★ TRUSTED BY 321,897+ PROFESSIONALS WORLDWIDE
🏢
Trusted Business
Verified & Licensed
🛡️
Virus Free Files
100% Safe Downloads
🔒
Secure Payment
SSL Protected
Instant Delivery
Available Immediately
Sale!

Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005

Original price was: $44.95.Current price is: $26.95.

Comprehensive Canadair Regional Jet Aircraft Maintenance Manual covering ATA Chapter 33 lighting systems, including flight compartment, passenger compartment, service and maintenance, exterior, and emergency lighting. Contains detailed system descriptions, component locations, operational tests, removal and installation procedures, inspections, adjustments, electrical information, and illustrated component and schematic diagrams.

Instant PDF Download
Available immediately
💾
Save to Your Device
Download & keep forever
🛡️
Antivirus Scanned
100% virus-free
🌍
Trusted Worldwide
175,000+ customers

Description

Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005

This Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005 provides extensive maintenance information for the aircraft lighting systems grouped under ATA Chapter 33. The material covers lighting used in the flight compartment, passenger compartment, service and maintenance areas, on the exterior of the aircraft, and throughout the emergency lighting system. It is structured as a working aircraft maintenance reference, combining system description and operation sections with component-location information, operational tests, removal and installation tasks, adjustments, inspections, safety precautions, and illustrated maintenance figures.

The chapter is particularly detailed because the Regional Jet lighting system is divided into many independent circuits and individual components. Procedures identify applicable circuit breakers, electrical connectors, access areas, lighting control panels, power units, dimmers, transformers, relays, lamps, switches, signs, battery packs, inverters, chargers, and emergency-light assemblies. Aircraft effectivity is stated throughout the chapter where configurations differ, allowing maintenance personnel to determine which procedure and component arrangement applies to the aircraft being serviced.

File Details

  • Manual type: Aircraft Maintenance Manual – ATA Chapter 33 Lights
  • Aircraft: Canadair Regional Jet
  • Chapter: 33 – Lights
  • Language: English
  • Page count: 1294 pages
  • File format: PDF
  • Effective date: Dec 10/2005

Lighting System Maintenance Coverage

The Canadair Regional Jet Chapter 33 Lights manual begins with an overall description of how the aircraft lighting circuits are arranged and powered. It explains the relationship between the AC and DC buses and the lighting circuits and identifies the principal lighting groups used throughout the aircraft. This provides the system-level background needed before working on individual lights, panels, dimmers, transformers, relays, signs, or emergency-light components.

Flight-compartment coverage includes panel floodlighting, integral panel lighting, display and control-panel illumination, map and chart-holder lights, standby-compass lighting, and floor floodlights. The chapter identifies where these components are installed and how their brightness controls operate. For the panel floodlighting system, for example, the manual includes component-location illustrations, a simplified electrical schematic, an operational test, and removal and installation procedures for the individual panel floodlights.

The passenger-compartment section is extensive and deals with the lighting encountered by passengers and cabin crew. It covers ceiling and sidewall illumination, reading lights, flight-attendant and boarding lights, passenger information signs, lavatory lighting, and galley lighting. Power units, dimmers, relays, switches, lamp assemblies, and control panels are treated as separate maintenance subjects where required. Many of these procedures contain aircraft-effectivity statements because equipment configuration varies between aircraft.

IMAGES PREVIEW

Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights - December 2005 — PDF page 845 preview
Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights - December 2005 — PDF page 84 preview
Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights - December 2005 — PDF page 1149 preview

Service and maintenance lighting is also included. This part of the Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights addresses lighting used in cargo, avionics, equipment, and wheel-well areas during servicing or maintenance operations. Exterior-lighting coverage then moves to the systems required for ground operation, flight visibility, inspection, and collision avoidance, including landing, taxi/recognition, navigation, wing inspection, anticollision, beacon, stair, and logo lights.

The emergency-lighting portion includes the normal Chapter 33 system description together with individual emergency-light components. Floor-track lights, emergency battery packs, charger assemblies, inverters, lighted exit signs, ceiling and floor-level emergency floodlights, and exterior emergency lights are covered through dedicated maintenance subjects. This gives technicians a single chapter for both the normal aircraft lighting equipment and the emergency illumination system.

Chapters Covered

  • 33-00-00 – Lighting System
    • Description and operation
    • Flight-compartment lighting
    • Passenger-compartment lighting
    • Service and maintenance lighting
    • Exterior lighting
    • Emergency lighting
  • 33-10-00 – Flight Compartment Lighting System
    • Panel floodlighting system
    • Panel integral lighting
    • Miscellaneous lighting system
    • Panel floodlights
    • Overhead-panel lighting power supplies and dimmers
    • Instrument-lighting and center-pedestal lighting panels
    • Floor floodlights, map-reading lights, lighted chart holders, and standby-compass light dimmer
  • 33-20-00 – Passenger Compartment Lighting
    • Passenger compartment ceiling and sidewall lights
    • Ceiling and sidewall light power units and relays
    • Reading lights and reading-light switches
    • Flight-attendant call lights and switches
    • Dome, flight-attendant, and boarding lights
    • Flight-attendant and boarding-light dimmers and inverters
    • Flight-attendant control panels
    • Lighted passenger, lavatory, galley, and windscreen ordinance signs
    • Passenger sign/emergency-light control panel
    • Lavatory dome and vanity lighting
    • Lavatory light power unit/dimmer, occupied relay, microswitch, and attendant call switch
    • Galley lights and galley light power unit/dimmer
  • 33-30-00 – Service and Maintenance Lighting
    • Service lights
    • Cargo-door light
    • Maintenance lights
    • Caged maintenance light
    • Dome maintenance light
  • 33-40-00 – Exterior Lighting System
    • Landing and taxi/recognition lights
    • Wing landing and taxi/recognition light assemblies
    • Nose landing light
    • Landing-light control panel
    • Landing and taxi/recognition light transformers
    • Navigation lights
    • Wing and vertical-stabilizer navigation lights
    • Navigation-light transformers and step-down transformer
    • Wing inspection lights
    • Anticollision strobe and beacon lights
    • External-lights panel
    • Wing and rear anticollision lights and power supplies
    • Beacon light and beacon power supply
    • Stair lights
    • Logo lights and logo-light transformer
  • 33-50-00 – Emergency Lighting
    • Emergency lights system
    • Floor-track emergency lights
    • Battery packs
    • Charger assemblies
    • Inverters
    • Door-exit beta lights
    • Floor-level and conventional lighted exit signs
    • Ceiling emergency floodlights
    • Floor-level emergency floodlights
    • Exterior emergency lights

Together these sections provide both a system-level understanding of the Regional Jet lighting installation and task-level instructions for maintaining individual components. The chapter is not limited to a simple wiring or component catalog: it follows the maintenance workflow from understanding system operation and locating a component through testing, removing, installing, inspecting, or adjusting it as applicable.

Complete PDF Bookmark Tree

Complete Bookmarks

The complete bookmarks in the “Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005” are as follows:

