency-light control panel
- Lavatory dome and vanity lighting
- Lavatory light power unit/dimmer, occupied relay, microswitch, and attendant call switch
- Galley lights and galley light power unit/dimmer
- 33-30-00 – Service and Maintenance Lighting
- Service lights
- Cargo-door light
- Maintenance lights
- Caged maintenance light
- Dome maintenance light
- 33-40-00 – Exterior Lighting System
- Landing and taxi/recognition lights
- Wing landing and taxi/recognition light assemblies
- Nose landing light
- Landing-light control panel
- Landing and taxi/recognition light transformers
- Navigation lights
- Wing and vertical-stabilizer navigation lights
- Navigation-light transformers and step-down transformer
- Wing inspection lights
- Anticollision strobe and beacon lights
- External-lights panel
- Wing and rear anticollision lights and power supplies
- Beacon light and beacon power supply
- Stair lights
- Logo lights and logo-light transformer
- 33-50-00 – Emergency Lighting
- Emergency lights system
- Floor-track emergency lights
- Battery packs
- Charger assemblies
- Inverters
- Door-exit beta lights
- Floor-level and conventional lighted exit signs
- Ceiling emergency floodlights
- Floor-level emergency floodlights
- Exterior emergency lights
Together these sections provide both a system-level understanding of the Regional Jet lighting installation and task-level instructions for maintaining individual components. The chapter is not limited to a simple wiring or component catalog: it follows the maintenance workflow from understanding system operation and locating a component through testing, removing, installing, inspecting, or adjusting it as applicable.
Complete PDF Bookmark Tree
Complete Bookmarks
The complete bookmarks in the “Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005” are as follows:
+Chapter 33
Effective Pagesp. 1
Contentsp. 19
+Section 00p. 71
+33-00-00p. 71
+1: LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 71
1. Generalp. 71
+2. Descriptionp. 71
A. Flight-Compartment Lighting Systemp. 71
B. Passenger-Compartment Lighting Systemp. 71
C. Service and Maintenance Lightingp. 73
D. Exterior Lighting Systemp. 73
E. Emergency Lighting Systemp. 75
+Section 10p. 77
+33-10-00p. 77
+1: FLIGHT COMPARTMENT LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 77
1. Generalp. 77
+2. Descriptionp. 77
A. Panel Floodlightingp. 77
B. Panel Integral Lightingp. 77
C. Miscellaneous Lightingp. 77
+3. Operationp. 78
A. Panel Floodlightingp. 78
B. Panel Integral Lightingp. 78
C. Miscellaneous Lighting Systemp. 79
+Section 11p. 81
+33-11-00p. 81
+1: PANEL FLOODLIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 81
1. Generalp. 81
+2. Component Detailsp. 81
A. Panel Floodlightsp. 81
B. Potentiometersp. 81
+3. Operationp. 81
A. Pilots Floodlightingp. 81
B. Instrument Panel Floodlightingp. 82
C. Copilots Floodlightingp. 82
4. Component Location Indexp. 82
+Panel Floodlighting System – Component Location/Recognitionp. 83
+Panel Floodlighting System – Simplified Schematic Diagramp. 84
+501: PANEL FLOODLIGHTING SYSTEM – ADJUSTMENT/TESTp. 85
1. Generalp. 85
+Task 33-11-00-710-801 Operational Test of the Panel Floodlighting Systemp. 85
1. Job Set-Up Informationp. 85
Subtask 33-11-00-946-001p. 85
2. Job Set-Upp. 85
Subtask 33-11-00-865-001p. 85
Subtask 33-11-00-860-001p. 85
Subtask 33-11-00-861-001p. 85
3. Procedurep. 86
Subtask 33-11-00-710-001p. 86
4. Close Outp. 87
Subtask 33-11-00-861-002p. 87
Subtask 33-11-00-941-001p. 87
+33-11-01p. 89
+401: FLOODLIGHT, PANEL – REMOVAL/INSTALLATIONp. 89
1. Generalp. 89
+Task 33-11-01-000-801 Removal of the Panel Floodlightp. 89
1. Job Set-Up Informationp. 89
Subtask 33-11-01-946-001p. 89
2. Job Set-Upp. 89
Subtask 33-11-01-910-001p. 89
Subtask 33-11-01-865-001p. 89
3. Procedurep. 90
Subtask 33-11-01-020-001p. 90
+Panel Floodlight – Removal/Installationp. 91
+Task 33-11-01-400-801 Installation of the Panel Floodlightp. 92
1. Job Set-Up Informationp. 92
Subtask 33-11-01-945-001p. 92
Subtask 33-11-01-946-002p. 92
2. Procedurep. 92
Subtask 33-11-01-420-001p. 92
3. Close Outp. 92
Subtask 33-11-01-865-002p. 92
Subtask 33-11-01-710-001p. 92
Subtask 33-11-01-941-001p. 92
+Section 12p. 93
+33-12-00p. 93
+1: PANEL INTEGRAL LIGHTING – DESCRIPTION AND OPERATIONp. 93
1. Generalp. 93
+2. Component Detailsp. 93
A. Overhead Panelp. 93
B. Pilots Instrument Panels and Side Consolep. 94
C. Copilots Instrument Panels and Side Consolep. 95
D. Copilots Instrument Panels and Side Consolep. 95
E. Center Instrument Panel and Pedestalp. 96
+3. Operationp. 98
A. Overhead Panelp. 99
B. Pilots Instrument Panels and Side Consolep. 99
C. Copilots Instrument Panels and Side Consolep. 99
D. Center Instrument Panel, Pedestal and Circuit Breaker Panelsp. 100
E. Center Instrument Panel, Pedestal and Circuit Breaker Panelsp. 100
F. Center Instrument Panel, Pedestal and Circuit Breaker Panelsp. 101
4. Component Location Indexp. 102
+Overhead Panel Integral Lighting – Component Locationsp. 105
+Pilot’s Instrument Panels and Side Console Integral Lighting – Component Locationsp. 106
Figure 2 (Sheet 1 of 2)p. 106
Figure 2 (Sheet 2 of 2)p. 107
+Copilot’s Instrument Panel and Side Console Integral Lighting – Component Locationsp. 108
Figure 3 (Sheet 1 of 2)p. 108
Figure 3 (Sheet 2 of 2)p. 109
+Copilot’s Instrument Panels and Side Console Integral Lighting – Component Locationsp. 110
Figure 4 (Sheet 1 of 2)p. 110
Figure 4 (Sheet 2 of 2)p. 111
+Center Instrument Panel and Pedestal Integral Lighting – Component Locationsp. 112
Figure 5 (Sheet 1 of 3)p. 112
Figure 5 (Sheet 2 of 3)p. 113
Figure 5 (Sheet 3 of 3)p. 114
+Center Instrument Panel and Pedestal Integral Lighting – Component Locationsp. 115
Figure 6 (Sheet 1 of 3)p. 115
Figure 6 (Sheet 2 of 3)p. 116
Figure 6 (Sheet 3 of 3)p. 117
+Overhead Panel Integral Lighting – Schematic Diagramp. 118
Figure 7 (Sheet 1 of 2)p. 118
Figure 7 (Sheet 2 of 2)p. 119
+Pilot’s Instrument Panels and Side Console Integral Lighting – Simplified Schematic Diagramp. 120
+Copilot’s Instrument Panels and Side Console Integral Lighting – Simplified Schematic Diagramp. 121
+Center Instrument Panel and Pedestal Integral Lighting – Simplified Schematic Diagramp. 122
Figure 10 (Sheet 1 of 5)p. 122
Figure 10 (Sheet 2 of 5)p. 123
Figure 10 (Sheet 3 of 5)p. 124
Figure 10 (Sheet 4 of 5)p. 125
Figure 10 (Sheet 5 of 5)p. 126
+Center Instrument Panel and Pedestal Integral Lighting – Component Locationsp. 127
Figure 11 (Sheet 1 of 5)p. 127
Figure 11 (Sheet 2 of 5)p. 128
Figure 11 (Sheet 3 of 5)p. 129
Figure 11 (Sheet 4 of 5)p. 130
Figure 11 (Sheet 5 of 5)p. 131
+Center Instrument Panel and Pedestal Integral Lighting – Simplified Schematic Diagramp. 132
Figure 12 (Sheet 1 of 5)p. 132
Figure 12 (Sheet 2 of 5)p. 133
Figure 12 (Sheet 3 of 5)p. 134
Figure 12 (Sheet 4 of 5)p. 135
Figure 12 (Sheet 5 of 5)p. 136
+501: PANEL INTEGRAL LIGHTING – ADJUSTMENT/TESTp. 137
1. Generalp. 137
+Task 33-12-00-710-801 Operational Test of the Panel Integral Lightingp. 137
1. Job Set-Up Informationp. 137
Subtask 33-12-00-946-001p. 137
2. Job Set-Upp. 137
Subtask 33-12-00-865-001p. 137
Subtask 33-12-00-860-001p. 138
Subtask 33-12-00-861-001p. 138
3. Procedurep. 138
Subtask 33-12-00-710-001p. 138
Subtask 33-12-00-710-002p. 139
Subtask 33-12-00-710-003p. 140
Subtask 33-12-00-710-004p. 141
Subtask 33-12-00-710-012p. 143
Subtask 33-12-00-710-013p. 144
Subtask 33-12-00-710-014p. 144
Subtask 33-12-00-710-015p. 145
Subtask 33-12-00-710-016p. 145
Subtask 33-12-00-710-017p. 145
Subtask 33-12-00-710-018p. 147
Subtask 33-12-00-710-019p. 147
Subtask 33-12-00-710-020p. 148
Subtask 33-12-00-710-021p. 148
Subtask 33-12-00-710-022p. 149
Subtask 33-12-00-710-010p. 149
Subtask 33-12-00-710-011p. 149
4. Close Outp. 150
Subtask 33-12-00-861-002p. 150
Subtask 33-12-00-941-001p. 150
+33-12-01p. 151
+401: DIMMER, INSTRUMENT-PANEL INTEGRAL-LIGHTING – REMOVAL/INSTALLATIONp. 151
1. Generalp. 151
+Task 33-12-01-000-801 Removal of the Instrument-Panel Integral-Lighting Dimmerp. 151
1. Job Set-Up Informationp. 151
Subtask 33-12-01-946-001p. 151
2. Job Set-Upp. 151
Subtask 33-12-01-910-001p. 151
Subtask 33-12-01-865-001p. 151
Subtask 33-12-01-010-001p. 152
3. Procedurep. 152
Subtask 33-12-01-020-001p. 152
+Instrument-Panel Integral-Lighting Dimmer – Removal/Installationp. 153
+Task 33-12-01-400-801 Installation of the Instrument-Panel Integral-Lighting Dimmerp. 154
1. Job Set-Up Informationp. 154
Subtask 33-12-01-945-001p. 154
Subtask 33-12-01-946-002p. 154
2. Job Set-Upp. 154
Subtask 33-12-01-869-001p. 154
3. Procedurep. 154
Subtask 33-12-01-420-001p. 154
4. Close Outp. 154
Subtask 33-12-01-865-002p. 154
Subtask 33-12-01-710-001p. 155
Subtask 33-12-01-941-001p. 155
Subtask 33-12-01-410-001p. 155
+33-12-04p. 157
+401: POWER-SUPPLY, CENTER-PEDESTAL INTEGRAL-LIGHTING – REMOVAL/INSTALLATIONp. 157
1. Generalp. 157
+Task 33-12-04-000-801 Removal of the Center-Pedestal Integral-Lighting Power-Supplyp. 157
1. Job Set-Up Informationp. 157
Subtask 33-12-04-946-001p. 157
2. Job Set-Upp. 157
Subtask 33-12-04-910-001p. 157
Subtask 33-12-04-865-001p. 157
Subtask 33-12-04-010-001p. 157
3. Procedurep. 158
Subtask 33-12-04-020-001p. 158
+Center-Pedestal Integral-Lighting Power-Supply – Removal/Installationp. 159
+Task 33-12-04-400-801 Installation of the Center-Pedestal Integral-Lighting Power-Supplyp. 160
1. Job Set-Up Informationp. 160
Subtask 33-12-04-945-001p. 160
Subtask 33-12-04-946-002p. 160
Subtask 33-12-04-869-001p. 160
2. Procedurep. 160
Subtask 33-12-04-420-001p. 160
3. Close Outp. 160
Subtask 33-12-04-865-002p. 160
Subtask 33-12-04-710-001p. 160
Subtask 33-12-04-941-001p. 161
Subtask 33-12-04-410-001p. 161
+33-12-07p. 163
+401: DIMMER, CENTER-PEDESTAL INTEGRAL-LIGHTING – REMOVAL/INSTALLATIONp. 163
1. Generalp. 163
+Task 33-12-07-000-801 Removal of the Center-Pedestal Integral-Lighting Dimmerp. 163
1. Job Set-Up Informationp. 163
Subtask 33-12-07-946-001p. 163
2. Job Set-Upp. 163
Subtask 33-12-07-910-001p. 163
Subtask 33-12-07-865-001p. 163
Subtask 33-12-07-010-001p. 164
3. Procedurep. 164
Subtask 33-12-07-020-001p. 164
+Dimmer, Center-Instrument Panel and Pedestal – Removal/Installationp. 165
+Task 33-12-07-400-801 Installation of the Center-Pedestal Integral-Lighting Dimmerp. 166
1. Job Set-Up Informationp. 166
Subtask 33-12-07-945-001p. 166
Subtask 33-12-07-946-002p. 166
2. Job Set-Upp. 166
Subtask 33-12-07-869-001p. 166
3. Procedurep. 166
Subtask 33-12-07-420-001p. 166
4. Close Outp. 166
Subtask 33-12-07-865-002p. 166
Subtask 33-12-07-710-001p. 167
Subtask 33-12-07-941-001p. 167
Subtask 33-12-07-410-001p. 167
+33-12-08p. 169
+401: POWER-SUPPLY, CENTER-PEDESTAL DISPLAY-LIGHTING – REMOVAL/INSTALLATIONp. 169
1. Generalp. 169
+Task 33-12-08-000-801 Removal of the Center-Pedestal Display-Lighting Power-Supplyp. 169
1. Job Set-Up Informationp. 169
Subtask 33-12-08-946-001p. 169
2. Job Set-Upp. 169
Subtask 33-12-08-910-001p. 169
Subtask 33-12-08-865-001p. 169
Subtask 33-12-08-010-001p. 169
3. Procedurep. 170
Subtask 33-12-08-020-001p. 170
+Center-Pedestal Display-Lighting Power-Supply – Removal/Installationp. 171
+Task 33-12-08-400-801 Installation of the Center-Pedestal Display-Lighting Power-Supplyp. 172
1. Job Set-Up Informationp. 172
Subtask 33-12-08-945-001p. 172
Subtask 33-12-08-946-002p. 172
2. Job Set-Upp. 172
Subtask 33-12-08-869-001p. 172
3. Procedurep. 172
Subtask 33-12-08-420-001p. 172
4. Close Outp. 172
Subtask 33-12-08-865-002p. 172
Subtask 33-12-08-710-001p. 173
Subtask 33-12-08-941-001p. 173
Subtask 33-12-08-410-001p. 173
+33-12-10p. 175
+401: POWER-SUPPLY, OVERHEAD-PANEL LIGHTING – REMOVAL/INSTALLATIONp. 175
1. Generalp. 175
+Task 33-12-10-000-801 Removal of the Overhead-Panel Lighting Power-Supplyp. 175
1. Job Set-Up Informationp. 175
Subtask 33-12-10-946-001p. 175
2. Job Set-Upp. 175
Subtask 33-12-10-910-001p. 175
Subtask 33-12-10-865-001p. 175
Subtask 33-12-10-010-001p. 175
3. Procedurep. 176
Subtask 33-12-10-020-001p. 176
+Overhead-Panel Lighting Power-Supply – Removal/Installationp. 177
+Task 33-12-10-400-801 Installation of the Overhead-Panel Lighting Power-Supplyp. 178
1. Job Set-Up Informationp. 178
Subtask 33-12-10-945-001p. 178
Subtask 33-12-10-946-002p. 178
2. Job Set-Upp. 178
Subtask 33-12-10-869-001p. 178
3. Procedurep. 178
Subtask 33-12-10-420-001p. 178
4. Close Outp. 178
Subtask 33-12-10-865-002p. 178
Subtask 33-12-10-710-001p. 179
Subtask 33-12-10-941-001p. 179
Subtask 33-12-10-410-001p. 179
+33-12-13p. 181
+401: DIMMER, OVERHEAD-PANEL LIGHTING – REMOVAL/INSTALLATIONp. 181
1. Generalp. 181
+Task 33-12-13-000-801 Removal of the Overhead-Panel Lighting Dimmerp. 181
1. Job Set-Up Informationp. 181
Subtask 33-12-13-946-001p. 181
2. Job Set-Upp. 181
Subtask 33-12-13-910-001p. 181
Subtask 33-12-13-865-001p. 181
Subtask 33-12-13-010-001p. 181
3. Procedurep. 182
Subtask 33-12-13-020-001p. 182
+Overhead-Panel Lighting Dimmer – Removal/Installationp. 183
+Task 33-12-13-400-801 Installation of the Overhead-Panel Lighting Dimmerp. 184
1. Job Set-Up Informationp. 184
Subtask 33-12-13-945-001p. 184
Subtask 33-12-13-946-002p. 184
2. Job Set-Upp. 184
Subtask 33-12-13-869-001p. 184
3. Procedurep. 184
Subtask 33-12-13-420-001p. 184
4. Close Outp. 184
Subtask 33-12-13-865-002p. 184
Subtask 33-12-13-710-001p. 185
Subtask 33-12-13-941-001p. 185
Subtask 33-12-13-410-001p. 185
+33-12-16p. 187
+401: PANEL, INSTRUMENT-LIGHTING CONTROL – REMOVAL/INSTALLATIONp. 187
1. Generalp. 187
+Task 33-12-16-000-801 Removal of the Instrument-Lighting Control Panelp. 187
1. Job Set-Up Informationp. 187
Subtask 33-12-16-946-001p. 187
2. Job Set-Upp. 187
Subtask 33-12-16-910-001p. 187
Subtask 33-12-16-865-001p. 187
3. Procedurep. 188
Subtask 33-12-16-020-001p. 188
+Instrument-Lighting Control Panel – Removal/Installationp. 189
+Task 33-12-16-400-801 Installation of the Instrument-Lighting Control Panelp. 190
1. Job Set-Up Informationp. 190
Subtask 33-12-16-946-002p. 190
2. Job Set-Upp. 190
Subtask 33-12-16-869-001p. 190
3. Procedurep. 190
Subtask 33-12-16-420-001p. 190
4. Close Outp. 190
Subtask 33-12-16-865-002p. 190
Subtask 33-12-16-710-001p. 191
Subtask 33-12-16-941-001p. 191
+501: PANEL, INSTRUMENT-LIGHTING CONTROL- ADJUSTMENT/TESTp. 193
1. Generalp. 193
+Task 33-12-16-710-801 Operational Test of the Pilot’s Instrument-Lighting Control Panelp. 193
1. Job Set-Up Informationp. 193
Subtask 33-12-16-946-003p. 193
2. Job Set-Upp. 193
Subtask 33-12-16-865-003p. 193
Subtask 33-12-16-860-001p. 193
Subtask 33-12-16-861-001p. 194
3. Procedurep. 194
Subtask 33-12-16-710-002p. 194
4. Close Outp. 195
Subtask 33-12-16-861-002p. 195
Subtask 33-12-16-941-002p. 195
+Task 33-12-16-710-802 Operational Test of the Copilot’s Instrument-Lighting Control Panelp. 196
1. Job Set-Up Informationp. 196
Subtask 33-12-16-946-004p. 196
2. Job Set-Upp. 196
Subtask 33-12-16-865-004p. 196
Subtask 33-12-16-860-002p. 196
Subtask 33-12-16-861-003p. 196
3. Procedurep. 196
Subtask 33-12-16-710-003p. 196
4. Close Outp. 198
Subtask 33-12-16-861-004p. 198
Subtask 33-12-16-941-003p. 198
+33-12-19p. 199
+401: PANEL, CENTER-PEDESTAL LIGHTING – REMOVAL/INSTALLATIONp. 199
1. Generalp. 199
+Task 33-12-19-000-801 Removal of the Center-Pedestal Lighting Panelp. 199
1. Job Set-Up Informationp. 199
Subtask 33-12-19-946-001p. 199
2. Job Set-Upp. 199
Subtask 33-12-19-910-001p. 199
Subtask 33-12-19-865-001p. 199
3. Procedurep. 199
Subtask 33-12-19-020-001p. 199
+Center-Pedestal Lighting Panel – Removal/Installationp. 201
+Task 33-12-19-400-801 Installation of the Center-Pedestal Lighting Panelp. 202
1. Job Set-Up Informationp. 202
Subtask 33-12-19-946-002p. 202
2. Job Set-Upp. 202
Subtask 33-12-19-869-001p. 202
3. Procedurep. 202
Subtask 33-12-19-420-001p. 202
4. Close Outp. 202
Subtask 33-12-19-865-002p. 202
Subtask 33-12-19-710-001p. 202
Subtask 33-12-19-941-001p. 203
+501: PANEL, CENTER-PEDESTAL LIGHTING – ADJUSTMENT/TESTp. 205
1. Generalp. 205
+Task 33-12-19-710-801 Operational Test of the Center-Pedestal Lighting Panelp. 205
1. Job Set-Up Informationp. 205
Subtask 33-12-19-946-003p. 205
2. Job Set-Upp. 205
Subtask 33-12-19-865-003p. 205
Subtask 33-12-19-860-001p. 205
Subtask 33-12-19-861-001p. 206
3. Procedurep. 206
Subtask 33-12-19-710-002p. 206
Subtask 33-12-19-710-003p. 207
Subtask 33-12-19-710-004p. 208
Subtask 33-12-19-710-007p. 208
Subtask 33-12-19-710-008p. 208
Subtask 33-12-19-710-009p. 209
Subtask 33-12-19-710-010p. 209
Subtask 33-12-19-710-011p. 210
Subtask 33-12-19-710-012p. 210
Subtask 33-12-19-710-005p. 211
Subtask 33-12-19-710-006p. 211
Subtask 33-12-19-710-013p. 212
Subtask 33-12-19-710-014p. 212
Subtask 33-12-19-710-015p. 213
Subtask 33-12-19-710-016p. 213
Subtask 33-12-19-710-017p. 214
Subtask 33-12-19-710-018p. 214
4. Close Outp. 215
Subtask 33-12-19-861-002p. 215
Subtask 33-12-19-941-002p. 215
+Section 13p. 217
+33-13-00p. 217
+1: MISCELLANEOUS LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 217
1. Generalp. 217
+2. Component Detailsp. 217
A. Floor Floodlights of Pilots and Copilots Floor Floodlightsp. 218
B. Lighted Chart Holdersp. 218
C. Map Reading Lightsp. 218
D. Dome Light (Cockpit)p. 218
E. Dome Lights (Cockpit)p. 218
F. Dome Lights (Cockpit)p. 219
G. Standby Compass Lightp. 219
H. Sterile Lightsp. 219
+3. Operationp. 219
A. Floor Floodlightsp. 221
B. Pilots and Copilots Chart Holdersp. 221
C. Map Reading Lightsp. 221
D. Standby Compass Lightp. 221
E. Dome Light (Cockpit)p. 221
F. Dome Light (Cockpit)p. 222
G. Sterile Lightp. 222
4. Component Location Indexp. 222
+Miscellaneous Lighting – Component Locationsp. 225
Figure 1 (Sheet 1 of 3)p. 225
Figure 1 (Sheet 2 of 3)p. 226
Figure 1 (Sheet 3 of 3)p. 227
+Miscellaneous Lighting – Component Locationsp. 228
Figure 2 (Sheet 1 of 4)p. 228
Figure 2 (Sheet 2 of 4)p. 229
Figure 2 (Sheet 3 of 4)p. 230
Figure 2 (Sheet 4 of 4)p. 231
+Miscellaneous Lighting – Component Locationsp. 232
Figure 3 (Sheet 1 of 4)p. 232
Figure 3 (Sheet 2 of 4)p. 233
Figure 3 (Sheet 3 of 4)p. 234
Figure 3 (Sheet 4 of 4)p. 235
+Miscellaneous Lighting – Component Locationsp. 236
Figure 4 (Sheet 1 of 4)p. 236
Figure 4 (Sheet 2 of 4)p. 237
Figure 4 (Sheet 3 of 4)p. 238
Figure 4 (Sheet 4 of 4)p. 239
+Miscellaneous Lighting – Simplified Schematic Diagramp. 240
+Miscellaneous Lights – Simplified Schematic Diagramp. 241