Chapter 33
Effective Pagesp. 1
Contentsp. 19
Section 00p. 71
33-00-00p. 71
1: LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 71
1. Generalp. 71
2. Descriptionp. 71
A. Flight-Compartment Lighting Systemp. 71
B. Passenger-Compartment Lighting Systemp. 71
C. Service and Maintenance Lightingp. 73
D. Exterior Lighting Systemp. 73
E. Emergency Lighting Systemp. 75
Section 10p. 77
33-10-00p. 77
1: FLIGHT COMPARTMENT LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 77
1. Generalp. 77
2. Descriptionp. 77
A. Panel Floodlightingp. 77
B. Panel Integral Lightingp. 77
C. Miscellaneous Lightingp. 77
3. Operationp. 78
A. Panel Floodlightingp. 78
B. Panel Integral Lightingp. 78
C. Miscellaneous Lighting Systemp. 79
Section 11p. 81
33-11-00p. 81
1: PANEL FLOODLIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 81
1. Generalp. 81
2. Component Detailsp. 81
A. Panel Floodlightsp. 81
B. Potentiometersp. 81
3. Operationp. 81
A. Pilots Floodlightingp. 81
B. Instrument Panel Floodlightingp. 82
C. Copilots Floodlightingp. 82
4. Component Location Indexp. 82
Panel Floodlighting System – Component Location/Recognitionp. 83
Figure 1p. 83
Panel Floodlighting System – Simplified Schematic Diagramp. 84
Figure 2p. 84
501: PANEL FLOODLIGHTING SYSTEM – ADJUSTMENT/TESTp. 85
1. Generalp. 85
Task 33-11-00-710-801 Operational Test of the Panel Floodlighting Systemp. 85
1. Job Set-Up Informationp. 85
Subtask 33-11-00-946-001p. 85
2. Job Set-Upp. 85
Subtask 33-11-00-865-001p. 85
Subtask 33-11-00-860-001p. 85
Subtask 33-11-00-861-001p. 85
3. Procedurep. 86
Subtask 33-11-00-710-001p. 86
4. Close Outp. 87
Subtask 33-11-00-861-002p. 87
Subtask 33-11-00-941-001p. 87
33-11-01p. 89
401: FLOODLIGHT, PANEL – REMOVAL/INSTALLATIONp. 89
1. Generalp. 89
Task 33-11-01-000-801 Removal of the Panel Floodlightp. 89
1. Job Set-Up Informationp. 89
Subtask 33-11-01-946-001p. 89
2. Job Set-Upp. 89
Subtask 33-11-01-910-001p. 89
Subtask 33-11-01-865-001p. 89
3. Procedurep. 90
Subtask 33-11-01-020-001p. 90
Panel Floodlight – Removal/Installationp. 91
Figure 401p. 91
Task 33-11-01-400-801 Installation of the Panel Floodlightp. 92
1. Job Set-Up Informationp. 92
Subtask 33-11-01-945-001p. 92
Subtask 33-11-01-946-002p. 92
2. Procedurep. 92
Subtask 33-11-01-420-001p. 92
3. Close Outp. 92
Subtask 33-11-01-865-002p. 92
Subtask 33-11-01-710-001p. 92
Subtask 33-11-01-941-001p. 92
Section 12p. 93
33-12-00p. 93
1: PANEL INTEGRAL LIGHTING – DESCRIPTION AND OPERATIONp. 93
1. Generalp. 93
2. Component Detailsp. 93
A. Overhead Panelp. 93
B. Pilots Instrument Panels and Side Consolep. 94
C. Copilots Instrument Panels and Side Consolep. 95
D. Copilots Instrument Panels and Side Consolep. 95
E. Center Instrument Panel and Pedestalp. 96
3. Operationp. 98
A. Overhead Panelp. 99
B. Pilots Instrument Panels and Side Consolep. 99
C. Copilots Instrument Panels and Side Consolep. 99
D. Center Instrument Panel, Pedestal and Circuit Breaker Panelsp. 100
E. Center Instrument Panel, Pedestal and Circuit Breaker Panelsp. 100
F. Center Instrument Panel, Pedestal and Circuit Breaker Panelsp. 101
4. Component Location Indexp. 102
Overhead Panel Integral Lighting – Component Locationsp. 105
Figure 1p. 105
Pilot’s Instrument Panels and Side Console Integral Lighting – Component Locationsp. 106
Figure 2 (Sheet 1 of 2)p. 106
Figure 2 (Sheet 2 of 2)p. 107
Copilot’s Instrument Panel and Side Console Integral Lighting – Component Locationsp. 108
Figure 3 (Sheet 1 of 2)p. 108
Figure 3 (Sheet 2 of 2)p. 109
Copilot’s Instrument Panels and Side Console Integral Lighting – Component Locationsp. 110
Figure 4 (Sheet 1 of 2)p. 110
Figure 4 (Sheet 2 of 2)p. 111
Center Instrument Panel and Pedestal Integral Lighting – Component Locationsp. 112
Figure 5 (Sheet 1 of 3)p. 112
Figure 5 (Sheet 2 of 3)p. 113
Figure 5 (Sheet 3 of 3)p. 114
Center Instrument Panel and Pedestal Integral Lighting – Component Locationsp. 115
Figure 6 (Sheet 1 of 3)p. 115
Figure 6 (Sheet 2 of 3)p. 116
Figure 6 (Sheet 3 of 3)p. 117
Overhead Panel Integral Lighting – Schematic Diagramp. 118
Figure 7 (Sheet 1 of 2)p. 118
Figure 7 (Sheet 2 of 2)p. 119
Pilot’s Instrument Panels and Side Console Integral Lighting – Simplified Schematic Diagramp. 120
Figure 8p. 120
Copilot’s Instrument Panels and Side Console Integral Lighting – Simplified Schematic Diagramp. 121
Figure 9p. 121
Center Instrument Panel and Pedestal Integral Lighting – Simplified Schematic Diagramp. 122
Figure 10 (Sheet 1 of 5)p. 122
Figure 10 (Sheet 2 of 5)p. 123
Figure 10 (Sheet 3 of 5)p. 124
Figure 10 (Sheet 4 of 5)p. 125
Figure 10 (Sheet 5 of 5)p. 126
Center Instrument Panel and Pedestal Integral Lighting – Component Locationsp. 127
Figure 11 (Sheet 1 of 5)p. 127
Figure 11 (Sheet 2 of 5)p. 128
Figure 11 (Sheet 3 of 5)p. 129
Figure 11 (Sheet 4 of 5)p. 130
Figure 11 (Sheet 5 of 5)p. 131
Center Instrument Panel and Pedestal Integral Lighting – Simplified Schematic Diagramp. 132
Figure 12 (Sheet 1 of 5)p. 132
Figure 12 (Sheet 2 of 5)p. 133
Figure 12 (Sheet 3 of 5)p. 134
Figure 12 (Sheet 4 of 5)p. 135
Figure 12 (Sheet 5 of 5)p. 136
501: PANEL INTEGRAL LIGHTING – ADJUSTMENT/TESTp. 137
1. Generalp. 137
Task 33-12-00-710-801 Operational Test of the Panel Integral Lightingp. 137
1. Job Set-Up Informationp. 137
Subtask 33-12-00-946-001p. 137
2. Job Set-Upp. 137
Subtask 33-12-00-865-001p. 137
Subtask 33-12-00-860-001p. 138
Subtask 33-12-00-861-001p. 138
3. Procedurep. 138
Subtask 33-12-00-710-001p. 138
Subtask 33-12-00-710-002p. 139
Subtask 33-12-00-710-003p. 140
Subtask 33-12-00-710-004p. 141
Subtask 33-12-00-710-012p. 143
Subtask 33-12-00-710-013p. 144
Subtask 33-12-00-710-014p. 144
Subtask 33-12-00-710-015p. 145
Subtask 33-12-00-710-016p. 145
Subtask 33-12-00-710-017p. 145
Subtask 33-12-00-710-018p. 147
Subtask 33-12-00-710-019p. 147
Subtask 33-12-00-710-020p. 148
Subtask 33-12-00-710-021p. 148
Subtask 33-12-00-710-022p. 149
Subtask 33-12-00-710-010p. 149
Subtask 33-12-00-710-011p. 149
4. Close Outp. 150
Subtask 33-12-00-861-002p. 150
Subtask 33-12-00-941-001p. 150
33-12-01p. 151
401: DIMMER, INSTRUMENT-PANEL INTEGRAL-LIGHTING – REMOVAL/INSTALLATIONp. 151
1. Generalp. 151
Task 33-12-01-000-801 Removal of the Instrument-Panel Integral-Lighting Dimmerp. 151
1. Job Set-Up Informationp. 151
Subtask 33-12-01-946-001p. 151
2. Job Set-Upp. 151
Subtask 33-12-01-910-001p. 151
Subtask 33-12-01-865-001p. 151
Subtask 33-12-01-010-001p. 152
3. Procedurep. 152
Subtask 33-12-01-020-001p. 152
Instrument-Panel Integral-Lighting Dimmer – Removal/Installationp. 153
Figure 401p. 153
Task 33-12-01-400-801 Installation of the Instrument-Panel Integral-Lighting Dimmerp. 154
1. Job Set-Up Informationp. 154
Subtask 33-12-01-945-001p. 154
Subtask 33-12-01-946-002p. 154
2. Job Set-Upp. 154
Subtask 33-12-01-869-001p. 154
3. Procedurep. 154
Subtask 33-12-01-420-001p. 154
4. Close Outp. 154
Subtask 33-12-01-865-002p. 154
Subtask 33-12-01-710-001p. 155
Subtask 33-12-01-941-001p. 155
Subtask 33-12-01-410-001p. 155
33-12-04p. 157
401: POWER-SUPPLY, CENTER-PEDESTAL INTEGRAL-LIGHTING – REMOVAL/INSTALLATIONp. 157
1. Generalp. 157
Task 33-12-04-000-801 Removal of the Center-Pedestal Integral-Lighting Power-Supplyp. 157
1. Job Set-Up Informationp. 157
Subtask 33-12-04-946-001p. 157
2. Job Set-Upp. 157
Subtask 33-12-04-910-001p. 157
Subtask 33-12-04-865-001p. 157
Subtask 33-12-04-010-001p. 157
3. Procedurep. 158
Subtask 33-12-04-020-001p. 158
Center-Pedestal Integral-Lighting Power-Supply – Removal/Installationp. 159
Figure 401p. 159
Task 33-12-04-400-801 Installation of the Center-Pedestal Integral-Lighting Power-Supplyp. 160
1. Job Set-Up Informationp. 160
Subtask 33-12-04-945-001p. 160
Subtask 33-12-04-946-002p. 160
Subtask 33-12-04-869-001p. 160
2. Procedurep. 160
Subtask 33-12-04-420-001p. 160
3. Close Outp. 160
Subtask 33-12-04-865-002p. 160
Subtask 33-12-04-710-001p. 160
Subtask 33-12-04-941-001p. 161
Subtask 33-12-04-410-001p. 161
33-12-07p. 163
401: DIMMER, CENTER-PEDESTAL INTEGRAL-LIGHTING – REMOVAL/INSTALLATIONp. 163
1. Generalp. 163
Task 33-12-07-000-801 Removal of the Center-Pedestal Integral-Lighting Dimmerp. 163
1. Job Set-Up Informationp. 163
Subtask 33-12-07-946-001p. 163
2. Job Set-Upp. 163
Subtask 33-12-07-910-001p. 163
Subtask 33-12-07-865-001p. 163
Subtask 33-12-07-010-001p. 164
3. Procedurep. 164
Subtask 33-12-07-020-001p. 164
Dimmer, Center-Instrument Panel and Pedestal – Removal/Installationp. 165
Figure 401p. 165
Task 33-12-07-400-801 Installation of the Center-Pedestal Integral-Lighting Dimmerp. 166
1. Job Set-Up Informationp. 166
Subtask 33-12-07-945-001p. 166
Subtask 33-12-07-946-002p. 166
2. Job Set-Upp. 166
Subtask 33-12-07-869-001p. 166
3. Procedurep. 166
Subtask 33-12-07-420-001p. 166
4. Close Outp. 166
Subtask 33-12-07-865-002p. 166
Subtask 33-12-07-710-001p. 167
Subtask 33-12-07-941-001p. 167
Subtask 33-12-07-410-001p. 167
33-12-08p. 169
401: POWER-SUPPLY, CENTER-PEDESTAL DISPLAY-LIGHTING – REMOVAL/INSTALLATIONp. 169
1. Generalp. 169
Task 33-12-08-000-801 Removal of the Center-Pedestal Display-Lighting Power-Supplyp. 169
1. Job Set-Up Informationp. 169
Subtask 33-12-08-946-001p. 169
2. Job Set-Upp. 169
Subtask 33-12-08-910-001p. 169
Subtask 33-12-08-865-001p. 169
Subtask 33-12-08-010-001p. 169
3. Procedurep. 170
Subtask 33-12-08-020-001p. 170
Center-Pedestal Display-Lighting Power-Supply – Removal/Installationp. 171
Figure 401p. 171
Task 33-12-08-400-801 Installation of the Center-Pedestal Display-Lighting Power-Supplyp. 172
1. Job Set-Up Informationp. 172
Subtask 33-12-08-945-001p. 172
Subtask 33-12-08-946-002p. 172
2. Job Set-Upp. 172
Subtask 33-12-08-869-001p. 172
3. Procedurep. 172
Subtask 33-12-08-420-001p. 172
4. Close Outp. 172
Subtask 33-12-08-865-002p. 172
Subtask 33-12-08-710-001p. 173
Subtask 33-12-08-941-001p. 173
Subtask 33-12-08-410-001p. 173
33-12-10p. 175
401: POWER-SUPPLY, OVERHEAD-PANEL LIGHTING – REMOVAL/INSTALLATIONp. 175
1. Generalp. 175
Task 33-12-10-000-801 Removal of the Overhead-Panel Lighting Power-Supplyp. 175
1. Job Set-Up Informationp. 175
Subtask 33-12-10-946-001p. 175
2. Job Set-Upp. 175
Subtask 33-12-10-910-001p. 175
Subtask 33-12-10-865-001p. 175
Subtask 33-12-10-010-001p. 175
3. Procedurep. 176
Subtask 33-12-10-020-001p. 176
Overhead-Panel Lighting Power-Supply – Removal/Installationp. 177
Figure 401p. 177
Task 33-12-10-400-801 Installation of the Overhead-Panel Lighting Power-Supplyp. 178
1. Job Set-Up Informationp. 178
Subtask 33-12-10-945-001p. 178
Subtask 33-12-10-946-002p. 178
2. Job Set-Upp. 178
Subtask 33-12-10-869-001p. 178
3. Procedurep. 178
Subtask 33-12-10-420-001p. 178
4. Close Outp. 178
Subtask 33-12-10-865-002p. 178
Subtask 33-12-10-710-001p. 179
Subtask 33-12-10-941-001p. 179
Subtask 33-12-10-410-001p. 179
33-12-13p. 181
401: DIMMER, OVERHEAD-PANEL LIGHTING – REMOVAL/INSTALLATIONp. 181
1. Generalp. 181
Task 33-12-13-000-801 Removal of the Overhead-Panel Lighting Dimmerp. 181
1. Job Set-Up Informationp. 181
Subtask 33-12-13-946-001p. 181
2. Job Set-Upp. 181
Subtask 33-12-13-910-001p. 181
Subtask 33-12-13-865-001p. 181
Subtask 33-12-13-010-001p. 181
3. Procedurep. 182
Subtask 33-12-13-020-001p. 182
Overhead-Panel Lighting Dimmer – Removal/Installationp. 183
Figure 401p. 183
Task 33-12-13-400-801 Installation of the Overhead-Panel Lighting Dimmerp. 184
1. Job Set-Up Informationp. 184
Subtask 33-12-13-945-001p. 184
Subtask 33-12-13-946-002p. 184
2. Job Set-Upp. 184
Subtask 33-12-13-869-001p. 184
3. Procedurep. 184
Subtask 33-12-13-420-001p. 184
4. Close Outp. 184
Subtask 33-12-13-865-002p. 184
Subtask 33-12-13-710-001p. 185
Subtask 33-12-13-941-001p. 185
Subtask 33-12-13-410-001p. 185
33-12-16p. 187
401: PANEL, INSTRUMENT-LIGHTING CONTROL – REMOVAL/INSTALLATIONp. 187
1. Generalp. 187
Task 33-12-16-000-801 Removal of the Instrument-Lighting Control Panelp. 187
1. Job Set-Up Informationp. 187
Subtask 33-12-16-946-001p. 187
2. Job Set-Upp. 187
Subtask 33-12-16-910-001p. 187
Subtask 33-12-16-865-001p. 187
3. Procedurep. 188
Subtask 33-12-16-020-001p. 188
Instrument-Lighting Control Panel – Removal/Installationp. 189
Figure 401p. 189
Task 33-12-16-400-801 Installation of the Instrument-Lighting Control Panelp. 190
1. Job Set-Up Informationp. 190
Subtask 33-12-16-946-002p. 190
2. Job Set-Upp. 190
Subtask 33-12-16-869-001p. 190
3. Procedurep. 190
Subtask 33-12-16-420-001p. 190
4. Close Outp. 190
Subtask 33-12-16-865-002p. 190
Subtask 33-12-16-710-001p. 191
Subtask 33-12-16-941-001p. 191
501: PANEL, INSTRUMENT-LIGHTING CONTROL- ADJUSTMENT/TESTp. 193
1. Generalp. 193
Task 33-12-16-710-801 Operational Test of the Pilot’s Instrument-Lighting Control Panelp. 193
1. Job Set-Up Informationp. 193
Subtask 33-12-16-946-003p. 193
2. Job Set-Upp. 193
Subtask 33-12-16-865-003p. 193
Subtask 33-12-16-860-001p. 193
Subtask 33-12-16-861-001p. 194
3. Procedurep. 194
Subtask 33-12-16-710-002p. 194
4. Close Outp. 195
Subtask 33-12-16-861-002p. 195
Subtask 33-12-16-941-002p. 195
Task 33-12-16-710-802 Operational Test of the Copilot’s Instrument-Lighting Control Panelp. 196
1. Job Set-Up Informationp. 196
Subtask 33-12-16-946-004p. 196
2. Job Set-Upp. 196
Subtask 33-12-16-865-004p. 196
Subtask 33-12-16-860-002p. 196
Subtask 33-12-16-861-003p. 196
3. Procedurep. 196
Subtask 33-12-16-710-003p. 196
4. Close Outp. 198
Subtask 33-12-16-861-004p. 198
Subtask 33-12-16-941-003p. 198
33-12-19p. 199
401: PANEL, CENTER-PEDESTAL LIGHTING – REMOVAL/INSTALLATIONp. 199
1. Generalp. 199
Task 33-12-19-000-801 Removal of the Center-Pedestal Lighting Panelp. 199
1. Job Set-Up Informationp. 199
Subtask 33-12-19-946-001p. 199
2. Job Set-Upp. 199
Subtask 33-12-19-910-001p. 199
Subtask 33-12-19-865-001p. 199
3. Procedurep. 199
Subtask 33-12-19-020-001p. 199
Center-Pedestal Lighting Panel – Removal/Installationp. 201
Figure 401p. 201
Task 33-12-19-400-801 Installation of the Center-Pedestal Lighting Panelp. 202
1. Job Set-Up Informationp. 202
Subtask 33-12-19-946-002p. 202
2. Job Set-Upp. 202
Subtask 33-12-19-869-001p. 202
3. Procedurep. 202
Subtask 33-12-19-420-001p. 202
4. Close Outp. 202
Subtask 33-12-19-865-002p. 202
Subtask 33-12-19-710-001p. 202
Subtask 33-12-19-941-001p. 203
501: PANEL, CENTER-PEDESTAL LIGHTING – ADJUSTMENT/TESTp. 205
1. Generalp. 205
Task 33-12-19-710-801 Operational Test of the Center-Pedestal Lighting Panelp. 205
1. Job Set-Up Informationp. 205
Subtask 33-12-19-946-003p. 205
2. Job Set-Upp. 205
Subtask 33-12-19-865-003p. 205
Subtask 33-12-19-860-001p. 205
Subtask 33-12-19-861-001p. 206
3. Procedurep. 206
Subtask 33-12-19-710-002p. 206
Subtask 33-12-19-710-003p. 207
Subtask 33-12-19-710-004p. 208
Subtask 33-12-19-710-007p. 208
Subtask 33-12-19-710-008p. 208
Subtask 33-12-19-710-009p. 209
Subtask 33-12-19-710-010p. 209
Subtask 33-12-19-710-011p. 210
Subtask 33-12-19-710-012p. 210
Subtask 33-12-19-710-005p. 211
Subtask 33-12-19-710-006p. 211
Subtask 33-12-19-710-013p. 212
Subtask 33-12-19-710-014p. 212
Subtask 33-12-19-710-015p. 213
Subtask 33-12-19-710-016p. 213
Subtask 33-12-19-710-017p. 214
Subtask 33-12-19-710-018p. 214
4. Close Outp. 215
Subtask 33-12-19-861-002p. 215
Subtask 33-12-19-941-002p. 215
Section 13p. 217
33-13-00p. 217
1: MISCELLANEOUS LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 217
1. Generalp. 217
2. Component Detailsp. 217
A. Floor Floodlights of Pilots and Copilots Floor Floodlightsp. 218
B. Lighted Chart Holdersp. 218
C. Map Reading Lightsp. 218
D. Dome Light (Cockpit)p. 218
E. Dome Lights (Cockpit)p. 218
F. Dome Lights (Cockpit)p. 219
G. Standby Compass Lightp. 219
H. Sterile Lightsp. 219
3. Operationp. 219
A. Floor Floodlightsp. 221
B. Pilots and Copilots Chart Holdersp. 221
C. Map Reading Lightsp. 221
D. Standby Compass Lightp. 221
E. Dome Light (Cockpit)p. 221
F. Dome Light (Cockpit)p. 222
G. Sterile Lightp. 222
4. Component Location Indexp. 222
Miscellaneous Lighting – Component Locationsp. 225
Figure 1 (Sheet 1 of 3)p. 225
Figure 1 (Sheet 2 of 3)p. 226
Figure 1 (Sheet 3 of 3)p. 227
Miscellaneous Lighting – Component Locationsp. 228
Figure 2 (Sheet 1 of 4)p. 228
Figure 2 (Sheet 2 of 4)p. 229
Figure 2 (Sheet 3 of 4)p. 230
Figure 2 (Sheet 4 of 4)p. 231
Miscellaneous Lighting – Component Locationsp. 232
Figure 3 (Sheet 1 of 4)p. 232
Figure 3 (Sheet 2 of 4)p. 233
Figure 3 (Sheet 3 of 4)p. 234
Figure 3 (Sheet 4 of 4)p. 235
Miscellaneous Lighting – Component Locationsp. 236
Figure 4 (Sheet 1 of 4)p. 236
Figure 4 (Sheet 2 of 4)p. 237
Figure 4 (Sheet 3 of 4)p. 238
Figure 4 (Sheet 4 of 4)p. 239
Miscellaneous Lighting – Simplified Schematic Diagramp. 240
Figure 5p. 240
Miscellaneous Lights – Simplified Schematic Diagramp. 241
Figure 6p. 241
Miscellaneous Lighting – Simplified Schematic Diagramp. 242
Figure 7p. 242
Miscellaneous Lighting – Simplified Schematic Diagramp. 243
Figure 8p. 243
Miscellaneous Lights – Simplified Block Diagramp. 244
Figure 9p. 244
Miscellaneous Lights – Simplified Schematic Diagramp. 245
Figure 10p. 245
Miscellaneous Lighting Panel – Simplified Schematic Diagramp. 246
Figure 11p. 246
501: MISCELLANEOUS LIGHTING SYSTEM – ADJUSTMENT/TESTp. 247
1. Generalp. 247
Task 33-13-00-710-801 Operational Test of the Miscellaneous Lighting Systemp. 247
1. Job Set-Up Informationp. 247
Subtask 33-13-00-946-001p. 247
2. Job Set-Upp. 247
Subtask 33-13-00-865-001p. 247
Subtask 33-13-00-861-001p. 247
3. Procedurep. 248
Subtask 33-13-00-710-001p. 248
Subtask 33-13-00-710-002p. 249
4. Close Outp. 251
Subtask 33-13-00-861-002p. 251
Subtask 33-13-00-941-001p. 251
33-13-01p. 253
401: FLOODLIGHT, FLOOR – REMOVAL/INSTALLATIONp. 253
1. Generalp. 253
Task 33-13-01-000-801 Removal of the Floor Floodlightp. 253
1. Job Set-Up Informationp. 253
Subtask 33-13-01-946-001p. 253
2. Job Set-Upp. 253
Subtask 33-13-01-910-001p. 253
Subtask 33-13-01-865-001p. 253
3. Procedurep. 253
Subtask 33-13-01-020-001p. 253
Floor Floodlight – Removal/Installationp. 255
Figure 401p. 255
Task 33-13-01-400-801 Installation of the Floor Floodlightp. 256
1. Job Set-Up Informationp. 256
Subtask 33-13-01-946-002p. 256
2. Job Set-Upp. 256
Subtask 33-13-01-869-001p. 256
3. Procedurep. 256
Subtask 33-13-01-420-001p. 256
4. Close Outp. 256
Subtask 33-13-01-865-002p. 256
Subtask 33-13-01-710-001p. 256
Subtask 33-13-01-941-001p. 256
33-13-07p. 257
401: LIGHT, MAP READING – REMOVAL/INSTALLATIONp. 257
1. Generalp. 257
Task 33-13-07-000-801 Removal of the Map Reading Lightp. 257
1. Job Set-Up Informationp. 257
Subtask 33-13-07-946-001p. 257
2. Job Set-Upp. 257
Subtask 33-13-07-910-001p. 257
Subtask 33-13-07-865-001p. 257
3. Procedurep. 258
Subtask 33-13-07-020-001p. 258
Map Reading Light – Removal/Installationp. 259
Figure 401p. 259
Task 33-13-07-400-801 Installation of the Map Reading Lightp. 260
1. Job Set-Up Informationp. 260
Subtask 33-13-07-945-001p. 260
Subtask 33-13-07-946-002p. 260
2. Job Set-Upp. 260
Subtask 33-13-07-869-001p. 260
3. Procedurep. 260
Subtask 33-13-07-420-001p. 260
4. Close Outp. 260
Subtask 33-13-07-865-002p. 260
Subtask 33-13-07-710-001p. 261
Subtask 33-13-07-941-001p. 261
33-13-13p. 263
401: CHART HOLDER, LIGHTED – REMOVAL/INSTALLATIONp. 263
1. Generalp. 263
Task 33-13-13-000-801 Removal of the Lighted Chart Holderp. 263
1. Job Set-Up Informationp. 263
Subtask 33-13-13-946-001p. 263
2. Job Set-Upp. 263
Subtask 33-13-13-910-001p. 263
Subtask 33-13-13-865-001p. 263
3. Procedurep. 264
Subtask 33-13-13-020-001p. 264
Subtask 33-13-13-020-002p. 264
Lighted Chart Holder – Removal/Installationp. 265
Figure 401p. 265
Lighted Chart Holder – Removal/Installationp. 266
Figure 402p. 266
Task 33-13-13-400-801 Installation of the Lighted Chart Holderp. 267
1. Job Set-Up Informationp. 267
Subtask 33-13-13-945-001p. 267
Subtask 33-13-13-946-002p. 267
2. Job Set-Upp. 267
Subtask 33-13-13-869-001p. 267
3. Procedurep. 267
Subtask 33-13-13-420-001p. 267
Subtask 33-13-13-420-002p. 268
4. Close Outp. 268
Subtask 33-13-13-865-002p. 268
Subtask 33-13-13-710-001p. 268
Subtask 33-13-13-941-001p. 268
33-13-16p. 269
401: PANEL, MISCELLANEOUS LIGHTS – REMOVAL/INSTALLATIONp. 269
1. Generalp. 269
Task 33-13-16-000-801 Removal of the Miscellaneous Lights Panelp. 269
1. Job Set-Up Informationp. 269
Subtask 33-13-16-946-001p. 269
2. Job Set-Upp. 269
Subtask 33-13-16-910-001p. 269
Subtask 33-13-16-865-001p. 269
3. Procedurep. 270
Subtask 33-13-16-020-001p. 270
Miscellaneous Lights Panel – Removal/Installationp. 271
Figure 401p. 271
Task 33-13-16-400-801 Installation of the Miscellaneous Lights Panelp. 272
1. Job Set-Up Informationp. 272
Subtask 33-13-16-946-002p. 272
2. Job Set-Upp. 272
Subtask 33-13-16-869-001p. 272
3. Procedurep. 272
Subtask 33-13-16-420-001p. 272
4. Close Outp. 272
Subtask 33-13-16-865-002p. 272
Subtask 33-13-16-710-001p. 272
Subtask 33-13-16-941-001p. 273
Task 33-13-16-000-802 Removal of the Miscellaneous Lights Panel with Sterile Lightp. 274
1. Job Set-Up Informationp. 274
Subtask 33-13-16-946-004p. 274
2. Job Set-Upp. 274
Subtask 33-13-16-910-002p. 274
Subtask 33-13-16-865-005p. 274
3. Procedurep. 274
Subtask 33-13-16-020-002p. 274
Miscellaneous Lights Panel with Sterile Light – Removal/Installationp. 276
Figure 402p. 276
Task 33-13-16-400-802 Installation of the Miscellaneous Lights Panel with Sterile Lightp. 277
1. Job Set-Up Informationp. 277
Subtask 33-13-16-946-005p. 277
2. Job Set-Upp. 277
Subtask 33-13-16-869-002p. 277
3. Procedurep. 277
Subtask 33-13-16-420-002p. 277
4. Close Outp. 277
Subtask 33-13-16-865-006p. 277
Subtask 33-13-16-710-005p. 277
Subtask 33-13-16-941-003p. 278
501: PANEL, MISCELLANEOUS LIGHTS – ADJUSTMENT/TESTp. 279
1. Generalp. 279
Task 33-13-16-710-801 Operational Test of the Miscellaneous Lights Panelp. 279
1. Job Set-Up Informationp. 279
Subtask 33-13-16-946-003p. 279
2. Job Set-Upp. 279
Subtask 33-13-16-865-003p. 279
Subtask 33-13-16-865-004p. 280
Subtask 33-13-16-861-001p. 280
3. Procedurep. 281
Subtask 33-13-16-710-002p. 281
Subtask 33-13-16-710-003p. 282
Subtask 33-13-16-710-004p. 283
4. Close Outp. 285
Subtask 33-13-16-861-002p. 285
Subtask 33-13-16-941-002p. 285
Task 33-13-16-710-802 Operational Test of the Miscellaneous Lights Panel with Sterile Lightp. 286
1. Job Set-Up Informationp. 286
Subtask 33-13-16-946-006p. 286
2. Job Set-Upp. 286
Subtask 33-13-16-865-008p. 286
Subtask 33-13-16-861-003p. 286
3. Procedurep. 286
Subtask 33-13-16-710-007p. 286
33-13-19p. 289
401: DIMMER, STANDBY-COMPASS LIGHT – REMOVAL/INSTALLATIONp. 289
1. Generalp. 289
Task 33-13-19-000-801 Removal of the Standby-Compass Light Dimmerp. 289
1. Job Set-Up Informationp. 289
Subtask 33-13-19-946-001p. 289
2. Job Set-Upp. 289
Subtask 33-13-19-910-001p. 289
Subtask 33-13-19-865-001p. 289
Subtask 33-13-19-010-001p. 289
3. Procedurep. 290
Subtask 33-13-19-020-001p. 290
Standby-Compass Light Dimmer – Removal/Installationp. 291
Figure 401p. 291
Task 33-13-19-400-801 Installation of the Standby-Compass Light Dimmerp. 292
1. Job Set-Up Informationp. 292
Subtask 33-13-19-945-001p. 292
Subtask 33-13-19-946-002p. 292
2. Job Set-Upp. 292
Subtask 33-13-19-869-001p. 292
3. Procedurep. 292
Subtask 33-13-19-420-001p. 292
4. Close Outp. 292
Subtask 33-13-19-865-002p. 292
Subtask 33-13-19-710-001p. 293
Subtask 33-13-19-941-001p. 293
Subtask 33-13-19-410-001p. 293
Section 20p. 295
33-20-00p. 295
1: PASSENGER-COMPARTMENT LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 295
1. Generalp. 295
2. Descriptionp. 295
A. Passenger Compartment Lightsp. 295
B. Passenger Compartment Lightsp. 296
C. Reading Lightsp. 296
D. Dome, Flight Attendant (Forward and Aft), and Boarding Lightsp. 296
E. Dome, Flight Attendant, and Boarding Lightsp. 297
F. Lighted Ordinance Signsp. 297
G. Lavatory Lightsp. 297
H. Galley Lightsp. 297
3. Operationp. 297
A. Passenger Compartment Lightsp. 297
B. Reading Lightsp. 299
C. Dome, Flight Attendant (Forward and Aft), and Boarding Lightsp. 299
D. Dome, Flight Attendant, and Boarding Lightsp. 299
E. Lighted Ordinance Signsp. 301
F. Lavatory Lightsp. 301
G. Galley Lightsp. 301
Section 21p. 303
33-21-00p. 303
1: PASSENGER COMPARTMENT LIGHTS – DESCRIPTION AND OPERATIONp. 303
1. Generalp. 303
2. Component Detailsp. 304
A. Ceiling and Sidewall Lightsp. 304
B. Power Units/Dimmersp. 304
C. Light Switchesp. 304
D. Power Relaysp. 304
3. Operationp. 305
A. Powerp. 305
B. Ceiling and Sidewall Lightsp. 305
4. Component Location Indexp. 306
Passenger Compartment Ceiling and Sidewall Lights – Component Locationsp. 308
Figure 1 (Sheet 1 of 2)p. 308
Figure 1 (Sheet 2 of 2)p. 309
Passenger Compartment Ceiling and Sidewall Lights – Component Locationsp. 310
Figure 2 (Sheet 1 of 2)p. 310
Figure 2 (Sheet 2 of 2)p. 311
Passenger Compartment Ceiling and Sidewall Lights – Simplified Schematic Diagramp. 312
Figure 3p. 312
Passenger Compartment Ceiling and Sidewall Lights – Simplified Schematic Diagramp. 313
Figure 4p. 313
501: PASSENGER COMPARTMENT LIGHTS – ADJUSTMENT/TESTp. 315
1. Generalp. 315
Task 33-21-00-710-801 Operational Test of the Passenger Compartment Lightsp. 315
1. Job Set-Up Informationp. 315
Subtask 33-21-00-946-001p. 315
2. Job Set-Upp. 315
Subtask 33-21-00-861-001p. 315
Subtask 33-21-00-865-001p. 315
3. Procedurep. 315
Subtask 33-21-00-710-001p. 315
Subtask 33-21-00-710-002p. 316
Subtask 33-21-00-710-003p. 316
Subtask 33-21-00-710-004p. 317
Subtask 33-21-00-710-005p. 317
Subtask 33-21-00-710-006p. 318
Subtask 33-21-00-710-007p. 318
Subtask 33-21-00-710-008p. 319
4. Close Outp. 319
Subtask 33-21-00-941-001p. 319
Subtask 33-21-00-861-002p. 319
33-21-01p. 321
401: LIGHT, PASSENGER COMPARTMENT CEILING – REMOVAL/INSTALLATIONp. 321
1. Generalp. 321
Task 33-21-01-000-801 Removal of the Passenger-Compartment Ceiling Lightp. 321
1. Job Set-Up Informationp. 321
Subtask 33-21-01-943-001p. 321
Subtask 33-21-01-946-001p. 321
Subtask 33-21-01-946-003p. 322
Subtask 33-21-01-946-004p. 322
2. Job Set-Upp. 322
Subtask 33-21-01-910-001p. 322
Subtask 33-21-01-865-004p. 323
Subtask 33-21-01-010-001p. 323
Subtask 33-21-01-010-002p. 323
Subtask 33-21-01-010-003p. 324
3. Procedurep. 324
Subtask 33-21-01-941-002p. 324
Subtask 33-21-01-020-001p. 324
Subtask 33-21-01-020-002p. 324
Passenger-Compartment Ceiling Light – Removal/Installationp. 326
Figure 401p. 326
Passenger-Compartment Ceiling Light – Removal/Installationp. 327
Figure 402 (Sheet 1 of 2)p. 327
Figure 402 (Sheet 2 of 2)p. 328
Task 33-21-01-400-801 Installation of the Passenger-Compartment Ceiling Lightp. 329
1. Job Set-Up Informationp. 329
Subtask 33-21-01-946-002p. 329
Subtask 33-21-01-946-005p. 329
Subtask 33-21-01-946-006p. 330
2. Job Set-Upp. 330
Subtask 33-21-01-869-001p. 330
3. Procedurep. 330
Subtask 33-21-01-420-001p. 330
Subtask 33-21-01-420-002p. 331
4. Close Outp. 331
Subtask 33-21-01-865-003p. 331
Subtask 33-21-01-410-005p. 331
Subtask 33-21-01-410-001p. 332
Subtask 33-21-01-410-002p. 332
Subtask 33-21-01-861-001p. 332
Subtask 33-21-01-710-001p. 332
Subtask 33-21-01-710-002p. 333
Subtask 33-21-01-941-001p. 333
Subtask 33-21-01-861-002p. 333
33-21-04p. 335
401: POWER UNIT/DIMMER, CEILING LIGHTS – REMOVAL/INSTALLATIONp. 335
1. Generalp. 335
Task 33-21-04-000-801 Removal of the Power Unit/Dimmerp. 335
1. Job Set-Up Informationp. 335
Subtask 33-21-04-946-001p. 335
Subtask 33-21-04-946-003p. 335
Subtask 33-21-04-946-005p. 335
2. Job Set-Upp. 336
Subtask 33-21-04-910-001p. 336
Subtask 33-21-04-865-001p. 336
Subtask 33-21-04-010-001p. 336
Subtask 33-21-04-010-002p. 336
Subtask 33-21-04-010-003p. 337
3. Procedurep. 338
Subtask 33-21-04-020-001p. 338
Subtask 33-21-04-020-002p. 338
Ceiling-Lights Power Unit/Dimmer – Removal/Installationp. 340
Figure 401p. 340
Ceiling-Lights Power Unit/Dimmer – Removal/Installationp. 341
Figure 402 (Sheet 1 of 3)p. 341
Figure 402 (Sheet 2 of 3)p. 342
Figure 402 (Sheet 3 of 3)p. 343
Task 33-21-04-400-801 Installation of the Power Unit/Dimmerp. 344
1. Job Set-Up Informationp. 344
Subtask 33-21-04-945-001p. 344
Subtask 33-21-04-945-002p. 344
Subtask 33-21-04-946-002p. 345
Subtask 33-21-04-946-004p. 345
Subtask 33-21-04-946-007p. 345
2. Job Set-Upp. 346
Subtask 33-21-04-869-001p. 346
3. Procedurep. 346
Subtask 33-21-04-420-001p. 346
Subtask 33-21-04-420-003p. 346
Subtask 33-21-04-410-001p. 347
Subtask 33-21-04-410-002p. 347
Subtask 33-21-04-410-003p. 348
4. Close Outp. 348
Subtask 33-21-04-865-002p. 348
Subtask 33-21-04-861-001p. 349
Subtask 33-21-04-710-001p. 349
Subtask 33-21-04-710-002p. 349
Subtask 33-21-04-941-001p. 350
Subtask 33-21-04-861-002p. 350
33-21-06p. 351
401: POWER RELAY, CEILING LIGHTS – REMOVAL/INSTALLATIONp. 351
1. Generalp. 351
Task 33-21-06-000-801 Removal of the Power Relayp. 351
1. Job Set-Up Informationp. 351
Subtask 33-21-06-946-001p. 351
2. Job Set-Upp. 351
Subtask 33-21-06-910-001p. 351
Subtask 33-21-06-865-001p. 351
Subtask 33-21-06-010-002p. 351
Subtask 33-21-06-010-003p. 352
3. Procedurep. 352
Subtask 33-21-06-020-001p. 352
Subtask 33-21-06-020-002p. 353
Ceiling-Lights Power Relay – Removal/Installationp. 354
Figure 401p. 354
Ceiling-Lights Power Relay – Removal/Installationp. 355
Figure 402p. 355
Task 33-21-06-400-801 Installation of the Power Relayp. 356
1. Job Set-Up Informationp. 356
Subtask 33-21-06-945-001p. 356
Subtask 33-21-06-945-002p. 356
Subtask 33-21-06-946-002p. 356
2. Job Set-Upp. 357
Subtask 33-21-06-869-001p. 357
3. Procedurep. 357
Subtask 33-21-06-420-001p. 357
Subtask 33-21-06-420-002p. 357
Subtask 33-21-06-410-002p. 357
Subtask 33-21-06-410-003p. 358
4. Close Outp. 358
Subtask 33-21-06-865-002p. 358
Subtask 33-21-06-861-001p. 358
Subtask 33-21-06-710-001p. 358
Subtask 33-21-06-710-002p. 359
Subtask 33-21-06-941-001p. 359
Subtask 33-21-06-861-002p. 359
33-21-07p. 361
401: LIGHT, PASSENGER COMPARTMENT SIDEWALL – REMOVAL/INSTALLATIONp. 361
1. Generalp. 361
Task 33-21-07-000-801 Removal of the Passenger-Compartment Sidewall Lightp. 361
1. Job Set-Up Informationp. 361
Subtask 33-21-07-946-001p. 361
2. Job Set-Upp. 361
Subtask 33-21-07-910-001p. 361
Subtask 33-21-07-865-001p. 361
Subtask 33-21-07-010-001p. 361
3. Procedurep. 362
Subtask 33-21-07-020-001p. 362
Passenger-Compartment Sidewall Light – Removal/Installationp. 363
Figure 401p. 363
Task 33-21-07-400-801 Installation of the Passenger-Compartment Sidewall Lightp. 364
1. Job Set-Up Informationp. 364
Subtask 33-21-07-946-002p. 364
2. Job Set-Upp. 364
Subtask 33-21-07-869-001p. 364
3. Procedurep. 364
Subtask 33-21-07-420-001p. 364
Subtask 33-21-07-410-001p. 364
4. Close Outp. 364
Subtask 33-21-07-865-002p. 364
Subtask 33-21-07-861-001p. 365
Subtask 33-21-07-710-001p. 365
Subtask 33-21-07-941-001p. 365
Subtask 33-21-07-861-002p. 365
33-21-10p. 367
401: POWER UNIT/DIMMER, SIDEWALL LIGHTS – REMOVAL/INSTALLATIONp. 367
1. Generalp. 367
Task 33-21-10-000-801 Removal of the Power Unit/Dimmerp. 367
1. Job Set-Up Informationp. 367
Subtask 33-21-10-946-001p. 367
2. Job Set-Upp. 367
Subtask 33-21-10-910-001p. 367
Subtask 33-21-10-865-001p. 367
Subtask 33-21-10-010-001p. 367
Subtask 33-21-10-010-002p. 368
3. Procedurep. 369
Subtask 33-21-10-020-001p. 369
Subtask 33-21-10-020-002p. 369
Sidewall-Lights Power Unit/Dimmer – Removal/Installationp. 370
Figure 401p. 370
Sidewall-Lights Power Unit/Dimmer – Removal/Installationp. 371
Figure 402 (Sheet 1 of 2)p. 371
Figure 402 (Sheet 2 of 2)p. 372
Task 33-21-10-400-801 Installation of the Power Unit/Dimmerp. 373
1. Job Set-Up Informationp. 373
Subtask 33-21-10-945-001p. 373
Subtask 33-21-10-945-002p. 373
Subtask 33-21-10-946-002p. 373
2. Job Set-Upp. 374
Subtask 33-21-10-869-001p. 374
3. Procedurep. 374
Subtask 33-21-10-420-001p. 374
Subtask 33-21-10-420-002p. 374
Subtask 33-21-10-410-001p. 375
Subtask 33-21-10-410-002p. 375
4. Close Outp. 376
Subtask 33-21-10-865-002p. 376
Subtask 33-21-10-861-001p. 376
Subtask 33-21-10-710-001p. 376
Subtask 33-21-10-941-001p. 377
Subtask 33-21-10-861-002p. 377
33-21-12p. 379
401: POWER RELAY, SIDEWALL LIGHTS – REMOVAL/INSTALLATIONp. 379
1. Generalp. 379
Task 33-21-12-000-801 Removal of the Power Relayp. 379
1. Job Set-Up Informationp. 379
Subtask 33-21-12-946-001p. 379
2. Job Set-Upp. 379
Subtask 33-21-12-910-001p. 379
Subtask 33-21-12-865-001p. 379
Subtask 33-21-12-010-002p. 379
Subtask 33-21-12-010-003p. 380
3. Procedurep. 380
Subtask 33-21-12-020-001p. 380
Subtask 33-21-12-020-002p. 381
Sidewall-Lights Power Relay – Removal/Installationp. 382
Figure 401p. 382
Sidewall-Lights Power Relay – Removal/Installationp. 383
Figure 402p. 383
Task 33-21-12-400-801 Installation of the Power Relayp. 384
1. Job Set-Up Informationp. 384
Subtask 33-21-12-945-001p. 384
Subtask 33-21-12-945-002p. 384
Subtask 33-21-12-946-002p. 384
2. Job Set-Upp. 385
Subtask 33-21-12-869-001p. 385
3. Procedurep. 385
Subtask 33-21-12-420-001p. 385
Subtask 33-21-12-420-002p. 385
Subtask 33-21-12-410-002p. 385
Subtask 33-21-12-410-003p. 386
4. Close Outp. 386
Subtask 33-21-12-865-002p. 386
Subtask 33-21-12-861-002p. 386
Subtask 33-21-12-710-001p. 386
Subtask 33-21-12-710-002p. 387
Subtask 33-21-12-941-001p. 387
Subtask 33-21-12-861-001p. 387
Section 22p. 389
33-22-00p. 389
1: READING LIGHTS – DESCRIPTION AND OPERATIONp. 389
1. Generalp. 389
2. Component Detailsp. 389
A. Reading Lightsp. 390
B. Miscellaneous Switch Panelp. 390
C. Miscellaneous Switch Panelp. 390
D. Test Relaysp. 391
3. Operationp. 391
4. Component Location Indexp. 391
Reading Lights – Component Locationsp. 393
Figure 1p. 393
Reading Lights – Component Locationsp. 394
Figure 2p. 394
Reading Lights – Block Diagramp. 395
Figure 3p. 395
501: READING LIGHTS – ADJUSTMENT/TESTp. 397