+Miscellaneous Lighting – Simplified Schematic Diagramp. 242
+Miscellaneous Lighting – Simplified Schematic Diagramp. 243
+Miscellaneous Lights – Simplified Block Diagramp. 244
+Miscellaneous Lights – Simplified Schematic Diagramp. 245
+Miscellaneous Lighting Panel – Simplified Schematic Diagramp. 246
+501: MISCELLANEOUS LIGHTING SYSTEM – ADJUSTMENT/TESTp. 247
1. Generalp. 247
+Task 33-13-00-710-801 Operational Test of the Miscellaneous Lighting Systemp. 247
1. Job Set-Up Informationp. 247
Subtask 33-13-00-946-001p. 247
2. Job Set-Upp. 247
Subtask 33-13-00-865-001p. 247
Subtask 33-13-00-861-001p. 247
3. Procedurep. 248
Subtask 33-13-00-710-001p. 248
Subtask 33-13-00-710-002p. 249
4. Close Outp. 251
Subtask 33-13-00-861-002p. 251
Subtask 33-13-00-941-001p. 251
+33-13-01p. 253
+401: FLOODLIGHT, FLOOR – REMOVAL/INSTALLATIONp. 253
1. Generalp. 253
+Task 33-13-01-000-801 Removal of the Floor Floodlightp. 253
1. Job Set-Up Informationp. 253
Subtask 33-13-01-946-001p. 253
2. Job Set-Upp. 253
Subtask 33-13-01-910-001p. 253
Subtask 33-13-01-865-001p. 253
3. Procedurep. 253
Subtask 33-13-01-020-001p. 253
+Floor Floodlight – Removal/Installationp. 255
+Task 33-13-01-400-801 Installation of the Floor Floodlightp. 256
1. Job Set-Up Informationp. 256
Subtask 33-13-01-946-002p. 256
2. Job Set-Upp. 256
Subtask 33-13-01-869-001p. 256
3. Procedurep. 256
Subtask 33-13-01-420-001p. 256
4. Close Outp. 256
Subtask 33-13-01-865-002p. 256
Subtask 33-13-01-710-001p. 256
Subtask 33-13-01-941-001p. 256
+33-13-07p. 257
+401: LIGHT, MAP READING – REMOVAL/INSTALLATIONp. 257
1. Generalp. 257
+Task 33-13-07-000-801 Removal of the Map Reading Lightp. 257
1. Job Set-Up Informationp. 257
Subtask 33-13-07-946-001p. 257
2. Job Set-Upp. 257
Subtask 33-13-07-910-001p. 257
Subtask 33-13-07-865-001p. 257
3. Procedurep. 258
Subtask 33-13-07-020-001p. 258
+Map Reading Light – Removal/Installationp. 259
+Task 33-13-07-400-801 Installation of the Map Reading Lightp. 260
1. Job Set-Up Informationp. 260
Subtask 33-13-07-945-001p. 260
Subtask 33-13-07-946-002p. 260
2. Job Set-Upp. 260
Subtask 33-13-07-869-001p. 260
3. Procedurep. 260
Subtask 33-13-07-420-001p. 260
4. Close Outp. 260
Subtask 33-13-07-865-002p. 260
Subtask 33-13-07-710-001p. 261
Subtask 33-13-07-941-001p. 261
+33-13-13p. 263
+401: CHART HOLDER, LIGHTED – REMOVAL/INSTALLATIONp. 263
1. Generalp. 263
+Task 33-13-13-000-801 Removal of the Lighted Chart Holderp. 263
1. Job Set-Up Informationp. 263
Subtask 33-13-13-946-001p. 263
2. Job Set-Upp. 263
Subtask 33-13-13-910-001p. 263
Subtask 33-13-13-865-001p. 263
3. Procedurep. 264
Subtask 33-13-13-020-001p. 264
Subtask 33-13-13-020-002p. 264
+Lighted Chart Holder – Removal/Installationp. 265
+Lighted Chart Holder – Removal/Installationp. 266
+Task 33-13-13-400-801 Installation of the Lighted Chart Holderp. 267
1. Job Set-Up Informationp. 267
Subtask 33-13-13-945-001p. 267
Subtask 33-13-13-946-002p. 267
2. Job Set-Upp. 267
Subtask 33-13-13-869-001p. 267
3. Procedurep. 267
Subtask 33-13-13-420-001p. 267
Subtask 33-13-13-420-002p. 268
4. Close Outp. 268
Subtask 33-13-13-865-002p. 268
Subtask 33-13-13-710-001p. 268
Subtask 33-13-13-941-001p. 268
+33-13-16p. 269
+401: PANEL, MISCELLANEOUS LIGHTS – REMOVAL/INSTALLATIONp. 269
1. Generalp. 269
+Task 33-13-16-000-801 Removal of the Miscellaneous Lights Panelp. 269
1. Job Set-Up Informationp. 269
Subtask 33-13-16-946-001p. 269
2. Job Set-Upp. 269
Subtask 33-13-16-910-001p. 269
Subtask 33-13-16-865-001p. 269
3. Procedurep. 270
Subtask 33-13-16-020-001p. 270
+Miscellaneous Lights Panel – Removal/Installationp. 271
+Task 33-13-16-400-801 Installation of the Miscellaneous Lights Panelp. 272
1. Job Set-Up Informationp. 272
Subtask 33-13-16-946-002p. 272
2. Job Set-Upp. 272
Subtask 33-13-16-869-001p. 272
3. Procedurep. 272
Subtask 33-13-16-420-001p. 272
4. Close Outp. 272
Subtask 33-13-16-865-002p. 272
Subtask 33-13-16-710-001p. 272
Subtask 33-13-16-941-001p. 273
+Task 33-13-16-000-802 Removal of the Miscellaneous Lights Panel with Sterile Lightp. 274
1. Job Set-Up Informationp. 274
Subtask 33-13-16-946-004p. 274
2. Job Set-Upp. 274
Subtask 33-13-16-910-002p. 274
Subtask 33-13-16-865-005p. 274
3. Procedurep. 274
Subtask 33-13-16-020-002p. 274
+Miscellaneous Lights Panel with Sterile Light – Removal/Installationp. 276
+Task 33-13-16-400-802 Installation of the Miscellaneous Lights Panel with Sterile Lightp. 277
1. Job Set-Up Informationp. 277
Subtask 33-13-16-946-005p. 277
2. Job Set-Upp. 277
Subtask 33-13-16-869-002p. 277
3. Procedurep. 277
Subtask 33-13-16-420-002p. 277
4. Close Outp. 277
Subtask 33-13-16-865-006p. 277
Subtask 33-13-16-710-005p. 277
Subtask 33-13-16-941-003p. 278
+501: PANEL, MISCELLANEOUS LIGHTS – ADJUSTMENT/TESTp. 279
1. Generalp. 279
+Task 33-13-16-710-801 Operational Test of the Miscellaneous Lights Panelp. 279
1. Job Set-Up Informationp. 279
Subtask 33-13-16-946-003p. 279
2. Job Set-Upp. 279
Subtask 33-13-16-865-003p. 279
Subtask 33-13-16-865-004p. 280
Subtask 33-13-16-861-001p. 280
3. Procedurep. 281
Subtask 33-13-16-710-002p. 281
Subtask 33-13-16-710-003p. 282
Subtask 33-13-16-710-004p. 283
4. Close Outp. 285
Subtask 33-13-16-861-002p. 285
Subtask 33-13-16-941-002p. 285
+Task 33-13-16-710-802 Operational Test of the Miscellaneous Lights Panel with Sterile Lightp. 286
1. Job Set-Up Informationp. 286
Subtask 33-13-16-946-006p. 286
2. Job Set-Upp. 286
Subtask 33-13-16-865-008p. 286
Subtask 33-13-16-861-003p. 286
3. Procedurep. 286
Subtask 33-13-16-710-007p. 286
+33-13-19p. 289
+401: DIMMER, STANDBY-COMPASS LIGHT – REMOVAL/INSTALLATIONp. 289
1. Generalp. 289
+Task 33-13-19-000-801 Removal of the Standby-Compass Light Dimmerp. 289
1. Job Set-Up Informationp. 289
Subtask 33-13-19-946-001p. 289
2. Job Set-Upp. 289
Subtask 33-13-19-910-001p. 289
Subtask 33-13-19-865-001p. 289
Subtask 33-13-19-010-001p. 289
3. Procedurep. 290
Subtask 33-13-19-020-001p. 290
+Standby-Compass Light Dimmer – Removal/Installationp. 291
+Task 33-13-19-400-801 Installation of the Standby-Compass Light Dimmerp. 292
1. Job Set-Up Informationp. 292
Subtask 33-13-19-945-001p. 292
Subtask 33-13-19-946-002p. 292
2. Job Set-Upp. 292
Subtask 33-13-19-869-001p. 292
3. Procedurep. 292
Subtask 33-13-19-420-001p. 292
4. Close Outp. 292
Subtask 33-13-19-865-002p. 292
Subtask 33-13-19-710-001p. 293
Subtask 33-13-19-941-001p. 293
Subtask 33-13-19-410-001p. 293
+Section 20p. 295
+33-20-00p. 295
+1: PASSENGER-COMPARTMENT LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 295
1. Generalp. 295
+2. Descriptionp. 295
A. Passenger Compartment Lightsp. 295
B. Passenger Compartment Lightsp. 296
C. Reading Lightsp. 296
D. Dome, Flight Attendant (Forward and Aft), and Boarding Lightsp. 296
E. Dome, Flight Attendant, and Boarding Lightsp. 297
F. Lighted Ordinance Signsp. 297
G. Lavatory Lightsp. 297
H. Galley Lightsp. 297
+3. Operationp. 297
A. Passenger Compartment Lightsp. 297
B. Reading Lightsp. 299
C. Dome, Flight Attendant (Forward and Aft), and Boarding Lightsp. 299
D. Dome, Flight Attendant, and Boarding Lightsp. 299
E. Lighted Ordinance Signsp. 301
F. Lavatory Lightsp. 301
G. Galley Lightsp. 301
+Section 21p. 303
+33-21-00p. 303
+1: PASSENGER COMPARTMENT LIGHTS – DESCRIPTION AND OPERATIONp. 303
1. Generalp. 303
+2. Component Detailsp. 304
A. Ceiling and Sidewall Lightsp. 304
B. Power Units/Dimmersp. 304
C. Light Switchesp. 304
D. Power Relaysp. 304
+3. Operationp. 305
A. Powerp. 305
B. Ceiling and Sidewall Lightsp. 305
4. Component Location Indexp. 306
+Passenger Compartment Ceiling and Sidewall Lights – Component Locationsp. 308
Figure 1 (Sheet 1 of 2)p. 308
Figure 1 (Sheet 2 of 2)p. 309
+Passenger Compartment Ceiling and Sidewall Lights – Component Locationsp. 310
Figure 2 (Sheet 1 of 2)p. 310
Figure 2 (Sheet 2 of 2)p. 311
+Passenger Compartment Ceiling and Sidewall Lights – Simplified Schematic Diagramp. 312
+Passenger Compartment Ceiling and Sidewall Lights – Simplified Schematic Diagramp. 313
+501: PASSENGER COMPARTMENT LIGHTS – ADJUSTMENT/TESTp. 315
1. Generalp. 315
+Task 33-21-00-710-801 Operational Test of the Passenger Compartment Lightsp. 315
1. Job Set-Up Informationp. 315
Subtask 33-21-00-946-001p. 315
2. Job Set-Upp. 315
Subtask 33-21-00-861-001p. 315
Subtask 33-21-00-865-001p. 315
3. Procedurep. 315
Subtask 33-21-00-710-001p. 315
Subtask 33-21-00-710-002p. 316
Subtask 33-21-00-710-003p. 316
Subtask 33-21-00-710-004p. 317
Subtask 33-21-00-710-005p. 317
Subtask 33-21-00-710-006p. 318
Subtask 33-21-00-710-007p. 318
Subtask 33-21-00-710-008p. 319
4. Close Outp. 319
Subtask 33-21-00-941-001p. 319
Subtask 33-21-00-861-002p. 319
+33-21-01p. 321
+401: LIGHT, PASSENGER COMPARTMENT CEILING – REMOVAL/INSTALLATIONp. 321
1. Generalp. 321
+Task 33-21-01-000-801 Removal of the Passenger-Compartment Ceiling Lightp. 321
1. Job Set-Up Informationp. 321
Subtask 33-21-01-943-001p. 321
Subtask 33-21-01-946-001p. 321
Subtask 33-21-01-946-003p. 322
Subtask 33-21-01-946-004p. 322
2. Job Set-Upp. 322
Subtask 33-21-01-910-001p. 322
Subtask 33-21-01-865-004p. 323
Subtask 33-21-01-010-001p. 323
Subtask 33-21-01-010-002p. 323
Subtask 33-21-01-010-003p. 324
3. Procedurep. 324
Subtask 33-21-01-941-002p. 324
Subtask 33-21-01-020-001p. 324
Subtask 33-21-01-020-002p. 324
+Passenger-Compartment Ceiling Light – Removal/Installationp. 326
+Passenger-Compartment Ceiling Light – Removal/Installationp. 327
Figure 402 (Sheet 1 of 2)p. 327
Figure 402 (Sheet 2 of 2)p. 328
+Task 33-21-01-400-801 Installation of the Passenger-Compartment Ceiling Lightp. 329
1. Job Set-Up Informationp. 329
Subtask 33-21-01-946-002p. 329
Subtask 33-21-01-946-005p. 329
Subtask 33-21-01-946-006p. 330
2. Job Set-Upp. 330
Subtask 33-21-01-869-001p. 330
3. Procedurep. 330
Subtask 33-21-01-420-001p. 330
Subtask 33-21-01-420-002p. 331
4. Close Outp. 331
Subtask 33-21-01-865-003p. 331
Subtask 33-21-01-410-005p. 331
Subtask 33-21-01-410-001p. 332
Subtask 33-21-01-410-002p. 332
Subtask 33-21-01-861-001p. 332
Subtask 33-21-01-710-001p. 332
Subtask 33-21-01-710-002p. 333
Subtask 33-21-01-941-001p. 333
Subtask 33-21-01-861-002p. 333
+33-21-04p. 335
+401: POWER UNIT/DIMMER, CEILING LIGHTS – REMOVAL/INSTALLATIONp. 335
1. Generalp. 335
+Task 33-21-04-000-801 Removal of the Power Unit/Dimmerp. 335
1. Job Set-Up Informationp. 335
Subtask 33-21-04-946-001p. 335
Subtask 33-21-04-946-003p. 335
Subtask 33-21-04-946-005p. 335
2. Job Set-Upp. 336
Subtask 33-21-04-910-001p. 336
Subtask 33-21-04-865-001p. 336
Subtask 33-21-04-010-001p. 336
Subtask 33-21-04-010-002p. 336
Subtask 33-21-04-010-003p. 337
3. Procedurep. 338
Subtask 33-21-04-020-001p. 338
Subtask 33-21-04-020-002p. 338
+Ceiling-Lights Power Unit/Dimmer – Removal/Installationp. 340
+Ceiling-Lights Power Unit/Dimmer – Removal/Installationp. 341
Figure 402 (Sheet 1 of 3)p. 341
Figure 402 (Sheet 2 of 3)p. 342
Figure 402 (Sheet 3 of 3)p. 343
+Task 33-21-04-400-801 Installation of the Power Unit/Dimmerp. 344
1. Job Set-Up Informationp. 344
Subtask 33-21-04-945-001p. 344
Subtask 33-21-04-945-002p. 344
Subtask 33-21-04-946-002p. 345
Subtask 33-21-04-946-004p. 345
Subtask 33-21-04-946-007p. 345
2. Job Set-Upp. 346
Subtask 33-21-04-869-001p. 346
3. Procedurep. 346
Subtask 33-21-04-420-001p. 346
Subtask 33-21-04-420-003p. 346
Subtask 33-21-04-410-001p. 347
Subtask 33-21-04-410-002p. 347
Subtask 33-21-04-410-003p. 348
4. Close Outp. 348
Subtask 33-21-04-865-002p. 348
Subtask 33-21-04-861-001p. 349
Subtask 33-21-04-710-001p. 349
Subtask 33-21-04-710-002p. 349
Subtask 33-21-04-941-001p. 350
Subtask 33-21-04-861-002p. 350
+33-21-06p. 351
+401: POWER RELAY, CEILING LIGHTS – REMOVAL/INSTALLATIONp. 351
1. Generalp. 351
+Task 33-21-06-000-801 Removal of the Power Relayp. 351
1. Job Set-Up Informationp. 351
Subtask 33-21-06-946-001p. 351
2. Job Set-Upp. 351
Subtask 33-21-06-910-001p. 351
Subtask 33-21-06-865-001p. 351
Subtask 33-21-06-010-002p. 351
Subtask 33-21-06-010-003p. 352
3. Procedurep. 352
Subtask 33-21-06-020-001p. 352
Subtask 33-21-06-020-002p. 353
+Ceiling-Lights Power Relay – Removal/Installationp. 354
+Ceiling-Lights Power Relay – Removal/Installationp. 355
+Task 33-21-06-400-801 Installation of the Power Relayp. 356
1. Job Set-Up Informationp. 356
Subtask 33-21-06-945-001p. 356
Subtask 33-21-06-945-002p. 356
Subtask 33-21-06-946-002p. 356
2. Job Set-Upp. 357
Subtask 33-21-06-869-001p. 357
3. Procedurep. 357
Subtask 33-21-06-420-001p. 357
Subtask 33-21-06-420-002p. 357
Subtask 33-21-06-410-002p. 357
Subtask 33-21-06-410-003p. 358
4. Close Outp. 358
Subtask 33-21-06-865-002p. 358
Subtask 33-21-06-861-001p. 358
Subtask 33-21-06-710-001p. 358
Subtask 33-21-06-710-002p. 359
Subtask 33-21-06-941-001p. 359
Subtask 33-21-06-861-002p. 359
+33-21-07p. 361
+401: LIGHT, PASSENGER COMPARTMENT SIDEWALL – REMOVAL/INSTALLATIONp. 361
1. Generalp. 361
+Task 33-21-07-000-801 Removal of the Passenger-Compartment Sidewall Lightp. 361
1. Job Set-Up Informationp. 361
Subtask 33-21-07-946-001p. 361
2. Job Set-Upp. 361
Subtask 33-21-07-910-001p. 361
Subtask 33-21-07-865-001p. 361
Subtask 33-21-07-010-001p. 361
3. Procedurep. 362
Subtask 33-21-07-020-001p. 362
+Passenger-Compartment Sidewall Light – Removal/Installationp. 363
+Task 33-21-07-400-801 Installation of the Passenger-Compartment Sidewall Lightp. 364
1. Job Set-Up Informationp. 364
Subtask 33-21-07-946-002p. 364
2. Job Set-Upp. 364
Subtask 33-21-07-869-001p. 364
3. Procedurep. 364
Subtask 33-21-07-420-001p. 364
Subtask 33-21-07-410-001p. 364
4. Close Outp. 364
Subtask 33-21-07-865-002p. 364
Subtask 33-21-07-861-001p. 365
Subtask 33-21-07-710-001p. 365
Subtask 33-21-07-941-001p. 365
Subtask 33-21-07-861-002p. 365
+33-21-10p. 367
+401: POWER UNIT/DIMMER, SIDEWALL LIGHTS – REMOVAL/INSTALLATIONp. 367
1. Generalp. 367
+Task 33-21-10-000-801 Removal of the Power Unit/Dimmerp. 367
1. Job Set-Up Informationp. 367
Subtask 33-21-10-946-001p. 367
2. Job Set-Upp. 367
Subtask 33-21-10-910-001p. 367
Subtask 33-21-10-865-001p. 367
Subtask 33-21-10-010-001p. 367
Subtask 33-21-10-010-002p. 368
3. Procedurep. 369
Subtask 33-21-10-020-001p. 369
Subtask 33-21-10-020-002p. 369
+Sidewall-Lights Power Unit/Dimmer – Removal/Installationp. 370
+Sidewall-Lights Power Unit/Dimmer – Removal/Installationp. 371
Figure 402 (Sheet 1 of 2)p. 371
Figure 402 (Sheet 2 of 2)p. 372
+Task 33-21-10-400-801 Installation of the Power Unit/Dimmerp. 373
1. Job Set-Up Informationp. 373
Subtask 33-21-10-945-001p. 373
Subtask 33-21-10-945-002p. 373
Subtask 33-21-10-946-002p. 373
2. Job Set-Upp. 374
Subtask 33-21-10-869-001p. 374
3. Procedurep. 374
Subtask 33-21-10-420-001p. 374
Subtask 33-21-10-420-002p. 374
Subtask 33-21-10-410-001p. 375
Subtask 33-21-10-410-002p. 375
4. Close Outp. 376
Subtask 33-21-10-865-002p. 376
Subtask 33-21-10-861-001p. 376
Subtask 33-21-10-710-001p. 376
Subtask 33-21-10-941-001p. 377
Subtask 33-21-10-861-002p. 377
+33-21-12p. 379
+401: POWER RELAY, SIDEWALL LIGHTS – REMOVAL/INSTALLATIONp. 379
1. Generalp. 379
+Task 33-21-12-000-801 Removal of the Power Relayp. 379
1. Job Set-Up Informationp. 379
Subtask 33-21-12-946-001p. 379
2. Job Set-Upp. 379
Subtask 33-21-12-910-001p. 379
Subtask 33-21-12-865-001p. 379
Subtask 33-21-12-010-002p. 379
Subtask 33-21-12-010-003p. 380
3. Procedurep. 380
Subtask 33-21-12-020-001p. 380
Subtask 33-21-12-020-002p. 381
+Sidewall-Lights Power Relay – Removal/Installationp. 382
+Sidewall-Lights Power Relay – Removal/Installationp. 383
+Task 33-21-12-400-801 Installation of the Power Relayp. 384
1. Job Set-Up Informationp. 384
Subtask 33-21-12-945-001p. 384
Subtask 33-21-12-945-002p. 384
Subtask 33-21-12-946-002p. 384
2. Job Set-Upp. 385
Subtask 33-21-12-869-001p. 385
3. Procedurep. 385
Subtask 33-21-12-420-001p. 385
Subtask 33-21-12-420-002p. 385
Subtask 33-21-12-410-002p. 385
Subtask 33-21-12-410-003p. 386
4. Close Outp. 386
Subtask 33-21-12-865-002p. 386
Subtask 33-21-12-861-002p. 386
Subtask 33-21-12-710-001p. 386
Subtask 33-21-12-710-002p. 387
Subtask 33-21-12-941-001p. 387
Subtask 33-21-12-861-001p. 387
+Section 22p. 389
+33-22-00p. 389
+1: READING LIGHTS – DESCRIPTION AND OPERATIONp. 389
1. Generalp. 389
+2. Component Detailsp. 389
A. Reading Lightsp. 390
B. Miscellaneous Switch Panelp. 390
C. Miscellaneous Switch Panelp. 390
D. Test Relaysp. 391
3. Operationp. 391
4. Component Location Indexp. 391
+Reading Lights – Component Locationsp. 393
+Reading Lights – Component Locationsp. 394
+Reading Lights – Block Diagramp. 395
+501: READING LIGHTS – ADJUSTMENT/TESTp. 397
1. Generalp. 397
+Task 33-22-00-710-801 Operational Test of the Reading Lightsp. 397
1. Job Set-Up Informationp. 397
Subtask 33-22-00-946-001p. 397
2. Job Set-Upp. 397
Subtask 33-22-00-861-001p. 397
Subtask 33-22-00-865-001p. 397
3. Procedurep. 397
Subtask 33-22-00-710-001p. 397
4. Close Outp. 398
Subtask 33-22-00-941-001p. 398
Subtask 33-22-00-861-002p. 399
+33-22-01p. 401
+401: LIGHT, READING – REMOVAL/INSTALLATIONp. 401
1. Generalp. 401
+Task 33-22-01-000-801 Removal of the Reading Lightp. 401
1. Job Set-Up Informationp. 401
Subtask 33-22-01-946-001p. 401
2. Job Set-Upp. 401
Subtask 33-22-01-910-001p. 401
Subtask 33-22-01-865-001p. 401
3. Procedurep. 402
Subtask 33-22-01-020-001p. 402
Subtask 33-22-01-020-002p. 402
+Reading Light – Removal/Installationp. 403
+Reading Light – Removal/Installationp. 404
+Task 33-22-01-400-801 Installation of the Reading Lightp. 405
1. Job Set-Up Informationp. 405
Subtask 33-22-01-946-002p. 405
2. Job Set-Upp. 405
Subtask 33-22-01-869-001p. 405
3. Procedurep. 405
Subtask 33-22-01-420-001p. 405
Subtask 33-22-01-420-002p. 405
4. Close Outp. 406
Subtask 33-22-01-865-002p. 406
Subtask 33-22-01-710-001p. 406
Subtask 33-22-01-941-001p. 406
+Task 33-22-01-000-802 Removal of the Reading Lightp. 407
1. Job Set-Up Informationp. 407
Subtask 33-22-01-946-003p. 407
2. Job Set-Upp. 407
Subtask 33-22-01-910-002p. 407
Subtask 33-22-01-865-003p. 407
3. Procedurep. 407
Subtask 33-22-01-020-003p. 407
+Reading Light – Removal/Installationp. 409
+Task 33-22-01-400-802 Installation of the Reading Lightsp. 410
1. Job Set-Up Informationp. 410
Subtask 33-22-01-944-001p. 410
Subtask 33-22-01-944-002p. 410
Subtask 33-22-01-946-004p. 410
2. Job Set-Upp. 410
Subtask 33-22-01-869-002p. 410
3. Procedurep. 411
Subtask 33-22-01-420-003p. 411
4. Close Outp. 411
Subtask 33-22-01-410-001p. 411