1. Generalp. 397
Task 33-22-00-710-801 Operational Test of the Reading Lightsp. 397
1. Job Set-Up Informationp. 397
Subtask 33-22-00-946-001p. 397
2. Job Set-Upp. 397
Subtask 33-22-00-861-001p. 397
Subtask 33-22-00-865-001p. 397
3. Procedurep. 397
Subtask 33-22-00-710-001p. 397
4. Close Outp. 398
Subtask 33-22-00-941-001p. 398
Subtask 33-22-00-861-002p. 399
33-22-01p. 401
401: LIGHT, READING – REMOVAL/INSTALLATIONp. 401
1. Generalp. 401
Task 33-22-01-000-801 Removal of the Reading Lightp. 401
1. Job Set-Up Informationp. 401
Subtask 33-22-01-946-001p. 401
2. Job Set-Upp. 401
Subtask 33-22-01-910-001p. 401
Subtask 33-22-01-865-001p. 401
3. Procedurep. 402
Subtask 33-22-01-020-001p. 402
Subtask 33-22-01-020-002p. 402
Reading Light – Removal/Installationp. 403
Figure 401p. 403
Reading Light – Removal/Installationp. 404
Figure 402p. 404
Task 33-22-01-400-801 Installation of the Reading Lightp. 405
1. Job Set-Up Informationp. 405
Subtask 33-22-01-946-002p. 405
2. Job Set-Upp. 405
Subtask 33-22-01-869-001p. 405
3. Procedurep. 405
Subtask 33-22-01-420-001p. 405
Subtask 33-22-01-420-002p. 405
4. Close Outp. 406
Subtask 33-22-01-865-002p. 406
Subtask 33-22-01-710-001p. 406
Subtask 33-22-01-941-001p. 406
Task 33-22-01-000-802 Removal of the Reading Lightp. 407
1. Job Set-Up Informationp. 407
Subtask 33-22-01-946-003p. 407
2. Job Set-Upp. 407
Subtask 33-22-01-910-002p. 407
Subtask 33-22-01-865-003p. 407
3. Procedurep. 407
Subtask 33-22-01-020-003p. 407
Reading Light – Removal/Installationp. 409
Figure 403p. 409
Task 33-22-01-400-802 Installation of the Reading Lightsp. 410
1. Job Set-Up Informationp. 410
Subtask 33-22-01-944-001p. 410
Subtask 33-22-01-944-002p. 410
Subtask 33-22-01-946-004p. 410
2. Job Set-Upp. 410
Subtask 33-22-01-869-002p. 410
3. Procedurep. 411
Subtask 33-22-01-420-003p. 411
4. Close Outp. 411
Subtask 33-22-01-410-001p. 411
Subtask 33-22-01-865-004p. 411
Subtask 33-22-01-710-002p. 411
Subtask 33-22-01-941-002p. 411
Task 33-22-01-960-801 Replacement of the Reading Light Bulbp. 412
1. Job Set-Up Informationp. 412
Subtask 33-22-01-945-001p. 412
Subtask 33-22-01-945-002p. 412
Subtask 33-22-01-946-005p. 412
2. Job Set-Upp. 413
Subtask 33-22-01-910-003p. 413
Subtask 33-22-01-865-005p. 413
3. Procedurep. 413
Subtask 33-22-01-960-001p. 413
4. Close Outp. 414
Subtask 33-22-01-410-002p. 414
Subtask 33-22-01-865-006p. 414
Subtask 33-22-01-710-003p. 414
Subtask 33-22-01-940-001p. 414
Reading Light Bulb – Removal/Installationp. 415
Figure 404p. 415
33-22-02p. 417
401: SWITCH, READING LIGHT – REMOVAL/INSTALLATIONp. 417
1. Generalp. 417
Task 33-22-02-000-801 Removal of the Passenger Reading Light Switchp. 417
1. Job Set-Up Informationp. 417
Subtask 33-22-02-946-001p. 417
2. Job Set-Upp. 417
Subtask 33-22-02-910-001p. 417
Subtask 33-22-02-865-001p. 417
Subtask 33-22-02-010-001p. 418
3. Procedurep. 418
Subtask 33-22-02-020-001p. 418
Reading Light Switch – Removal/Installationp. 419
Figure 401p. 419
Task 33-22-02-400-801 Installation of the Reading Light Switchp. 420
1. Job Set-Up Informationp. 420
Subtask 33-22-02-944-001p. 420
Subtask 33-22-02-944-003p. 420
Subtask 33-22-02-944-002p. 420
Subtask 33-22-02-946-002p. 420
2. Job Set-Upp. 421
Subtask 33-22-02-860-001p. 421
3. Procedurep. 421
Subtask 33-22-02-420-001p. 421
4. Close Outp. 421
Subtask 33-22-02-410-001p. 421
Subtask 33-22-02-710-001p. 421
Subtask 33-22-02-941-001p. 421
33-22-03p. 423
401: SWITCH PANEL, MISCELLANEOUS – REMOVAL/INSTALLATIONp. 423
1. Generalp. 423
Task 33-22-03-000-801 Removal of the Miscellaneous Switch Panelp. 423
1. Job Set-Up Informationp. 423
Subtask 33-22-03-946-001p. 423
2. Job Set-Upp. 423
Subtask 33-22-03-910-001p. 423
Subtask 33-22-03-861-001p. 423
3. Procedurep. 423
Subtask 33-22-03-020-002p. 423
Miscellaneous Switch Panel -Removal/Installationp. 425
Figure 401p. 425
Task 33-22-03-400-801 Installation of the Miscellaneous Switch Panelp. 426
1. Job Set-Up Informationp. 426
Subtask 33-22-03-945-001p. 426
Subtask 33-22-03-946-002p. 426
2. Job Set-Upp. 426
Subtask 33-22-03-869-001p. 426
3. Procedurep. 426
Subtask 33-22-03-420-002p. 426
4. Close Outp. 426
Subtask 33-22-03-710-001p. 426
Subtask 33-22-03-941-001p. 426
501: SWITCH PANEL, MISCELLANEOUS – ADJUSTMENT/TESTp. 427
1. Generalp. 427
Task 33-22-03-710-801 Operational Test of the Miscellaneous Switch Panelp. 427
1. Job Set-Up Informationp. 427
Subtask 33-22-03-946-003p. 427
2. Job Set-Upp. 427
Subtask 33-22-03-865-001p. 427
Subtask 33-22-03-865-003p. 428
Subtask 33-22-03-861-002p. 428
3. Procedurep. 428
Subtask 33-22-03-710-002p. 428
Subtask 33-22-03-710-003p. 429
Subtask 33-22-03-710-004p. 429
Subtask 33-22-03-710-006p. 429
4. Close Outp. 430
Subtask 33-22-03-941-002p. 430
Subtask 33-22-03-861-003p. 430
Subtask 33-22-03-710-005p. 430
Task 33-22-03-710-802 Operational Test of the Cabin and Lavatory Attendant Call Lightsp. 431
1. Job Set-Up Informationp. 431
Subtask 33-22-03-946-004p. 431
2. Job Set-Upp. 431
Subtask 33-22-03-865-002p. 431
Subtask 33-22-03-861-004p. 431
3. Procedurep. 431
Subtask 33-22-03-710-007p. 431
Subtask 33-22-03-710-008p. 436
4. Close Outp. 437
Subtask 33-22-03-861-005p. 437
Subtask 33-22-03-941-003p. 437
33-22-05p. 439
401: LIGHT, FLIGHT ATTENDANT CALL – REMOVAL/INSTALLATIONp. 439
1. Generalp. 439
Task 33-22-05-000-801 Removal of the Flight Attendant Call Lightp. 439
1. Job Set-Up Informationp. 439
Subtask 33-22-05-946-001p. 439
2. Job Set-Upp. 439
Subtask 33-22-05-910-001p. 439
Subtask 33-22-05-865-001p. 439
Subtask 33-22-05-010-002p. 440
3. Procedurep. 440
Subtask 33-22-05-020-001p. 440
Flight Attendant Call Light – Removal/Installationp. 441
Figure 401p. 441
Task 33-22-05-400-801 Installation of the Flight Attendant Call Lightp. 442
1. Job Set-Up Informationp. 442
Subtask 33-22-05-944-001p. 442
Subtask 33-22-05-944-002p. 442
Subtask 33-22-05-946-002p. 442
2. Job Set-Upp. 442
Subtask 33-22-05-860-001p. 442
3. Procedurep. 442
Subtask 33-22-05-420-001p. 442
4. Close Outp. 443
Subtask 33-22-05-410-001p. 443
Subtask 33-22-05-710-001p. 443
Subtask 33-22-05-941-001p. 443
33-22-07p. 445
401: SWITCH, FLIGHT ATTENDANT CALL LIGHT – REMOVAL/INSTALLATIONp. 445
1. Generalp. 445
Task 33-22-07-000-801 Removal of the Flight Attendant Call Light Switchp. 445
1. Job Set-Up Informationp. 445
Subtask 33-22-07-946-001p. 445
2. Job Set-Upp. 445
Subtask 33-22-07-910-001p. 445
Subtask 33-22-07-865-001p. 445
Subtask 33-22-07-010-001p. 446
3. Procedurep. 446
Subtask 33-22-07-020-001p. 446
Flight Attendant Call Light Switch – Removal/Installationp. 447
Figure 401p. 447
Task 33-22-07-400-801 Installation of the Flight Attendant Call Light Switchp. 448
1. Job Set-Up Informationp. 448
Subtask 33-22-07-944-001p. 448
Subtask 33-22-07-944-002p. 448
Subtask 33-22-07-946-002p. 448
2. Job Set-Upp. 448
Subtask 33-22-07-860-001p. 448
3. Procedurep. 448
Subtask 33-22-07-420-001p. 448
4. Close Outp. 449
Subtask 33-22-07-410-001p. 449
Subtask 33-22-07-710-001p. 449
Subtask 33-22-07-941-001p. 449
Section 23p. 451
33-23-00p. 451
1: DOME, FLIGHT ATTENDANT, AND BOARDING LIGHTS – DESCRIPTION AND OPERATIONp. 451
1. Generalp. 451
2. Component Detailsp. 454
A. Incandescent Dome Lightp. 454
B. Flight Attendant (Forward and Aft) Lightsp. 455
C. Boarding Lightsp. 455
D. Power Units/Dimmersp. 455
E. Flight Attendant Lightp. 456
F. Boarding Lightsp. 456
G. Power Units/Dimmersp. 456
H. Miscellaneous Switch Panelp. 456
I. Miscellaneous Switch Panelp. 457
J. Flight Attendant (Forward and Aft) Panelsp. 457
K. Flight Attendant Panelp. 458
L. Miscellaneous-Lights Control Panelp. 458
3. Operationp. 458
A. Dome Lightp. 461
B. Dome Lightp. 462
C. Flight Attendant (Forward and Aft) Lightsp. 462
D. Flight Attendant Lightp. 463
4. Component Location Indexp. 464
Dome, Flight Attendant (Fwd and Aft), and Boarding Lights -Component Locationsp. 468
Figure 1 (Sheet 1 of 2)p. 468
Figure 1 (Sheet 2 of 2)p. 469
Dome, Flight Attendant, and Boarding Lights – Component Locationsp. 470
Figure 2p. 470
Dome, Flight Attendant (Fwd and Aft), and Boarding Lights – Simplified Schematic Diagramp. 471
Figure 3p. 471
Dome, Flight Attendant (Fwd and Aft), and Boarding Lights – Simplified Schematic Diagramp. 472
Figure 4p. 472
Dome, Flight Attendant, and Boarding Lights – Simplified Schematic Diagramp. 473
Figure 5p. 473
Dome, Flight Attendant, and Boarding Lights – Simplified Schematic Diagramp. 474
Figure 6p. 474
501: DOME, FLIGHT ATTENDANT, AND BOARDING LIGHTS – ADJUSTMENT/TESTp. 475
1. Generalp. 475
Task 33-23-00-710-801 Operational Test of the Dome, Flight Attendant, and Boarding Lightsp. 475
1. Job Set-Up Informationp. 475
Subtask 33-23-00-946-001p. 475
2. Job Set-Upp. 475
Subtask 33-23-00-861-001p. 475
Subtask 33-23-00-865-001p. 475
Subtask 33-23-00-865-002p. 476
3. Procedurep. 476
Subtask 33-23-00-710-003p. 476
Subtask 33-23-00-710-006p. 477
Subtask 33-23-00-710-001p. 477
Subtask 33-23-00-710-004p. 478
Subtask 33-23-00-710-005p. 479
4. Close Outp. 479
Subtask 33-23-00-941-001p. 479
Subtask 33-23-00-861-002p. 479
33-23-01p. 481
401: LIGHT, DOME – REMOVAL/INSTALLATIONp. 481
1. Generalp. 481
Task 33-23-01-000-801 Removal of the Dome Lightp. 481
1. Job Set-Up Informationp. 481
Subtask 33-23-01-943-001p. 481
Subtask 33-23-01-946-001p. 481
2. Job Set-Upp. 481
Subtask 33-23-01-910-001p. 481
Subtask 33-23-01-865-001p. 482
Subtask 33-23-01-865-003p. 482
3. Procedurep. 482
Subtask 33-23-01-941-001p. 482
Subtask 33-23-01-020-001p. 482
Dome Light – Removal/Installationp. 484
Figure 401p. 484
Task 33-23-01-400-801 Installation of the Dome Lightp. 485
1. Job Set-Up Informationp. 485
Subtask 33-23-01-943-002p. 485
Subtask 33-23-01-946-002p. 485
2. Job Set-Upp. 485
Subtask 33-23-01-869-001p. 485
3. Procedurep. 485
Subtask 33-23-01-420-001p. 485
4. Close Outp. 486
Subtask 33-23-01-865-002p. 486
Subtask 33-23-01-865-004p. 486
Subtask 33-23-01-861-001p. 486
Subtask 33-23-01-710-001p. 486
Subtask 33-23-01-941-002p. 487
Subtask 33-23-01-861-002p. 487
Task 33-23-01-000-802 Removal of the Dome Lightp. 488
1. Job Set-Up Informationp. 488
Subtask 33-23-01-943-003p. 488
Subtask 33-23-01-946-003p. 488
2. Job Set-Upp. 488
Subtask 33-23-01-910-002p. 488
Subtask 33-23-01-865-005p. 488
Subtask 33-23-01-941-003p. 488
Subtask 33-23-01-010-001p. 488
3. Procedurep. 489
Subtask 33-23-01-020-002p. 489
Dome Light – Removal/Installationp. 490
Figure 402p. 490
Task 33-23-01-400-802 Installation of the Dome Lightp. 491
1. Job Set-Up Informationp. 491
Subtask 33-23-01-943-004p. 491
Subtask 33-23-01-945-002p. 491
Subtask 33-23-01-946-004p. 491
2. Job Set-Upp. 491
Subtask 33-23-01-869-002p. 491
3. Procedurep. 491
Subtask 33-23-01-420-003p. 491
4. Close Outp. 492
Subtask 33-23-01-410-001p. 492
Subtask 33-23-01-865-008p. 492
Subtask 33-23-01-861-003p. 492
Subtask 33-23-01-710-002p. 492
Subtask 33-23-01-861-004p. 492
Subtask 33-23-01-941-004p. 492
Task 33-23-01-000-803 Removal of the Dome Lightp. 493
1. Job Set-Up Informationp. 493
Subtask 33-23-01-943-005p. 493
Subtask 33-23-01-946-005p. 493
2. Job Set-Upp. 493
Subtask 33-23-01-910-003p. 493
Subtask 33-23-01-865-010p. 493
Subtask 33-23-01-865-011p. 494
Subtask 33-23-01-941-005p. 494
Subtask 33-23-01-010-002p. 494
3. Procedurep. 494
Subtask 33-23-01-020-003p. 494
Dome Light – Removal/Installationp. 495
Figure 403p. 495
Task 33-23-01-400-803 Installation of the Dome Lightp. 496
1. Job Set-Up Informationp. 496
Subtask 33-23-01-943-006p. 496
Subtask 33-23-01-945-003p. 496
Subtask 33-23-01-946-006p. 496
2. Job Set-Upp. 496
Subtask 33-23-01-869-003p. 496
3. Procedurep. 496
Subtask 33-23-01-420-004p. 496
4. Close Outp. 497
Subtask 33-23-01-410-002p. 497
Subtask 33-23-01-865-012p. 497
Subtask 33-23-01-865-013p. 497
Subtask 33-23-01-861-005p. 498
Subtask 33-23-01-710-005p. 498
Subtask 33-23-01-861-006p. 498
Subtask 33-23-01-941-006p. 498
33-23-02p. 499
401: LIGHT, FORWARD FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 499
1. Generalp. 499
Task 33-23-02-000-801 Removal of the Forward Flight-Attendant Lightp. 499
1. Job Set-Up Informationp. 499
Subtask 33-23-02-946-001p. 499
2. Job Set-Upp. 499
Subtask 33-23-02-910-001p. 499
Subtask 33-23-02-865-001p. 499
3. Procedurep. 499
Subtask 33-23-02-020-001p. 499
Forward Flight-Attendant Light – Removal/Installationp. 501
Figure 401p. 501
Task 33-23-02-400-801 Installation of the Forward Flight-Attendant Lightp. 502
1. Job Set-Up Informationp. 502
Subtask 33-23-02-946-002p. 502
2. Job Set-Upp. 502
Subtask 33-23-02-869-001p. 502
3. Procedurep. 502
Subtask 33-23-02-420-001p. 502
4. Close Outp. 502
Subtask 33-23-02-865-002p. 502
Subtask 33-23-02-861-001p. 502
Subtask 33-23-02-710-001p. 502
Subtask 33-23-02-941-001p. 503
Subtask 33-23-02-861-002p. 503
33-23-03p. 505
401: LIGHT, AFT FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 505
1. Generalp. 505
Task 33-23-03-000-801 Removal of the Aft Flight-Attendant Lightp. 505
1. Job Set-Up Informationp. 505
Subtask 33-23-03-946-001p. 505
2. Job Set-Upp. 505
Subtask 33-23-03-910-001p. 505
Subtask 33-23-03-865-001p. 505
3. Procedurep. 505
Subtask 33-23-03-020-001p. 505
Aft Flight-Attendant Light – Removal/Installationp. 507
Figure 401p. 507
Task 33-23-03-400-801 Installation of the Aft Flight-Attendant Lightp. 508
1. Job Set-Up Informationp. 508
Subtask 33-23-03-946-002p. 508
2. Job Set-Upp. 508
Subtask 33-23-03-869-001p. 508
3. Procedurep. 508
Subtask 33-23-03-420-001p. 508
4. Close Outp. 508
Subtask 33-23-03-865-002p. 508
Subtask 33-23-03-861-002p. 508
Subtask 33-23-03-710-001p. 508
Subtask 33-23-03-941-001p. 509
Subtask 33-23-03-861-001p. 509
33-23-04p. 511
401: LIGHT, BOARDING – REMOVAL/INSTALLATIONp. 511
1. Generalp. 511
Task 33-23-04-000-801 Removal of the Boarding Lightp. 511
1. Job Set-Up Informationp. 511
Subtask 33-23-04-946-001p. 511
2. Job Set-Upp. 511
Subtask 33-23-04-910-001p. 511
Subtask 33-23-04-865-001p. 511
Subtask 33-23-04-865-003p. 512
3. Procedurep. 512
Subtask 33-23-04-020-001p. 512
Subtask 33-23-04-020-002p. 513
Boarding Light – Removal/Installationp. 514
Figure 401p. 514
Boarding Light – Removal/Installationp. 515
Figure 402p. 515
Task 33-23-04-400-801 Installation of the Boarding Lightp. 516
1. Job Set-Up Informationp. 516
Subtask 33-23-04-946-002p. 516
2. Job Set-Upp. 516
Subtask 33-23-04-869-001p. 516
3. Procedurep. 516
Subtask 33-23-04-420-001p. 516
Subtask 33-23-04-420-002p. 517
4. Close Outp. 517
Subtask 33-23-04-865-002p. 517
Subtask 33-23-04-865-004p. 518
Subtask 33-23-04-861-001p. 518
Subtask 33-23-04-710-002p. 518
Subtask 33-23-04-861-002p. 518
Subtask 33-23-04-941-001p. 519
33-23-05p. 521
401: LIGHT, FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 521
1. Generalp. 521
Task 33-23-05-000-801 Removal of the Flight Attendant Lightp. 521
1. Job Set-Up Informationp. 521
Subtask 33-23-05-946-001p. 521
2. Job Set-Upp. 521
Subtask 33-23-05-910-001p. 521
Subtask 33-23-05-865-001p. 521
3. Procedurep. 521
Subtask 33-23-05-020-001p. 521
Flight Attendant Light – Removal/Installationp. 523
Figure 401p. 523
Task 33-23-05-400-801 Installation of the Flight Attendant Lightp. 524
1. Job Set-Up Informationp. 524
Subtask 33-23-05-946-002p. 524
2. Job Set-Upp. 524
Subtask 33-23-05-869-001p. 524
3. Procedurep. 524
Subtask 33-23-05-420-001p. 524
4. Close Outp. 524
Subtask 33-23-05-865-002p. 524
Subtask 33-23-05-861-001p. 524
Subtask 33-23-05-710-001p. 524
Subtask 33-23-05-941-001p. 525
Subtask 33-23-05-861-002p. 525
33-23-06p. 527
401: POWER UNIT/DIMMER, FLIGHT ATTENDANT LIGHT – REMOVAL/INSTALLATIONp. 527
1. Generalp. 527
Task 33-23-06-000-801 Removal of the Power Unit/Dimmerp. 527
1. Job Set-Up Informationp. 527
Subtask 33-23-06-946-003p. 527
Subtask 33-23-06-946-005p. 527
2. Job Set-Upp. 528
Subtask 33-23-06-910-001p. 528
Subtask 33-23-06-865-001p. 528
Subtask 33-23-06-010-002p. 528
Subtask 33-23-06-010-004p. 528
3. Procedurep. 528
Subtask 33-23-06-020-001p. 528
Flight-Attendant-Light Power Unit/Dimmer – Removal/Installationp. 530
Figure 401p. 530
Task 33-23-06-400-801 Installation of the Power Unit/Dimmerp. 531
1. Job Set-Up Informationp. 531
Subtask 33-23-06-945-001p. 531
Subtask 33-23-06-946-002p. 531
Subtask 33-23-06-946-007p. 531
2. Job Set-Upp. 532
Subtask 33-23-06-869-001p. 532
3. Procedurep. 532
Subtask 33-23-06-420-001p. 532
Subtask 33-23-06-410-001p. 532
Subtask 33-23-06-410-003p. 532
4. Close Outp. 533
Subtask 33-23-06-865-002p. 533
Subtask 33-23-06-861-001p. 533
Subtask 33-23-06-710-001p. 533
Subtask 33-23-06-941-001p. 533
Subtask 33-23-06-861-002p. 533
33-23-09p. 535
401: POWER UNIT/DIMMER, FORWARD FLIGHT-ATTENDANT LIGHT – REMOVAL/INSTALLATIONp. 535
1. Generalp. 535
Task 33-23-09-000-801 Removal of the Power Unit/Dimmerp. 535
1. Job Set-Up Informationp. 535
Subtask 33-23-09-946-001p. 535
Subtask 33-23-09-946-003p. 535
2. Job Set-Upp. 536
Subtask 33-23-09-910-001p. 536
Subtask 33-23-09-865-001p. 536
Subtask 33-23-09-010-001p. 536
Subtask 33-23-09-010-002p. 536
3. Procedurep. 537
Subtask 33-23-09-020-001p. 537
Forward-Flight-Attendant-Light Power Unit/Dimmer – Removal/Installationp. 538
Figure 401p. 538
Task 33-23-09-400-801 Installation of the Power Unit/Dimmerp. 539
1. Job Set-Up Informationp. 539
Subtask 33-23-09-945-001p. 539
Subtask 33-23-09-946-002p. 539
Subtask 33-23-09-946-006p. 539
2. Job Set-Upp. 540
Subtask 33-23-09-869-001p. 540
3. Procedurep. 540
Subtask 33-23-09-420-001p. 540
Subtask 33-23-09-410-002p. 540
Subtask 33-23-09-410-003p. 540
4. Close Outp. 541
Subtask 33-23-09-865-002p. 541
Subtask 33-23-09-861-001p. 541
Subtask 33-23-09-710-001p. 541
Subtask 33-23-09-941-001p. 541
Subtask 33-23-09-861-002p. 541
33-23-10p. 543
401: POWER UNIT/DIMMER, AFT FLIGHT-ATTENDANT LIGHT – REMOVAL/INSTALLATIONp. 543
1. Generalp. 543
Task 33-23-10-000-801 Removal of the Power Unit/Dimmerp. 543
1. Job Set-Up Informationp. 543
Subtask 33-23-10-946-001p. 543
2. Job Set-Upp. 543
Subtask 33-23-10-910-001p. 543
Subtask 33-23-10-865-001p. 543
Subtask 33-23-10-010-001p. 544
3. Procedurep. 544
Subtask 33-23-10-020-001p. 544
Aft-Flight-Attendant-Light Power Unit/Dimmer – Removal/Installationp. 545
Figure 401p. 545
Task 33-23-10-400-801 Installation of the Power Unit/Dimmerp. 546
1. Job Set-Up Informationp. 546
Subtask 33-23-10-945-001p. 546
Subtask 33-23-10-946-002p. 546
2. Job Set-Upp. 546
Subtask 33-23-10-869-001p. 546
3. Procedurep. 546
Subtask 33-23-10-420-001p. 546
Subtask 33-23-10-410-001p. 546
4. Close Outp. 547
Subtask 33-23-10-865-002p. 547
Subtask 33-23-10-861-001p. 547
Subtask 33-23-10-710-001p. 547
Subtask 33-23-10-941-001p. 547
Subtask 33-23-10-861-002p. 547
33-23-12p. 549
401: PANEL, FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 549
1. Generalp. 549
Task 33-23-12-000-801 Removal of the Flight Attendant Panelp. 550
1. Job Set-Up Informationp. 550
Subtask 33-23-12-946-001p. 550
2. Job Set-Upp. 550
Subtask 33-23-12-910-001p. 550
Subtask 33-23-12-865-002p. 551
Subtask 33-23-12-865-003p. 551
3. Procedurep. 552
Subtask 33-23-12-020-001p. 552
Forward Flight-Attendant Panel – Removal/Installationp. 553
Figure 401p. 553
Task 33-23-12-400-801 Installation of the Flight Attendant Panelp. 554
1. Job Set-Up Informationp. 554
Subtask 33-23-12-945-001p. 554
Subtask 33-23-12-946-002p. 554
2. Job Set-Upp. 554
Subtask 33-23-12-869-001p. 554
3. Procedurep. 554
Subtask 33-23-12-420-002p. 554
4. Close Outp. 555
Subtask 33-23-12-865-004p. 555
Subtask 33-23-12-865-008p. 555
Subtask 33-23-12-710-002p. 556
Subtask 33-23-12-941-002p. 556
Task 33-23-12-000-802 Removal of the Flight Attendant Panel with Sterile Lightp. 557
1. Job Set-Up Informationp. 557
Subtask 33-23-12-946-004p. 557
2. Job Set-Upp. 557
Subtask 33-23-12-910-002p. 557
Subtask 33-23-12-865-009p. 557
3. Procedurep. 557
Subtask 33-23-12-020-002p. 557
Flight Attendant Panel with Sterile Light – Removal/Installationp. 558
Figure 402p. 558
Task 33-23-12-400-802 Installation of the Flight Attendant Panel with Sterile Lightp. 559
1. Job Set-Up Informationp. 559
Subtask 33-23-12-945-002p. 559
Subtask 33-23-12-946-005p. 559
2. Job Set-Upp. 559
Subtask 33-23-12-869-002p. 559
3. Procedurep. 559
Subtask 33-23-12-420-003p. 559
4. Close Outp. 559
Subtask 33-23-12-865-010p. 559
Subtask 33-23-12-710-003p. 560
Subtask 33-23-12-941-003p. 560
501: PANEL, FLIGHT ATTENDANT – ADJUSTMENT/TESTp. 561
1. Generalp. 561
Task 33-23-12-710-801 Operational Test of the Flight Attendant Panelp. 562
1. Job Set-Up Informationp. 562
Subtask 33-23-12-946-003p. 562
2. Job Set-Upp. 562
Subtask 33-23-12-861-002p. 562
Subtask 33-23-12-865-005p. 563
Subtask 33-23-12-865-006p. 563
3. Procedurep. 564
Subtask 33-23-12-710-001p. 564
4. Close Outp. 566
Subtask 33-23-12-941-001p. 566
Subtask 33-23-12-861-001p. 566
Task 33-23-12-710-802 Operational Test of the Forward Flight-Attendant Panel with Sterile Lightp. 567
1. Job Set-Up Informationp. 567
Subtask 33-23-12-946-006p. 567
2. Job Set-Upp. 567
Subtask 33-23-12-861-003p. 567
Subtask 33-23-12-865-011p. 567
3. Procedurep. 567
Subtask 33-23-12-710-004p. 567
4. Close Outp. 569
Subtask 33-23-12-941-004p. 569
Subtask 33-23-12-861-004p. 570
33-23-13p. 571
401: PANEL, FORWARD FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 571
1. Generalp. 571
Task 33-23-13-000-801 Removal of the Forward Flight-Attendant Panelp. 571
1. Job Set-Up Informationp. 571
Subtask 33-23-13-946-001p. 571
2. Job Set-Upp. 571
Subtask 33-23-13-910-001p. 571
Subtask 33-23-13-865-001p. 572
Subtask 33-23-13-865-004p. 572
3. Procedurep. 573
Subtask 33-23-13-020-001p. 573
Forward Flight-Attendant Panel – Removal/Installationp. 574
Figure 401p. 574
Task 33-23-13-400-801 Installation of the Forward Flight-Attendant Panelp. 575
1. Job Set-Up Informationp. 575
Subtask 33-23-13-945-001p. 575
Subtask 33-23-13-946-002p. 575
2. Job Set-Upp. 575
Subtask 33-23-13-869-001p. 575
3. Procedurep. 575
Subtask 33-23-13-420-001p. 575
4. Close Outp. 576
Subtask 33-23-13-865-002p. 576
Subtask 33-23-13-865-005p. 576
Subtask 33-23-13-710-001p. 577
Subtask 33-23-13-941-001p. 577
501: PANEL, FORWARD FLIGHT ATTENDANT – ADJUSTMENT/TESTp. 579
1. Generalp. 579
Task 33-23-13-710-801 Operational Test of the Forward Flight-Attendant Panelp. 579
1. Job Set-Up Informationp. 579
Subtask 33-23-13-946-003p. 579
2. Job Set-Upp. 579
Subtask 33-23-13-861-001p. 579
Subtask 33-23-13-865-003p. 580
Subtask 33-23-13-865-006p. 580
3. Procedurep. 581
Subtask 33-23-13-710-002p. 581
4. Close Outp. 582
Subtask 33-23-13-941-002p. 582
Subtask 33-23-13-861-002p. 583
33-23-14p. 585
401: PANEL, AFT FLIGHT ATTENDANT – REMOVAL/INSTALLATIONp. 585
1. Generalp. 585
Task 33-23-14-000-801 Removal of the Aft Flight-Attendant Panelp. 585
1. Job Set-Up Informationp. 585
Subtask 33-23-14-946-001p. 585
2. Job Set-Upp. 585
Subtask 33-23-14-910-001p. 585
Subtask 33-23-14-865-001p. 585
3. Procedurep. 586
Subtask 33-23-14-020-001p. 586
Aft Flight-Attendant Panel – Removal/Installationp. 587
Figure 401p. 587
Task 33-23-14-400-801 Installation of the Aft Flight-Attendant Panelp. 588
1. Job Set-Up Informationp. 588
Subtask 33-23-14-945-001p. 588
2. Job Set-Upp. 588
Subtask 33-23-14-869-001p. 588
3. Procedurep. 588
Subtask 33-23-14-420-001p. 588
4. Close Outp. 588
Subtask 33-23-14-865-002p. 588
Subtask 33-23-14-941-003p. 588
Subtask 33-23-14-710-001p. 588
501: PANEL, AFT FLIGHT ATTENDANT – ADJUSTMENT/TESTp. 589
1. Generalp. 589
Task 33-23-14-710-801 Operational Test of the Aft Flight-Attendant Panelp. 589
1. Job Set-Up Informationp. 589
Subtask 33-23-14-946-003p. 589
2. Job Set-Upp. 589
Subtask 33-23-14-861-003p. 589
Subtask 33-23-14-865-004p. 589
3. Procedurep. 590
Subtask 33-23-14-710-002p. 590
4. Close Outp. 590
Subtask 33-23-14-941-002p. 590
Subtask 33-23-14-861-004p. 590
33-23-15p. 591
401: INVERTER, BOARDING LIGHTS – REMOVAL/INSTALLATIONp. 591
1. Generalp. 591
Task 33-23-15-000-801 Removal of the Inverterp. 591
1. Job Set-Up Informationp. 591
Subtask 33-23-15-946-001p. 591
Subtask 33-23-15-946-003p. 591
Subtask 33-23-15-946-004p. 592
Subtask 33-23-15-946-005p. 592
2. Job Set-Upp. 592
Subtask 33-23-15-910-001p. 592
Subtask 33-23-15-865-001p. 593
Subtask 33-23-15-010-002p. 593
Subtask 33-23-15-010-003p. 593
Subtask 33-23-15-010-004p. 593
Subtask 33-23-15-010-001p. 594
3. Procedurep. 594
Subtask 33-23-15-020-001p. 594
Boarding Lights Inverter – Removal/Installationp. 595
Figure 401p. 595
Task 33-23-15-400-801 Installation of the Inverterp. 596
1. Job Set-Up Informationp. 596
Subtask 33-23-15-945-001p. 596
Subtask 33-23-15-946-002p. 596
Subtask 33-23-15-946-006p. 596
Subtask 33-23-15-946-007p. 597
Subtask 33-23-15-946-008p. 597
2. Job Set-Upp. 597
Subtask 33-23-15-869-001p. 597
3. Procedurep. 598
Subtask 33-23-15-420-001p. 598
Subtask 33-23-15-410-001p. 598
Subtask 33-23-15-410-002p. 598
Subtask 33-23-15-410-003p. 598
Subtask 33-23-15-410-004p. 599
4. Close Outp. 599
Subtask 33-23-15-865-002p. 599
Subtask 33-23-15-861-001p. 599
Subtask 33-23-15-710-001p. 599
Subtask 33-23-15-941-001p. 599
Subtask 33-23-15-861-002p. 599
33-23-17p. 601
401: POWER UNIT/DIMMER, BOARDING LIGHTS – REMOVAL/INSTALLATIONp. 601
1. Generalp. 601
Task 33-23-17-000-801 Removal of the Power Unit/Dimmerp. 601
1. Job Set-Up Informationp. 601
Subtask 33-23-17-946-001p. 601
Subtask 33-23-17-946-004p. 601
Subtask 33-23-17-946-005p. 602
Subtask 33-23-17-946-003p. 602
2. Job Set-Upp. 602
Subtask 33-23-17-910-001p. 602
Subtask 33-23-17-865-001p. 603
Subtask 33-23-17-865-003p. 603
Subtask 33-23-17-010-001p. 603
Subtask 33-23-17-010-003p. 604
Subtask 33-23-17-010-002p. 604
Subtask 33-23-17-010-004p. 604
3. Procedurep. 604
Subtask 33-23-17-020-002p. 604
Subtask 33-23-17-020-001p. 605
Boarding-lights Power Unit/Dimmer – Removal/installationp. 606
Figure 401p. 606
Boarding-Lights Power Unit/Dimmer – Removal/Installationp. 607
Figure 402p. 607
Task 33-23-17-400-801 Installation of the Power Unit/Dimmerp. 608
1. Job Set-Up Informationp. 608
Subtask 33-23-17-945-001p. 608
Subtask 33-23-17-945-002p. 608
Subtask 33-23-17-946-002p. 609
Subtask 33-23-17-946-006p. 609
Subtask 33-23-17-946-007p. 609
Subtask 33-23-17-946-008p. 610
2. Job Set-Upp. 610
Subtask 33-23-17-869-001p. 610
3. Procedurep. 610
Subtask 33-23-17-420-001p. 610
Subtask 33-23-17-420-002p. 611
Subtask 33-23-17-410-002p. 612
Subtask 33-23-17-410-003p. 612
Subtask 33-23-17-410-001p. 612
Subtask 33-23-17-410-004p. 612
4. Close Outp. 613
Subtask 33-23-17-865-002p. 613
Subtask 33-23-17-865-004p. 613
Subtask 33-23-17-861-001p. 613
Subtask 33-23-17-710-002p. 613
Subtask 33-23-17-941-001p. 614
Subtask 33-23-17-861-002p. 614
Section 24p. 615
33-24-00p. 615
1: LIGHTED ORDINANCE SIGNS – DESCRIPTION AND OPERATIONp. 615
1. Generalp. 615
2. Component Detailsp. 616
3. Component Detailsp. 617
4. Component Detailsp. 617
A. PASS SIGNS/EMER LTS Panelp. 617
B. PASS SIGNS/EMER LTS Panelp. 617
C. Passenger Lighted Ordinance-Signs (PSUs)p. 617
D. Passenger Lighted Ordinance-Signs (PSUs)p. 618
E. Galley Lighted Ordinance-Signsp. 618
F. Windscreen Lighted Ordinance-Signp. 619
G. Lavatory Lighted Ordinance-Signp. 619
5. Operationp. 620
6. Operationp. 621
7. Operationp. 622
8. Component Location Indexp. 622
9. Component Location Indexp. 623
10. Component Location Indexp. 623
Lighted Ordinance Signs – Component Locationsp. 625
Figure 1 (Sheet 1 of 3)p. 625
Figure 1 (Sheet 2 of 3)p. 626
Figure 1 (Sheet 3 of 3)p. 627
Lighted Ordinance Signs – Components Locationsp. 628
Figure 2 (Sheet 1 of 3)p. 628
Figure 2 (Sheet 2 of 3)p. 629
Figure 2 (Sheet 3 of 3)p. 630
Lighted Ordinance Signs – Component Locationp. 631
Figure 3 (Sheet 1 of 3)p. 631
Figure 3 (Sheet 2 of 3)p. 632
Figure 3 (Sheet 3 of 3)p. 633
Lighted Ordinance Signs – Block Diagramp. 634
Figure 4p. 634
Lighted Ordinance Signs – Block Diagramp. 635
Figure 5p. 635
Lighted Ordinance Signs – Block Diagramp. 636
Figure 6p. 636
501: LIGHTED ORDINANCE SIGNS – ADJUSTMENT/TESTp. 637
1. Generalp. 637
Task 33-24-00-710-801 Operational Test of the Lighted Ordinance Signsp. 637
1. Job Set-Up Informationp. 637
Subtask 33-24-00-946-001p. 637
2. Job Set-Upp. 637
Subtask 33-24-00-861-001p. 637
Subtask 33-24-00-865-001p. 637
3. Procedurep. 638
Subtask 33-24-00-710-001p. 638
4. Procedurep. 639
Subtask 33-24-00-710-002p. 639
5. Procedurep. 640
Subtask 33-24-00-710-004p. 640
6. Procedurep. 640
Subtask 33-24-00-710-005p. 640
7. Close Outp. 641
Subtask 33-24-00-861-002p. 641
Subtask 33-24-00-941-001p. 641
33-24-01p. 643
401: SIGN, LIGHTED PASSENGER ORDINANCE – REMOVAL/INSTALLATIONp. 643
1. Generalp. 643
Task 33-24-01-000-801 Removal of the Lighted Passenger Ordinance-Signp. 643
1. Job Set-Up Informationp. 643
Subtask 33-24-01-943-001p. 643
Subtask 33-24-01-946-001p. 643
2. Job Set-Upp. 643
Subtask 33-24-01-941-001p. 643
Subtask 33-24-01-865-001p. 643
Subtask 33-24-01-010-001p. 644
Subtask 33-24-01-010-002p. 644
Subtask 33-24-01-010-003p. 644
3. Procedurep. 645
Subtask 33-24-01-020-001p. 645
Subtask 33-24-01-020-002p. 645
Subtask 33-24-01-020-003p. 645
Lighted Passenger Ordinance Sign – Removal/Installationp. 646
Figure 401p. 646
Lighted Passenger Ordinance Sign – Removal/Installationp. 647
Figure 402p. 647
Lighted Passenger Ordinance Sign – Removal/Installationp. 648
Figure 403p. 648
Task 33-24-01-400-801 Installation of the Lighted Passenger Ordinance-Signp. 649
1. Job Set-Up Informationp. 649
Subtask 33-24-01-943-002p. 649
Subtask 33-24-01-945-001p. 649
Subtask 33-24-01-945-002p. 649
Subtask 33-24-01-945-003p. 649
Subtask 33-24-01-946-002p. 650
2. Job Set-Upp. 650
Subtask 33-24-01-869-001p. 650
3. Procedurep. 650
Subtask 33-24-01-420-001p. 650
Subtask 33-24-01-420-002p. 650
Subtask 33-24-01-420-003p. 651
Subtask 33-24-01-410-001p. 651
Subtask 33-24-01-410-002p. 651
Subtask 33-24-01-410-003p. 652
4. Close Outp. 652
Subtask 33-24-01-865-002p. 652
Subtask 33-24-01-710-001p. 652
Subtask 33-24-01-941-002p. 652
33-24-04p. 653
401: SIGN, LIGHTED LAVATORY ORDINANCE – REMOVAL/INSTALLATIONp. 653
1. Generalp. 653
Task 33-24-04-000-801 Removal of the Lighted Ordinance Signp. 653
1. Job Set-Up Informationp. 653
Subtask 33-24-04-946-001p. 653
2. Job Set-Upp. 653
Subtask 33-24-04-910-001p. 653
Subtask 33-24-04-865-001p. 653
3. Procedurep. 654
Subtask 33-24-04-020-001p. 654
Subtask 33-24-04-020-002p. 655
Lighted Ordinance Sign (Lavatory) – Removal/Installationp. 656
Figure 401p. 656
Lighted Ordinance Sign (Lavatory) – Removal/Installationp. 657
Figure 402p. 657
Task 33-24-04-400-801 Installation of the Lighted Ordinance Signp. 658
1. Job Set-Up Informationp. 658
Subtask 33-24-04-945-001p. 658
Subtask 33-24-04-946-002p. 658
2. Job Set-Upp. 658
Subtask 33-24-04-869-001p. 658
3. Procedurep. 658
Subtask 33-24-04-420-001p. 658
Subtask 33-24-04-420-002p. 659
4. Close Outp. 659
Subtask 33-24-04-865-002p. 659
Subtask 33-24-04-861-001p. 660
Subtask 33-24-04-710-001p. 660
Subtask 33-24-04-941-001p. 660
Subtask 33-24-04-861-002p. 660
33-24-07p. 661
401: SIGN, LIGHTED GALLEY ORDINANCE – REMOVAL/INSTALLATIONp. 661
1. Generalp. 661
Task 33-24-07-000-801 Removal of the Lighted Ordinance Signp. 661
1. Job Set-Up Informationp. 661
Subtask 33-24-07-946-001p. 661
2. Job Set-Upp. 661
Subtask 33-24-07-910-001p. 661
Subtask 33-24-07-865-001p. 661
3. Procedurep. 662
Subtask 33-24-07-020-001p. 662
Lighted Ordinance Sign (Galley) – Removal/Installationp. 663
Figure 401p. 663
Task 33-24-07-400-801 Installation of the Lighted Ordinance Signp. 664
1. Job Set-Up Informationp. 664
Subtask 33-24-07-945-001p. 664
Subtask 33-24-07-946-002p. 664
2. Job Set-Upp. 664
Subtask 33-24-07-869-001p. 664
3. Procedurep. 664
Subtask 33-24-07-420-001p. 664
4. Close Outp. 664
Subtask 33-24-07-865-002p. 664
Subtask 33-24-07-710-001p. 665
Subtask 33-24-07-941-001p. 665
33-24-08p. 667
401: SIGN, LIGHTED ORDINANCE – REMOVAL/INSTALLATIONp. 667
1. Generalp. 667
Task 33-24-08-000-801 Removal of the Lighted Ordinance Signp. 667
1. Job Set-Up Informationp. 667
Subtask 33-24-08-946-002p. 667
2. Job Set-Upp. 668
Subtask 33-24-08-910-001p. 668
Subtask 33-24-08-865-001p. 668
3. Procedurep. 668
Subtask 33-24-08-020-001p. 668
Subtask 33-24-08-020-002p. 669
Subtask 33-24-08-020-003p. 669
Lighted Ordinance Sign (Windscreen) – Removal/Installationp. 670
Figure 401p. 670
Lighted Ordinance Sign (FWD Stowage) – Removal/Installationp. 671
Figure 402p. 671
Lighted Ordinance Sign (FWD Stowage) – Removal/Installationp. 672
Figure 403p. 672
Task 33-24-08-400-801 Installation of the Lighted Ordinance Signp. 673
1. Job Set-Up Informationp. 673
Subtask 33-24-08-945-001p. 673
Subtask 33-24-08-946-003p. 673
2. Job Set-Upp. 674
Subtask 33-24-08-869-001p. 674
3. Procedurep. 674
Subtask 33-24-08-420-002p. 674
Subtask 33-24-08-420-001p. 675
Subtask 33-24-08-420-003p. 675
4. Close Outp. 676
Subtask 33-24-08-865-002p. 676
Subtask 33-24-08-710-001p. 676
Subtask 33-24-08-941-001p. 676
33-24-10p. 677
401: PANEL, PASSENGER SIGN/EMERGENCY LIGHTS – REMOVAL/INSTALLATIONp. 677
1. Generalp. 677
Task 33-24-10-000-801 Removal of the Passenger-Sign/Emergency Lights Panelp. 677
1. Job Set-Up Informationp. 677
Subtask 33-24-10-946-001p. 677
2. Job Set-Upp. 677
Subtask 33-24-10-910-001p. 677
Subtask 33-24-10-865-001p. 677
3. Procedurep. 677
Subtask 33-24-10-020-001p. 677
4. Procedurep. 678
Subtask 33-24-10-020-002p. 678
Passenger Sign/Emergency Lights Panel – Removal/Installationp. 679
Figure 401p. 679
Passenger Sign/Emergency Lights Panel – Removal/Installationp. 680
Figure 402p. 680
Task 33-24-10-400-801 Installation of the Passenger-Sign/Emergency Lights Panelp. 681
1. Job Set-Up Informationp. 681
Subtask 33-24-10-946-002p. 681