Subtask 33-22-01-865-004p. 411
Subtask 33-22-01-710-002p. 411
Subtask 33-22-01-941-002p. 411
+Task 33-22-01-960-801 Replacement of the Reading Light Bulbp. 412
1. Job Set-Up Informationp. 412
Subtask 33-22-01-945-001p. 412
Subtask 33-22-01-945-002p. 412
Subtask 33-22-01-946-005p. 412
2. Job Set-Upp. 413
Subtask 33-22-01-910-003p. 413
Subtask 33-22-01-865-005p. 413
3. Procedurep. 413
Subtask 33-22-01-960-001p. 413
4. Close Outp. 414
Subtask 33-22-01-410-002p. 414
Subtask 33-22-01-865-006p. 414
Subtask 33-22-01-710-003p. 414
Subtask 33-22-01-940-001p. 414
+Reading Light Bulb – Removal/Installationp. 415
+33-22-02p. 417
+401: SWITCH, READING LIGHT – REMOVAL/INSTALLATIONp. 417
1. Generalp. 417
+Task 33-22-02-000-801 Removal of the Passenger Reading Light Switchp. 417
1. Job Set-Up Informationp. 417
Subtask 33-22-02-946-001p. 417
2. Job Set-Upp. 417
Subtask 33-22-02-910-001p. 417
Subtask 33-22-02-865-001p. 417
Subtask 33-22-02-010-001p. 418
3. Procedurep. 418
Subtask 33-22-02-020-001p. 418
+Reading Light Switch – Removal/Installationp. 419
+Task 33-22-02-400-801 Installation of the Reading Light Switchp. 420
1. Job Set-Up Informationp. 420
Subtask 33-22-02-944-001p. 420
Subtask 33-22-02-944-003p. 420
Subtask 33-22-02-944-002p. 420
Subtask 33-22-02-946-002p. 420
2. Job Set-Upp. 421
Subtask 33-22-02-860-001p. 421
3. Procedurep. 421
Subtask 33-22-02-420-001p. 421
4. Close Outp. 421
Subtask 33-22-02-410-001p. 421
Subtask 33-22-02-710-001p. 421
Subtask 33-22-02-941-001p. 421
+33-22-03p. 423
+401: SWITCH PANEL, MISCELLANEOUS – REMOVAL/INSTALLATIONp. 423
1. Generalp. 423
+Task 33-22-03-000-801 Removal of the Miscellaneous Switch Panelp. 423
1. Job Set-Up Informationp. 423
Subtask 33-22-03-946-001p. 423
2. Job Set-Upp. 423
Subtask 33-22-03-910-001p. 423
Subtask 33-22-03-861-001p. 423
3. Procedurep. 423
Subtask 33-22-03-020-002p. 423
+Miscellaneous Switch Panel -Removal/Installationp. 425
+Task 33-22-03-400-801 Installation of the Miscellaneous Switch Panelp. 426
1. Job Set-Up Informationp. 426
Subtask 33-22-03-945-001p. 426
Subtask 33-22-03-946-002p. 426
2. Job Set-Upp. 426
Subtask 33-22-03-869-001p. 426
3. Procedurep. 426
Subtask 33-22-03-420-002p. 426
4. Close Outp. 426
Subtask 33-22-03-710-001p. 426
Subtask 33-22-03-941-001p. 426
+501: SWITCH PANEL, MISCELLANEOUS – ADJUSTMENT/TESTp. 427
1. Generalp. 427
+Task 33-22-03-710-801 Operational Test of the Miscellaneous Switch Panelp. 427
1. Job Set-Up Informationp. 427
Subtask 33-22-03-946-003p. 427
2. Job Set-Upp. 427
Subtask 33-22-03-865-001p. 427
Subtask 33-22-03-865-003p. 428
Subtask 33-22-03-861-002p. 428
3. Procedurep. 428
Subtask 33-22-03-710-002p. 428
Subtask 33-22-03-710-003p. 429
Subtask 33-22-03-710-004p. 429
Subtask 33-22-03-710-006p. 429
4. Close Outp. 430
Subtask 33-22-03-941-002p. 430
Subtask 33-22-03-861-003p. 430
Subtask 33-22-03-710-005p. 430
+Task 33-22-03-710-802 Operational Test of the Cabin and Lavatory Attendant Call Lightsp. 431
1. Job Set-Up Informationp. 431
Subtask 33-22-03-946-004p. 431
2. Job Set-Upp. 431
Subtask 33-22-03-865-002p. 431
Subtask 33-22-03-861-004p. 431
3. Procedurep. 431
Subtask 33-22-03-710-007p. 431
Subtask 33-22-03-710-008p. 436
4. Close Outp. 437
Subtask 33-22-03-861-005p. 437
Subtask 33-22-03-941-003p. 437
+33-22-05p. 439
+401: LIGHT, FLIGHT ATTENDANT CALL – REMOVAL/INSTALLATIONp. 439
1. Generalp. 439
+Task 33-22-05-000-801 Removal of the Flight Attendant Call Lightp. 439
1. Job Set-Up Informationp. 439
Subtask 33-22-05-946-001p. 439
2. Job Set-Upp. 439
Subtask 33-22-05-910-001p. 439
Subtask 33-22-05-865-001p. 439
Subtask 33-22-05-010-002p. 440
3. Procedurep. 440
Subtask 33-22-05-020-001p. 440
+Flight Attendant Call Light – Removal/Installationp. 441
+Task 33-22-05-400-801 Installation of the Flight Attendant Call Lightp. 442
1. Job Set-Up Informationp. 442
Subtask 33-22-05-944-001p. 442
Subtask 33-22-05-944-002p. 442
Subtask 33-22-05-946-002p. 442
2. Job Set-Upp. 442
Subtask 33-22-05-860-001p. 442
3. Procedurep. 442
Subtask 33-22-05-420-001p. 442
4. Close Outp. 443
Subtask 33-22-05-410-001p. 443
Subtask 33-22-05-710-001p. 443
Subtask 33-22-05-941-001p. 443
+33-22-07p. 445
+401: SWITCH, FLIGHT ATTENDANT CALL LIGHT – REMOVAL/INSTALLATIONp. 445
1. Generalp. 445
+Task 33-22-07-000-801 Removal of the Flight Attendant Call Light Switchp. 445
1. Job Set-Up Informationp. 445
Subtask 33-22-07-946-001p. 445
2. Job Set-Upp. 445
Subtask 33-22-07-910-001p. 445
Subtask 33-22-07-865-001p. 445
Subtask 33-22-07-010-001p. 446
3. Procedurep. 446
Subtask 33-22-07-020-001p. 446
+Flight Attendant Call Light Switch – Removal/Installationp. 447
+Task 33-22-07-400-801 Installation of the Flight Attendant Call Light Switchp. 448
1. Job Set-Up Informationp. 448
Subtask 33-22-07-944-001p. 448
Subtask 33-22-07-944-002p. 448
Subtask 33-22-07-946-002p. 448
2. Job Set-Upp. 448
Subtask 33-22-07-860-001p. 448
3. Procedurep. 448
Subtask 33-22-07-420-001p. 448
4. Close Outp. 449
Subtask 33-22-07-410-001p. 449
Subtask 33-22-07-710-001p. 449
Subtask 33-22-07-941-001p. 449
+Section 23p. 451
+33-23-00p. 451
+1: DOME, FLIGHT ATTENDANT, AND BOARDING LIGHTS – DESCRIPTION AND OPERATIONp. 451
1. Generalp. 451
+2. Component Detailsp. 454
A. Incandescent Dome Lightp. 454
B. Flight Attendant (Forward and Aft) Lightsp. 455
C. Boarding Lightsp. 455
D. Power Units/Dimmersp. 455
E. Flight Attendant Lightp. 456
F. Boarding Lightsp. 456
G. Power Units/Dimmersp. 456
H. Miscellaneous Switch Panelp. 456
I. Miscellaneous Switch Panelp. 457
J. Flight Attendant (Forward and Aft) Panelsp. 457
K. Flight Attendant Panelp. 458
L. Miscellaneous-Lights Control Panelp. 458
+3. Operationp. 458
A. Dome Lightp. 461
B. Dome Lightp. 462
C. Flight Attendant (Forward and Aft) Lightsp. 462
D. Flight Attendant Lightp. 463
4. Component Location Indexp. 464
+Dome, Flight Attendant (Fwd and Aft), and Boarding Lights -Component Locationsp. 468
Figure 1 (Sheet 1 of 2)p. 468
Figure 1 (Sheet 2 of 2)p. 469
+Dome, Flight Attendant, and Boarding Lights – Component Locationsp. 470
+Dome, Flight Attendant (Fwd and Aft), and Boarding Lights – Simplified Schematic Diagramp. 471
+Dome, Flight Attendant (Fwd and Aft), and Boarding Lights – Simplified Schematic Diagramp. 472
+Dome, Flight Attendant, and Boarding Lights – Simplified Schematic Diagramp. 473
+Dome, Flight Attendant, and Boarding Lights – Simplified Schematic Diagramp. 474
+501: DOME, FLIGHT ATTENDANT, AND BOARDING LIGHTS – ADJUSTMENT/TESTp. 475
1. Generalp. 475
+Task 33-23-00-710-801 Operational Test of the Dome, Flight Attendant, and Boarding Lightsp. 475
1. Job Set-Up Informationp. 475
Subtask 33-23-00-946-001p. 475
2. Job Set-Upp. 475
Subtask 33-23-00-861-001p. 475
Subtask 33-23-00-865-001p. 475
Subtask 33-23-00-865-002p. 476
3. Procedurep. 476
Subtask 33-23-00-710-003p. 476
Subtask 33-23-00-710-006p. 477
Subtask 33-23-00-710-001p. 477
Subtask 33-23-00-710-004p. 478
Subtask 33-23-00-710-005p. 479
4. Close Outp. 479
Subtask 33-23-00-941-001p. 479
Subtask 33-23-00-861-002p. 479
+33-23-01p. 481
+401: LIGHT, DOME – REMOVAL/INSTALLATIONp. 481
1. Generalp. 481
+Task 33-23-01-000-801 Removal of the Dome Lightp. 481
1. Job Set-Up Informationp. 481
Subtask 33-23-01-943-001p. 481
Subtask 33-23-01-946-001p. 481
2. Job Set-Upp. 481
Subtask 33-23-01-910-001p. 481
Subtask 33-23-01-865-001p. 482
Subtask 33-23-01-865-003p. 482
3. Procedurep. 482
Subtask 33-23-01-941-001p. 482
Subtask 33-23-01-020-001p. 482
+Dome Light – Removal/Installationp. 484
+Task 33-23-01-400-801 Installation of the Dome Lightp. 485
1. Job Set-Up Informationp. 485
Subtask 33-23-01-943-002p. 485
Subtask 33-23-01-946-002p. 485
2. Job Set-Upp. 485
Subtask 33-23-01-869-001p. 485
3. Procedurep. 485
Subtask 33-23-01-420-001p. 485
4. Close Outp. 486
Subtask 33-23-01-865-002p. 486
Subtask 33-23-01-865-004p. 486
Subtask 33-23-01-861-001p. 486
Subtask 33-23-01-710-001p. 486
Subtask 33-23-01-941-002p. 487
Subtask 33-23-01-861-002p. 487
+Task 33-23-01-000-802 Removal of the Dome Lightp. 488
1. Job Set-Up Informationp. 488
Subtask 33-23-01-943-003p. 488
Subtask 33-23-01-946-003p. 488
2. Job Set-Upp. 488
Subtask 33-23-01-910-002p. 488
Subtask 33-23-01-865-005p. 488
Subtask 33-23-01-941-003p. 488
Subtask 33-23-01-010-001p. 488
3. Procedurep. 489
Subtask 33-23-01-020-002p. 489
+Dome Light – Removal/Installationp. 490
+Task 33-23-01-400-802 Installation of the Dome Lightp. 491
1. Job Set-Up Informationp. 491
Subtask 33-23-01-943-004p. 491
Subtask 33-23-01-945-002p. 491
Subtask 33-23-01-946-004p. 491
2. Job Set-Upp. 491
Subtask 33-23-01-869-002p. 491
3. Procedurep. 491
Subtask 33-23-01-420-003p. 491
4. Close Outp. 492
Subtask 33-23-01-410-001p. 492
Subtask 33-23-01-865-008p. 492
Subtask 33-23-01-861-003p. 492
Subtask 33-23-01-710-002p. 492
Subtask 33-23-01-861-004p. 492
Subtask 33-23-01-941-004p. 492
+Task 33-23-01-000-803 Removal of the Dome Lightp. 493
1. Job Set-Up Informationp. 493
Subtask 33-23-01-943-005p. 493
Subtask 33-23-01-946-005p. 493
2. Job Set-Upp. 493
Subtask 33-23-01-910-003p. 493
Subtask 33-23-01-865-010p. 493
Subtask 33-23-01-865-011p. 494
Subtask 33-23-01-941-005p. 494
Subtask 33-23-01-010-002p. 494
3. Procedurep. 494
Subtask 33-23-01-020-003p. 494
+Dome Light – Removal/Installationp. 495
+Task 33-23-01-400-803 Installation of the Dome Lightp. 496
1. Job Set-Up Informationp. 496
Subtask 33-23-01-943-006p. 496
Subtask 33-23-01-945-003p. 496
Subtask 33-23-01-946-006p. 496
2. Job Set-Upp. 496
Subtask 33-23-01-869-003p. 496
3. Procedurep. 496
Subtask 33-23-01-420-004p. 496
4. Close Outp. 497
Subtask 33-23-01-410-002p. 497
Subtask 33-23-01-865-012p. 497
Subtask 33-23-01-865-013p. 497
Subtask 33-23-01-861-005p. 498
Subtask 33-23-01-710-005p. 498
Subtask 33-23-01-861-006p. 498
Subtask 33-23-01-941-006p. 498
+33-23-02p. 499
+401: LIGHT, FORWARD FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 499
1. Generalp. 499
+Task 33-23-02-000-801 Removal of the Forward Flight-Attendant Lightp. 499
1. Job Set-Up Informationp. 499
Subtask 33-23-02-946-001p. 499
2. Job Set-Upp. 499
Subtask 33-23-02-910-001p. 499
Subtask 33-23-02-865-001p. 499
3. Procedurep. 499
Subtask 33-23-02-020-001p. 499
+Forward Flight-Attendant Light – Removal/Installationp. 501
+Task 33-23-02-400-801 Installation of the Forward Flight-Attendant Lightp. 502
1. Job Set-Up Informationp. 502
Subtask 33-23-02-946-002p. 502
2. Job Set-Upp. 502
Subtask 33-23-02-869-001p. 502
3. Procedurep. 502
Subtask 33-23-02-420-001p. 502
4. Close Outp. 502
Subtask 33-23-02-865-002p. 502
Subtask 33-23-02-861-001p. 502
Subtask 33-23-02-710-001p. 502
Subtask 33-23-02-941-001p. 503
Subtask 33-23-02-861-002p. 503
+33-23-03p. 505
+401: LIGHT, AFT FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 505
1. Generalp. 505
+Task 33-23-03-000-801 Removal of the Aft Flight-Attendant Lightp. 505
1. Job Set-Up Informationp. 505
Subtask 33-23-03-946-001p. 505
2. Job Set-Upp. 505
Subtask 33-23-03-910-001p. 505
Subtask 33-23-03-865-001p. 505
3. Procedurep. 505
Subtask 33-23-03-020-001p. 505
+Aft Flight-Attendant Light – Removal/Installationp. 507
+Task 33-23-03-400-801 Installation of the Aft Flight-Attendant Lightp. 508
1. Job Set-Up Informationp. 508
Subtask 33-23-03-946-002p. 508
2. Job Set-Upp. 508
Subtask 33-23-03-869-001p. 508
3. Procedurep. 508
Subtask 33-23-03-420-001p. 508
4. Close Outp. 508
Subtask 33-23-03-865-002p. 508
Subtask 33-23-03-861-002p. 508
Subtask 33-23-03-710-001p. 508
Subtask 33-23-03-941-001p. 509
Subtask 33-23-03-861-001p. 509
+33-23-04p. 511
+401: LIGHT, BOARDING – REMOVAL/INSTALLATIONp. 511
1. Generalp. 511
+Task 33-23-04-000-801 Removal of the Boarding Lightp. 511
1. Job Set-Up Informationp. 511
Subtask 33-23-04-946-001p. 511
2. Job Set-Upp. 511
Subtask 33-23-04-910-001p. 511
Subtask 33-23-04-865-001p. 511
Subtask 33-23-04-865-003p. 512
3. Procedurep. 512
Subtask 33-23-04-020-001p. 512
Subtask 33-23-04-020-002p. 513
+Boarding Light – Removal/Installationp. 514
+Boarding Light – Removal/Installationp. 515
+Task 33-23-04-400-801 Installation of the Boarding Lightp. 516
1. Job Set-Up Informationp. 516
Subtask 33-23-04-946-002p. 516
2. Job Set-Upp. 516
Subtask 33-23-04-869-001p. 516
3. Procedurep. 516
Subtask 33-23-04-420-001p. 516
Subtask 33-23-04-420-002p. 517
4. Close Outp. 517
Subtask 33-23-04-865-002p. 517
Subtask 33-23-04-865-004p. 518
Subtask 33-23-04-861-001p. 518
Subtask 33-23-04-710-002p. 518
Subtask 33-23-04-861-002p. 518
Subtask 33-23-04-941-001p. 519
+33-23-05p. 521
+401: LIGHT, FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 521
1. Generalp. 521
+Task 33-23-05-000-801 Removal of the Flight Attendant Lightp. 521
1. Job Set-Up Informationp. 521
Subtask 33-23-05-946-001p. 521
2. Job Set-Upp. 521
Subtask 33-23-05-910-001p. 521
Subtask 33-23-05-865-001p. 521
3. Procedurep. 521
Subtask 33-23-05-020-001p. 521
+Flight Attendant Light – Removal/Installationp. 523
+Task 33-23-05-400-801 Installation of the Flight Attendant Lightp. 524
1. Job Set-Up Informationp. 524
Subtask 33-23-05-946-002p. 524
2. Job Set-Upp. 524
Subtask 33-23-05-869-001p. 524
3. Procedurep. 524
Subtask 33-23-05-420-001p. 524
4. Close Outp. 524
Subtask 33-23-05-865-002p. 524
Subtask 33-23-05-861-001p. 524
Subtask 33-23-05-710-001p. 524
Subtask 33-23-05-941-001p. 525
Subtask 33-23-05-861-002p. 525
+33-23-06p. 527
+401: POWER UNIT/DIMMER, FLIGHT ATTENDANT LIGHT – REMOVAL/INSTALLATIONp. 527
1. Generalp. 527
+Task 33-23-06-000-801 Removal of the Power Unit/Dimmerp. 527
1. Job Set-Up Informationp. 527
Subtask 33-23-06-946-003p. 527
Subtask 33-23-06-946-005p. 527
2. Job Set-Upp. 528
Subtask 33-23-06-910-001p. 528
Subtask 33-23-06-865-001p. 528
Subtask 33-23-06-010-002p. 528
Subtask 33-23-06-010-004p. 528
3. Procedurep. 528
Subtask 33-23-06-020-001p. 528
+Flight-Attendant-Light Power Unit/Dimmer – Removal/Installationp. 530
+Task 33-23-06-400-801 Installation of the Power Unit/Dimmerp. 531
1. Job Set-Up Informationp. 531
Subtask 33-23-06-945-001p. 531
Subtask 33-23-06-946-002p. 531
Subtask 33-23-06-946-007p. 531
2. Job Set-Upp. 532
Subtask 33-23-06-869-001p. 532
3. Procedurep. 532
Subtask 33-23-06-420-001p. 532
Subtask 33-23-06-410-001p. 532
Subtask 33-23-06-410-003p. 532
4. Close Outp. 533
Subtask 33-23-06-865-002p. 533
Subtask 33-23-06-861-001p. 533
Subtask 33-23-06-710-001p. 533
Subtask 33-23-06-941-001p. 533
Subtask 33-23-06-861-002p. 533
+33-23-09p. 535
+401: POWER UNIT/DIMMER, FORWARD FLIGHT-ATTENDANT LIGHT – REMOVAL/INSTALLATIONp. 535
1. Generalp. 535
+Task 33-23-09-000-801 Removal of the Power Unit/Dimmerp. 535
1. Job Set-Up Informationp. 535
Subtask 33-23-09-946-001p. 535
Subtask 33-23-09-946-003p. 535
2. Job Set-Upp. 536
Subtask 33-23-09-910-001p. 536
Subtask 33-23-09-865-001p. 536
Subtask 33-23-09-010-001p. 536
Subtask 33-23-09-010-002p. 536
3. Procedurep. 537
Subtask 33-23-09-020-001p. 537
+Forward-Flight-Attendant-Light Power Unit/Dimmer – Removal/Installationp. 538
+Task 33-23-09-400-801 Installation of the Power Unit/Dimmerp. 539
1. Job Set-Up Informationp. 539
Subtask 33-23-09-945-001p. 539
Subtask 33-23-09-946-002p. 539
Subtask 33-23-09-946-006p. 539
2. Job Set-Upp. 540
Subtask 33-23-09-869-001p. 540
3. Procedurep. 540
Subtask 33-23-09-420-001p. 540
Subtask 33-23-09-410-002p. 540
Subtask 33-23-09-410-003p. 540
4. Close Outp. 541
Subtask 33-23-09-865-002p. 541
Subtask 33-23-09-861-001p. 541
Subtask 33-23-09-710-001p. 541
Subtask 33-23-09-941-001p. 541
Subtask 33-23-09-861-002p. 541
+33-23-10p. 543
+401: POWER UNIT/DIMMER, AFT FLIGHT-ATTENDANT LIGHT – REMOVAL/INSTALLATIONp. 543
1. Generalp. 543
+Task 33-23-10-000-801 Removal of the Power Unit/Dimmerp. 543
1. Job Set-Up Informationp. 543
Subtask 33-23-10-946-001p. 543
2. Job Set-Upp. 543
Subtask 33-23-10-910-001p. 543
Subtask 33-23-10-865-001p. 543
Subtask 33-23-10-010-001p. 544
3. Procedurep. 544
Subtask 33-23-10-020-001p. 544
+Aft-Flight-Attendant-Light Power Unit/Dimmer – Removal/Installationp. 545
+Task 33-23-10-400-801 Installation of the Power Unit/Dimmerp. 546
1. Job Set-Up Informationp. 546
Subtask 33-23-10-945-001p. 546
Subtask 33-23-10-946-002p. 546
2. Job Set-Upp. 546
Subtask 33-23-10-869-001p. 546
3. Procedurep. 546
Subtask 33-23-10-420-001p. 546
Subtask 33-23-10-410-001p. 546
4. Close Outp. 547
Subtask 33-23-10-865-002p. 547
Subtask 33-23-10-861-001p. 547
Subtask 33-23-10-710-001p. 547
Subtask 33-23-10-941-001p. 547
Subtask 33-23-10-861-002p. 547
+33-23-12p. 549
+401: PANEL, FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 549
1. Generalp. 549
+Task 33-23-12-000-801 Removal of the Flight Attendant Panelp. 550
1. Job Set-Up Informationp. 550
Subtask 33-23-12-946-001p. 550
2. Job Set-Upp. 550
Subtask 33-23-12-910-001p. 550
Subtask 33-23-12-865-002p. 551
Subtask 33-23-12-865-003p. 551
3. Procedurep. 552
Subtask 33-23-12-020-001p. 552
+Forward Flight-Attendant Panel – Removal/Installationp. 553
+Task 33-23-12-400-801 Installation of the Flight Attendant Panelp. 554
1. Job Set-Up Informationp. 554
Subtask 33-23-12-945-001p. 554
Subtask 33-23-12-946-002p. 554
2. Job Set-Upp. 554
Subtask 33-23-12-869-001p. 554
3. Procedurep. 554
Subtask 33-23-12-420-002p. 554
4. Close Outp. 555
Subtask 33-23-12-865-004p. 555
Subtask 33-23-12-865-008p. 555
Subtask 33-23-12-710-002p. 556
Subtask 33-23-12-941-002p. 556
+Task 33-23-12-000-802 Removal of the Flight Attendant Panel with Sterile Lightp. 557
1. Job Set-Up Informationp. 557
Subtask 33-23-12-946-004p. 557
2. Job Set-Upp. 557
Subtask 33-23-12-910-002p. 557
Subtask 33-23-12-865-009p. 557
3. Procedurep. 557
Subtask 33-23-12-020-002p. 557
+Flight Attendant Panel with Sterile Light – Removal/Installationp. 558
+Task 33-23-12-400-802 Installation of the Flight Attendant Panel with Sterile Lightp. 559
1. Job Set-Up Informationp. 559
Subtask 33-23-12-945-002p. 559
Subtask 33-23-12-946-005p. 559
2. Job Set-Upp. 559
Subtask 33-23-12-869-002p. 559
3. Procedurep. 559
Subtask 33-23-12-420-003p. 559
4. Close Outp. 559
Subtask 33-23-12-865-010p. 559
Subtask 33-23-12-710-003p. 560
Subtask 33-23-12-941-003p. 560
+501: PANEL, FLIGHT ATTENDANT – ADJUSTMENT/TESTp. 561
1. Generalp. 561
+Task 33-23-12-710-801 Operational Test of the Flight Attendant Panelp. 562
1. Job Set-Up Informationp. 562
Subtask 33-23-12-946-003p. 562
2. Job Set-Upp. 562
Subtask 33-23-12-861-002p. 562
Subtask 33-23-12-865-005p. 563
Subtask 33-23-12-865-006p. 563
3. Procedurep. 564
Subtask 33-23-12-710-001p. 564
4. Close Outp. 566
Subtask 33-23-12-941-001p. 566
Subtask 33-23-12-861-001p. 566
+Task 33-23-12-710-802 Operational Test of the Forward Flight-Attendant Panel with Sterile Lightp. 567
1. Job Set-Up Informationp. 567
Subtask 33-23-12-946-006p. 567
2. Job Set-Upp. 567
Subtask 33-23-12-861-003p. 567
Subtask 33-23-12-865-011p. 567
3. Procedurep. 567
Subtask 33-23-12-710-004p. 567
4. Close Outp. 569
Subtask 33-23-12-941-004p. 569
Subtask 33-23-12-861-004p. 570
+33-23-13p. 571
+401: PANEL, FORWARD FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 571
1. Generalp. 571
+Task 33-23-13-000-801 Removal of the Forward Flight-Attendant Panelp. 571
1. Job Set-Up Informationp. 571
Subtask 33-23-13-946-001p. 571
2. Job Set-Upp. 571
Subtask 33-23-13-910-001p. 571
Subtask 33-23-13-865-001p. 572
Subtask 33-23-13-865-004p. 572
3. Procedurep. 573
Subtask 33-23-13-020-001p. 573
+Forward Flight-Attendant Panel – Removal/Installationp. 574
+Task 33-23-13-400-801 Installation of the Forward Flight-Attendant Panelp. 575
1. Job Set-Up Informationp. 575
Subtask 33-23-13-945-001p. 575
Subtask 33-23-13-946-002p. 575
2. Job Set-Upp. 575
Subtask 33-23-13-869-001p. 575
3. Procedurep. 575
Subtask 33-23-13-420-001p. 575
4. Close Outp. 576
Subtask 33-23-13-865-002p. 576
Subtask 33-23-13-865-005p. 576
Subtask 33-23-13-710-001p. 577
Subtask 33-23-13-941-001p. 577
+501: PANEL, FORWARD FLIGHT ATTENDANT – ADJUSTMENT/TESTp. 579
1. Generalp. 579
+Task 33-23-13-710-801 Operational Test of the Forward Flight-Attendant Panelp. 579
1. Job Set-Up Informationp. 579
Subtask 33-23-13-946-003p. 579
2. Job Set-Upp. 579
Subtask 33-23-13-861-001p. 579
Subtask 33-23-13-865-003p. 580
Subtask 33-23-13-865-006p. 580
3. Procedurep. 581
Subtask 33-23-13-710-002p. 581
4. Close Outp. 582
Subtask 33-23-13-941-002p. 582
Subtask 33-23-13-861-002p. 583
+33-23-14p. 585
+401: PANEL, AFT FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 585
1. Generalp. 585
+Task 33-23-14-000-801 Removal of the Aft Flight-Attendant Panelp. 585
1. Job Set-Up Informationp. 585
Subtask 33-23-14-946-001p. 585
2. Job Set-Upp. 585
Subtask 33-23-14-910-001p. 585
Subtask 33-23-14-865-001p. 585
3. Procedurep. 586
Subtask 33-23-14-020-001p. 586
+Aft Flight-Attendant Panel – Removal/Installationp. 587
+Task 33-23-14-400-801 Installation of the Aft Flight-Attendant Panelp. 588
1. Job Set-Up Informationp. 588
Subtask 33-23-14-945-001p. 588
2. Job Set-Upp. 588
Subtask 33-23-14-869-001p. 588
3. Procedurep. 588
Subtask 33-23-14-420-001p. 588
4. Close Outp. 588
Subtask 33-23-14-865-002p. 588
Subtask 33-23-14-941-003p. 588
Subtask 33-23-14-710-001p. 588
+501: PANEL, AFT FLIGHT ATTENDANT – ADJUSTMENT/TESTp. 589
1. Generalp. 589
+Task 33-23-14-710-801 Operational Test of the Aft Flight-Attendant Panelp. 589
1. Job Set-Up Informationp. 589
Subtask 33-23-14-946-003p. 589
2. Job Set-Upp. 589
Subtask 33-23-14-861-003p. 589
Subtask 33-23-14-865-004p. 589
3. Procedurep. 590
Subtask 33-23-14-710-002p. 590
4. Close Outp. 590
Subtask 33-23-14-941-002p. 590
Subtask 33-23-14-861-004p. 590
+33-23-15p. 591
+401: INVERTER, BOARDING LIGHTS – REMOVAL/INSTALLATIONp. 591
1. Generalp. 591
+Task 33-23-15-000-801 Removal of the Inverterp. 591
1. Job Set-Up Informationp. 591
Subtask 33-23-15-946-001p. 591
Subtask 33-23-15-946-003p. 591
Subtask 33-23-15-946-004p. 592
Subtask 33-23-15-946-005p. 592
2. Job Set-Upp. 592
Subtask 33-23-15-910-001p. 592
Subtask 33-23-15-865-001p. 593
Subtask 33-23-15-010-002p. 593
Subtask 33-23-15-010-003p. 593
Subtask 33-23-15-010-004p. 593
Subtask 33-23-15-010-001p. 594
3. Procedurep. 594
Subtask 33-23-15-020-001p. 594
+Boarding Lights Inverter – Removal/Installationp. 595
+Task 33-23-15-400-801 Installation of the Inverterp. 596
1. Job Set-Up Informationp. 596
Subtask 33-23-15-945-001p. 596
Subtask 33-23-15-946-002p. 596
Subtask 33-23-15-946-006p. 596
Subtask 33-23-15-946-007p. 597
Subtask 33-23-15-946-008p. 597
2. Job Set-Upp. 597
Subtask 33-23-15-869-001p. 597
3. Procedurep. 598
Subtask 33-23-15-420-001p. 598
Subtask 33-23-15-410-001p. 598
Subtask 33-23-15-410-002p. 598
Subtask 33-23-15-410-003p. 598
Subtask 33-23-15-410-004p. 599
4. Close Outp. 599
Subtask 33-23-15-865-002p. 599
Subtask 33-23-15-861-001p. 599
Subtask 33-23-15-710-001p. 599
Subtask 33-23-15-941-001p. 599
Subtask 33-23-15-861-002p. 599
+33-23-17p. 601
+401: POWER UNIT/DIMMER, BOARDING LIGHTS – REMOVAL/INSTALLATIONp. 601
1. Generalp. 601
+Task 33-23-17-000-801 Removal of the Power Unit/Dimmerp. 601
1. Job Set-Up Informationp. 601
Subtask 33-23-17-946-001p. 601
Subtask 33-23-17-946-004p. 601
Subtask 33-23-17-946-005p. 602
Subtask 33-23-17-946-003p. 602
2. Job Set-Upp. 602
Subtask 33-23-17-910-001p. 602
Subtask 33-23-17-865-001p. 603
Subtask 33-23-17-865-003p. 603
Subtask 33-23-17-010-001p. 603
Subtask 33-23-17-010-003p. 604
Subtask 33-23-17-010-002p. 604
Subtask 33-23-17-010-004p. 604
3. Procedurep. 604
Subtask 33-23-17-020-002p. 604
Subtask 33-23-17-020-001p. 605
+Boarding-lights Power Unit/Dimmer – Removal/installationp. 606
+Boarding-Lights Power Unit/Dimmer – Removal/Installationp. 607
+Task 33-23-17-400-801 Installation of the Power Unit/Dimmerp. 608
1. Job Set-Up Informationp. 608
Subtask 33-23-17-945-001p. 608
Subtask 33-23-17-945-002p. 608
Subtask 33-23-17-946-002p. 609
Subtask 33-23-17-946-006p. 609
Subtask 33-23-17-946-007p. 609
Subtask 33-23-17-946-008p. 610
2. Job Set-Upp. 610
Subtask 33-23-17-869-001p. 610
3. Procedurep. 610
Subtask 33-23-17-420-001p. 610
Subtask 33-23-17-420-002p. 611
Subtask 33-23-17-410-002p. 612
Subtask 33-23-17-410-003p. 612
Subtask 33-23-17-410-001p. 612
Subtask 33-23-17-410-004p. 612
4. Close Outp. 613
Subtask 33-23-17-865-002p. 613
Subtask 33-23-17-865-004p. 613
Subtask 33-23-17-861-001p. 613
Subtask 33-23-17-710-002p. 613
Subtask 33-23-17-941-001p. 614
Subtask 33-23-17-861-002p. 614
+Section 24p. 615
+33-24-00p. 615
+1: LIGHTED ORDINANCE SIGNS – DESCRIPTION AND OPERATIONp. 615
1. Generalp. 615
2. Component Detailsp. 616
3. Component Detailsp. 617
+4. Component Detailsp. 617
A. PASS SIGNS/EMER LTS Panelp. 617
B. PASS SIGNS/EMER LTS Panelp. 617
C. Passenger Lighted Ordinance-Signs (PSUs)p. 617
D. Passenger Lighted Ordinance-Signs (PSUs)p. 618
E. Galley Lighted Ordinance-Signsp. 618
F. Windscreen Lighted Ordinance-Signp. 619
G. Lavatory Lighted Ordinance-Signp. 619
5. Operationp. 620
6. Operationp. 621
7. Operationp. 622
8. Component Location Indexp. 622
9. Component Location Indexp. 623
10. Component Location Indexp. 623
+Lighted Ordinance Signs – Component Locationsp. 625
Figure 1 (Sheet 1 of 3)p. 625
Figure 1 (Sheet 2 of 3)p. 626
Figure 1 (Sheet 3 of 3)p. 627
+Lighted Ordinance Signs – Components Locationsp. 628
Figure 2 (Sheet 1 of 3)p. 628
Figure 2 (Sheet 2 of 3)p. 629
Figure 2 (Sheet 3 of 3)p. 630
+Lighted Ordinance Signs – Component Locationp. 631
Figure 3 (Sheet 1 of 3)p. 631
Figure 3 (Sheet 2 of 3)p. 632
Figure 3 (Sheet 3 of 3)p. 633
+Lighted Ordinance Signs – Block Diagramp. 634
+Lighted Ordinance Signs – Block Diagramp. 635
+Lighted Ordinance Signs – Block Diagramp. 636
+501: LIGHTED ORDINANCE SIGNS – ADJUSTMENT/TESTp. 637
1. Generalp. 637
+Task 33-24-00-710-801 Operational Test of the Lighted Ordinance Signsp. 637
1. Job Set-Up Informationp. 637
Subtask 33-24-00-946-001p. 637
2. Job Set-Upp. 637
Subtask 33-24-00-861-001p. 637
Subtask 33-24-00-865-001p. 637
3. Procedurep. 638
Subtask 33-24-00-710-001p. 638
4. Procedurep. 639
Subtask 33-24-00-710-002p. 639
5. Procedurep. 640
Subtask 33-24-00-710-004p. 640
6. Procedurep. 640
Subtask 33-24-00-710-005p. 640
7. Close Outp. 641
Subtask 33-24-00-861-002p. 641
Subtask 33-24-00-941-001p. 641
+33-24-01p. 643
+401: SIGN, LIGHTED PASSENGER ORDINANCE – REMOVAL/INSTALLATIONp. 643
1. Generalp. 643
+Task 33-24-01-000-801 Removal of the Lighted Passenger Ordinance-Signp. 643
1. Job Set-Up Informationp. 643
Subtask 33-24-01-943-001p. 643
Subtask 33-24-01-946-001p. 643
2. Job Set-Upp. 643
Subtask 33-24-01-941-001p. 643
Subtask 33-24-01-865-001p. 643
Subtask 33-24-01-010-001p. 644
Subtask 33-24-01-010-002p. 644
Subtask 33-24-01-010-003p. 644
3. Procedurep. 645
Subtask 33-24-01-020-001p. 645
Subtask 33-24-01-020-002p. 645
Subtask 33-24-01-020-003p. 645
+Lighted Passenger Ordinance Sign – Removal/Installationp. 646
+Lighted Passenger Ordinance Sign – Removal/Installationp. 647
+Lighted Passenger Ordinance Sign – Removal/Installationp. 648
+Task 33-24-01-400-801 Installation of the Lighted Passenger Ordinance-Signp. 649
1. Job Set-Up Informationp. 649
Subtask 33-24-01-943-002p. 649
Subtask 33-24-01-945-001p. 649
Subtask 33-24-01-945-002p. 649
Subtask 33-24-01-945-003p. 649
Subtask 33-24-01-946-002p. 650
2. Job Set-Upp. 650
Subtask 33-24-01-869-001p. 650
3. Procedurep. 650
Subtask 33-24-01-420-001p. 650
Subtask 33-24-01-420-002p. 650
Subtask 33-24-01-420-003p. 651
Subtask 33-24-01-410-001p. 651
Subtask 33-24-01-410-002p. 651
Subtask 33-24-01-410-003p. 652
4. Close Outp. 652
Subtask 33-24-01-865-002p. 652
Subtask 33-24-01-710-001p. 652
Subtask 33-24-01-941-002p. 652
+33-24-04p. 653
+401: SIGN, LIGHTED LAVATORY ORDINANCE – REMOVAL/INSTALLATIONp. 653
1. Generalp. 653
+Task 33-24-04-000-801 Removal of the Lighted Ordinance Signp. 653
1. Job Set-Up Informationp. 653
Subtask 33-24-04-946-001p. 653
2. Job Set-Upp. 653
Subtask 33-24-04-910-001p. 653
Subtask 33-24-04-865-001p. 653
3. Procedurep. 654
Subtask 33-24-04-020-001p. 654
Subtask 33-24-04-020-002p. 655
+Lighted Ordinance Sign (Lavatory) – Removal/Installationp. 656
+Lighted Ordinance Sign (Lavatory) – Removal/Installationp. 657
+Task 33-24-04-400-801 Installation of the Lighted Ordinance Signp. 658
1. Job Set-Up Informationp. 658
Subtask 33-24-04-945-001p. 658
Subtask 33-24-04-946-002p. 658
2. Job Set-Upp. 658
Subtask 33-24-04-869-001p. 658
3. Procedurep. 658
Subtask 33-24-04-420-001p. 658
Subtask 33-24-04-420-002p. 659
4. Close Outp. 659
Subtask 33-24-04-865-002p. 659
Subtask 33-24-04-861-001p. 660
Subtask 33-24-04-710-001p. 660
Subtask 33-24-04-941-001p. 660
Subtask 33-24-04-861-002p. 660
+33-24-07p. 661
+401: SIGN, LIGHTED GALLEY ORDINANCE – REMOVAL/INSTALLATIONp. 661
1. Generalp. 661
+Task 33-24-07-000-801 Removal of the Lighted Ordinance Signp. 661
1. Job Set-Up Informationp. 661
Subtask 33-24-07-946-001p. 661
2. Job Set-Upp. 661
Subtask 33-24-07-910-001p. 661
Subtask 33-24-07-865-001p. 661
3. Procedurep. 662
Subtask 33-24-07-020-001p. 662
+Lighted Ordinance Sign (Galley) – Removal/Installationp. 663
+Task 33-24-07-400-801 Installation of the Lighted Ordinance Signp. 664
1. Job Set-Up Informationp. 664
Subtask 33-24-07-945-001p. 664
Subtask 33-24-07-946-002p. 664
2. Job Set-Upp. 664
Subtask 33-24-07-869-001p. 664
3. Procedurep. 664
Subtask 33-24-07-420-001p. 664
4. Close Outp. 664
Subtask 33-24-07-865-002p. 664
Subtask 33-24-07-710-001p. 665
Subtask 33-24-07-941-001p. 665
+33-24-08p. 667
+401: SIGN, LIGHTED ORDINANCE – REMOVAL/INSTALLATIONp. 667
1. Generalp. 667
+Task 33-24-08-000-801 Removal of the Lighted Ordinance Signp. 667
1. Job Set-Up Informationp. 667
Subtask 33-24-08-946-002p. 667
2. Job Set-Upp. 668
Subtask 33-24-08-910-001p. 668
Subtask 33-24-08-865-001p. 668
3. Procedurep. 668
Subtask 33-24-08-020-001p. 668
Subtask 33-24-08-020-002p. 669
Subtask 33-24-08-020-003p. 669
+Lighted Ordinance Sign (Windscreen) – Removal/Installationp. 670
+Lighted Ordinance Sign (FWD Stowage) – Removal/Installationp. 671
+Lighted Ordinance Sign (FWD Stowage) – Removal/Installationp. 672
+Task 33-24-08-400-801 Installation of the Lighted Ordinance Signp. 673
1. Job Set-Up Informationp. 673
Subtask 33-24-08-945-001p. 673
Subtask 33-24-08-946-003p. 673
2. Job Set-Upp. 674
Subtask 33-24-08-869-001p. 674
3. Procedurep. 674
Subtask 33-24-08-420-002p. 674
Subtask 33-24-08-420-001p. 675
Subtask 33-24-08-420-003p. 675
4. Close Outp. 676
Subtask 33-24-08-865-002p. 676
Subtask 33-24-08-710-001p. 676
Subtask 33-24-08-941-001p. 676
+33-24-10p. 677
+401: PANEL, PASSENGER SIGN/EMERGENCY LIGHTS – REMOVAL/INSTALLATIONp. 677
1. Generalp. 677
+Task 33-24-10-000-801 Removal of the Passenger-Sign/Emergency Lights Panelp. 677
1. Job Set-Up Informationp. 677
Subtask 33-24-10-946-001p. 677
2. Job Set-Upp. 677
Subtask 33-24-10-910-001p. 677
Subtask 33-24-10-865-001p. 677
3. Procedurep. 677
Subtask 33-24-10-020-001p. 677
4. Procedurep. 678
Subtask 33-24-10-020-002p. 678
+Passenger Sign/Emergency Lights Panel – Removal/Installationp. 679
+Passenger Sign/Emergency Lights Panel – Removal/Installationp. 680
+Task 33-24-10-400-801 Installation of the Passenger-Sign/Emergency Lights Panelp. 681
1. Job Set-Up Informationp. 681
Subtask 33-24-10-946-002p. 681
2. Job Set-Upp. 681
Subtask 33-24-10-869-001p. 681
3. Procedurep. 681
Subtask 33-24-10-420-001p. 681
4. Procedurep. 681
Subtask 33-24-10-420-002p. 681
5. Close Outp. 682
Subtask 33-24-10-865-002p. 682
Subtask 33-24-10-710-001p. 682
Subtask 33-24-10-941-001p. 682
+Section 25p. 683
+33-25-00p. 683
+1: LAVATORY LIGHTS – DESCRIPTION AND OPERATIONp. 683
+1. Component Detailsp. 684
A. Vanity Light Assemblyp. 684
B. Dome Lightp. 684
C. Power Unit/Dimmerp. 684
D. Lavatory Occupied Relayp. 685
E. Lavatory Occupied Microswitchp. 685
2. Operationp. 685
3. Component Location Indexp. 687
+Lavatory Lights – Component Locationsp. 688
Figure 1 (Sheet 1 of 3)p. 688
Figure 1 (Sheet 2 of 3)p. 689
Figure 1 (Sheet 3 of 3)p. 690
+Lavatory Lights – Component Locationsp. 691
Figure 2 (Sheet 1 of 3)p. 691
Figure 2 (Sheet 2 of 3)p. 692
Figure 2 (Sheet 3 of 3)p. 693
+Lavatory Lights – Block Diagramp. 694
+Lavatory Lights – Block Diagramp. 695
+501: LAVATORY LIGHTS – ADJUSTMENT/TESTp. 697
1. Generalp. 697
+Task 33-25-00-710-801 Operational Test of the Lavatory Lightsp. 697
1. Job Set-Up Informationp. 697
Subtask 33-25-00-946-001p. 697
2. Job Set-Upp. 697
Subtask 33-25-00-861-001p. 697
Subtask 33-25-00-865-001p. 697
3. Procedurep. 697
Subtask 33-25-00-710-001p. 697
Subtask 33-25-00-710-002p. 698
Subtask 33-25-00-710-003p. 698
4. Close Outp. 699
Subtask 33-25-00-941-001p. 699
Subtask 33-25-00-861-002p. 699
+33-25-01p. 701
+401: DOME LIGHT, LAVATORY – REMOVAL/INSTALLATIONp. 701
1. Generalp. 701
+Task 33-25-01-000-801 Removal of the Lavatory Dome Lightp. 701
1. Job Set-Up Informationp. 701
Subtask 33-25-01-946-001p. 701
2. Job Set-Upp. 701
Subtask 33-25-01-910-001p. 701
Subtask 33-25-01-865-001p. 701
3. Procedurep. 701
Subtask 33-25-01-020-001p. 701
+Lavatory Dome Light – Removal/Installationp. 703
+Task 33-25-01-400-801 Installation of the Lavatory Dome Lightp. 704
1. Job Set-Up Informationp. 704
Subtask 33-25-01-946-002p. 704
2. Job Set-Upp. 704
Subtask 33-25-01-869-001p. 704
3. Procedurep. 704
Subtask 33-25-01-420-001p. 704
4. Close Outp. 704
Subtask 33-25-01-865-002p. 704
Subtask 33-25-01-710-001p. 704
Subtask 33-25-01-941-001p. 704
+33-25-02p. 705
+401: LIGHT, LAVATORY VANITY ASSEMBLY – REMOVAL/INSTALLATIONp. 705
1. Generalp. 705
+Task 33-25-02-000-801 Removal of the Lavatory Vanity-Assembly Lightp. 705
1. Job Set-Up Informationp. 705
Subtask 33-25-02-946-001p. 705
2. Job Set-Upp. 705
Subtask 33-25-02-910-001p. 705
Subtask 33-25-02-865-001p. 705
3. Procedurep. 705
Subtask 33-25-02-020-001p. 705
Subtask 33-25-02-020-002p. 706
+Lavatory Vanity Light – Removal/Installationp. 707
+Lavatory Vanity Light – Removal/Installationp. 708
+Task 33-25-02-400-801 Installation of the Lavatory Vanity-Assembly Lightp. 709
1. Job Set-Up Informationp. 709
Subtask 33-25-02-946-002p. 709
2. Job Set-Upp. 709
Subtask 33-25-02-869-001p. 709
3. Procedurep. 709
Subtask 33-25-02-420-001p. 709
Subtask 33-25-02-420-002p. 709
4. Close Outp. 710
Subtask 33-25-02-865-002p. 710
Subtask 33-25-02-710-001p. 710
Subtask 33-25-02-941-001p. 710
+33-25-07p. 711
+401: POWER UNIT/DIMMER, LAVATORY LIGHT – REMOVAL/INSTALLATIONp. 711
1. Generalp. 711
+Task 33-25-07-000-801 Removal of the Lavatory-Light Power Unit/Dimmerp. 711
1. Job Set-Up Informationp. 711
Subtask 33-25-07-946-001p. 711
2. Job Set-Upp. 711
Subtask 33-25-07-910-001p. 711
Subtask 33-25-07-865-001p. 711
3. Procedurep. 711
Subtask 33-25-07-010-002p. 711
Subtask 33-25-07-010-003p. 712
Subtask 33-25-07-020-001p. 712
+Lavatory Power Unit/Dimmer – Removal/Installationp. 713
Figure 401 (Sheet 1 of 2)p. 713
Figure 401 (Sheet 2 of 2)p. 714
+Lavatory Power Unit/Dimmer – Removal/Installationp. 715
Figure 402 (Sheet 1 of 2)p. 715
Figure 402 (Sheet 2 of 2)p. 716
+Task 33-25-07-400-801 Installation of the Lavatory-Light Power Unit/Dimmerp. 717
1. Job Set-Up Informationp. 717
Subtask 33-25-07-945-002p. 717
Subtask 33-25-07-946-002p. 717
2. Job Set-Upp. 717
Subtask 33-25-07-869-001p. 717
3. Procedurep. 717
Subtask 33-25-07-420-001p. 717
Subtask 33-25-07-420-002p. 718
Subtask 33-25-07-410-001p. 718
4. Close Outp. 718
Subtask 33-25-07-865-002p. 718
Subtask 33-25-07-710-001p. 718
Subtask 33-25-07-941-001p. 718
+33-25-09p. 719
+401: RELAY, LAVATORY OCCUPIED – REMOVAL/INSTALLATIONp. 719
1. Generalp. 719
+Task 33-25-09-000-801 Removal of the Lavatory Occupied Relayp. 719
1. Job Set-Up Informationp. 719
Subtask 33-25-09-946-001p. 719
2. Job Set-Upp. 719
Subtask 33-25-09-910-001p. 719
Subtask 33-25-09-865-001p. 719
Subtask 33-25-09-010-001p. 719
3. Procedurep. 720
Subtask 33-25-09-020-001p. 720
Subtask 33-25-09-020-003p. 720
+Lavatory Occupied Relay – Removal/Installationp. 721
+Lavatory Occupied Relay – Removal/Installationp. 722
+Task 33-25-09-400-801 Installation of the Lavatory Occupied Relayp. 723
1. Job Set-Upp. 723
Subtask 33-25-09-945-002p. 723
Subtask 33-25-09-869-001p. 723
2. Procedurep. 723
Subtask 33-25-09-420-001p. 723
Subtask 33-25-09-420-003p. 723
3. Close Outp. 724
Subtask 33-25-09-410-001p. 724
Subtask 33-25-09-865-002p. 724
Subtask 33-25-09-861-001p. 724
Subtask 33-25-09-710-002p. 724
Subtask 33-25-09-710-001p. 725
Subtask 33-25-09-861-002p. 726
Subtask 33-25-09-941-001p. 726
+33-25-11p. 727
+401: MICROSWITCH, LAVATORY-OCCUPIED – REMOVAL/INSTALLATIONp. 727
1. Generalp. 727
+Task 33-25-11-000-801 Removal of the Lavatory Occupied Microswitchp. 727
1. Job Set-Up Informationp. 727
Subtask 33-25-11-943-001p. 727
Subtask 33-25-11-946-001p. 727
2. Job Set-Upp. 727
Subtask 33-25-11-910-001p. 727
Subtask 33-25-11-865-001p. 727
Subtask 33-25-11-010-001p. 728
3. Procedurep. 728
Subtask 33-25-11-020-001p. 728