2. Job Set-Upp. 681
Subtask 33-24-10-869-001p. 681
3. Procedurep. 681
Subtask 33-24-10-420-001p. 681
4. Procedurep. 681
Subtask 33-24-10-420-002p. 681
5. Close Outp. 682
Subtask 33-24-10-865-002p. 682
Subtask 33-24-10-710-001p. 682
Subtask 33-24-10-941-001p. 682
Section 25p. 683
33-25-00p. 683
1: LAVATORY LIGHTS – DESCRIPTION AND OPERATIONp. 683
1. Component Detailsp. 684
A. Vanity Light Assemblyp. 684
B. Dome Lightp. 684
C. Power Unit/Dimmerp. 684
D. Lavatory Occupied Relayp. 685
E. Lavatory Occupied Microswitchp. 685
2. Operationp. 685
3. Component Location Indexp. 687
Lavatory Lights – Component Locationsp. 688
Figure 1 (Sheet 1 of 3)p. 688
Figure 1 (Sheet 2 of 3)p. 689
Figure 1 (Sheet 3 of 3)p. 690
Lavatory Lights – Component Locationsp. 691
Figure 2 (Sheet 1 of 3)p. 691
Figure 2 (Sheet 2 of 3)p. 692
Figure 2 (Sheet 3 of 3)p. 693
Lavatory Lights – Block Diagramp. 694
Figure 3p. 694
Lavatory Lights – Block Diagramp. 695
Figure 4p. 695
501: LAVATORY LIGHTS – ADJUSTMENT/TESTp. 697
1. Generalp. 697
Task 33-25-00-710-801 Operational Test of the Lavatory Lightsp. 697
1. Job Set-Up Informationp. 697
Subtask 33-25-00-946-001p. 697
2. Job Set-Upp. 697
Subtask 33-25-00-861-001p. 697
Subtask 33-25-00-865-001p. 697
3. Procedurep. 697
Subtask 33-25-00-710-001p. 697
Subtask 33-25-00-710-002p. 698
Subtask 33-25-00-710-003p. 698
4. Close Outp. 699
Subtask 33-25-00-941-001p. 699
Subtask 33-25-00-861-002p. 699
33-25-01p. 701
401: DOME LIGHT, LAVATORY – REMOVAL/INSTALLATIONp. 701
1. Generalp. 701
Task 33-25-01-000-801 Removal of the Lavatory Dome Lightp. 701
1. Job Set-Up Informationp. 701
Subtask 33-25-01-946-001p. 701
2. Job Set-Upp. 701
Subtask 33-25-01-910-001p. 701
Subtask 33-25-01-865-001p. 701
3. Procedurep. 701
Subtask 33-25-01-020-001p. 701
Lavatory Dome Light – Removal/Installationp. 703
Figure 401p. 703
Task 33-25-01-400-801 Installation of the Lavatory Dome Lightp. 704
1. Job Set-Up Informationp. 704
Subtask 33-25-01-946-002p. 704
2. Job Set-Upp. 704
Subtask 33-25-01-869-001p. 704
3. Procedurep. 704
Subtask 33-25-01-420-001p. 704
4. Close Outp. 704
Subtask 33-25-01-865-002p. 704
Subtask 33-25-01-710-001p. 704
Subtask 33-25-01-941-001p. 704
33-25-02p. 705
401: LIGHT, LAVATORY VANITY ASSEMBLY – REMOVAL/INSTALLATIONp. 705
1. Generalp. 705
Task 33-25-02-000-801 Removal of the Lavatory Vanity-Assembly Lightp. 705
1. Job Set-Up Informationp. 705
Subtask 33-25-02-946-001p. 705
2. Job Set-Upp. 705
Subtask 33-25-02-910-001p. 705
Subtask 33-25-02-865-001p. 705
3. Procedurep. 705
Subtask 33-25-02-020-001p. 705
Subtask 33-25-02-020-002p. 706
Lavatory Vanity Light – Removal/Installationp. 707
Figure 401p. 707
Lavatory Vanity Light – Removal/Installationp. 708
Figure 402p. 708
Task 33-25-02-400-801 Installation of the Lavatory Vanity-Assembly Lightp. 709
1. Job Set-Up Informationp. 709
Subtask 33-25-02-946-002p. 709
2. Job Set-Upp. 709
Subtask 33-25-02-869-001p. 709
3. Procedurep. 709
Subtask 33-25-02-420-001p. 709
Subtask 33-25-02-420-002p. 709
4. Close Outp. 710
Subtask 33-25-02-865-002p. 710
Subtask 33-25-02-710-001p. 710
Subtask 33-25-02-941-001p. 710
33-25-07p. 711
401: POWER UNIT/DIMMER, LAVATORY LIGHT – REMOVAL/INSTALLATIONp. 711
1. Generalp. 711
Task 33-25-07-000-801 Removal of the Lavatory-Light Power Unit/Dimmerp. 711
1. Job Set-Up Informationp. 711
Subtask 33-25-07-946-001p. 711
2. Job Set-Upp. 711
Subtask 33-25-07-910-001p. 711
Subtask 33-25-07-865-001p. 711
3. Procedurep. 711
Subtask 33-25-07-010-002p. 711
Subtask 33-25-07-010-003p. 712
Subtask 33-25-07-020-001p. 712
Lavatory Power Unit/Dimmer – Removal/Installationp. 713
Figure 401 (Sheet 1 of 2)p. 713
Figure 401 (Sheet 2 of 2)p. 714
Lavatory Power Unit/Dimmer – Removal/Installationp. 715
Figure 402 (Sheet 1 of 2)p. 715
Figure 402 (Sheet 2 of 2)p. 716
Task 33-25-07-400-801 Installation of the Lavatory-Light Power Unit/Dimmerp. 717
1. Job Set-Up Informationp. 717
Subtask 33-25-07-945-002p. 717
Subtask 33-25-07-946-002p. 717
2. Job Set-Upp. 717
Subtask 33-25-07-869-001p. 717
3. Procedurep. 717
Subtask 33-25-07-420-001p. 717
Subtask 33-25-07-420-002p. 718
Subtask 33-25-07-410-001p. 718
4. Close Outp. 718
Subtask 33-25-07-865-002p. 718
Subtask 33-25-07-710-001p. 718
Subtask 33-25-07-941-001p. 718
33-25-09p. 719
401: RELAY, LAVATORY OCCUPIED – REMOVAL/INSTALLATIONp. 719
1. Generalp. 719
Task 33-25-09-000-801 Removal of the Lavatory Occupied Relayp. 719
1. Job Set-Up Informationp. 719
Subtask 33-25-09-946-001p. 719
2. Job Set-Upp. 719
Subtask 33-25-09-910-001p. 719
Subtask 33-25-09-865-001p. 719
Subtask 33-25-09-010-001p. 719
3. Procedurep. 720
Subtask 33-25-09-020-001p. 720
Subtask 33-25-09-020-003p. 720
Lavatory Occupied Relay – Removal/Installationp. 721
Figure 401p. 721
Lavatory Occupied Relay – Removal/Installationp. 722
Figure 402p. 722
Task 33-25-09-400-801 Installation of the Lavatory Occupied Relayp. 723
1. Job Set-Upp. 723
Subtask 33-25-09-945-002p. 723
Subtask 33-25-09-869-001p. 723
2. Procedurep. 723
Subtask 33-25-09-420-001p. 723
Subtask 33-25-09-420-003p. 723
3. Close Outp. 724
Subtask 33-25-09-410-001p. 724
Subtask 33-25-09-865-002p. 724
Subtask 33-25-09-861-001p. 724
Subtask 33-25-09-710-002p. 724
Subtask 33-25-09-710-001p. 725
Subtask 33-25-09-861-002p. 726
Subtask 33-25-09-941-001p. 726
33-25-11p. 727
401: MICROSWITCH, LAVATORY-OCCUPIED – REMOVAL/INSTALLATIONp. 727
1. Generalp. 727
Task 33-25-11-000-801 Removal of the Lavatory Occupied Microswitchp. 727
1. Job Set-Up Informationp. 727
Subtask 33-25-11-943-001p. 727
Subtask 33-25-11-946-001p. 727
2. Job Set-Upp. 727
Subtask 33-25-11-910-001p. 727
Subtask 33-25-11-865-001p. 727
Subtask 33-25-11-010-001p. 728
3. Procedurep. 728
Subtask 33-25-11-020-001p. 728
Subtask 33-25-11-020-003p. 728
Subtask 33-25-11-020-002p. 729
Lavatory Occupied Microswitch – Removal/Installationp. 730
Figure 401p. 730
Lavatory Occupied Microswitch – Removal/Installationp. 731
Figure 402p. 731
Lavatory Occupied Microswitch – Removal/Installationp. 732
Figure 403p. 732
Lavatory Occupied Microswitch – Removal/Installationp. 733
Figure 404p. 733
Task 33-25-11-400-801 Installation of the Lavatory Occupied Microswitchp. 734
1. Job Set-Up Informationp. 734
Subtask 33-25-11-943-002p. 734
Subtask 33-25-11-944-001p. 734
Subtask 33-25-11-945-001p. 734
Subtask 33-25-11-945-002p. 734
Subtask 33-25-11-946-002p. 735
2. Job Set-Upp. 735
Subtask 33-25-11-869-001p. 735
3. Procedurep. 735
Subtask 33-25-11-420-001p. 735
Subtask 33-25-11-420-003p. 735
Subtask 33-25-11-420-002p. 736
4. Close Outp. 736
Subtask 33-25-11-865-002p. 736
Subtask 33-25-11-861-001p. 737
Subtask 33-25-11-710-001p. 737
Subtask 33-25-11-710-002p. 737
Subtask 33-25-11-861-002p. 738
Subtask 33-25-11-941-001p. 738
33-25-12p. 739
401: CALL SWITCH, FLIGHT-ATTENDANT, LAVATORY – REMOVAL/INSTALLATIONp. 739
1. Generalp. 739
Task 33-25-12-000-802 Removal of the Lavatory Flight-Attendant Call Switchp. 739
1. Job Set-Up Informationp. 739
Subtask 33-25-12-946-001p. 739
2. Job Setupp. 739
Subtask 33-25-12-910-001p. 739
Subtask 33-25-12-800-002p. 739
Subtask 33-25-12-010-001p. 739
3. Procedurep. 739
Subtask 33-25-12-020-002p. 739
Lavatory Flight-Attendant Call Switchp. 741
Figure 401p. 741
Task 33-25-12-420-801 Installation of the Lavatory Flight-Attendant Call Switchp. 742
1. Job Set-Up Informationp. 742
Subtask 33-25-12-945-001p. 742
Subtask 33-25-12-946-002p. 742
2. Job Set-Upp. 742
Subtask 33-25-12-869-001p. 742
3. Procedurep. 742
Subtask 33-25-12-420-001p. 742
4. Close Outp. 742
Subtask 33-25-12-865-003p. 742
Subtask 33-25-12-861-001p. 743
Subtask 33-25-12-861-002p. 743
Section 26p. 745
33-26-00p. 745
1: GALLEY LIGHTS – DESCRIPTION AND OPERATIONp. 745
1. Generalp. 745
2. Component Detailsp. 745
A. Galley Lightsp. 745
B. Power Units/Dimmersp. 746
C. Light Switchp. 746
3. Operationp. 746
4. Component Location Indexp. 747
Galley Lights – Component Locationsp. 748
Figure 1 (Sheet 1 of 2)p. 748
Figure 1 (Sheet 2 of 2)p. 749
Galley Lights – Component Locationsp. 750
Figure 2 (Sheet 1 of 2)p. 750
Figure 2 (Sheet 2 of 2)p. 751
Galley Lights – Block Diagramp. 752
Figure 3p. 752
Galley Lights – Block Diagramp. 753
Figure 4p. 753
501: GALLEY LIGHTS – ADJUSTMENT/TESTp. 755
1. Generalp. 755
Task 33-26-00-710-801 Operational Test of the Galley Lightsp. 755
1. Job Set-Up Informationp. 755
Subtask 33-26-00-946-001p. 755
2. Job Set-Upp. 755
Subtask 33-26-00-861-001p. 755
Subtask 33-26-00-865-001p. 755
3. Procedurep. 755
Subtask 33-26-00-710-001p. 755
Subtask 33-26-00-710-002p. 756
Subtask 33-26-00-710-003p. 756
Subtask 33-26-00-710-004p. 757
4. Close Outp. 757
Subtask 33-26-00-941-001p. 757
Subtask 33-26-00-861-002p. 757
33-26-01p. 759
401: LIGHT, GALLEY – REMOVAL/INSTALLATIONp. 759
1. Generalp. 759
Task 33-26-01-000-801 Removal of the Galley Lightp. 759
1. Job Set-Up Informationp. 759
Subtask 33-26-01-946-001p. 759
2. Job Set-Upp. 759
Subtask 33-26-01-910-001p. 759
Subtask 33-26-01-865-001p. 759
3. Procedurep. 759
Subtask 33-26-01-020-001p. 759
Galley Light – Removal/Installationp. 760
Figure 401p. 760
Task 33-26-01-400-801 Installation of the Galley Lightp. 761
1. Job Set-Up Informationp. 761
Subtask 33-26-01-946-002p. 761
2. Job Set-Upp. 761
Subtask 33-26-01-869-001p. 761
3. Procedurep. 761
Subtask 33-26-01-420-001p. 761
4. Close Outp. 761
Subtask 33-26-01-865-002p. 761
Subtask 33-26-01-710-001p. 761
Subtask 33-26-01-941-001p. 761
33-26-05p. 763
401: POWER UNIT/DIMMER, GALLEY LIGHT – REMOVAL/INSTALLATIONp. 763
1. Generalp. 763
Task 33-26-05-000-801 Removal of the Galley-Light Power Unit/Dimmerp. 763
1. Job Set-Up Informationp. 763
Subtask 33-26-05-946-001p. 763
Subtask 33-26-05-946-003p. 763
Subtask 33-26-05-946-004p. 764
Subtask 33-26-05-946-005p. 764
2. Job Set-Upp. 764
Subtask 33-26-05-910-001p. 764
Subtask 33-26-05-865-001p. 765
Subtask 33-26-05-010-002p. 765
Subtask 33-26-05-010-003p. 765
Subtask 33-26-05-010-004p. 765
Subtask 33-26-05-010-001p. 766
3. Procedurep. 766
Subtask 33-26-05-020-001p. 766
Galley Light Power Unit/Dimmer – Removal/Installationp. 767
Figure 401p. 767
Task 33-26-05-400-801 Installation of the Galley-Light Power Unit/Dimmerp. 768
1. Job Set-Up Informationp. 768
Subtask 33-26-05-945-001p. 768
Subtask 33-26-05-946-002p. 768
Subtask 33-26-05-946-006p. 768
Subtask 33-26-05-946-007p. 769
Subtask 33-26-05-946-008p. 769
2. Job Set-Upp. 769
Subtask 33-26-05-869-001p. 769
3. Procedurep. 770
Subtask 33-26-05-420-001p. 770
Subtask 33-26-05-410-002p. 770
Subtask 33-26-05-410-003p. 770
Subtask 33-26-05-410-004p. 770
Subtask 33-26-05-410-001p. 771
4. Close Outp. 771
Subtask 33-26-05-865-002p. 771
Subtask 33-26-05-710-001p. 771
Subtask 33-26-05-941-001p. 771
Section 30p. 773
33-30-00p. 773
1: SERVICE AND MAINTENANCE LIGHTING – DESCRIPTION AND OPERATIONp. 773
1. Generalp. 773
2. Descriptionp. 773
A. Service Lightsp. 773
B. Maintenance Lightsp. 773
Section 31p. 775
33-31-00p. 775
1: SERVICE LIGHTS – DESCRIPTION AND OPERATIONp. 775
1. Generalp. 775
2. Component Detailsp. 775
A. Service Lightp. 775
B. Cargo Door Lightp. 776
3. Operationp. 776
4. Component Location Indexp. 778
Service Lights – Component Locationp. 781
Figure 1p. 781
Service Lights – Component Locationp. 782
Figure 2p. 782
Service Lights – Component Locationp. 783
Figure 3p. 783
Service Lights – Schematic Diagramp. 784
Figure 4p. 784
Service Lights – Schematic Diagramp. 785
Figure 5p. 785
Service Lights – Schematic Diagramp. 786
Figure 6p. 786
Service Lights – Schematic Diagramp. 787
Figure 7p. 787
Service Lights – Schematic Diagramp. 788
Figure 8p. 788
Service Lights – Schematic Diagramp. 789
Figure 9p. 789
501: SERVICE LIGHTS – ADJUSTMENT/TESTp. 791
1. Generalp. 791
Task 33-31-00-710-801 Operational Test of the Service Lightsp. 791
1. Job Set-Up Informationp. 791
Subtask 33-31-00-946-001p. 791
2. Job Set-Upp. 791
Subtask 33-31-00-010-001p. 791
Subtask 33-31-00-865-001p. 791
Subtask 33-31-00-865-002p. 792
Subtask 33-31-00-865-003p. 792
Subtask 33-31-00-861-001p. 792
3. Procedurep. 792
Subtask 33-31-00-710-001p. 792
Subtask 33-31-00-710-002p. 793
4. Close Outp. 793
Subtask 33-31-00-861-002p. 793
Subtask 33-31-00-410-001p. 793
Subtask 33-31-00-941-001p. 793
33-31-01p. 795
401: LIGHT, SERVICE – REMOVAL/INSTALLATIONp. 795
1. Generalp. 795
Task 33-31-01-000-801 Removal of the Service Light Assemblyp. 795
1. Job Set-Up Informationp. 795
Subtask 33-31-01-946-001p. 795
2. Job Set-Upp. 795
Subtask 33-31-01-910-001p. 795
Subtask 33-31-01-865-001p. 795
Subtask 33-31-01-865-005p. 796
Subtask 33-31-01-865-010p. 796
Subtask 33-31-01-010-001p. 796
3. Procedurep. 796
Subtask 33-31-01-020-001p. 796
Subtask 33-31-01-020-003p. 797
Service Light Assembly – Removal/Installationp. 798
Figure 401p. 798
Service Light Assembly – Removal/Installationp. 799
Figure 402p. 799
Task 33-31-01-400-801 Installation of the Service Light Assemblyp. 800
1. Job Set-Up Informationp. 800
Subtask 33-31-01-944-001p. 800
Subtask 33-31-01-945-001p. 800
Subtask 33-31-01-945-003p. 800
Subtask 33-31-01-946-002p. 801
2. Job Set-Upp. 801
Subtask 33-31-01-869-001p. 801
3. Procedurep. 801
Subtask 33-31-01-420-001p. 801
Subtask 33-31-01-420-003p. 801
4. Close Outp. 802
Subtask 33-31-01-865-002p. 802
Subtask 33-31-01-865-006p. 802
Subtask 33-31-01-865-011p. 802
Subtask 33-31-01-710-001p. 803
Subtask 33-31-01-410-001p. 803
Subtask 33-31-01-941-001p. 803
Task 33-31-01-030-801 Removal of the Service Lampp. 804
1. Job Set-Up Informationp. 804
Subtask 33-31-01-946-003p. 804
2. Job Set-Upp. 804
Subtask 33-31-01-910-002p. 804
Subtask 33-31-01-865-004p. 804
Subtask 33-31-01-865-007p. 805
Subtask 33-31-01-865-009p. 805
Subtask 33-31-01-010-002p. 805
3. Procedurep. 805
Subtask 33-31-01-020-002p. 805
Service Lamp – Removal/Installationp. 806
Figure 403p. 806
Task 33-31-01-430-801 Installation of the Service Lampp. 807
1. Job Set-Up Informationp. 807
Subtask 33-31-01-945-002p. 807
Subtask 33-31-01-946-004p. 807
2. Job Set-Upp. 807
Subtask 33-31-01-869-002p. 807
3. Procedurep. 807
Subtask 33-31-01-420-002p. 807
4. Close Outp. 808
Subtask 33-31-01-865-003p. 808
Subtask 33-31-01-865-008p. 808
Subtask 33-31-01-710-002p. 808
Subtask 33-31-01-410-002p. 808
Subtask 33-31-01-941-002p. 809
33-31-04p. 811
401: LIGHT, CARGO DOOR – REMOVAL/INSTALLATIONp. 811
1. Generalp. 811
Task 33-31-04-000-801 Removal of the Cargo Door Lightp. 811
1. Job Set-Up Informationp. 811
Subtask 33-31-04-946-003p. 811
2. Job Set-Upp. 811
Subtask 33-31-04-910-001p. 811
Subtask 33-31-04-865-001p. 811
Subtask 33-31-04-010-001p. 811
3. Procedurep. 812
Subtask 33-31-04-020-001p. 812
Cargo Door Light – Removal/Installationp. 813
Figure 401p. 813
Task 33-31-04-400-801 Installation of the Cargo Door Lightp. 814
1. Job Set-Up Informationp. 814
Subtask 33-31-04-944-001p. 814
Subtask 33-31-04-945-001p. 814
Subtask 33-31-04-946-002p. 814
2. Job Set-Upp. 814
Subtask 33-31-04-869-001p. 814
3. Procedurep. 814
Subtask 33-31-04-420-001p. 814
4. Close Outp. 815
Subtask 33-31-04-865-002p. 815
Subtask 33-31-04-710-001p. 815
Subtask 33-31-04-410-001p. 815
Subtask 33-31-04-941-001p. 815
Section 32p. 817
33-32-00p. 817
1: MAINTENANCE LIGHTS – DESCRIPTION AND OPERATIONp. 817
1. Generalp. 817
2. Component Detailsp. 817
A. Caged Maintenance Lightp. 817
B. Dome Maintenance Lightp. 817
3. Operationp. 817
4. Component Location Indexp. 818
Maintenance Lights – Component Locationp. 820
Figure 1p. 820
Maintenance Lights – Schematicp. 821
Figure 2p. 821
Maintenance Lights – Schematicp. 822
Figure 3p. 822
501: MAINTENANCE LIGHTS – ADJUSTMENT/TESTp. 823
1. Generalp. 823
Task 33-32-00-710-801 Operational Test of the Caged Maintenance Light in the Nosewheel Wellp. 823
1. Job Set-Up Informationp. 823
Subtask 33-32-00-946-001p. 823
2. Job Set-Upp. 823
Subtask 33-32-00-865-001p. 823
Subtask 33-32-00-861-001p. 823
3. Procedurep. 823
Subtask 33-32-00-710-001p. 823
4. Close Outp. 824
Subtask 33-32-00-861-002p. 824
Subtask 33-32-00-941-001p. 824
Task 33-32-00-710-802 Operational Test of the Caged Maintenance Lights in the Aft Equipment Compartmentp. 825
1. Job Set-Up Informationp. 825
Subtask 33-32-00-946-002p. 825
2. Job Set-Upp. 825
Subtask 33-32-00-010-002p. 825
Subtask 33-32-00-865-002p. 825
Subtask 33-32-00-861-003p. 825
3. Procedurep. 825
Subtask 33-32-00-710-002p. 825
4. Close Outp. 826
Subtask 33-32-00-861-004p. 826
Subtask 33-32-00-410-002p. 826
Subtask 33-32-00-941-002p. 826
Task 33-32-00-710-803 Operational Test of the Dome Maintenance Lightsp. 827
1. Job Set-Up Informationp. 827
Subtask 33-32-00-946-003p. 827
2. Job Set-Upp. 827
Subtask 33-32-00-010-003p. 827
Subtask 33-32-00-865-003p. 827
Subtask 33-32-00-861-005p. 827
3. Procedurep. 827
Subtask 33-32-00-710-003p. 827
4. Close Outp. 827
Subtask 33-32-00-861-006p. 827