Subtask 33-25-11-020-003p. 728
Subtask 33-25-11-020-002p. 729
+Lavatory Occupied Microswitch – Removal/Installationp. 730
+Lavatory Occupied Microswitch – Removal/Installationp. 731
+Lavatory Occupied Microswitch – Removal/Installationp. 732
+Lavatory Occupied Microswitch – Removal/Installationp. 733
+Task 33-25-11-400-801 Installation of the Lavatory Occupied Microswitchp. 734
1. Job Set-Up Informationp. 734
Subtask 33-25-11-943-002p. 734
Subtask 33-25-11-944-001p. 734
Subtask 33-25-11-945-001p. 734
Subtask 33-25-11-945-002p. 734
Subtask 33-25-11-946-002p. 735
2. Job Set-Upp. 735
Subtask 33-25-11-869-001p. 735
3. Procedurep. 735
Subtask 33-25-11-420-001p. 735
Subtask 33-25-11-420-003p. 735
Subtask 33-25-11-420-002p. 736
4. Close Outp. 736
Subtask 33-25-11-865-002p. 736
Subtask 33-25-11-861-001p. 737
Subtask 33-25-11-710-001p. 737
Subtask 33-25-11-710-002p. 737
Subtask 33-25-11-861-002p. 738
Subtask 33-25-11-941-001p. 738
+33-25-12p. 739
+401: CALL SWITCH, FLIGHT-ATTENDANT, LAVATORY – REMOVAL/INSTALLATIONp. 739
1. Generalp. 739
+Task 33-25-12-000-802 Removal of the Lavatory Flight-Attendant Call Switchp. 739
1. Job Set-Up Informationp. 739
Subtask 33-25-12-946-001p. 739
2. Job Setupp. 739
Subtask 33-25-12-910-001p. 739
Subtask 33-25-12-800-002p. 739
Subtask 33-25-12-010-001p. 739
3. Procedurep. 739
Subtask 33-25-12-020-002p. 739
+Lavatory Flight-Attendant Call Switchp. 741
+Task 33-25-12-420-801 Installation of the Lavatory Flight-Attendant Call Switchp. 742
1. Job Set-Up Informationp. 742
Subtask 33-25-12-945-001p. 742
Subtask 33-25-12-946-002p. 742
2. Job Set-Upp. 742
Subtask 33-25-12-869-001p. 742
3. Procedurep. 742
Subtask 33-25-12-420-001p. 742
4. Close Outp. 742
Subtask 33-25-12-865-003p. 742
Subtask 33-25-12-861-001p. 743
Subtask 33-25-12-861-002p. 743
+Section 26p. 745
+33-26-00p. 745
+1: GALLEY LIGHTS – DESCRIPTION AND OPERATIONp. 745
1. Generalp. 745
+2. Component Detailsp. 745
A. Galley Lightsp. 745
B. Power Units/Dimmersp. 746
C. Light Switchp. 746
3. Operationp. 746
4. Component Location Indexp. 747
+Galley Lights – Component Locationsp. 748
Figure 1 (Sheet 1 of 2)p. 748
Figure 1 (Sheet 2 of 2)p. 749
+Galley Lights – Component Locationsp. 750
Figure 2 (Sheet 1 of 2)p. 750
Figure 2 (Sheet 2 of 2)p. 751
+Galley Lights – Block Diagramp. 752
+Galley Lights – Block Diagramp. 753
+501: GALLEY LIGHTS – ADJUSTMENT/TESTp. 755
1. Generalp. 755
+Task 33-26-00-710-801 Operational Test of the Galley Lightsp. 755
1. Job Set-Up Informationp. 755
Subtask 33-26-00-946-001p. 755
2. Job Set-Upp. 755
Subtask 33-26-00-861-001p. 755
Subtask 33-26-00-865-001p. 755
3. Procedurep. 755
Subtask 33-26-00-710-001p. 755
Subtask 33-26-00-710-002p. 756
Subtask 33-26-00-710-003p. 756
Subtask 33-26-00-710-004p. 757
4. Close Outp. 757
Subtask 33-26-00-941-001p. 757
Subtask 33-26-00-861-002p. 757
+33-26-01p. 759
+401: LIGHT, GALLEY – REMOVAL/INSTALLATIONp. 759
1. Generalp. 759
+Task 33-26-01-000-801 Removal of the Galley Lightp. 759
1. Job Set-Up Informationp. 759
Subtask 33-26-01-946-001p. 759
2. Job Set-Upp. 759
Subtask 33-26-01-910-001p. 759
Subtask 33-26-01-865-001p. 759
3. Procedurep. 759
Subtask 33-26-01-020-001p. 759
+Galley Light – Removal/Installationp. 760
+Task 33-26-01-400-801 Installation of the Galley Lightp. 761
1. Job Set-Up Informationp. 761
Subtask 33-26-01-946-002p. 761
2. Job Set-Upp. 761
Subtask 33-26-01-869-001p. 761
3. Procedurep. 761
Subtask 33-26-01-420-001p. 761
4. Close Outp. 761
Subtask 33-26-01-865-002p. 761
Subtask 33-26-01-710-001p. 761
Subtask 33-26-01-941-001p. 761
+33-26-05p. 763
+401: POWER UNIT/DIMMER, GALLEY LIGHT – REMOVAL/INSTALLATIONp. 763
1. Generalp. 763
+Task 33-26-05-000-801 Removal of the Galley-Light Power Unit/Dimmerp. 763
1. Job Set-Up Informationp. 763
Subtask 33-26-05-946-001p. 763
Subtask 33-26-05-946-003p. 763
Subtask 33-26-05-946-004p. 764
Subtask 33-26-05-946-005p. 764
2. Job Set-Upp. 764
Subtask 33-26-05-910-001p. 764
Subtask 33-26-05-865-001p. 765
Subtask 33-26-05-010-002p. 765
Subtask 33-26-05-010-003p. 765
Subtask 33-26-05-010-004p. 765
Subtask 33-26-05-010-001p. 766
3. Procedurep. 766
Subtask 33-26-05-020-001p. 766
+Galley Light Power Unit/Dimmer – Removal/Installationp. 767
+Task 33-26-05-400-801 Installation of the Galley-Light Power Unit/Dimmerp. 768
1. Job Set-Up Informationp. 768
Subtask 33-26-05-945-001p. 768
Subtask 33-26-05-946-002p. 768
Subtask 33-26-05-946-006p. 768
Subtask 33-26-05-946-007p. 769
Subtask 33-26-05-946-008p. 769
2. Job Set-Upp. 769
Subtask 33-26-05-869-001p. 769
3. Procedurep. 770
Subtask 33-26-05-420-001p. 770
Subtask 33-26-05-410-002p. 770
Subtask 33-26-05-410-003p. 770
Subtask 33-26-05-410-004p. 770
Subtask 33-26-05-410-001p. 771
4. Close Outp. 771
Subtask 33-26-05-865-002p. 771
Subtask 33-26-05-710-001p. 771
Subtask 33-26-05-941-001p. 771
+Section 30p. 773
+33-30-00p. 773
+1: SERVICE AND MAINTENANCE LIGHTING – DESCRIPTION AND OPERATIONp. 773
1. Generalp. 773
+2. Descriptionp. 773
A. Service Lightsp. 773
B. Maintenance Lightsp. 773
+Section 31p. 775
+33-31-00p. 775
+1: SERVICE LIGHTS – DESCRIPTION AND OPERATIONp. 775
1. Generalp. 775
+2. Component Detailsp. 775
A. Service Lightp. 775
B. Cargo Door Lightp. 776
3. Operationp. 776
4. Component Location Indexp. 778
+Service Lights – Component Locationp. 781
+Service Lights – Component Locationp. 782
+Service Lights – Component Locationp. 783
+Service Lights – Schematic Diagramp. 784
+Service Lights – Schematic Diagramp. 785
+Service Lights – Schematic Diagramp. 786
+Service Lights – Schematic Diagramp. 787
+Service Lights – Schematic Diagramp. 788
+Service Lights – Schematic Diagramp. 789
+501: SERVICE LIGHTS – ADJUSTMENT/TESTp. 791
1. Generalp. 791
+Task 33-31-00-710-801 Operational Test of the Service Lightsp. 791
1. Job Set-Up Informationp. 791
Subtask 33-31-00-946-001p. 791
2. Job Set-Upp. 791
Subtask 33-31-00-010-001p. 791
Subtask 33-31-00-865-001p. 791
Subtask 33-31-00-865-002p. 792
Subtask 33-31-00-865-003p. 792
Subtask 33-31-00-861-001p. 792
3. Procedurep. 792
Subtask 33-31-00-710-001p. 792
Subtask 33-31-00-710-002p. 793
4. Close Outp. 793
Subtask 33-31-00-861-002p. 793
Subtask 33-31-00-410-001p. 793
Subtask 33-31-00-941-001p. 793
+33-31-01p. 795
+401: LIGHT, SERVICE – REMOVAL/INSTALLATIONp. 795
1. Generalp. 795
+Task 33-31-01-000-801 Removal of the Service Light Assemblyp. 795
1. Job Set-Up Informationp. 795
Subtask 33-31-01-946-001p. 795
2. Job Set-Upp. 795
Subtask 33-31-01-910-001p. 795
Subtask 33-31-01-865-001p. 795
Subtask 33-31-01-865-005p. 796
Subtask 33-31-01-865-010p. 796
Subtask 33-31-01-010-001p. 796
3. Procedurep. 796
Subtask 33-31-01-020-001p. 796
Subtask 33-31-01-020-003p. 797
+Service Light Assembly – Removal/Installationp. 798
+Service Light Assembly – Removal/Installationp. 799
+Task 33-31-01-400-801 Installation of the Service Light Assemblyp. 800
1. Job Set-Up Informationp. 800
Subtask 33-31-01-944-001p. 800
Subtask 33-31-01-945-001p. 800
Subtask 33-31-01-945-003p. 800
Subtask 33-31-01-946-002p. 801
2. Job Set-Upp. 801
Subtask 33-31-01-869-001p. 801
3. Procedurep. 801
Subtask 33-31-01-420-001p. 801
Subtask 33-31-01-420-003p. 801
4. Close Outp. 802
Subtask 33-31-01-865-002p. 802
Subtask 33-31-01-865-006p. 802
Subtask 33-31-01-865-011p. 802
Subtask 33-31-01-710-001p. 803
Subtask 33-31-01-410-001p. 803
Subtask 33-31-01-941-001p. 803
+Task 33-31-01-030-801 Removal of the Service Lampp. 804
1. Job Set-Up Informationp. 804
Subtask 33-31-01-946-003p. 804
2. Job Set-Upp. 804
Subtask 33-31-01-910-002p. 804
Subtask 33-31-01-865-004p. 804
Subtask 33-31-01-865-007p. 805
Subtask 33-31-01-865-009p. 805
Subtask 33-31-01-010-002p. 805
3. Procedurep. 805
Subtask 33-31-01-020-002p. 805
+Service Lamp – Removal/Installationp. 806
+Task 33-31-01-430-801 Installation of the Service Lampp. 807
1. Job Set-Up Informationp. 807
Subtask 33-31-01-945-002p. 807
Subtask 33-31-01-946-004p. 807
2. Job Set-Upp. 807
Subtask 33-31-01-869-002p. 807
3. Procedurep. 807
Subtask 33-31-01-420-002p. 807
4. Close Outp. 808
Subtask 33-31-01-865-003p. 808
Subtask 33-31-01-865-008p. 808
Subtask 33-31-01-710-002p. 808
Subtask 33-31-01-410-002p. 808
Subtask 33-31-01-941-002p. 809
+33-31-04p. 811
+401: LIGHT, CARGO DOOR – REMOVAL/INSTALLATIONp. 811
1. Generalp. 811
+Task 33-31-04-000-801 Removal of the Cargo Door Lightp. 811
1. Job Set-Up Informationp. 811
Subtask 33-31-04-946-003p. 811
2. Job Set-Upp. 811
Subtask 33-31-04-910-001p. 811
Subtask 33-31-04-865-001p. 811
Subtask 33-31-04-010-001p. 811
3. Procedurep. 812
Subtask 33-31-04-020-001p. 812
+Cargo Door Light – Removal/Installationp. 813
+Task 33-31-04-400-801 Installation of the Cargo Door Lightp. 814
1. Job Set-Up Informationp. 814
Subtask 33-31-04-944-001p. 814
Subtask 33-31-04-945-001p. 814
Subtask 33-31-04-946-002p. 814
2. Job Set-Upp. 814
Subtask 33-31-04-869-001p. 814
3. Procedurep. 814
Subtask 33-31-04-420-001p. 814
4. Close Outp. 815
Subtask 33-31-04-865-002p. 815
Subtask 33-31-04-710-001p. 815
Subtask 33-31-04-410-001p. 815
Subtask 33-31-04-941-001p. 815
+Section 32p. 817
+33-32-00p. 817
+1: MAINTENANCE LIGHTS – DESCRIPTION AND OPERATIONp. 817
1. Generalp. 817
+2. Component Detailsp. 817
A. Caged Maintenance Lightp. 817
B. Dome Maintenance Lightp. 817
3. Operationp. 817
4. Component Location Indexp. 818
+Maintenance Lights – Component Locationp. 820
+Maintenance Lights – Schematicp. 821
+Maintenance Lights – Schematicp. 822
+501: MAINTENANCE LIGHTS – ADJUSTMENT/TESTp. 823
1. Generalp. 823
+Task 33-32-00-710-801 Operational Test of the Caged Maintenance Light in the Nosewheel Wellp. 823
1. Job Set-Up Informationp. 823
Subtask 33-32-00-946-001p. 823
2. Job Set-Upp. 823
Subtask 33-32-00-865-001p. 823
Subtask 33-32-00-861-001p. 823
3. Procedurep. 823
Subtask 33-32-00-710-001p. 823
4. Close Outp. 824
Subtask 33-32-00-861-002p. 824
Subtask 33-32-00-941-001p. 824
+Task 33-32-00-710-802 Operational Test of the Caged Maintenance Lights in the Aft Equipment Compartmentp. 825
1. Job Set-Up Informationp. 825
Subtask 33-32-00-946-002p. 825
2. Job Set-Upp. 825
Subtask 33-32-00-010-002p. 825
Subtask 33-32-00-865-002p. 825
Subtask 33-32-00-861-003p. 825
3. Procedurep. 825
Subtask 33-32-00-710-002p. 825
4. Close Outp. 826
Subtask 33-32-00-861-004p. 826
Subtask 33-32-00-410-002p. 826
Subtask 33-32-00-941-002p. 826
+Task 33-32-00-710-803 Operational Test of the Dome Maintenance Lightsp. 827
1. Job Set-Up Informationp. 827
Subtask 33-32-00-946-003p. 827
2. Job Set-Upp. 827
Subtask 33-32-00-010-003p. 827
Subtask 33-32-00-865-003p. 827
Subtask 33-32-00-861-005p. 827
3. Procedurep. 827
Subtask 33-32-00-710-003p. 827
4. Close Outp. 827
Subtask 33-32-00-861-006p. 827
Subtask 33-32-00-410-003p. 828
Subtask 33-32-00-941-003p. 828
+33-32-01p. 829
+401: LIGHT, CAGED MAINTENANCE – REMOVAL/INSTALLATIONp. 829
1. Generalp. 829
+Task 33-32-01-000-801 Removal of the Caged Maintenance Lightp. 829
1. Job Set-Up Informationp. 829
Subtask 33-32-01-946-001p. 829
2. Job Set-Upp. 829
Subtask 33-32-01-910-001p. 829
Subtask 33-32-01-865-001p. 829
Subtask 33-32-01-980-001p. 829
Subtask 33-32-01-010-001p. 829
3. Procedurep. 830
Subtask 33-32-01-020-001p. 830
+Caged Maintenance Light – Removal/Installationp. 831
+Task 33-32-01-400-801 Installation of the Caged Maintenance Lightp. 832
1. Job Set-Up Informationp. 832
Subtask 33-32-01-945-001p. 832
Subtask 33-32-01-946-002p. 832
2. Job Set-Upp. 832
Subtask 33-32-01-869-001p. 832
3. Procedurep. 832
Subtask 33-32-01-420-001p. 832
4. Close Outp. 833
Subtask 33-32-01-865-002p. 833
Subtask 33-32-01-710-001p. 833
Subtask 33-32-01-980-002p. 833
Subtask 33-32-01-410-001p. 833
Subtask 33-32-01-941-001p. 833
+33-32-04p. 835
+401: LIGHT, DOME MAINTENANCE – REMOVAL/INSTALLATIONp. 835
1. Generalp. 835
+Task 33-32-04-000-801 Removal of the Dome Maintenance Lightp. 835
1. Job Set-Up Informationp. 835
Subtask 33-32-04-946-001p. 835
2. Job Set-Upp. 835
Subtask 33-32-04-910-001p. 835
Subtask 33-32-04-865-001p. 835
Subtask 33-32-04-010-001p. 835
3. Procedurep. 836
Subtask 33-32-04-020-001p. 836
+Dome Maintenance Light – Removal/Installationp. 837
+Task 33-32-04-400-801 Installation of the Dome Maintenance Lightp. 838
1. Job Set-Up Informationp. 838
Subtask 33-32-04-945-001p. 838
Subtask 33-32-04-946-002p. 838
2. Job Set-Upp. 838
Subtask 33-32-04-869-001p. 838
3. Procedurep. 838
Subtask 33-32-04-420-001p. 838
4. Close Outp. 838
Subtask 33-32-04-865-002p. 838
Subtask 33-32-04-710-001p. 839
Subtask 33-32-04-410-001p. 839
Subtask 33-32-04-941-001p. 839
+Section 40p. 841
+33-40-00p. 841
+1: EXTERIOR LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 841
1. Generalp. 841
+2. Descriptionp. 842
A. Landing and Taxi/Recognition Lights Systemp. 842
B. Navigation Lights Systemp. 843
C. Wing Inspection Lights Systemp. 843
D. Anticollision Lights Systemp. 843
E. Stair Lightsp. 843
F. Logo Lightsp. 844
+Exterior Lighting System – Component Locationsp. 845
+Exterior Lighting System – Control Panelsp. 846
+Exterior Lighting System – Component Locationsp. 847
+Exterior Lighting System – Control Panelsp. 848
+601: EXTERIOR LIGHTING SYSTEM – INSPECTION/CHECKp. 849
1. Generalp. 849
+Task 33-40-00-210-802 General Visual Inspection of Position Light Lenses for Crazing and Diffusion of Light Sourcep. 849
1. Reason for the Jobp. 849
2. Procedurep. 849
Subtask 33-40-00-210-003p. 849
+General Visual Inspection of the Position Light Lensep. 850
+Section 41p. 851
+33-41-00p. 851
+1: LANDING AND TAXI/RECOGNITION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 851
1. Generalp. 851
+2. Component Detailsp. 851
A. Landing and Taxi/Recognition Lights Systemp. 851
B. Transformersp. 851
C. Taxi/Recognition Lights Switchp. 851
D. Landing Lights Switchesp. 852
E. Landing Lights Switchesp. 852
3. Operationp. 852
4. Operationp. 852
5. Component Location Indexp. 852
+Landing and Taxi/Recognition Lights System – Component Locationsp. 854
Figure 1 (Sheet 1 of 3)p. 854
Figure 1 (Sheet 2 of 3)p. 855
Figure 1 (Sheet 3 of 3)p. 856
+Landing and Taxi/Recognition Light System – Component Locationp. 857
Figure 2 (Sheet 1 of 3)p. 857
Figure 2 (Sheet 2 of 3)p. 858
Figure 2 (Sheet 3 of 3)p. 859
+Landing and Taxi/Recognition Lights System – Simplified Schematic Diagramp. 860
+Landing and Taxi/Recognition Lights System – Simplified Schematic Diagramp. 861
+501: LANDING AND TAXI/RECOGNITION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 863
1. Generalp. 863
+Task 33-41-00-710-801 Operational Test of the Landing and Taxi/Recognition Lightsp. 863
1. Job Set-Up Informationp. 863
Subtask 33-41-00-946-001p. 863
2. Job Set-Upp. 863
Subtask 33-41-00-865-001p. 863
Subtask 33-41-00-861-001p. 863
3. Procedurep. 864
Subtask 33-41-00-710-001p. 864
Subtask 33-41-00-710-002p. 864
4. Close Outp. 865
Subtask 33-41-00-861-002p. 865
Subtask 33-41-00-941-001p. 866
+33-41-01p. 867
+401: LIGHT, WING LANDING AND TAXI/RECOGNITION – REMOVAL/INSTALLATIONp. 867
1. Generalp. 867
+Task 33-41-01-000-802 Removal of the Wing Landing and the Taxi/Recognition Lampp. 867
1. Job Set-Up Informationp. 867
Subtask 33-41-01-946-004p. 867
2. Job Set-Upp. 867
Subtask 33-41-01-910-002p. 867
Subtask 33-41-01-865-003p. 867
Subtask 33-41-01-010-003p. 867
3. Procedurep. 868
Subtask 33-41-01-020-002p. 868
+Wing Landing and Taxi/Recognition Lamp – Removal/Installationp. 869
+Task 33-41-01-400-802 Installation of the Wing Landing and the Taxi/Recognition Lampp. 870
1. Job Set-Up Informationp. 870
Subtask 33-41-01-945-002p. 870
Subtask 33-41-01-946-005p. 870
2. Job Set-Upp. 870
Subtask 33-41-01-869-002p. 870
3. Procedurep. 870
Subtask 33-41-01-420-002p. 870
4. Close Outp. 871
Subtask 33-41-01-865-004p. 871
Subtask 33-41-01-710-002p. 871
Subtask 33-41-01-410-003p. 871
Subtask 33-41-01-941-003p. 871
+Task 33-41-01-000-801 Removal of the Wing Landing and the Taxi/Recognition Lightp. 872
1. Job Set-Up Informationp. 872
Subtask 33-41-01-946-001p. 872
2. Job Set-Upp. 872
Subtask 33-41-01-910-001p. 872
Subtask 33-41-01-865-001p. 872
Subtask 33-41-01-010-001p. 872
3. Procedurep. 872
Subtask 33-41-01-020-001p. 872
+Wing Landing and Taxi/Recognition Light – Removal/Installationp. 874
+Task 33-41-01-400-801 Installation of the Wing Landing and the Taxi/Recognition Lightp. 875
1. Job Set-Up Informationp. 875
Subtask 33-41-01-945-001p. 875
Subtask 33-41-01-946-002p. 875
2. Job Set-Upp. 875
Subtask 33-41-01-869-001p. 875
3. Procedurep. 875
Subtask 33-41-01-420-001p. 875
4. Close Outp. 876
Subtask 33-41-01-865-002p. 876
Subtask 33-41-01-820-001p. 876
Subtask 33-41-01-710-001p. 876
Subtask 33-41-01-410-001p. 876
Subtask 33-41-01-941-001p. 876
+501: LIGHT, WING LANDING AND TAXI/RECOGNITION – ADJUSTMENT/TESTp. 877
1. Generalp. 877
+Task 33-41-01-820-801 Adjustment of the Wing Landing and Taxi/Recognition Lightp. 877
1. Job Set-Up Informationp. 877
Subtask 33-41-01-943-001p. 877
Subtask 33-41-01-946-003p. 877
2. Job Set-Upp. 877
Subtask 33-41-01-010-002p. 877
3. Procedurep. 877
Subtask 33-41-01-820-002p. 877
4. Close Outp. 878
Subtask 33-41-01-410-002p. 878
Subtask 33-41-01-941-002p. 878
+Wing Landing and Taxi/Recognition Light – Adjustment/Testp. 879
+33-41-04p. 881
+401: LIGHT, NOSE LANDING – REMOVAL/INSTALLATIONp. 881
1. Generalp. 881
+Task 33-41-04-000-802 Removal of the Nose Landing Lampp. 881
1. Job Set-Up Informationp. 881
Subtask 33-41-04-946-004p. 881
2. Job Set-Upp. 881
Subtask 33-41-04-910-002p. 881
Subtask 33-41-04-865-003p. 881
Subtask 33-41-04-010-003p. 881
3. Procedurep. 882
Subtask 33-41-04-020-002p. 882
+Nose Landing Lamp – Removal/Installationp. 883
Figure 401 (Sheet 1 of 2)p. 883
Figure 401 (Sheet 2 of 2)p. 884
+Task 33-41-04-400-802 Installation of the Nose Landing Lampp. 885
1. Job Set-Up Informationp. 885
Subtask 33-41-04-945-002p. 885
Subtask 33-41-04-946-005p. 885
2. Job Set-Upp. 885
Subtask 33-41-04-869-002p. 885
3. Procedurep. 885
Subtask 33-41-04-420-002p. 885
4. Close Outp. 886
Subtask 33-41-04-865-004p. 886
Subtask 33-41-04-710-002p. 886
Subtask 33-41-04-410-003p. 886
Subtask 33-41-04-941-002p. 886
+Task 33-41-04-000-801 Removal of the Nose Landing Lightp. 887
1. Job Set-Up Informationp. 887
Subtask 33-41-04-946-001p. 887
2. Job Set-Upp. 887
Subtask 33-41-04-910-001p. 887
Subtask 33-41-04-865-001p. 887
Subtask 33-41-04-010-001p. 887
3. Procedurep. 887
Subtask 33-41-04-020-001p. 887