Subtask 33-32-00-410-003p. 828
Subtask 33-32-00-941-003p. 828
33-32-01p. 829
401: LIGHT, CAGED MAINTENANCE – REMOVAL/INSTALLATIONp. 829
1. Generalp. 829
Task 33-32-01-000-801 Removal of the Caged Maintenance Lightp. 829
1. Job Set-Up Informationp. 829
Subtask 33-32-01-946-001p. 829
2. Job Set-Upp. 829
Subtask 33-32-01-910-001p. 829
Subtask 33-32-01-865-001p. 829
Subtask 33-32-01-980-001p. 829
Subtask 33-32-01-010-001p. 829
3. Procedurep. 830
Subtask 33-32-01-020-001p. 830
Caged Maintenance Light – Removal/Installationp. 831
Figure 401p. 831
Task 33-32-01-400-801 Installation of the Caged Maintenance Lightp. 832
1. Job Set-Up Informationp. 832
Subtask 33-32-01-945-001p. 832
Subtask 33-32-01-946-002p. 832
2. Job Set-Upp. 832
Subtask 33-32-01-869-001p. 832
3. Procedurep. 832
Subtask 33-32-01-420-001p. 832
4. Close Outp. 833
Subtask 33-32-01-865-002p. 833
Subtask 33-32-01-710-001p. 833
Subtask 33-32-01-980-002p. 833
Subtask 33-32-01-410-001p. 833
Subtask 33-32-01-941-001p. 833
33-32-04p. 835
401: LIGHT, DOME MAINTENANCE – REMOVAL/INSTALLATIONp. 835
1. Generalp. 835
Task 33-32-04-000-801 Removal of the Dome Maintenance Lightp. 835
1. Job Set-Up Informationp. 835
Subtask 33-32-04-946-001p. 835
2. Job Set-Upp. 835
Subtask 33-32-04-910-001p. 835
Subtask 33-32-04-865-001p. 835
Subtask 33-32-04-010-001p. 835
3. Procedurep. 836
Subtask 33-32-04-020-001p. 836
Dome Maintenance Light – Removal/Installationp. 837
Figure 401p. 837
Task 33-32-04-400-801 Installation of the Dome Maintenance Lightp. 838
1. Job Set-Up Informationp. 838
Subtask 33-32-04-945-001p. 838
Subtask 33-32-04-946-002p. 838
2. Job Set-Upp. 838
Subtask 33-32-04-869-001p. 838
3. Procedurep. 838
Subtask 33-32-04-420-001p. 838
4. Close Outp. 838
Subtask 33-32-04-865-002p. 838
Subtask 33-32-04-710-001p. 839
Subtask 33-32-04-410-001p. 839
Subtask 33-32-04-941-001p. 839
Section 40p. 841
33-40-00p. 841
1: EXTERIOR LIGHTING SYSTEM – DESCRIPTION AND OPERATIONp. 841
1. Generalp. 841
2. Descriptionp. 842
A. Landing and Taxi/Recognition Lights Systemp. 842
B. Navigation Lights Systemp. 843
C. Wing Inspection Lights Systemp. 843
D. Anticollision Lights Systemp. 843
E. Stair Lightsp. 843
F. Logo Lightsp. 844
Exterior Lighting System – Component Locationsp. 845
Figure 1p. 845
Exterior Lighting System – Control Panelsp. 846
Figure 2p. 846
Exterior Lighting System – Component Locationsp. 847
Figure 3p. 847
Exterior Lighting System – Control Panelsp. 848
Figure 4p. 848
601: EXTERIOR LIGHTING SYSTEM – INSPECTION/CHECKp. 849
1. Generalp. 849
Task 33-40-00-210-802 General Visual Inspection of Position Light Lenses for Crazing and Diffusion of Light Sourcep. 849
1. Reason for the Jobp. 849
2. Procedurep. 849
Subtask 33-40-00-210-003p. 849
General Visual Inspection of the Position Light Lensep. 850
Figure 601p. 850
Section 41p. 851
33-41-00p. 851
1: LANDING AND TAXI/RECOGNITION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 851
1. Generalp. 851
2. Component Detailsp. 851
A. Landing and Taxi/Recognition Lights Systemp. 851
B. Transformersp. 851
C. Taxi/Recognition Lights Switchp. 851
D. Landing Lights Switchesp. 852
E. Landing Lights Switchesp. 852
3. Operationp. 852
4. Operationp. 852
5. Component Location Indexp. 852
Landing and Taxi/Recognition Lights System – Component Locationsp. 854
Figure 1 (Sheet 1 of 3)p. 854
Figure 1 (Sheet 2 of 3)p. 855
Figure 1 (Sheet 3 of 3)p. 856
Landing and Taxi/Recognition Light System – Component Locationp. 857
Figure 2 (Sheet 1 of 3)p. 857
Figure 2 (Sheet 2 of 3)p. 858
Figure 2 (Sheet 3 of 3)p. 859
Landing and Taxi/Recognition Lights System – Simplified Schematic Diagramp. 860
Figure 3p. 860
Landing and Taxi/Recognition Lights System – Simplified Schematic Diagramp. 861
Figure 4p. 861
501: LANDING AND TAXI/RECOGNITION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 863
1. Generalp. 863
Task 33-41-00-710-801 Operational Test of the Landing and Taxi/Recognition Lightsp. 863
1. Job Set-Up Informationp. 863
Subtask 33-41-00-946-001p. 863
2. Job Set-Upp. 863
Subtask 33-41-00-865-001p. 863
Subtask 33-41-00-861-001p. 863
3. Procedurep. 864
Subtask 33-41-00-710-001p. 864
Subtask 33-41-00-710-002p. 864
4. Close Outp. 865
Subtask 33-41-00-861-002p. 865
Subtask 33-41-00-941-001p. 866
33-41-01p. 867
401: LIGHT, WING LANDING AND TAXI/RECOGNITION – REMOVAL/INSTALLATIONp. 867
1. Generalp. 867
Task 33-41-01-000-802 Removal of the Wing Landing and the Taxi/Recognition Lampp. 867
1. Job Set-Up Informationp. 867
Subtask 33-41-01-946-004p. 867
2. Job Set-Upp. 867
Subtask 33-41-01-910-002p. 867
Subtask 33-41-01-865-003p. 867
Subtask 33-41-01-010-003p. 867
3. Procedurep. 868
Subtask 33-41-01-020-002p. 868
Wing Landing and Taxi/Recognition Lamp – Removal/Installationp. 869
Figure 401p. 869
Task 33-41-01-400-802 Installation of the Wing Landing and the Taxi/Recognition Lampp. 870
1. Job Set-Up Informationp. 870
Subtask 33-41-01-945-002p. 870
Subtask 33-41-01-946-005p. 870
2. Job Set-Upp. 870
Subtask 33-41-01-869-002p. 870
3. Procedurep. 870
Subtask 33-41-01-420-002p. 870
4. Close Outp. 871
Subtask 33-41-01-865-004p. 871
Subtask 33-41-01-710-002p. 871
Subtask 33-41-01-410-003p. 871
Subtask 33-41-01-941-003p. 871
Task 33-41-01-000-801 Removal of the Wing Landing and the Taxi/Recognition Lightp. 872
1. Job Set-Up Informationp. 872
Subtask 33-41-01-946-001p. 872
2. Job Set-Upp. 872
Subtask 33-41-01-910-001p. 872
Subtask 33-41-01-865-001p. 872
Subtask 33-41-01-010-001p. 872
3. Procedurep. 872
Subtask 33-41-01-020-001p. 872
Wing Landing and Taxi/Recognition Light – Removal/Installationp. 874
Figure 402p. 874
Task 33-41-01-400-801 Installation of the Wing Landing and the Taxi/Recognition Lightp. 875
1. Job Set-Up Informationp. 875
Subtask 33-41-01-945-001p. 875
Subtask 33-41-01-946-002p. 875
2. Job Set-Upp. 875
Subtask 33-41-01-869-001p. 875
3. Procedurep. 875
Subtask 33-41-01-420-001p. 875
4. Close Outp. 876
Subtask 33-41-01-865-002p. 876
Subtask 33-41-01-820-001p. 876
Subtask 33-41-01-710-001p. 876
Subtask 33-41-01-410-001p. 876
Subtask 33-41-01-941-001p. 876
501: LIGHT, WING LANDING AND TAXI/RECOGNITION – ADJUSTMENT/TESTp. 877
1. Generalp. 877
Task 33-41-01-820-801 Adjustment of the Wing Landing and Taxi/Recognition Lightp. 877
1. Job Set-Up Informationp. 877
Subtask 33-41-01-943-001p. 877
Subtask 33-41-01-946-003p. 877
2. Job Set-Upp. 877
Subtask 33-41-01-010-002p. 877
3. Procedurep. 877
Subtask 33-41-01-820-002p. 877
4. Close Outp. 878
Subtask 33-41-01-410-002p. 878
Subtask 33-41-01-941-002p. 878
Wing Landing and Taxi/Recognition Light – Adjustment/Testp. 879
Figure 501p. 879
33-41-04p. 881
401: LIGHT, NOSE LANDING – REMOVAL/INSTALLATIONp. 881
1. Generalp. 881
Task 33-41-04-000-802 Removal of the Nose Landing Lampp. 881
1. Job Set-Up Informationp. 881
Subtask 33-41-04-946-004p. 881
2. Job Set-Upp. 881
Subtask 33-41-04-910-002p. 881
Subtask 33-41-04-865-003p. 881
Subtask 33-41-04-010-003p. 881
3. Procedurep. 882
Subtask 33-41-04-020-002p. 882
Nose Landing Lamp – Removal/Installationp. 883
Figure 401 (Sheet 1 of 2)p. 883
Figure 401 (Sheet 2 of 2)p. 884
Task 33-41-04-400-802 Installation of the Nose Landing Lampp. 885
1. Job Set-Up Informationp. 885
Subtask 33-41-04-945-002p. 885
Subtask 33-41-04-946-005p. 885
2. Job Set-Upp. 885
Subtask 33-41-04-869-002p. 885
3. Procedurep. 885
Subtask 33-41-04-420-002p. 885
4. Close Outp. 886
Subtask 33-41-04-865-004p. 886
Subtask 33-41-04-710-002p. 886
Subtask 33-41-04-410-003p. 886
Subtask 33-41-04-941-002p. 886
Task 33-41-04-000-801 Removal of the Nose Landing Lightp. 887
1. Job Set-Up Informationp. 887
Subtask 33-41-04-946-001p. 887
2. Job Set-Upp. 887
Subtask 33-41-04-910-001p. 887
Subtask 33-41-04-865-001p. 887
Subtask 33-41-04-010-001p. 887
3. Procedurep. 887
Subtask 33-41-04-020-001p. 887
Nose Landing Light – Removal/Installationp. 889
Figure 402 (Sheet 1 of 2)p. 889
Figure 402 (Sheet 2 of 2)p. 890
Task 33-41-04-400-801 Installation of the Nose Landing Lightp. 891
1. Job Set-Up Informationp. 891
Subtask 33-41-04-945-001p. 891
Subtask 33-41-04-946-002p. 891
2. Job Set-Upp. 891
Subtask 33-41-04-869-001p. 891
3. Procedurep. 891
Subtask 33-41-04-420-001p. 891
4. Close Outp. 892
Subtask 33-41-04-865-002p. 892
Subtask 33-41-04-820-001p. 892
Subtask 33-41-04-710-001p. 892
Subtask 33-41-04-410-001p. 892
Subtask 33-41-04-941-001p. 892
501: LIGHT, NOSE LANDING – ADJUSTMENT/TESTp. 893
1. Generalp. 893
Task 33-41-04-820-801 Adjustment of the Nose Landing Lightp. 893
1. Job Set-Up Informationp. 893
Subtask 33-41-04-943-001p. 893
2. Job Set-Upp. 893
Subtask 33-41-04-010-002p. 893
3. Procedurep. 893
Subtask 33-41-04-820-002p. 893
4. Close Outp. 894
Subtask 33-41-04-410-002p. 894
Subtask 33-41-04-940-002p. 894
Nose Landing Light – Adjustment/Testp. 895
Figure 501 (Sheet 1 of 2)p. 895
Figure 501 (Sheet 2 of 2)p. 896
33-41-07p. 897
401: PANEL, LANDING LIGHTS – REMOVAL/INSTALLATIONp. 897
1. Generalp. 897
Task 33-41-07-000-801 Removal of the Landing Lights Control Panelp. 897
1. Job Set-Up Informationp. 897
Subtask 33-41-07-946-001p. 897
2. Job Set-Upp. 897
Subtask 33-41-07-910-001p. 897
Subtask 33-41-07-865-001p. 897
3. Procedurep. 897
Subtask 33-41-07-020-001p. 897
Landing Lights Control Panel – Removal/Installationp. 899
Figure 401p. 899
Task 33-41-07-400-801 Installation of the Landing Lights Control Panelp. 900
1. Job Set-Up Informationp. 900
Subtask 33-41-07-946-002p. 900
2. Job Set-Upp. 900
Subtask 33-41-07-869-001p. 900
3. Procedurep. 900
Subtask 33-41-07-420-001p. 900
4. Close Outp. 900
Subtask 33-41-07-865-002p. 900
Subtask 33-41-07-710-001p. 900
Subtask 33-41-07-941-001p. 901
33-41-10p. 903
401: TRANSFORMER, LANDING AND TAXI/RECOGNITION LIGHTS – REMOVAL/INSTALLATIONp. 903
1. Generalp. 903
Task 33-41-10-000-801 Removal of the Wing Landing and Taxi/Recognition Lights Transformerp. 903
1. Job Set-Up Informationp. 903
Subtask 33-41-10-946-001p. 903
2. Job Set-Upp. 903
Subtask 33-41-10-910-001p. 903
Subtask 33-41-10-865-001p. 903
Subtask 33-41-10-010-001p. 904
3. Procedurep. 904
Subtask 33-41-10-020-001p. 904
Wing Landing and Taxi/Recognition Lights Transformer – Removal/Installationp. 905
Figure 401p. 905
Task 33-41-10-400-801 Installation of the Wing Landing and Taxi/Recognition Lights Transformerp. 906
1. Job Set-Up Informationp. 906
Subtask 33-41-10-945-001p. 906
Subtask 33-41-10-946-002p. 906
2. Job Set-Upp. 906
Subtask 33-41-10-869-001p. 906
3. Procedurep. 906
Subtask 33-41-10-420-001p. 906
4. Close Outp. 906
Subtask 33-41-10-865-002p. 906
Subtask 33-41-10-710-001p. 907
Subtask 33-41-10-410-001p. 907
Subtask 33-41-10-941-001p. 907
Task 33-41-10-000-802 Removal of the Nose Landing Lights Transformerp. 908
1. Job Set-Up Informationp. 908
Subtask 33-41-10-946-003p. 908
2. Job Set-Upp. 908
Subtask 33-41-10-910-002p. 908
Subtask 33-41-10-865-003p. 908
Subtask 33-41-10-861-001p. 908
Subtask 33-41-10-010-002p. 908
3. Procedurep. 908
Subtask 33-41-10-020-002p. 908
Nose Landing Lights Transformer – Removal/Installationp. 910
Figure 402p. 910
Task 33-41-10-400-802 Installation of the Nose Landing Lights Transformerp. 911
1. Job Set-Up Informationp. 911
Subtask 33-41-10-945-002p. 911
Subtask 33-41-10-946-004p. 911
2. Job Set-Upp. 911
Subtask 33-41-10-869-002p. 911
3. Procedurep. 911
Subtask 33-41-10-420-002p. 911
4. Close Outp. 911
Subtask 33-41-10-861-002p. 911
Subtask 33-41-10-865-004p. 912
Subtask 33-41-10-710-002p. 912
Subtask 33-41-10-410-002p. 912
Subtask 33-41-10-941-002p. 912
Section 42p. 913
33-42-00p. 913
1: NAVIGATION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 913
1. Generalp. 913
2. Generalp. 913
3. Component Detailsp. 913
A. Navigation Lightsp. 914
B. Light Switchp. 914
C. Powerp. 914
D. Relaysp. 914
E. Transformerp. 914
4. Component Detailsp. 914
A. Navigation Lightsp. 914
B. Light Switchp. 915
C. Powerp. 915
D. Relaysp. 915
E. Transformersp. 915
5. Operationp. 915
6. Operationp. 916
7. Component Location Indexp. 916
8. Component Location Indexp. 917
Navigation Lights – Component Locationsp. 919
Figure 1 (Sheet 1 of 2)p. 919
Figure 1 (Sheet 2 of 2)p. 920
Navigation Lights – Component Locationsp. 921
Figure 2 (Sheet 1 of 2)p. 921
Figure 2 (Sheet 2 of 2)p. 922
Navigation Lights – Simplified Schematic Diagramp. 923
Figure 3p. 923
Navigation Lights – Simplified Schematic Diagramp. 924
Figure 4p. 924
401: LIGHT, WING NAVIGATION – DEACTIVATION/REACTIVATIONp. 925
1. Generalp. 925
Task 33-42-00-040-801 Deactivation of the Navigation Lightsp. 925
1. Job Set-up Informationp. 925
Subtask 33-42-00-946-003p. 925
2. Job Set-upp. 925
Subtask 33-42-00-910-001p. 925
3. Procedurep. 926
Subtask 33-42-00-040-001p. 926
4. Close-outp. 930
Subtask 33-42-00-941-003p. 930
Task 33-42-00-440-801 Reactivation of the Navigation Lightsp. 931
1. Job Set-upp. 931
Subtask 33-42-00-910-002p. 931
2. 2. Procedurep. 931
Subtask 33-42-00-440-001p. 931
3. 3. Close-outp. 932
Subtask 33-42-00-940-001p. 932
501: NAVIGATION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 933
1. Generalp. 933
Task 33-42-00-710-801 Operational Test of the Navigation Lightsp. 933
1. Job Set-Up Informationp. 933
Subtask 33-42-00-946-001p. 933
Subtask 33-42-00-946-002p. 934
2. Job Set-Upp. 934
Subtask 33-42-00-865-001p. 934
Subtask 33-42-00-861-001p. 934
3. Procedurep. 935
Subtask 33-42-00-710-001p. 935
Subtask 33-42-00-710-002p. 936
4. Close Outp. 937
Subtask 33-42-00-941-002p. 937
Subtask 33-42-00-865-002p. 937
Subtask 33-42-00-941-001p. 937
33-42-01p. 939
401: LIGHT, WING NAVIGATION – REMOVAL/INSTALLATIONp. 939
1. Generalp. 939
Task 33-42-01-000-801 Removal of the Wing Navigation Lightp. 939
1. Job Set-Up Informationp. 939
Subtask 33-42-01-946-001p. 939
2. Job Set-Upp. 939
Subtask 33-42-01-910-001p. 939
Subtask 33-42-01-865-001p. 939
Subtask 33-42-01-010-001p. 939
3. Procedurep. 940
Subtask 33-42-01-020-001p. 940
Subtask 33-42-01-020-004p. 940
Wing Navigation Light – Removal/Installationp. 941
Figure 401p. 941
Wing Navigation Lights – Removal/Installationp. 942
Figure 402p. 942
Task 33-42-01-400-801 Installation of the Wing Navigation Lightp. 943
1. Job Set-Up Informationp. 943
Subtask 33-42-01-945-001p. 943
Subtask 33-42-01-946-002p. 943
2. Job Set-Upp. 943
Subtask 33-42-01-869-001p. 943
3. Procedurep. 943
Subtask 33-42-01-420-001p. 943
Subtask 33-42-01-420-004p. 944
4. Close Outp. 944
Subtask 33-42-01-865-002p. 944
Subtask 33-42-01-710-001p. 944
Subtask 33-42-01-410-001p. 944
Subtask 33-42-01-941-001p. 944
Task 33-42-01-000-802 Removal of the Wing Navigation Light Lampp. 945
1. Job Set-Up Informationp. 945
Subtask 33-42-01-946-003p. 945
2. Job Set-Upp. 945
Subtask 33-42-01-941-002p. 945
Subtask 33-42-01-865-003p. 945
Subtask 33-42-01-010-002p. 945
3. Procedurep. 945
Subtask 33-42-01-020-003p. 945
Subtask 33-42-01-020-002p. 946
Wing Navigation Light Lamp – Removal/Installationp. 947
Figure 403p. 947
Wing Navigation Light Lamp – Removal/Installationp. 948
Figure 404p. 948
Task 33-42-01-400-802 Installation of the Wing Navigation Light Lampp. 949
1. Job Set-Up Informationp. 949
Subtask 33-42-01-945-002p. 949
2. Reference Informationp. 949
Subtask 33-42-01-946-004p. 949
3. Job Set-Upp. 949
Subtask 33-42-01-869-002p. 949
4. Procedurep. 949
Subtask 33-42-01-420-002p. 949
Subtask 33-42-01-420-003p. 949
5. Close Outp. 950
Subtask 33-42-01-865-004p. 950
Subtask 33-42-01-710-002p. 950
Subtask 33-42-01-410-002p. 950
Subtask 33-42-01-941-003p. 950
33-42-04p. 951
401: LIGHT, VERTICAL STABILIZER NAVIGATION – REMOVAL/INSTALLATIONp. 951
1. Generalp. 951
Task 33-42-04-000-801 Removal of the Vertical-Stabilizer Navigation Lightp. 951
1. Job Set-Up Informationp. 951
Subtask 33-42-04-943-001p. 951
Subtask 33-42-04-946-001p. 951
2. Job Set-Upp. 952
Subtask 33-42-04-941-001p. 952
Subtask 33-42-04-010-001p. 952
Subtask 33-42-04-910-001p. 952
Subtask 33-42-04-865-001p. 952
3. Procedurep. 952
Subtask 33-42-04-020-001p. 952
Vertical-Stabilizer Navigation Light – Removal/Installationp. 954
Figure 401p. 954
Task 33-42-04-400-801 Installation of the Vertical-Stabilizer Navigation Lightp. 955
1. Job Set-Up Informationp. 955
Subtask 33-42-04-943-002p. 955
Subtask 33-42-04-944-001p. 955
Subtask 33-42-04-945-001p. 955
Subtask 33-42-04-946-002p. 955
2. Job Set-Upp. 956
Subtask 33-42-04-869-001p. 956
3. Procedurep. 956
Subtask 33-42-04-420-001p. 956
4. Close Outp. 956
Subtask 33-42-04-865-002p. 956
Subtask 33-42-04-861-001p. 957
Subtask 33-42-04-710-001p. 957
Subtask 33-42-04-861-002p. 957
Subtask 33-42-04-390-002p. 957
Subtask 33-42-04-410-001p. 957
Subtask 33-42-04-941-002p. 957
Task 33-42-04-000-804 Removal of the Vertical-Stabilizer Navigation-Light Lampp. 958
1. Job Set-Up Informationp. 958
Subtask 33-42-04-943-006p. 958
Subtask 33-42-04-946-006p. 958
2. Job Set-Upp. 958