+Nose Landing Light – Removal/Installationp. 889
Figure 402 (Sheet 1 of 2)p. 889
Figure 402 (Sheet 2 of 2)p. 890
+Task 33-41-04-400-801 Installation of the Nose Landing Lightp. 891
1. Job Set-Up Informationp. 891
Subtask 33-41-04-945-001p. 891
Subtask 33-41-04-946-002p. 891
2. Job Set-Upp. 891
Subtask 33-41-04-869-001p. 891
3. Procedurep. 891
Subtask 33-41-04-420-001p. 891
4. Close Outp. 892
Subtask 33-41-04-865-002p. 892
Subtask 33-41-04-820-001p. 892
Subtask 33-41-04-710-001p. 892
Subtask 33-41-04-410-001p. 892
Subtask 33-41-04-941-001p. 892
+501: LIGHT, NOSE LANDING – ADJUSTMENT/TESTp. 893
1. Generalp. 893
+Task 33-41-04-820-801 Adjustment of the Nose Landing Lightp. 893
1. Job Set-Up Informationp. 893
Subtask 33-41-04-943-001p. 893
2. Job Set-Upp. 893
Subtask 33-41-04-010-002p. 893
3. Procedurep. 893
Subtask 33-41-04-820-002p. 893
4. Close Outp. 894
Subtask 33-41-04-410-002p. 894
Subtask 33-41-04-940-002p. 894
+Nose Landing Light – Adjustment/Testp. 895
Figure 501 (Sheet 1 of 2)p. 895
Figure 501 (Sheet 2 of 2)p. 896
+33-41-07p. 897
+401: PANEL, LANDING LIGHTS – REMOVAL/INSTALLATIONp. 897
1. Generalp. 897
+Task 33-41-07-000-801 Removal of the Landing Lights Control Panelp. 897
1. Job Set-Up Informationp. 897
Subtask 33-41-07-946-001p. 897
2. Job Set-Upp. 897
Subtask 33-41-07-910-001p. 897
Subtask 33-41-07-865-001p. 897
3. Procedurep. 897
Subtask 33-41-07-020-001p. 897
+Landing Lights Control Panel – Removal/Installationp. 899
+Task 33-41-07-400-801 Installation of the Landing Lights Control Panelp. 900
1. Job Set-Up Informationp. 900
Subtask 33-41-07-946-002p. 900
2. Job Set-Upp. 900
Subtask 33-41-07-869-001p. 900
3. Procedurep. 900
Subtask 33-41-07-420-001p. 900
4. Close Outp. 900
Subtask 33-41-07-865-002p. 900
Subtask 33-41-07-710-001p. 900
Subtask 33-41-07-941-001p. 901
+33-41-10p. 903
+401: TRANSFORMER, LANDING AND TAXI/RECOGNITION LIGHTS – REMOVAL/INSTALLATIONp. 903
1. Generalp. 903
+Task 33-41-10-000-801 Removal of the Wing Landing and Taxi/Recognition Lights Transformerp. 903
1. Job Set-Up Informationp. 903
Subtask 33-41-10-946-001p. 903
2. Job Set-Upp. 903
Subtask 33-41-10-910-001p. 903
Subtask 33-41-10-865-001p. 903
Subtask 33-41-10-010-001p. 904
3. Procedurep. 904
Subtask 33-41-10-020-001p. 904
+Wing Landing and Taxi/Recognition Lights Transformer – Removal/Installationp. 905
+Task 33-41-10-400-801 Installation of the Wing Landing and Taxi/Recognition Lights Transformerp. 906
1. Job Set-Up Informationp. 906
Subtask 33-41-10-945-001p. 906
Subtask 33-41-10-946-002p. 906
2. Job Set-Upp. 906
Subtask 33-41-10-869-001p. 906
3. Procedurep. 906
Subtask 33-41-10-420-001p. 906
4. Close Outp. 906
Subtask 33-41-10-865-002p. 906
Subtask 33-41-10-710-001p. 907
Subtask 33-41-10-410-001p. 907
Subtask 33-41-10-941-001p. 907
+Task 33-41-10-000-802 Removal of the Nose Landing Lights Transformerp. 908
1. Job Set-Up Informationp. 908
Subtask 33-41-10-946-003p. 908
2. Job Set-Upp. 908
Subtask 33-41-10-910-002p. 908
Subtask 33-41-10-865-003p. 908
Subtask 33-41-10-861-001p. 908
Subtask 33-41-10-010-002p. 908
3. Procedurep. 908
Subtask 33-41-10-020-002p. 908
+Nose Landing Lights Transformer – Removal/Installationp. 910
+Task 33-41-10-400-802 Installation of the Nose Landing Lights Transformerp. 911
1. Job Set-Up Informationp. 911
Subtask 33-41-10-945-002p. 911
Subtask 33-41-10-946-004p. 911
2. Job Set-Upp. 911
Subtask 33-41-10-869-002p. 911
3. Procedurep. 911
Subtask 33-41-10-420-002p. 911
4. Close Outp. 911
Subtask 33-41-10-861-002p. 911
Subtask 33-41-10-865-004p. 912
Subtask 33-41-10-710-002p. 912
Subtask 33-41-10-410-002p. 912
Subtask 33-41-10-941-002p. 912
+Section 42p. 913
+33-42-00p. 913
+1: NAVIGATION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 913
1. Generalp. 913
2. Generalp. 913
+3. Component Detailsp. 913
A. Navigation Lightsp. 914
B. Light Switchp. 914
C. Powerp. 914
D. Relaysp. 914
E. Transformerp. 914
+4. Component Detailsp. 914
A. Navigation Lightsp. 914
B. Light Switchp. 915
C. Powerp. 915
D. Relaysp. 915
E. Transformersp. 915
5. Operationp. 915
6. Operationp. 916
7. Component Location Indexp. 916
8. Component Location Indexp. 917
+Navigation Lights – Component Locationsp. 919
Figure 1 (Sheet 1 of 2)p. 919
Figure 1 (Sheet 2 of 2)p. 920
+Navigation Lights – Component Locationsp. 921
Figure 2 (Sheet 1 of 2)p. 921
Figure 2 (Sheet 2 of 2)p. 922
+Navigation Lights – Simplified Schematic Diagramp. 923
+Navigation Lights – Simplified Schematic Diagramp. 924
+401: LIGHT, WING NAVIGATION – DEACTIVATION/REACTIVATIONp. 925
1. Generalp. 925
+Task 33-42-00-040-801 Deactivation of the Navigation Lightsp. 925
1. Job Set-up Informationp. 925
Subtask 33-42-00-946-003p. 925
2. Job Set-upp. 925
Subtask 33-42-00-910-001p. 925
3. Procedurep. 926
Subtask 33-42-00-040-001p. 926
4. Close-outp. 930
Subtask 33-42-00-941-003p. 930
+Task 33-42-00-440-801 Reactivation of the Navigation Lightsp. 931
1. Job Set-upp. 931
Subtask 33-42-00-910-002p. 931
2. 2. Procedurep. 931
Subtask 33-42-00-440-001p. 931
3. 3. Close-outp. 932
Subtask 33-42-00-940-001p. 932
+501: NAVIGATION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 933
1. Generalp. 933
+Task 33-42-00-710-801 Operational Test of the Navigation Lightsp. 933
1. Job Set-Up Informationp. 933
Subtask 33-42-00-946-001p. 933
Subtask 33-42-00-946-002p. 934
2. Job Set-Upp. 934
Subtask 33-42-00-865-001p. 934
Subtask 33-42-00-861-001p. 934
3. Procedurep. 935
Subtask 33-42-00-710-001p. 935
Subtask 33-42-00-710-002p. 936
4. Close Outp. 937
Subtask 33-42-00-941-002p. 937
Subtask 33-42-00-865-002p. 937
Subtask 33-42-00-941-001p. 937
+33-42-01p. 939
+401: LIGHT, WING NAVIGATION – REMOVAL/INSTALLATIONp. 939
1. Generalp. 939
+Task 33-42-01-000-801 Removal of the Wing Navigation Lightp. 939
1. Job Set-Up Informationp. 939
Subtask 33-42-01-946-001p. 939
2. Job Set-Upp. 939
Subtask 33-42-01-910-001p. 939
Subtask 33-42-01-865-001p. 939
Subtask 33-42-01-010-001p. 939
3. Procedurep. 940
Subtask 33-42-01-020-001p. 940
Subtask 33-42-01-020-004p. 940
+Wing Navigation Light – Removal/Installationp. 941
+Wing Navigation Lights – Removal/Installationp. 942
+Task 33-42-01-400-801 Installation of the Wing Navigation Lightp. 943
1. Job Set-Up Informationp. 943
Subtask 33-42-01-945-001p. 943
Subtask 33-42-01-946-002p. 943
2. Job Set-Upp. 943
Subtask 33-42-01-869-001p. 943
3. Procedurep. 943
Subtask 33-42-01-420-001p. 943
Subtask 33-42-01-420-004p. 944
4. Close Outp. 944
Subtask 33-42-01-865-002p. 944
Subtask 33-42-01-710-001p. 944
Subtask 33-42-01-410-001p. 944
Subtask 33-42-01-941-001p. 944
+Task 33-42-01-000-802 Removal of the Wing Navigation Light Lampp. 945
1. Job Set-Up Informationp. 945
Subtask 33-42-01-946-003p. 945
2. Job Set-Upp. 945
Subtask 33-42-01-941-002p. 945
Subtask 33-42-01-865-003p. 945
Subtask 33-42-01-010-002p. 945
3. Procedurep. 945
Subtask 33-42-01-020-003p. 945
Subtask 33-42-01-020-002p. 946
+Wing Navigation Light Lamp – Removal/Installationp. 947
+Wing Navigation Light Lamp – Removal/Installationp. 948
+Task 33-42-01-400-802 Installation of the Wing Navigation Light Lampp. 949
1. Job Set-Up Informationp. 949
Subtask 33-42-01-945-002p. 949
2. Reference Informationp. 949
Subtask 33-42-01-946-004p. 949
3. Job Set-Upp. 949
Subtask 33-42-01-869-002p. 949
4. Procedurep. 949
Subtask 33-42-01-420-002p. 949
Subtask 33-42-01-420-003p. 949
5. Close Outp. 950
Subtask 33-42-01-865-004p. 950
Subtask 33-42-01-710-002p. 950
Subtask 33-42-01-410-002p. 950
Subtask 33-42-01-941-003p. 950
+33-42-04p. 951
+401: LIGHT, VERTICAL STABILIZER NAVIGATION – REMOVAL/INSTALLATIONp. 951
1. Generalp. 951
+Task 33-42-04-000-801 Removal of the Vertical-Stabilizer Navigation Lightp. 951
1. Job Set-Up Informationp. 951
Subtask 33-42-04-943-001p. 951
Subtask 33-42-04-946-001p. 951
2. Job Set-Upp. 952
Subtask 33-42-04-941-001p. 952
Subtask 33-42-04-010-001p. 952
Subtask 33-42-04-910-001p. 952
Subtask 33-42-04-865-001p. 952
3. Procedurep. 952
Subtask 33-42-04-020-001p. 952
+Vertical-Stabilizer Navigation Light – Removal/Installationp. 954
+Task 33-42-04-400-801 Installation of the Vertical-Stabilizer Navigation Lightp. 955
1. Job Set-Up Informationp. 955
Subtask 33-42-04-943-002p. 955
Subtask 33-42-04-944-001p. 955
Subtask 33-42-04-945-001p. 955
Subtask 33-42-04-946-002p. 955
2. Job Set-Upp. 956
Subtask 33-42-04-869-001p. 956
3. Procedurep. 956
Subtask 33-42-04-420-001p. 956
4. Close Outp. 956
Subtask 33-42-04-865-002p. 956
Subtask 33-42-04-861-001p. 957
Subtask 33-42-04-710-001p. 957
Subtask 33-42-04-861-002p. 957
Subtask 33-42-04-390-002p. 957
Subtask 33-42-04-410-001p. 957
Subtask 33-42-04-941-002p. 957
+Task 33-42-04-000-804 Removal of the Vertical-Stabilizer Navigation-Light Lampp. 958
1. Job Set-Up Informationp. 958
Subtask 33-42-04-943-006p. 958
Subtask 33-42-04-946-006p. 958
2. Job Set-Upp. 958
Subtask 33-42-04-941-007p. 958
Subtask 33-42-04-910-003p. 958
Subtask 33-42-04-865-005p. 958
3. Procedurep. 959
Subtask 33-42-04-020-004p. 959
+Vertical-Stabilizer Navigation-Light Lamp – Removal/Installationp. 960
+Task 33-42-04-400-803 Installation of the Vertical-Stabilizer Navigation-Light Lampp. 961
1. Job Set-Up Informationp. 961
Subtask 33-42-04-943-007p. 961
Subtask 33-42-04-944-003p. 961
Subtask 33-42-04-945-003p. 961
Subtask 33-42-04-946-007p. 961
2. Job Set-Upp. 961
Subtask 33-42-04-869-003p. 961
3. Procedurep. 962
Subtask 33-42-04-420-003p. 962
4. Close Outp. 962
Subtask 33-42-04-865-006p. 962
Subtask 33-42-04-861-006p. 962
Subtask 33-42-04-710-003p. 962
Subtask 33-42-04-861-005p. 962
Subtask 33-42-04-390-003p. 962
Subtask 33-42-04-941-008p. 962
+Task 33-42-04-000-805 Removal of the Vertical-Stabilizer Navigation-Light Shock-Mountp. 963
1. Job Set-Up Informationp. 963
Subtask 33-42-04-943-003p. 963
Subtask 33-42-04-946-003p. 963
2. Job Set-Upp. 963
Subtask 33-42-04-940-001p. 963
3. Procedurep. 963
Subtask 33-42-04-020-002p. 963
+Vertical-Stabilizer Navigation-Light Shock Mount – Removal/Installationp. 964
+Task 33-42-04-400-804 Installation of the Vertical-Stabilizer Navigation-Light Shock-Mountp. 965
1. Job Set-Up Informationp. 965
Subtask 33-42-04-943-004p. 965
Subtask 33-42-04-944-004p. 965
Subtask 33-42-04-945-002p. 965
Subtask 33-42-04-946-004p. 965
2. Job Set-Upp. 965
Subtask 33-42-04-940-002p. 965
3. Procedurep. 965
Subtask 33-42-04-420-002p. 965
4. Close Outp. 966
Subtask 33-42-04-940-003p. 966
+401: LIGHT, VERTICAL STABILIZER NAVIGATION – REMOVAL/INSTALLATIONp. 967
1. Generalp. 967
+Task 33-42-04-000-808 Removal of the Vertical-Stabilizer Navigation-Lamp Assemblyp. 967
1. Job Set-Up Informationp. 967
Subtask 33-42-04-943-009p. 967
Subtask 33-42-04-946-011p. 967
2. Job Set-Upp. 968
Subtask 33-42-04-941-005p. 968
Subtask 33-42-04-910-004p. 968
Subtask 33-42-04-865-007p. 968
3. Procedurep. 968
Subtask 33-42-04-020-005p. 968
+Vertical-Stabilizer Navigation-Light Lamp – Removal/Installationp. 970
+Task 33-42-04-400-806 Installation of the Vertical-Stabilizer Navigation-Lamp Assemblyp. 971
1. Job Set-Up Informationp. 971
Subtask 33-42-04-943-010p. 971
Subtask 33-42-04-944-006p. 971
Subtask 33-42-04-945-005p. 971
Subtask 33-42-04-946-012p. 971
2. Job Set-Upp. 972
Subtask 33-42-04-869-004p. 972
3. Procedurep. 972
Subtask 33-42-04-420-006p. 972
4. Close Outp. 972
Subtask 33-42-04-865-008p. 972
Subtask 33-42-04-861-007p. 972
Subtask 33-42-04-710-004p. 972
Subtask 33-42-04-861-008p. 973
Subtask 33-42-04-390-004p. 973
Subtask 33-42-04-941-006p. 973
+33-42-07p. 975
+401: TRANSFORMER, NAVIGATION LIGHTS – REMOVAL/INSTALLATIONp. 975
1. Generalp. 975
+Task 33-42-07-000-801 Removal of the Navigation Lights Transformerp. 975
1. Job Set-Up Informationp. 975
Subtask 33-42-07-946-001p. 975
2. Job Set-Upp. 975
Subtask 33-42-07-910-001p. 975
Subtask 33-42-07-865-001p. 975
Subtask 33-42-07-010-001p. 975
3. Procedurep. 976
Subtask 33-42-07-020-001p. 976
+Navigation Lights Transformer – Removal/Installationp. 977
+Task 33-42-07-400-801 Installation of the Navigation Lights Transformerp. 978
1. Job Set-Up Informationp. 978
Subtask 33-42-07-945-001p. 978
Subtask 33-42-07-946-002p. 978
2. Job Set-Upp. 978
Subtask 33-42-07-869-001p. 978
3. Procedurep. 978
Subtask 33-42-07-420-001p. 978
4. Close Outp. 978
Subtask 33-42-07-865-002p. 978
Subtask 33-42-07-710-001p. 979
Subtask 33-42-07-410-001p. 979
Subtask 33-42-07-941-001p. 979
+33-42-09p. 981
+401: STEP-DOWN TRANSFORMER, VERTICAL-STABILIZER NAVIGATION LIGHT – REMOVAL/INSTALLATIONp. 981
1. Generalp. 981
+Task 33-42-09-000-801 Removal of the Vertical-Stabilizer Navigation Light Step-Down Transformerp. 981
1. Job Set-Up Informationp. 981
Subtask 33-42-09-946-001p. 981
2. Job Set-Upp. 981
Subtask 33-42-09-910-001p. 981
Subtask 33-42-09-865-001p. 982
Subtask 33-42-09-010-001p. 982
3. Procedurep. 982
Subtask 33-42-09-020-001p. 982
+Step-Down Transformer Removal/Installationp. 983
+Task 33-42-09-400-801 Installation of the Vertical-Stabilizer Navigation Light Step-Down Transformerp. 984
1. Job Set-Up Informationp. 984
Subtask 33-42-09-946-002p. 984
2. Job Set-Upp. 984
Subtask 33-42-09-869-001p. 984
3. Procedurep. 984
Subtask 33-42-09-420-001p. 984
4. Close Outp. 984
Subtask 33-42-09-865-002p. 984
Subtask 33-42-09-710-001p. 985
Subtask 33-42-09-410-001p. 985
Subtask 33-42-09-861-001p. 985
Subtask 33-42-09-866-001p. 985
Subtask 33-42-09-861-002p. 985
Subtask 33-42-09-941-001p. 985
+Section 43p. 987
+33-43-00p. 987
+1: WING INSPECTION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 987
1. Generalp. 987
+2. Component Detailsp. 987
A. Wing Inspection Lightsp. 988
3. Operationp. 988
4. Component Location Indexp. 989
+Wing Inspection Lights – Component Locationsp. 991
+Wing Inspection Light – Component Locationsp. 992
+Wing Inspection Lights – Simplified Schematic Diagramp. 993
+501: WING INSPECTION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 995
1. Generalp. 995
+Task 33-43-00-710-801 Operational Test of the Wing Inspection Lightsp. 995
1. Job Set-Up Informationp. 995
Subtask 33-43-00-946-001p. 995
2. Job Set-Upp. 995
Subtask 33-43-00-865-001p. 995
Subtask 33-43-00-861-001p. 995
3. Procedurep. 995
Subtask 33-43-00-710-001p. 995
4. Close Outp. 996
Subtask 33-43-00-861-002p. 996
Subtask 33-43-00-941-001p. 996
+Wing Inspection-Light-Light Beam Illumination Areap. 997
+Wing Inspection-Light-Adjustmentp. 998
+Task 33-43-00-820-801 Adjustment of the Wing Anti-Ice Lightsp. 999
1. Job Set-Up Informationp. 999
Subtask 33-43-00-946-002p. 999
2. Job Set-Upp. 999
Subtask 33-43-00-865-002p. 999
Subtask 33-43-00-861-003p. 999
3. Procedurep. 999
Subtask 33-43-00-710-002p. 999
4. Close Outp. 1000
Subtask 33-43-00-861-004p. 1000
Subtask 33-43-00-941-002p. 1000
+33-43-01p. 1001
+401: LIGHT, WING INSPECTION – REMOVAL/INSTALLATIONp. 1001
1. Generalp. 1001
+Task 33-43-01-000-801 Removal of the Wing Inspection Lightp. 1001
1. Job Set-Up Informationp. 1001
Subtask 33-43-01-946-001p. 1001
2. Job Set-Upp. 1001
Subtask 33-43-01-910-001p. 1001
Subtask 33-43-01-865-001p. 1001
Subtask 33-43-01-010-001p. 1001
3. Procedurep. 1002
Subtask 33-43-01-020-001p. 1002
+Wing Inspection Light – Removal/Installationp. 1003
+Task 33-43-01-400-801 Installation of the Wing Inspection Lightp. 1004
1. Job Set-Up Informationp. 1004
Subtask 33-43-01-945-001p. 1004
Subtask 33-43-01-946-002p. 1004
2. Job Set-Upp. 1004
Subtask 33-43-01-869-001p. 1004
3. Procedurep. 1004
Subtask 33-43-01-420-001p. 1004
4. Close Outp. 1004
Subtask 33-43-01-865-002p. 1004
Subtask 33-43-01-710-001p. 1005
Subtask 33-43-01-410-001p. 1005
Subtask 33-43-01-941-001p. 1005
+Task 33-43-01-000-802 Removal of the Wing Inspection-Light Lampp. 1006
1. Job Set-Up Informationp. 1006
Subtask 33-43-01-943-001p. 1006
Subtask 33-43-01-945-004p. 1006
Subtask 33-43-01-946-005p. 1006
2. Job Set-Upp. 1006
Subtask 33-43-01-910-002p. 1006
Subtask 33-43-01-865-003p. 1006
3. Procedurep. 1006
Subtask 33-43-01-020-002p. 1006
+Wing Inspection-Light Lamp – Removal/Installationp. 1008
+Task 33-43-01-400-803 Installation of the Wing Inspection-Light Lampp. 1009
1. Job Set-Up Informationp. 1009
Subtask 33-43-01-945-003p. 1009
Subtask 33-43-01-946-004p. 1009
2. Job Set-Upp. 1009
Subtask 33-43-01-869-002p. 1009
3. Procedurep. 1009
Subtask 33-43-01-420-002p. 1009
4. Close Outp. 1009
Subtask 33-43-01-865-004p. 1009
Subtask 33-43-01-710-002p. 1010
Subtask 33-43-01-941-002p. 1010
+Section 44p. 1011
+33-44-00p. 1011
+1: ANTICOLLISION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 1011
1. Generalp. 1011
+2. Component Detailsp. 1011
A. White Anticollision Strobe Lightsp. 1012
B. White Anticollision-Strobe-Lights Power-Suppliesp. 1013
C. White Anticollision-Strobe-Lights Relayp. 1013
D. STROBE OFF-ON Lights Switchp. 1013
E. Red Anticollision Beacon Lightsp. 1013
F. Red Anticollision Beacon-Lights Power-Supplyp. 1013
G. BEACON OFF-ON Lights Switchp. 1013
3. Operationp. 1013
4. Component Location Indexp. 1014
+White Anticollision Strobe Lights – Components Locationsp. 1017
+White Anticollision-Strobe-Lights Power-Relay – Component Locationp. 1018
+Red Anticollision Beacon Lights – Component Locationsp. 1019
+White Anticollision Strobe Lights – Component Locationsp. 1020
+Red Anticollision Beacon Lights – Component Locationsp. 1021
+White Anticollision Strobe Lights – Schematic Diagramp. 1022
+Red Anticollision Beacon Lights – Schematic Diagramp. 1023
+501: ANTICOLLISION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 1025
1. Generalp. 1025
+Task 33-44-00-710-801 Operational Test of the Anticollision Strobe Lightsp. 1025
1. Job Set-Up Informationp. 1025
Subtask 33-44-00-946-001p. 1025
2. Job Set-Upp. 1025
Subtask 33-44-00-865-001p. 1025
Subtask 33-44-00-861-001p. 1025
3. Procedurep. 1025
Subtask 33-44-00-710-001p. 1025
4. Close Outp. 1026
Subtask 33-44-00-861-002p. 1026
Subtask 33-44-00-941-001p. 1026
+Task 33-44-00-710-802 Operational Test of the Anticollision Beacon Lightsp. 1027
1. Job Set-Up Informationp. 1027
Subtask 33-44-00-946-002p. 1027
2. Job Set-Upp. 1027
Subtask 33-44-00-865-002p. 1027
Subtask 33-44-00-861-003p. 1027
3. Procedurep. 1027
Subtask 33-44-00-710-002p. 1027
4. Close Outp. 1027
Subtask 33-44-00-861-004p. 1027
Subtask 33-44-00-941-002p. 1027
+33-44-01p. 1029
+401: PANEL, EXTERNAL LIGHTS – REMOVAL/INSTALLATIONp. 1029
1. Generalp. 1029
+Task 33-44-01-000-801 Removal of the External Lights Panelp. 1029
1. Job Set-Up Informationp. 1029
Subtask 33-44-01-946-001p. 1029
2. Job Set-Upp. 1029
Subtask 33-44-01-910-001p. 1029
Subtask 33-44-01-865-001p. 1029
Subtask 33-44-01-865-002p. 1030
3. Procedurep. 1031
Subtask 33-44-01-020-001p. 1031
Subtask 33-44-01-020-002p. 1032
+External Lights Panel – Removal/Installationp. 1033
+External Lights Panel – Removal/Installationp. 1034
+Task 33-44-01-400-801 Installation of the External Lights Panelp. 1035
1. Job Set-Up Informationp. 1035
Subtask 33-44-01-946-002p. 1035
2. Job Set-Upp. 1035
Subtask 33-44-01-869-001p. 1035
3. Procedurep. 1035
Subtask 33-44-01-420-001p. 1035
Subtask 33-44-01-420-002p. 1036
4. Close Outp. 1037
Subtask 33-44-01-865-003p. 1037
Subtask 33-44-01-865-004p. 1038
Subtask 33-44-01-710-001p. 1038
Subtask 33-44-01-941-001p. 1038
+501: PANEL, EXTERNAL LIGHTS – ADJUSTMENT/TESTp. 1039
1. Generalp. 1039
+Task 33-44-01-710-801 Operational Test of the External Lights Panelp. 1039
1. Job Set-Up Informationp. 1039
Subtask 33-44-01-946-003p. 1039
Subtask 33-44-01-946-004p. 1040
2. Job Set-Upp. 1041
Subtask 33-44-01-865-005p. 1041
Subtask 33-44-01-865-006p. 1042
Subtask 33-44-01-861-001p. 1042
3. Procedurep. 1043
Subtask 33-44-01-710-002p. 1043
Subtask 33-44-01-710-003p. 1044
4. Close Outp. 1044
Subtask 33-44-01-861-002p. 1044
Subtask 33-44-01-941-002p. 1044
+33-44-04p. 1045
+401: LIGHT, WING ANTICOLLISION – REMOVAL/INSTALLATIONp. 1045
1. Generalp. 1045
+Task 33-44-04-000-801 Removal of the Wing Anticollision Lightp. 1045
1. Job Set-Up Informationp. 1045
Subtask 33-44-04-946-001p. 1045
2. Job Set-Upp. 1045
Subtask 33-44-04-910-001p. 1045
Subtask 33-44-04-865-001p. 1045
Subtask 33-44-04-010-001p. 1045
3. Procedurep. 1045
Subtask 33-44-04-020-001p. 1045
+Wing Anticollision Light – Removal/Installationp. 1047
+Task 33-44-04-400-801 Installation of the Wing Anticollision Lightp. 1048
1. Job Set-Up Informationp. 1048
Subtask 33-44-04-945-001p. 1048
Subtask 33-44-04-946-002p. 1048
2. Job Set-Upp. 1048
Subtask 33-44-04-869-001p. 1048
3. Procedurep. 1048
Subtask 33-44-04-420-001p. 1048
4. Close Outp. 1048
Subtask 33-44-04-865-002p. 1048
Subtask 33-44-04-710-001p. 1049
Subtask 33-44-04-410-001p. 1049
Subtask 33-44-04-941-001p. 1049
+Task 33-44-04-000-802 Removal of the Wing-Anticollision-Light Flash Tubep. 1050
1. Job Set-Up Informationp. 1050
Subtask 33-44-04-946-003p. 1050
2. Job Set-Upp. 1050
Subtask 33-44-04-910-002p. 1050
Subtask 33-44-04-865-003p. 1050
Subtask 33-44-04-010-002p. 1050
3. Procedurep. 1050
Subtask 33-44-04-020-002p. 1050
+Wing-Anticollision-Light Flash Tube – Removal/Installationp. 1052
+Task 33-44-04-400-802 Installation of the Wing-Anticollision-Light Flash Tubep. 1053
1. Job Set-Up Informationp. 1053
Subtask 33-44-04-945-002p. 1053
Subtask 33-44-04-946-004p. 1053
2. Job Set-Upp. 1053
Subtask 33-44-04-869-002p. 1053
3. Procedurep. 1053
Subtask 33-44-04-420-002p. 1053
4. Close Outp. 1054
Subtask 33-44-04-865-004p. 1054
Subtask 33-44-04-710-002p. 1054
Subtask 33-44-04-410-002p. 1054
Subtask 33-44-04-941-002p. 1054
+33-44-07p. 1055
+401: POWER-SUPPLY, WING ANTICOLLISION-LIGHT – REMOVAL/INSTALLATIONp. 1055
1. Generalp. 1055
+Task 33-44-07-000-801 Removal of the Wing Anticollision-Light Power-Supplyp. 1055
1. Job Set-Up Informationp. 1055
Subtask 33-44-07-946-001p. 1055
Subtask 33-44-07-910-001p. 1055
2. Job Set-Upp. 1055
Subtask 33-44-07-865-001p. 1055
Subtask 33-44-07-010-001p. 1055
3. Procedurep. 1055
Subtask 33-44-07-020-001p. 1055
+Wing Anticollision-Light Power-Supply – Removal/Installationp. 1057
+Task 33-44-07-400-801 Installation of the Wing Anticollision-Light Power-Supplyp. 1058
1. Job Set-Up Informationp. 1058
Subtask 33-44-07-945-001p. 1058
Subtask 33-44-07-946-002p. 1058
2. Job Set-Upp. 1058
Subtask 33-44-07-869-001p. 1058
3. Procedurep. 1058
Subtask 33-44-07-420-001p. 1058
4. Close Outp. 1058
Subtask 33-44-07-865-002p. 1058
Subtask 33-44-07-710-001p. 1059
Subtask 33-44-07-410-001p. 1059
Subtask 33-44-07-941-001p. 1059
+33-44-10p. 1061
+401: ANTICOLLISION/NAVIGATION LIGHT, REAR – REMOVAL/INSTALLATIONp. 1061
1. Generalp. 1061
+Task 33-44-10-000-801 Removal of the Rear Anticollision/Navigation Lightp. 1061
1. Job Set-Up Informationp. 1061
Subtask 33-44-10-943-001p. 1061
Subtask 33-44-10-946-001p. 1061
2. Job Set-Upp. 1061
Subtask 33-44-10-910-001p. 1061
Subtask 33-44-10-865-001p. 1061
3. Procedurep. 1062
Subtask 33-44-10-020-001p. 1062
+Rear Anticollision/Navigation Light – Removal/Installationp. 1063
+Task 33-44-10-400-801 Installation of the Rear Anticollision/Navigation Lightp. 1064
1. Job Set-Up Informationp. 1064
Subtask 33-44-10-944-001p. 1064
Subtask 33-44-10-945-001p. 1064
Subtask 33-44-10-946-002p. 1064
2. Job Set-Upp. 1064
Subtask 33-44-10-869-001p. 1064
3. Procedurep. 1064
Subtask 33-44-10-420-001p. 1064
4. Close Outp. 1065
Subtask 33-44-10-865-002p. 1065
Subtask 33-44-10-710-001p. 1065
Subtask 33-44-10-941-001p. 1065
+Task 33-44-10-000-802 Removal of the Rear Navigation Light-Lamp and Strobe Flash-Tube Assemblyp. 1066
1. Job Set-Up Informationp. 1066
Subtask 33-44-10-943-002p. 1066
Subtask 33-44-10-946-003p. 1066
2. Job Set-Upp. 1066
Subtask 33-44-10-910-002p. 1066
Subtask 33-44-10-865-003p. 1066
3. Procedurep. 1066
Subtask 33-44-10-020-002p. 1066
+Rear Navigation Light-Lamp and Strobe Flash-Tube Assembly – Removal/Installationp. 1068
+Task 33-44-10-400-802 Installation of the Rear Navigation Light-Lamp and Strobe Flash-Tube Assemblyp. 1069
1. Job Set-Up Informationp. 1069
Subtask 33-44-10-944-002p. 1069
Subtask 33-44-10-945-002p. 1069
Subtask 33-44-10-946-004p. 1069
2. Job Set-Upp. 1069
Subtask 33-44-10-869-002p. 1069
3. Procedurep. 1069
Subtask 33-44-10-420-002p. 1069
4. Close Outp. 1070
Subtask 33-44-10-865-004p. 1070
Subtask 33-44-10-710-002p. 1070
Subtask 33-44-10-941-002p. 1070
+33-44-13p. 1071
+401: POWER-SUPPLY, REAR ANTICOLLISION-LIGHT – REMOVAL/INSTALLATIONp. 1071
1. Generalp. 1071
+Task 33-44-13-000-801 Removal of the Rear Anticollision-Light Power-Supplyp. 1071
1. Job Set-Up Informationp. 1071
Subtask 33-44-13-946-001p. 1071
2. Job Set-Upp. 1071
Subtask 33-44-13-910-001p. 1071
Subtask 33-44-13-865-001p. 1071
Subtask 33-44-13-010-001p. 1071
3. Procedurep. 1072
Subtask 33-44-13-020-001p. 1072
+Rear Anticollision-Light Power-Supply – Removal/Installationp. 1073
+Task 33-44-13-400-801 Installation of the Rear Anticollision-Light Power-Supplyp. 1074
1. Job Set-Up Informationp. 1074
Subtask 33-44-13-945-001p. 1074
Subtask 33-44-13-946-002p. 1074
2. Job Set-Upp. 1074
Subtask 33-44-13-869-001p. 1074
3. Procedurep. 1074
Subtask 33-44-13-420-001p. 1074
4. Close Outp. 1074
Subtask 33-44-13-865-002p. 1074
Subtask 33-44-13-710-001p. 1075
Subtask 33-44-13-941-001p. 1075
Subtask 33-44-13-410-001p. 1075
+33-44-16p. 1077
+401: LIGHT, BEACON – REMOVAL/INSTALLATIONp. 1077
1. Generalp. 1077
+Task 33-44-16-000-801 Removal of the Beacon Lightp. 1077
1. Job Set-Up Informationp. 1077
Subtask 33-44-16-946-001p. 1077
Subtask 33-44-16-946-004p. 1078
Subtask 33-44-16-946-005p. 1078
2. Job Set-Upp. 1078
Subtask 33-44-16-943-001p. 1078
Subtask 33-44-16-910-001p. 1079
Subtask 33-44-16-865-001p. 1079
Subtask 33-44-16-010-001p. 1079
Subtask 33-44-16-010-002p. 1080
Subtask 33-44-16-010-003p. 1080
3. Procedurep. 1080
Subtask 33-44-16-020-001p. 1080
Subtask 33-44-16-020-002p. 1081
+Beacon Light – Removal/Installationp. 1082
+Beacon Light – Removal/Installationp. 1083
+Task 33-44-16-400-801 Installation of the Beacon Lightp. 1084
1. Job Set-Up Informationp. 1084
Subtask 33-44-16-944-001p. 1084
Subtask 33-44-16-944-002p. 1084
Subtask 33-44-16-945-001p. 1084
Subtask 33-44-16-945-002p. 1085
Subtask 33-44-16-946-002p. 1085
Subtask 33-44-16-946-006p. 1085
Subtask 33-44-16-946-003p. 1086
Subtask 33-44-16-946-008p. 1086
Subtask 33-44-16-946-009p. 1087
2. Job Set-Upp. 1087
Subtask 33-44-16-869-001p. 1087
3. Procedurep. 1087
Subtask 33-44-16-420-001p. 1087
Subtask 33-44-16-420-004p. 1088
Subtask 33-44-16-420-002p. 1088
4. Close Outp. 1089
Subtask 33-44-16-865-002p. 1089
Subtask 33-44-16-710-001p. 1089
Subtask 33-44-16-410-001p. 1089
Subtask 33-44-16-410-002p. 1089
Subtask 33-44-16-410-003p. 1090
Subtask 33-44-16-941-001p. 1090
+33-44-19p. 1091
+401: POWER SUPPLY, BEACON LIGHT – REMOVAL/INSTALLATIONp. 1091
1. Generalp. 1091
+Task 33-44-19-000-801 Removal of the Beacon Light Power Supplyp. 1091
1. Job Set-Up Informationp. 1091
Subtask 33-44-19-946-001p. 1091
2. Job Set-Upp. 1091
Subtask 33-44-19-910-001p. 1091
Subtask 33-44-19-865-001p. 1091
Subtask 33-44-19-010-001p. 1091
3. Procedurep. 1092
Subtask 33-44-19-020-001p. 1092
+Beacon Light Power Supply – Removal/Installationp. 1093
+Task 33-44-19-400-801 Installation of the Beacon Light Power Supplyp. 1094
1. Job Set-Up Informationp. 1094
Subtask 33-44-19-945-001p. 1094
Subtask 33-44-19-946-002p. 1094
2. Job Set-Upp. 1094
Subtask 33-44-19-869-001p. 1094
3. Procedurep. 1094
Subtask 33-44-19-420-001p. 1094
4. Close Outp. 1094
Subtask 33-44-19-865-002p. 1094
Subtask 33-44-19-710-001p. 1095
Subtask 33-44-19-941-001p. 1095
Subtask 33-44-19-410-001p. 1095
+Section 45p. 1097
+33-45-00p. 1097
+1: STAIR LIGHTS – DESCRIPTION AND OPERATIONp. 1097
1. Generalp. 1097
+2. Component Detailsp. 1097
A. Stair Lightp. 1097
B. Boarding Lights Switchp. 1097
3. Operationp. 1097
4. Component Location Indexp. 1097
+Stair Lights – Component Locationp. 1098
+Stair Lights – Schematicp. 1099
+501: STAIR LIGHTS – ADJUSTMENT/TESTp. 1101
1. Generalp. 1101
+Task 33-45-00-710-801 Operational Test of the Air Stair Lightsp. 1101
1. Job Set-up Informationp. 1101
Subtask 33-45-00-946-001p. 1101
2. Job Set-upp. 1101
Subtask 33-45-00-861-001p. 1101
3. Procedurep. 1101
Subtask 33-45-00-710-001p. 1101
4. Close Outp. 1102
Subtask 33-45-00-861-002p. 1102
Subtask 33-45-00-941-001p. 1102
+601: STAIR LIGHTS – INSPECTION/CHECKp. 1103
1. Generalp. 1103
+Task 33-45-00-210-801 Visual Inspection of the Stair Lightsp. 1103
1. Procedurep. 1103
Subtask 33-45-00-210-001p. 1103
2. Close Outp. 1103
Subtask 33-45-00-941-002p. 1103
+Stair Lights – Inspection/Checkp. 1104
+33-45-01p. 1105
+401: LIGHT, STAIR – REMOVAL/INSTALLATIONp. 1105
1. Generalp. 1105
+Task 33-45-01-000-801 Removal of the Stair Lightp. 1105
1. Job Set-Up Informationp. 1105
Subtask 33-45-01-946-001p. 1105
2. Job Set-Upp. 1105
Subtask 33-45-01-910-001p. 1105
Subtask 33-45-01-865-001p. 1105
Subtask 33-45-01-010-001p. 1105
3. Procedurep. 1106
Subtask 33-45-01-020-001p. 1106
+Stair Light – Removal/Installationp. 1107
+Task 33-45-01-400-801 Installation of the Stair Lightp. 1108
1. Job Set-Up Informationp. 1108
Subtask 33-45-01-945-001p. 1108
Subtask 33-45-01-946-002p. 1108
2. Job Set-Upp. 1108
Subtask 33-45-01-869-001p. 1108
3. Procedurep. 1108
Subtask 33-45-01-420-001p. 1108
4. Close Outp. 1108
Subtask 33-45-01-865-002p. 1108
Subtask 33-45-01-941-001p. 1109
Subtask 33-45-01-410-001p. 1109
Subtask 33-45-01-710-001p. 1109
+Section 46p. 1111
+33-46-00p. 1111
+1: LOGO LIGHTS – DESCRIPTION AND OPERATIONp. 1111
1. Generalp. 1111
+2. Component Detailsp. 1111
A. Logo Lightp. 1111
B. Logo Light Transformerp. 1111
C. Logo Lights Switchp. 1111
3. Operationp. 1112
4. Component Location Indexp. 1112
+Logo Lights – Component Location/Recognitionp. 1113
+Logo Lights Switch – Component Location/Recognitionp. 1114
+Logo Lights – Schematicp. 1115
+501: LOGO LIGHTS – ADJUSTMENT/TESTp. 1117
1. Generalp. 1117
+Task 33-46-00-710-801 Operational Test of the Logo Lightsp. 1117
1. Job Set-Up Informationp. 1117
Subtask 33-46-00-946-001p. 1117
2. Job Set-Upp. 1118
Subtask 33-46-00-865-001p. 1118
Subtask 33-46-00-861-001p. 1118
3. Procedurep. 1118
Subtask 33-46-00-710-001p. 1118
4. Close Outp. 1118
Subtask 33-46-00-861-002p. 1118
Subtask 33-46-00-941-001p. 1118
+33-46-01p. 1119
+401: LIGHT, LOGO – REMOVAL/INSTALLATIONp. 1119
1. Generalp. 1119
+Task 33-46-01-000-801 Removal of the Logo Lightp. 1119
1. Job Set-Up Informationp. 1119
Subtask 33-46-01-946-001p. 1119
2. Job Set-Upp. 1120
Subtask 33-46-01-910-001p. 1120
Subtask 33-46-01-865-001p. 1120
Subtask 33-46-01-010-001p. 1120
3. Procedurep. 1120
Subtask 33-46-01-020-001p. 1120
+Logo Light – Removal/Installationp. 1121
+Task 33-46-01-400-801 Installation of the Logo Lightp. 1122
1. Job Set-Up Informationp. 1122
Subtask 33-46-01-945-001p. 1122
Subtask 33-46-01-946-002p. 1122
2. Job Set-Upp. 1122
Subtask 33-46-01-869-001p. 1122
3. Procedurep. 1122
Subtask 33-46-01-420-001p. 1122
4. Close Outp. 1123
Subtask 33-46-01-865-002p. 1123
Subtask 33-46-01-710-001p. 1123
Subtask 33-46-01-410-001p. 1123
Subtask 33-46-01-941-001p. 1123
+501: LIGHT, LOGO – ADJUSTMENT/TESTp. 1125
1. Generalp. 1125
+Task 33-46-01-820-801 Adjustment of the Logo Lightp. 1125
1. Job Set-Up Informationp. 1125
Subtask 33-46-01-946-003p. 1125
2. Job Set-Upp. 1126
Subtask 33-46-01-910-002p. 1126
Subtask 33-46-01-865-003p. 1126
Subtask 33-46-01-010-002p. 1126
3. Procedurep. 1126
Subtask 33-46-01-820-001p. 1126
4. Close Outp. 1127
Subtask 33-46-01-410-002p. 1127
Subtask 33-46-01-941-002p. 1127
+Logo Light – Adjustment/Testp. 1128
+33-46-04p. 1129
+401: TRANSFORMER, LOGO LIGHT – REMOVAL/INSTALLATIONp. 1129
1. Generalp. 1129
+Task 33-46-04-000-801 Removal of the Logo Light Transformerp. 1129
1. Job Set-Up Informationp. 1129
Subtask 33-46-04-946-001p. 1129
2. Job Set-Upp. 1129
Subtask 33-46-04-910-001p. 1129
Subtask 33-46-04-865-001p. 1130
Subtask 33-46-04-010-001p. 1130
3. Procedurep. 1130
Subtask 33-46-04-020-001p. 1130
+Logo Light Transformer – Removal/Installationp. 1131
+Task 33-46-04-400-801 Installation of the Logo Light Transformerp. 1132
1. Job Set-Up Informationp. 1132
Subtask 33-46-04-945-001p. 1132
Subtask 33-46-04-946-002p. 1132
2. Job Set-Upp. 1132
Subtask 33-46-04-869-001p. 1132
3. Procedurep. 1132
Subtask 33-46-04-420-001p. 1132
4. Close Outp. 1132
Subtask 33-46-04-865-002p. 1132
Subtask 33-46-04-710-001p. 1133
Subtask 33-46-04-410-001p. 1133
Subtask 33-46-04-941-001p. 1133
+Section 50p. 1135
+33-50-00p. 1135
+1: EMERGENCY LIGHTING – DESCRIPTION AND OPERATIONp. 1135
1. Generalp. 1135
+2. Descriptionp. 1135
A. Emergency Lightsp. 1135
+Section 51p. 1137
+33-51-00p. 1137
+1: EMERGENCY LIGHTS – DESCRIPTION AND OPERATIONp. 1137
1. Generalp. 1137
+2. Component Detailsp. 1138
A. Battery Packsp. 1138
B. Charger Assembliesp. 1138
C. Invertersp. 1138
D. Floor-Track Emergency Lightsp. 1138
E. Lighted Floor-Level Exit-Signsp. 1139
F. Photoluminescent Floor Proximity Marking/Lightsp. 1139
G. Lighted Floor-Level Exit-Signsp. 1140
H. Lighted Exit-Signsp. 1140
I. Lighted Ceiling Exit-Signsp. 1140
J. Ceiling Emergency Floodlightsp. 1140
K. Floor-Level Emergency Floodlightsp. 1140
L. External Emergency Lightsp. 1141
M. Emergency Light Switchesp. 1141
N. Emergency Lights Indicator-Lightp. 1142
3. Operationp. 1142
4. Component Location Indexp. 1144
+Emergency Lights – Power Supply/Distribution – Component Location/Recognitionp. 1146
+Emergency Lights – Floor-Level – Component Location/Recognitionp. 1147
+Emergency Lights – Above Floor-Level – Component Location/Recognitionp. 1148
+External Emergency Lights – Component Location/Recognitionp. 1149
+Emergency Lights – Cockpit Controls – Component Location/Recognitionp. 1150
+Emergency Photoluminescent Lights – Floor-Level – Component Location / Recognitionp. 1151
+Emergency Floor Track Lights – Component Location/Recognitionp. 1152
+501: EMERGENCY LIGHTS – ADJUSTMENT/TESTp. 1153
1. Generalp. 1153
+Task 33-51-00-710-801 Operational Test of the Emergency Lightsp. 1153
1. Job Set-Up Informationp. 1153
Subtask 33-51-00-946-001p. 1153
2. Job Set-Upp. 1153
Subtask 33-51-00-865-001p. 1153
Subtask 33-51-00-861-001p. 1154
Subtask 33-51-00-840-001p. 1154
3. Procedurep. 1154
Subtask 33-51-00-710-001p. 1154
4. Close Outp. 1157
Subtask 33-51-00-861-002p. 1157
Subtask 33-51-00-941-001p. 1157
+Emergency Lights – Adjustment/Testp. 1158
+Task 33-51-00-710-804 Operational Test of the Emergency Lightsp. 1159
1. Reason for the Jobp. 1159
2. Job Set-Up Informationp. 1159
Subtask 33-51-00-946-006p. 1159
3. Job Set-Upp. 1159
Subtask 33-51-00-865-006p. 1159
Subtask 33-51-00-840-009p. 1159
Subtask 33-51-00-861-011p. 1159
4. Procedurep. 1159
Subtask 33-51-00-710-007p. 1159
5. Close Outp. 1160
Subtask 33-51-00-861-012p. 1160
Subtask 33-51-00-941-006p. 1160
+Emergency Lights – Operational Testp. 1161
Figure 502 (Sheet 1 of 2)p. 1161
Figure 502 (Sheet 2 of 2)p. 1162
+Task 33-51-00-710-802 Operational Test of the Photoluminescent Proximity Marking/Lightsp. 1163
1. Reason for the Jobp. 1163
2. Job Set-Up Informationp. 1163
Subtask 33-51-00-946-003p. 1163
3. Job Set-Upp. 1163
Subtask 33-51-00-861-005p. 1163
4. Procedurep. 1163
Subtask 33-51-00-710-005p. 1163
5. Close Outp. 1164
Subtask 33-51-00-861-006p. 1164
Subtask 33-51-00-941-003p. 1164
+Task 33-51-00-710-805 Operational Test of the Emergency Light Systemp. 1165
1. Reason for the Jobp. 1165
2. Job Set-Up Informationp. 1165
Subtask 33-51-00-946-007p. 1165
3. Job Set-Upp. 1165
Subtask 33-51-00-865-007p. 1165
Subtask 33-51-00-840-010p. 1165
Subtask 33-51-00-840-011p. 1166
Subtask 33-51-00-861-013p. 1166
4. Procedurep. 1166
Subtask 33-51-00-710-008p. 1166
Subtask 33-51-00-710-009p. 1167
5. Close Outp. 1168
Subtask 33-51-00-861-014p. 1168
Subtask 33-51-00-941-007p. 1169
+33-51-01p. 1171
+401: LIGHT, FLOOR-TRACK EMERGENCY – REMOVAL/INSTALLATIONp. 1171
1. Generalp. 1171
+Task 33-51-01-000-801 Removal of the Floor-Track Emergency Lightp. 1171
1. Job Set-Up Informationp. 1171
Subtask 33-51-01-946-001p. 1171
2. Job Set-Upp. 1172
Subtask 33-51-01-910-001p. 1172
Subtask 33-51-01-840-001p. 1172
Subtask 33-51-01-865-001p. 1172
3. Procedurep. 1172
Subtask 33-51-01-020-001p. 1172
+Floor-Track Emergency Light – Removal/Installationp. 1173
+Task 33-51-01-400-801 Installation of the Floor-Track Emergency Lightp. 1174
1. Job Set-Up Informationp. 1174
Subtask 33-51-01-946-002p. 1174
2. Job Set-Upp. 1174
Subtask 33-51-01-869-001p. 1174
3. Procedurep. 1174
Subtask 33-51-01-420-001p. 1174
4. Close Outp. 1174
Subtask 33-51-01-865-002p. 1174
Subtask 33-51-01-710-001p. 1175
Subtask 33-51-01-941-001p. 1175
+Task 33-51-01-000-806 Removal of the Photoluminescent Floor Marking/Lightsp. 1176
1. Job Set-Up Informationp. 1176
Subtask 33-51-01-946-011p. 1176
2. Job Set-Upp. 1176
Subtask 33-51-01-910-003p. 1176
3. Procedurep. 1176
Subtask 33-51-01-020-006p. 1176
+Photoluminescent Marking/Light – Removal/Installationp. 1177
Figure 402 (Sheet 1 of 2)p. 1177
Figure 402 (Sheet 2 of 2)p. 1178
+Task 33-51-01-400-806 Installation of the Photoluminescent Floor Marking/Lightsp. 1179
1. Job Set-Up Informationp. 1179
Subtask 33-51-01-943-006p. 1179
Subtask 33-51-01-944-010p. 1179
Subtask 33-51-01-945-007p. 1179
Subtask 33-51-01-946-014p. 1179
2. Job Set-Upp. 1179
Subtask 33-51-01-869-006p. 1179
3. Procedurep. 1179
Subtask 33-51-01-420-006p. 1179
4. Close Outp. 1180
Subtask 33-51-01-941-007p. 1180
+Task 33-51-01-960-801 Discard Photoluminescent Emergency Floor Path Lighting Assembliesp. 1181
1. Reason for the Jobp. 1181
2. Job Set-Up Informationp. 1181
Subtask 33-51-01-946-015p. 1181
3. Job Set-Upp. 1181
Subtask 33-51-01-000-001p. 1181
4. Procedurep. 1181
Subtask 33-51-01-960-001p. 1181
5. Close Outp. 1181
Subtask 33-51-01-400-001p. 1181
+33-51-04p. 1183
+401: BATTERY PACK – REMOVAL/INSTALLATIONp. 1183
1. Generalp. 1183
+Task 33-51-04-000-801 Removal of the Battery Packp. 1183
1. Reason for the Jobp. 1183
2. Job Set-Up Informationp. 1183
Subtask 33-51-04-946-001p. 1183
Subtask 33-51-04-946-007p. 1184
Subtask 33-51-04-946-008p. 1184
3. Job Set-Upp. 1184
Subtask 33-51-04-910-001p. 1184
Subtask 33-51-04-860-001p. 1185
Subtask 33-51-04-860-002p. 1185
Subtask 33-51-04-865-001p. 1185
Subtask 33-51-04-010-001p. 1186
Subtask 33-51-04-010-014p. 1186
Subtask 33-51-04-010-015p. 1187
4. Procedurep. 1187
Subtask 33-51-04-020-001p. 1187
+Battery Pack – Removal/Installationp. 1188
+Task 33-51-04-400-801 Installation of the Battery Packp. 1189
1. Job Set-Up Informationp. 1189
Subtask 33-51-04-946-002p. 1189
Subtask 33-51-04-946-009p. 1189
Subtask 33-51-04-946-010p. 1190
2. Job Set-Upp. 1190
Subtask 33-51-04-869-001p. 1190
3. Procedurep. 1190
Subtask 33-51-04-420-001p. 1190
4. Close Outp. 1190
Subtask 33-51-04-865-002p. 1190
Subtask 33-51-04-740-005p. 1191
Subtask 33-51-04-410-001p. 1191
Subtask 33-51-04-410-002p. 1192
Subtask 33-51-04-410-003p. 1192
Subtask 33-51-04-941-001p. 1193
+501: BATTERY PACK/CHARGER ASSEMBLY – ADJUSTMENT/TESTp. 1195
1. Generalp. 1195
+Task 33-51-04-740-801 Test of the Battery Pack/Charger Assemblyp. 1195
1. Job Set-Up Informationp. 1195
Subtask 33-51-04-946-003p. 1195
Subtask 33-51-04-946-005p. 1196
Subtask 33-51-04-946-006p. 1196
Subtask 33-51-04-910-002p. 1196
2. Job Set-Upp. 1197
Subtask 33-51-04-865-003p. 1197
Subtask 33-51-04-010-003p. 1197
Subtask 33-51-04-010-004p. 1197
Subtask 33-51-04-010-002p. 1198
Subtask 33-51-04-010-011p. 1198
Subtask 33-51-04-840-001p. 1198
3. Procedurep. 1199
Subtask 33-51-04-740-001p. 1199
Subtask 33-51-04-740-002p. 1199
Subtask 33-51-04-740-003p. 1200
Subtask 33-51-04-740-004p. 1200
4. Close Outp. 1201
Subtask 33-51-04-010-005p. 1201
Subtask 33-51-04-010-006p. 1201
Subtask 33-51-04-010-012p. 1202
Subtask 33-51-04-010-013p. 1202
Subtask 33-51-04-941-002p. 1202
+Task 33-51-04-710-801 Operational Test of the Emergency Lighting System Battery Packsp. 1203
1. Reason for the Jobp. 1203
2. Job Set-Up Informationp. 1203
Subtask 33-51-04-946-004p. 1203
Subtask 33-51-04-946-011p. 1203
Subtask 33-51-04-946-012p. 1204
3. Job Set-Upp. 1204
Subtask 33-51-04-010-007p. 1204
Subtask 33-51-04-010-008p. 1204
Subtask 33-51-04-010-016p. 1205
Subtask 33-51-04-010-017p. 1205
4. Procedurep. 1206
Subtask 33-51-04-740-006p. 1206
5. Close Outp. 1207
Subtask 33-51-04-010-009p. 1207
Subtask 33-51-04-010-010p. 1207
Subtask 33-51-04-010-018p. 1208
Subtask 33-51-04-010-019p. 1208
Subtask 33-51-04-941-003p. 1208
+33-51-05p. 1209
+401: CHARGER ASSEMBLY – REMOVAL/INSTALLATIONp. 1209
1. Generalp. 1209
+Task 33-51-05-000-801 Removal of the Charger Assemblyp. 1209
1. Job Set-Up Informationp. 1209
Subtask 33-51-05-946-001p. 1209
Subtask 33-51-05-946-003p. 1210
Subtask 33-51-05-946-004p. 1210
2. Job Set-Upp. 1210
Subtask 33-51-05-910-001p. 1210
Subtask 33-51-05-840-001p. 1211
Subtask 33-51-05-840-002p. 1211
Subtask 33-51-05-865-001p. 1211
Subtask 33-51-05-010-001p. 1211
Subtask 33-51-05-010-002p. 1212
Subtask 33-51-05-010-003p. 1212
Subtask 33-51-05-010-004p. 1213
3. Procedurep. 1213
Subtask 33-51-05-020-001p. 1213
+Charger Assembly – Removal/Installationp. 1214
+Task 33-51-05-400-801 Installation of the Charger Assemblyp. 1215
1. Job Set-Up Informationp. 1215
Subtask 33-51-05-945-001p. 1215
Subtask 33-51-05-946-002p. 1215
Subtask 33-51-05-946-005p. 1215
Subtask 33-51-05-946-006p. 1216
2. Job Set-Upp. 1216
Subtask 33-51-05-869-001p. 1216
3. Procedurep. 1216
Subtask 33-51-05-420-001p. 1216
4. Close Outp. 1217
Subtask 33-51-05-865-002p. 1217
Subtask 33-51-05-740-001p. 1217
Subtask 33-51-05-410-003p. 1217
Subtask 33-51-05-410-004p. 1217
Subtask 33-51-05-410-001p. 1218
Subtask 33-51-05-410-002p. 1218
Subtask 33-51-05-941-001p. 1218
+33-51-07p. 1219
+401: INVERTER – REMOVAL/INSTALLATIONp. 1219
1. Generalp. 1219
+Task 33-51-07-000-801 Removal of the Inverterp. 1219
1. Job Set-Up Informationp. 1219
Subtask 33-51-07-946-001p. 1219
Subtask 33-51-07-946-003p. 1220
Subtask 33-51-07-946-004p. 1220
2. Job Set-Upp. 1220
Subtask 33-51-07-910-001p. 1220
Subtask 33-51-07-840-001p. 1221
Subtask 33-51-07-840-002p. 1221
Subtask 33-51-07-865-001p. 1221
Subtask 33-51-07-010-001p. 1221
Subtask 33-51-07-010-002p. 1222
Subtask 33-51-07-010-005p. 1222
Subtask 33-51-07-010-006p. 1223
3. Procedurep. 1223
Subtask 33-51-07-020-001p. 1223
+Inverter – Removal/Installationp. 1224
+Task 33-51-07-400-801 Installation of the Inverterp. 1225
1. Job Set-Up Informationp. 1225
Subtask 33-51-07-945-001p. 1225
Subtask 33-51-07-946-002p. 1225
Subtask 33-51-07-946-005p. 1225
Subtask 33-51-07-946-006p. 1226
2. Job Set-Upp. 1226
Subtask 33-51-07-869-001p. 1226
3. Procedurep. 1226
Subtask 33-51-07-420-001p. 1226
4. Close Outp. 1226
Subtask 33-51-07-865-002p. 1226
Subtask 33-51-07-710-001p. 1227
Subtask 33-51-07-010-003p. 1227
Subtask 33-51-07-010-004p. 1227
Subtask 33-51-07-010-007p. 1227
Subtask 33-51-07-010-008p. 1228
Subtask 33-51-07-941-001p. 1228
+33-51-09p. 1229
+401: BETA LIGHTS, DOOR EXIT-SIGN – REMOVAL/INSTALLATIONp. 1229
1. Generalp. 1229
+Task 33-51-09-000-801 Removal of the Beta Lights for the Passenger Doorp. 1229
1. Job Set-Upp. 1229
Subtask 33-51-09-010-002p. 1229
2. Procedurep. 1229
Subtask 33-51-09-020-001p. 1229
+Task 33-51-09-400-801 Installation of the Beta Lights for the Passenger Doorp. 1230
1. Job Set-Up Informationp. 1230
Subtask 33-51-09-943-003p. 1230
Subtask 33-51-09-945-001p. 1230
Subtask 33-51-09-946-002p. 1230
2. Job Set-Upp. 1230
Subtask 33-51-09-869-001p. 1230
3. Procedurep. 1230
Subtask 33-51-09-420-001p. 1230
4. Close Outp. 1230
Subtask 33-51-09-941-002p. 1230
Subtask 33-51-09-710-001p. 1231
+Task 33-51-09-000-802 Removal of the Beta Lights for the Service Doorp. 1232
1. Job Set-Upp. 1232
Subtask 33-51-09-010-003p. 1232
2. Procedurep. 1232
Subtask 33-51-09-020-003p. 1232
+Task 33-51-09-400-802 Installation of the Beta Lights for the Service Doorp. 1233
1. Job Set-Up Informationp. 1233
Subtask 33-51-09-943-004p. 1233
Subtask 33-51-09-945-002p. 1233
Subtask 33-51-09-946-003p. 1233
2. Job Set-Upp. 1233
Subtask 33-51-09-869-002p. 1233
3. Procedurep. 1233
Subtask 33-51-09-420-002p. 1233
4. Close Outp. 1233
Subtask 33-51-09-941-003p. 1233
Subtask 33-51-09-710-002p. 1234
+Beta Light, Passenger Door – Removal/Installationp. 1235
+Beta Light, Service Door – Removal/Installationp. 1236
+501: BETA LIGHTS, DOOR EXIT-SIGN – ADJUSTMENT/TESTp. 1237
+Task 33-51-09-720-801 Functional Test of the Door Exit-Sign Beta-Lightsp. 1237
1. Reason for the Jobp. 1237
2. Job Set-Up Informationp. 1237
Subtask 33-51-09-943-001p. 1237
3. Procedurep. 1237
Subtask 33-51-09-720-001p. 1237
4. Close Outp. 1237
Subtask 33-51-09-940-001p. 1237
+Door Exit-Sign Beta-Light – Functional Testp. 1238
Figure 501 (Sheet 1 of 4)p. 1238
Figure 501 (Sheet 2 of 4)p. 1239
Figure 501 (Sheet 3 of 4)p. 1240
Figure 501 (Sheet 4 of 4)p. 1241
+33-51-10p. 1243
+401: EXIT-SIGN, LIGHTED FLOOR-LEVEL – REMOVAL/INSTALLATIONp. 1243
1. Generalp. 1243
+Task 33-51-10-000-801 Removal of the Lighted Floor-Level Exit-Signp. 1243
1. Job Set-Up Informationp. 1243
Subtask 33-51-10-946-001p. 1243
2. Job Set-Upp. 1243
Subtask 33-51-10-910-001p. 1243
Subtask 33-51-10-840-001p. 1243
Subtask 33-51-10-840-002p. 1244
Subtask 33-51-10-865-001p. 1244
Subtask 33-51-10-010-001p. 1244
3. Procedurep. 1244
Subtask 33-51-10-020-001p. 1244
Subtask 33-51-10-020-003p. 1245
+Lighted Floor-Level Exit-Sign – Removal/Installationp. 1246
+Lighted Floor-Level Exit-Sign – Removal/Installationp. 1247
+Task 33-51-10-400-801 Installation of the Lighted Floor-Level Exit-Signp. 1248
1. Job Set-Up Informationp. 1248
Subtask 33-51-10-945-001p. 1248
Subtask 33-51-10-945-003p. 1248
Subtask 33-51-10-946-002p. 1248
2. Job Set-Upp. 1249
Subtask 33-51-10-869-001p. 1249
3. Procedurep. 1249
Subtask 33-51-10-420-001p. 1249
Subtask 33-51-10-420-002p. 1249
4. Close Outp. 1249
Subtask 33-51-10-410-001p. 1249
Subtask 33-51-10-865-002p. 1249
Subtask 33-51-10-710-001p. 1250
Subtask 33-51-10-941-001p. 1250
+33-51-13p. 1251
+401: EXIT-SIGN, LIGHTED – REMOVAL/INSTALLATIONp. 1251
1. Generalp. 1251
+Task 33-51-13-000-801 Removal of the Lighted Exit-Signp. 1251
1. Job Set-Up Informationp. 1251
Subtask 33-51-13-946-001p. 1251
2. Job Set-Upp. 1251
Subtask 33-51-13-910-001p. 1251
Subtask 33-51-13-840-002p. 1251
Subtask 33-51-13-865-001p. 1251
Subtask 33-51-13-010-001p. 1252
3. Procedurep. 1252
Subtask 33-51-13-020-001p. 1252
Subtask 33-51-13-020-002p. 1252
+Lighted Exit-Sign – Removal/Installationp. 1253
+Lighted Exit-Sign – Removal/Installationp. 1254
+Task 33-51-13-400-801 Installation of the Lighted Exit-Signp. 1255
1. Job Set-Up Informationp. 1255
Subtask 33-51-13-945-001p. 1255
Subtask 33-51-13-946-002p. 1255
Subtask 33-51-13-410-001p. 1255
2. Job Set-Upp. 1255
Subtask 33-51-13-869-001p. 1255
3. Procedurep. 1256
Subtask 33-51-13-420-001p. 1256
Subtask 33-51-13-420-002p. 1256
4. Close Outp. 1256
Subtask 33-51-13-865-002p. 1256
Subtask 33-51-13-710-001p. 1256
Subtask 33-51-13-941-001p. 1257
+33-51-14p. 1259
+401: CEILING EXIT SIGNS (FORWARD AND CENTER) – REMOVAL/INSTALLATIONp. 1259
1. Generalp. 1259
+Task 33-51-14-000-801 Removal of the Lighted Ceiling Exit Signp. 1259
1. Job Set-Up Informationp. 1259
Subtask 33-51-14-946-001p. 1259
Subtask 33-51-14-946-003p. 1260
Subtask 33-51-14-946-004p. 1260
2. Job Set-Upp. 1260
Subtask 33-51-14-910-001p. 1260
Subtask 33-51-14-860-001p. 1261
Subtask 33-51-14-860-002p. 1261
Subtask 33-51-14-865-001p. 1262
Subtask 33-51-14-010-001p. 1262
3. Procedurep. 1262
Subtask 33-51-14-020-001p. 1262
Subtask 33-51-14-020-002p. 1262
+Forward Lighted-Ceiling Exit-Sign – Removal/Installationp. 1263
+Center Lighted-Ceiling Exit-Sign – Removal/Installationp. 1264
+Task 33-51-14-400-801 Installation of the Lighted Ceiling Exit Signp. 1265
1. Job Set-Up Informationp. 1265
Subtask 33-51-14-945-001p. 1265
Subtask 33-51-14-946-002p. 1265
Subtask 33-51-14-946-005p. 1265
Subtask 33-51-14-946-006p. 1266
2. Job Set-Upp. 1266
Subtask 33-51-14-869-001p. 1266
Subtask 33-51-14-410-001p. 1266
3. Procedurep. 1266
Subtask 33-51-14-420-001p. 1266
Subtask 33-51-14-420-002p. 1267
4. Close Outp. 1267
Subtask 33-51-14-865-002p. 1267
Subtask 33-51-14-710-001p. 1267
Subtask 33-51-14-941-001p. 1267
+33-51-16p. 1269
+401: FLOODLIGHT, CEILING EMERGENCY – REMOVAL/INSTALLATIONp. 1269
1. Generalp. 1269
+Task 33-51-16-000-801 Removal of the Ceiling Emergency Floodlightp. 1269
1. Job Set-Up Informationp. 1269
Subtask 33-51-16-946-001p. 1269
Subtask 33-51-16-946-003p. 1270
Subtask 33-51-16-946-004p. 1270
2. Job Set-Upp. 1270
Subtask 33-51-16-910-001p. 1270
Subtask 33-51-16-840-001p. 1271
Subtask 33-51-16-840-002p. 1271
Subtask 33-51-16-865-001p. 1271
Subtask 33-51-16-010-001p. 1272
Subtask 33-51-16-010-002p. 1272
Subtask 33-51-16-010-003p. 1273
3. Procedurep. 1273
Subtask 33-51-16-020-001p. 1273
+Ceiling Emergency Floodlight – Removal/Installationp. 1274
+Task 33-51-16-400-801 Installation of the Ceiling Emergency Floodlightp. 1275
1. Job Set-Up Informationp. 1275
Subtask 33-51-16-945-001p. 1275
Subtask 33-51-16-946-002p. 1275
Subtask 33-51-16-946-005p. 1276
Subtask 33-51-16-946-006p. 1276
2. Job Set-Upp. 1276
Subtask 33-51-16-869-001p. 1276
3. Procedurep. 1277
Subtask 33-51-16-420-001p. 1277
4. Close Outp. 1277
Subtask 33-51-16-865-002p. 1277
Subtask 33-51-16-710-001p. 1277
Subtask 33-51-16-410-001p. 1277
Subtask 33-51-16-410-002p. 1278
Subtask 33-51-16-410-003p. 1278
Subtask 33-51-16-941-001p. 1279
+33-51-19p. 1281
+401: FLOODLIGHT, FLOOR-LEVEL EMERGENCY – REMOVAL/INSTALLATIONp. 1281
1. Generalp. 1281
+Task 33-51-19-000-801 Removal of the Floor-Level Emergency Floodlightp. 1281
1. Job Set-Up Informationp. 1281
Subtask 33-51-19-946-001p. 1281
2. Job Set-Upp. 1281
Subtask 33-51-19-910-001p. 1281
Subtask 33-51-19-860-003p. 1281
Subtask 33-51-19-860-002p. 1282
Subtask 33-51-19-865-001p. 1282
Subtask 33-51-19-010-001p. 1282
3. Procedurep. 1282
Subtask 33-51-19-020-001p. 1282
+Floor-Level Emergency Floodlight – Removal/Installationp. 1283
+Task 33-51-19-400-801 Installation of the Floor-Level Emergency Floodlightp. 1284
1. Job Set-Up Informationp. 1284
Subtask 33-51-19-945-001p. 1284
Subtask 33-51-19-946-002p. 1284
2. Job Set-Upp. 1284
Subtask 33-51-19-869-001p. 1284
3. Procedurep. 1284
Subtask 33-51-19-420-001p. 1284
4. Close Outp. 1284
Subtask 33-51-19-865-002p. 1284
Subtask 33-51-19-710-001p. 1285
Subtask 33-51-19-410-001p. 1285
Subtask 33-51-19-941-001p. 1285
+33-51-21p. 1287
+401: LIGHT, EXTERIOR EMERGENCY – REMOVAL/INSTALLATIONp. 1287
1. Generalp. 1287
+Task 33-51-21-000-801 Removal of the Exterior Emergency Lightp. 1287
1. Job Set-Up Informationp. 1287
Subtask 33-51-21-943-001p. 1287
Subtask 33-51-21-946-001p. 1287
2. Job Set-Upp. 1287
Subtask 33-51-21-910-001p. 1287
Subtask 33-51-21-865-001p. 1288
Subtask 33-51-21-860-001p. 1288
Subtask 33-51-21-860-002p. 1288
Subtask 33-51-21-010-001p. 1288
3. Procedurep. 1289
Subtask 33-51-21-020-001p. 1289
Subtask 33-51-21-020-002p. 1289
Subtask 33-51-21-020-003p. 1289
+Exterior Emergency Light – Removal/Installationp. 1290
+Task 33-51-21-400-801 Installation of the Exterior Emergency Lightp. 1291
1. Job Set-Up Informationp. 1291
Subtask 33-51-21-944-001p. 1291
Subtask 33-51-21-945-001p. 1291
Subtask 33-51-21-946-002p. 1291
2. Job Set-Upp. 1291
Subtask 33-51-21-869-001p. 1291
3. Procedurep. 1291
Subtask 33-51-21-420-001p. 1291
Subtask 33-51-21-420-002p. 1292
Subtask 33-51-21-420-003p. 1292
4. Close Outp. 1293
Subtask 33-51-21-865-002p. 1293
Subtask 33-51-21-710-001p. 1293
Subtask 33-51-21-410-001p. 1293
Subtask 33-51-21-941-001p. 1293
Removal, Installation and Operational Test Procedures
A large part of this 1294-page Chapter 33 manual consists of practical maintenance tasks. Removal and installation procedures identify preparatory steps, electrical safety requirements, circuit breakers to open and tag, connectors and fasteners to disconnect, access points, and the sequence needed to remove or refit the applicable lighting component. Illustrated figures accompany many procedures and identify screws, washers, brackets, retaining rings, electrical leads, lamps, holders, power units, dimmers, panels, and other hardware.
Operational tests are provided for numerous systems so that technicians can verify correct function after maintenance or when investigating a lighting problem. Typical procedures specify the required power configuration, control-switch or dimmer positions, expected lamp response, and close-out actions. The chapter also includes adjustment procedures where light aim or system setup must be checked, along with visual inspections for applicable installations.
Electrical and Component Location Information
The Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005 contains a large number of component-location drawings and simplified electrical schematics. These illustrations show where lighting equipment is installed in the flight compartment, passenger cabin, aircraft exterior, and emergency-lighting areas. Exterior-lighting diagrams identify the positions of landing, taxi/recognition, navigation, anticollision, beacon, logo, stair, and wing inspection lights around the aircraft.
System schematics illustrate relationships between lamps, switches, dimmers, potentiometers, circuit breakers, transformers, relays, power buses, and control panels. This information is useful when tracing how a lighting circuit is supplied and controlled or when confirming that a fault is in the lamp assembly rather than the upstream switch, dimmer, relay, transformer, or electrical supply.
Aircraft Effectivity and Configuration Detail
Chapter 33 repeatedly provides specific aircraft-effectivity information where lighting installations changed between aircraft configurations or service-bulletin states. Some subjects apply to all aircraft, while others identify individual aircraft numbers and groups. This is especially important for passenger-compartment equipment, navigation-light arrangements, beacon and emergency-light installations, and other systems where components or procedures differ. Technicians can therefore match the applicable pageblock and procedure to the configuration being maintained instead of treating every Regional Jet lighting installation as identical.
Maintain and Diagnose Canadair Regional Jet Lighting Systems
The Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005 supports a wide range of real maintenance work: understanding lighting-system operation, locating components, checking circuit and control functions, performing operational tests, removing and installing lights and associated electrical equipment, inspecting applicable installations, adjusting lighting systems, and working through configuration-specific procedures. Having the correct maintenance sequence, electrical precautions, component references, and effectivity information available is especially valuable when a lighting fault involves more than simply replacing a lamp.
This manual is supplied as an instant PDF download after payment. There is no physical book and no shipping delay. You can open the PDF on a computer, tablet, or other compatible device and print the pages required for workshop or maintenance use.
Reviews
There are no reviews yet.