Subtask 33-42-04-941-007p. 958
Subtask 33-42-04-910-003p. 958
Subtask 33-42-04-865-005p. 958
3. Procedurep. 959
Subtask 33-42-04-020-004p. 959
Vertical-Stabilizer Navigation-Light Lamp – Removal/Installationp. 960
Figure 402p. 960
Task 33-42-04-400-803 Installation of the Vertical-Stabilizer Navigation-Light Lampp. 961
1. Job Set-Up Informationp. 961
Subtask 33-42-04-943-007p. 961
Subtask 33-42-04-944-003p. 961
Subtask 33-42-04-945-003p. 961
Subtask 33-42-04-946-007p. 961
2. Job Set-Upp. 961
Subtask 33-42-04-869-003p. 961
3. Procedurep. 962
Subtask 33-42-04-420-003p. 962
4. Close Outp. 962
Subtask 33-42-04-865-006p. 962
Subtask 33-42-04-861-006p. 962
Subtask 33-42-04-710-003p. 962
Subtask 33-42-04-861-005p. 962
Subtask 33-42-04-390-003p. 962
Subtask 33-42-04-941-008p. 962
Task 33-42-04-000-805 Removal of the Vertical-Stabilizer Navigation-Light Shock-Mountp. 963
1. Job Set-Up Informationp. 963
Subtask 33-42-04-943-003p. 963
Subtask 33-42-04-946-003p. 963
2. Job Set-Upp. 963
Subtask 33-42-04-940-001p. 963
3. Procedurep. 963
Subtask 33-42-04-020-002p. 963
Vertical-Stabilizer Navigation-Light Shock Mount – Removal/Installationp. 964
Figure 403p. 964
Task 33-42-04-400-804 Installation of the Vertical-Stabilizer Navigation-Light Shock-Mountp. 965
1. Job Set-Up Informationp. 965
Subtask 33-42-04-943-004p. 965
Subtask 33-42-04-944-004p. 965
Subtask 33-42-04-945-002p. 965
Subtask 33-42-04-946-004p. 965
2. Job Set-Upp. 965
Subtask 33-42-04-940-002p. 965
3. Procedurep. 965
Subtask 33-42-04-420-002p. 965
4. Close Outp. 966
Subtask 33-42-04-940-003p. 966
401: LIGHT, VERTICAL STABILIZER NAVIGATION – REMOVAL/INSTALLATIONp. 967
1. Generalp. 967
Task 33-42-04-000-808 Removal of the Vertical-Stabilizer Navigation-Lamp Assemblyp. 967
1. Job Set-Up Informationp. 967
Subtask 33-42-04-943-009p. 967
Subtask 33-42-04-946-011p. 967
2. Job Set-Upp. 968
Subtask 33-42-04-941-005p. 968
Subtask 33-42-04-910-004p. 968
Subtask 33-42-04-865-007p. 968
3. Procedurep. 968
Subtask 33-42-04-020-005p. 968
Vertical-Stabilizer Navigation-Light Lamp – Removal/Installationp. 970
Figure 401p. 970
Task 33-42-04-400-806 Installation of the Vertical-Stabilizer Navigation-Lamp Assemblyp. 971
1. Job Set-Up Informationp. 971
Subtask 33-42-04-943-010p. 971
Subtask 33-42-04-944-006p. 971
Subtask 33-42-04-945-005p. 971
Subtask 33-42-04-946-012p. 971
2. Job Set-Upp. 972
Subtask 33-42-04-869-004p. 972
3. Procedurep. 972
Subtask 33-42-04-420-006p. 972
4. Close Outp. 972
Subtask 33-42-04-865-008p. 972
Subtask 33-42-04-861-007p. 972
Subtask 33-42-04-710-004p. 972
Subtask 33-42-04-861-008p. 973
Subtask 33-42-04-390-004p. 973
Subtask 33-42-04-941-006p. 973
33-42-07p. 975
401: TRANSFORMER, NAVIGATION LIGHTS – REMOVAL/INSTALLATIONp. 975
1. Generalp. 975
Task 33-42-07-000-801 Removal of the Navigation Lights Transformerp. 975
1. Job Set-Up Informationp. 975
Subtask 33-42-07-946-001p. 975
2. Job Set-Upp. 975
Subtask 33-42-07-910-001p. 975
Subtask 33-42-07-865-001p. 975
Subtask 33-42-07-010-001p. 975
3. Procedurep. 976
Subtask 33-42-07-020-001p. 976
Navigation Lights Transformer – Removal/Installationp. 977
Figure 401p. 977
Task 33-42-07-400-801 Installation of the Navigation Lights Transformerp. 978
1. Job Set-Up Informationp. 978
Subtask 33-42-07-945-001p. 978
Subtask 33-42-07-946-002p. 978
2. Job Set-Upp. 978
Subtask 33-42-07-869-001p. 978
3. Procedurep. 978
Subtask 33-42-07-420-001p. 978
4. Close Outp. 978
Subtask 33-42-07-865-002p. 978
Subtask 33-42-07-710-001p. 979
Subtask 33-42-07-410-001p. 979
Subtask 33-42-07-941-001p. 979
33-42-09p. 981
401: STEP-DOWN TRANSFORMER, VERTICAL-STABILIZER NAVIGATION LIGHT – REMOVAL/INSTALLATIONp. 981
1. Generalp. 981
Task 33-42-09-000-801 Removal of the Vertical-Stabilizer Navigation Light Step-Down Transformerp. 981
1. Job Set-Up Informationp. 981
Subtask 33-42-09-946-001p. 981
2. Job Set-Upp. 981
Subtask 33-42-09-910-001p. 981
Subtask 33-42-09-865-001p. 982
Subtask 33-42-09-010-001p. 982
3. Procedurep. 982
Subtask 33-42-09-020-001p. 982
Step-Down Transformer Removal/Installationp. 983
Figure 401p. 983
Task 33-42-09-400-801 Installation of the Vertical-Stabilizer Navigation Light Step-Down Transformerp. 984
1. Job Set-Up Informationp. 984
Subtask 33-42-09-946-002p. 984
2. Job Set-Upp. 984
Subtask 33-42-09-869-001p. 984
3. Procedurep. 984
Subtask 33-42-09-420-001p. 984
4. Close Outp. 984
Subtask 33-42-09-865-002p. 984
Subtask 33-42-09-710-001p. 985
Subtask 33-42-09-410-001p. 985
Subtask 33-42-09-861-001p. 985
Subtask 33-42-09-866-001p. 985
Subtask 33-42-09-861-002p. 985
Subtask 33-42-09-941-001p. 985
Section 43p. 987
33-43-00p. 987
1: WING INSPECTION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 987
1. Generalp. 987
2. Component Detailsp. 987
A. Wing Inspection Lightsp. 988
3. Operationp. 988
4. Component Location Indexp. 989
Wing Inspection Lights – Component Locationsp. 991
Figure 1p. 991
Wing Inspection Light – Component Locationsp. 992
Figure 2p. 992
Wing Inspection Lights – Simplified Schematic Diagramp. 993
Figure 3p. 993
501: WING INSPECTION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 995
1. Generalp. 995
Task 33-43-00-710-801 Operational Test of the Wing Inspection Lightsp. 995
1. Job Set-Up Informationp. 995
Subtask 33-43-00-946-001p. 995
2. Job Set-Upp. 995
Subtask 33-43-00-865-001p. 995
Subtask 33-43-00-861-001p. 995
3. Procedurep. 995
Subtask 33-43-00-710-001p. 995
4. Close Outp. 996
Subtask 33-43-00-861-002p. 996
Subtask 33-43-00-941-001p. 996
Wing Inspection-Light-Light Beam Illumination Areap. 997
Figure 501p. 997
Wing Inspection-Light-Adjustmentp. 998
Figure 502p. 998
Task 33-43-00-820-801 Adjustment of the Wing Anti-Ice Lightsp. 999
1. Job Set-Up Informationp. 999
Subtask 33-43-00-946-002p. 999
2. Job Set-Upp. 999
Subtask 33-43-00-865-002p. 999
Subtask 33-43-00-861-003p. 999
3. Procedurep. 999
Subtask 33-43-00-710-002p. 999
4. Close Outp. 1000
Subtask 33-43-00-861-004p. 1000
Subtask 33-43-00-941-002p. 1000
33-43-01p. 1001
401: LIGHT, WING INSPECTION – REMOVAL/INSTALLATIONp. 1001
1. Generalp. 1001
Task 33-43-01-000-801 Removal of the Wing Inspection Lightp. 1001
1. Job Set-Up Informationp. 1001
Subtask 33-43-01-946-001p. 1001
2. Job Set-Upp. 1001
Subtask 33-43-01-910-001p. 1001
Subtask 33-43-01-865-001p. 1001
Subtask 33-43-01-010-001p. 1001
3. Procedurep. 1002
Subtask 33-43-01-020-001p. 1002
Wing Inspection Light – Removal/Installationp. 1003
Figure 401p. 1003
Task 33-43-01-400-801 Installation of the Wing Inspection Lightp. 1004
1. Job Set-Up Informationp. 1004
Subtask 33-43-01-945-001p. 1004
Subtask 33-43-01-946-002p. 1004
2. Job Set-Upp. 1004
Subtask 33-43-01-869-001p. 1004
3. Procedurep. 1004
Subtask 33-43-01-420-001p. 1004
4. Close Outp. 1004
Subtask 33-43-01-865-002p. 1004
Subtask 33-43-01-710-001p. 1005
Subtask 33-43-01-410-001p. 1005
Subtask 33-43-01-941-001p. 1005
Task 33-43-01-000-802 Removal of the Wing Inspection-Light Lampp. 1006
1. Job Set-Up Informationp. 1006
Subtask 33-43-01-943-001p. 1006
Subtask 33-43-01-945-004p. 1006
Subtask 33-43-01-946-005p. 1006
2. Job Set-Upp. 1006
Subtask 33-43-01-910-002p. 1006
Subtask 33-43-01-865-003p. 1006
3. Procedurep. 1006
Subtask 33-43-01-020-002p. 1006
Wing Inspection-Light Lamp – Removal/Installationp. 1008
Figure 402p. 1008
Task 33-43-01-400-803 Installation of the Wing Inspection-Light Lampp. 1009
1. Job Set-Up Informationp. 1009
Subtask 33-43-01-945-003p. 1009
Subtask 33-43-01-946-004p. 1009
2. Job Set-Upp. 1009
Subtask 33-43-01-869-002p. 1009
3. Procedurep. 1009
Subtask 33-43-01-420-002p. 1009
4. Close Outp. 1009
Subtask 33-43-01-865-004p. 1009
Subtask 33-43-01-710-002p. 1010
Subtask 33-43-01-941-002p. 1010
Section 44p. 1011
33-44-00p. 1011
1: ANTICOLLISION LIGHTS SYSTEM – DESCRIPTION AND OPERATIONp. 1011
1. Generalp. 1011
2. Component Detailsp. 1011
A. White Anticollision Strobe Lightsp. 1012
B. White Anticollision-Strobe-Lights Power-Suppliesp. 1013
C. White Anticollision-Strobe-Lights Relayp. 1013
D. STROBE OFF-ON Lights Switchp. 1013
E. Red Anticollision Beacon Lightsp. 1013
F. Red Anticollision Beacon-Lights Power-Supplyp. 1013
G. BEACON OFF-ON Lights Switchp. 1013
3. Operationp. 1013
4. Component Location Indexp. 1014
White Anticollision Strobe Lights – Components Locationsp. 1017
Figure 1p. 1017
White Anticollision-Strobe-Lights Power-Relay – Component Locationp. 1018
Figure 2p. 1018
Red Anticollision Beacon Lights – Component Locationsp. 1019
Figure 3p. 1019
White Anticollision Strobe Lights – Component Locationsp. 1020
Figure 4p. 1020
Red Anticollision Beacon Lights – Component Locationsp. 1021
Figure 5p. 1021
White Anticollision Strobe Lights – Schematic Diagramp. 1022
Figure 6p. 1022
Red Anticollision Beacon Lights – Schematic Diagramp. 1023
Figure 7p. 1023
501: ANTICOLLISION LIGHTS SYSTEM – ADJUSTMENT/TESTp. 1025
1. Generalp. 1025
Task 33-44-00-710-801 Operational Test of the Anticollision Strobe Lightsp. 1025
1. Job Set-Up Informationp. 1025
Subtask 33-44-00-946-001p. 1025
2. Job Set-Upp. 1025
Subtask 33-44-00-865-001p. 1025
Subtask 33-44-00-861-001p. 1025
3. Procedurep. 1025
Subtask 33-44-00-710-001p. 1025
4. Close Outp. 1026
Subtask 33-44-00-861-002p. 1026
Subtask 33-44-00-941-001p. 1026
Task 33-44-00-710-802 Operational Test of the Anticollision Beacon Lightsp. 1027
1. Job Set-Up Informationp. 1027
Subtask 33-44-00-946-002p. 1027
2. Job Set-Upp. 1027
Subtask 33-44-00-865-002p. 1027
Subtask 33-44-00-861-003p. 1027
3. Procedurep. 1027
Subtask 33-44-00-710-002p. 1027
4. Close Outp. 1027
Subtask 33-44-00-861-004p. 1027
Subtask 33-44-00-941-002p. 1027
33-44-01p. 1029
401: PANEL, EXTERNAL LIGHTS – REMOVAL/INSTALLATIONp. 1029
1. Generalp. 1029
Task 33-44-01-000-801 Removal of the External Lights Panelp. 1029
1. Job Set-Up Informationp. 1029
Subtask 33-44-01-946-001p. 1029
2. Job Set-Upp. 1029
Subtask 33-44-01-910-001p. 1029
Subtask 33-44-01-865-001p. 1029
Subtask 33-44-01-865-002p. 1030
3. Procedurep. 1031
Subtask 33-44-01-020-001p. 1031
Subtask 33-44-01-020-002p. 1032
External Lights Panel – Removal/Installationp. 1033
Figure 401p. 1033
External Lights Panel – Removal/Installationp. 1034
Figure 402p. 1034
Task 33-44-01-400-801 Installation of the External Lights Panelp. 1035
1. Job Set-Up Informationp. 1035
Subtask 33-44-01-946-002p. 1035
2. Job Set-Upp. 1035
Subtask 33-44-01-869-001p. 1035
3. Procedurep. 1035
Subtask 33-44-01-420-001p. 1035
Subtask 33-44-01-420-002p. 1036
4. Close Outp. 1037
Subtask 33-44-01-865-003p. 1037
Subtask 33-44-01-865-004p. 1038
Subtask 33-44-01-710-001p. 1038
Subtask 33-44-01-941-001p. 1038
501: PANEL, EXTERNAL LIGHTS – ADJUSTMENT/TESTp. 1039
1. Generalp. 1039
Task 33-44-01-710-801 Operational Test of the External Lights Panelp. 1039
1. Job Set-Up Informationp. 1039
Subtask 33-44-01-946-003p. 1039
Subtask 33-44-01-946-004p. 1040
2. Job Set-Upp. 1041
Subtask 33-44-01-865-005p. 1041
Subtask 33-44-01-865-006p. 1042
Subtask 33-44-01-861-001p. 1042
3. Procedurep. 1043
Subtask 33-44-01-710-002p. 1043
Subtask 33-44-01-710-003p. 1044
4. Close Outp. 1044
Subtask 33-44-01-861-002p. 1044
Subtask 33-44-01-941-002p. 1044
33-44-04p. 1045
401: LIGHT, WING ANTICOLLISION – REMOVAL/INSTALLATIONp. 1045
1. Generalp. 1045
Task 33-44-04-000-801 Removal of the Wing Anticollision Lightp. 1045
1. Job Set-Up Informationp. 1045
Subtask 33-44-04-946-001p. 1045
2. Job Set-Upp. 1045
Subtask 33-44-04-910-001p. 1045
Subtask 33-44-04-865-001p. 1045
Subtask 33-44-04-010-001p. 1045
3. Procedurep. 1045
Subtask 33-44-04-020-001p. 1045
Wing Anticollision Light – Removal/Installationp. 1047
Figure 401p. 1047
Task 33-44-04-400-801 Installation of the Wing Anticollision Lightp. 1048
1. Job Set-Up Informationp. 1048
Subtask 33-44-04-945-001p. 1048
Subtask 33-44-04-946-002p. 1048
2. Job Set-Upp. 1048
Subtask 33-44-04-869-001p. 1048
3. Procedurep. 1048
Subtask 33-44-04-420-001p. 1048
4. Close Outp. 1048
Subtask 33-44-04-865-002p. 1048
Subtask 33-44-04-710-001p. 1049
Subtask 33-44-04-410-001p. 1049
Subtask 33-44-04-941-001p. 1049
Task 33-44-04-000-802 Removal of the Wing-Anticollision-Light Flash Tubep. 1050
1. Job Set-Up Informationp. 1050
Subtask 33-44-04-946-003p. 1050
2. Job Set-Upp. 1050
Subtask 33-44-04-910-002p. 1050
Subtask 33-44-04-865-003p. 1050
Subtask 33-44-04-010-002p. 1050
3. Procedurep. 1050
Subtask 33-44-04-020-002p. 1050
Wing-Anticollision-Light Flash Tube – Removal/Installationp. 1052
Figure 402p. 1052
Task 33-44-04-400-802 Installation of the Wing-Anticollision-Light Flash Tubep. 1053
1. Job Set-Up Informationp. 1053
Subtask 33-44-04-945-002p. 1053
Subtask 33-44-04-946-004p. 1053
2. Job Set-Upp. 1053
Subtask 33-44-04-869-002p. 1053
3. Procedurep. 1053
Subtask 33-44-04-420-002p. 1053
4. Close Outp. 1054
Subtask 33-44-04-865-004p. 1054
Subtask 33-44-04-710-002p. 1054
Subtask 33-44-04-410-002p. 1054
Subtask 33-44-04-941-002p. 1054
33-44-07p. 1055
401: POWER-SUPPLY, WING ANTICOLLISION-LIGHT – REMOVAL/INSTALLATIONp. 1055
1. Generalp. 1055
Task 33-44-07-000-801 Removal of the Wing Anticollision-Light Power-Supplyp. 1055
1. Job Set-Up Informationp. 1055
Subtask 33-44-07-946-001p. 1055
Subtask 33-44-07-910-001p. 1055
2. Job Set-Upp. 1055
Subtask 33-44-07-865-001p. 1055
Subtask 33-44-07-010-001p. 1055
3. Procedurep. 1055
Subtask 33-44-07-020-001p. 1055
Wing Anticollision-Light Power-Supply – Removal/Installationp. 1057
Figure 401p. 1057
Task 33-44-07-400-801 Installation of the Wing Anticollision-Light Power-Supplyp. 1058
1. Job Set-Up Informationp. 1058
Subtask 33-44-07-945-001p. 1058
Subtask 33-44-07-946-002p. 1058
2. Job Set-Upp. 1058
Subtask 33-44-07-869-001p. 1058
3. Procedurep. 1058
Subtask 33-44-07-420-001p. 1058
4. Close Outp. 1058
Subtask 33-44-07-865-002p. 1058
Subtask 33-44-07-710-001p. 1059
Subtask 33-44-07-410-001p. 1059
Subtask 33-44-07-941-001p. 1059
33-44-10p. 1061
401: ANTICOLLISION/NAVIGATION LIGHT, REAR – REMOVAL/INSTALLATIONp. 1061
1. Generalp. 1061
Task 33-44-10-000-801 Removal of the Rear Anticollision/Navigation Lightp. 1061
1. Job Set-Up Informationp. 1061
Subtask 33-44-10-943-001p. 1061
Subtask 33-44-10-946-001p. 1061
2. Job Set-Upp. 1061
Subtask 33-44-10-910-001p. 1061
Subtask 33-44-10-865-001p. 1061
3. Procedurep. 1062
Subtask 33-44-10-020-001p. 1062
Rear Anticollision/Navigation Light – Removal/Installationp. 1063
Figure 401p. 1063
Task 33-44-10-400-801 Installation of the Rear Anticollision/Navigation Lightp. 1064
1. Job Set-Up Informationp. 1064
Subtask 33-44-10-944-001p. 1064
Subtask 33-44-10-945-001p. 1064
Subtask 33-44-10-946-002p. 1064
2. Job Set-Upp. 1064
Subtask 33-44-10-869-001p. 1064
3. Procedurep. 1064
Subtask 33-44-10-420-001p. 1064
4. Close Outp. 1065
Subtask 33-44-10-865-002p. 1065
Subtask 33-44-10-710-001p. 1065
Subtask 33-44-10-941-001p. 1065
Task 33-44-10-000-802 Removal of the Rear Navigation Light-Lamp and Strobe Flash-Tube Assemblyp. 1066
1. Job Set-Up Informationp. 1066
Subtask 33-44-10-943-002p. 1066
Subtask 33-44-10-946-003p. 1066
2. Job Set-Upp. 1066
Subtask 33-44-10-910-002p. 1066
Subtask 33-44-10-865-003p. 1066
3. Procedurep. 1066
Subtask 33-44-10-020-002p. 1066
Rear Navigation Light-Lamp and Strobe Flash-Tube Assembly – Removal/Installationp. 1068
Figure 402p. 1068
Task 33-44-10-400-802 Installation of the Rear Navigation Light-Lamp and Strobe Flash-Tube Assemblyp. 1069
1. Job Set-Up Informationp. 1069
Subtask 33-44-10-944-002p. 1069
Subtask 33-44-10-945-002p. 1069
Subtask 33-44-10-946-004p. 1069
2. Job Set-Upp. 1069
Subtask 33-44-10-869-002p. 1069
3. Procedurep. 1069
Subtask 33-44-10-420-002p. 1069
4. Close Outp. 1070
Subtask 33-44-10-865-004p. 1070
Subtask 33-44-10-710-002p. 1070
Subtask 33-44-10-941-002p. 1070
33-44-13p. 1071
401: POWER-SUPPLY, REAR ANTICOLLISION-LIGHT – REMOVAL/INSTALLATIONp. 1071
1. Generalp. 1071
Task 33-44-13-000-801 Removal of the Rear Anticollision-Light Power-Supplyp. 1071
1. Job Set-Up Informationp. 1071
Subtask 33-44-13-946-001p. 1071
2. Job Set-Upp. 1071
Subtask 33-44-13-910-001p. 1071
Subtask 33-44-13-865-001p. 1071
Subtask 33-44-13-010-001p. 1071
3. Procedurep. 1072
Subtask 33-44-13-020-001p. 1072
Rear Anticollision-Light Power-Supply – Removal/Installationp. 1073
Figure 401p. 1073
Task 33-44-13-400-801 Installation of the Rear Anticollision-Light Power-Supplyp. 1074
1. Job Set-Up Informationp. 1074
Subtask 33-44-13-945-001p. 1074
Subtask 33-44-13-946-002p. 1074
2. Job Set-Upp. 1074
Subtask 33-44-13-869-001p. 1074
3. Procedurep. 1074
Subtask 33-44-13-420-001p. 1074
4. Close Outp. 1074
Subtask 33-44-13-865-002p. 1074
Subtask 33-44-13-710-001p. 1075
Subtask 33-44-13-941-001p. 1075
Subtask 33-44-13-410-001p. 1075
33-44-16p. 1077
401: LIGHT, BEACON – REMOVAL/INSTALLATIONp. 1077
1. Generalp. 1077
Task 33-44-16-000-801 Removal of the Beacon Lightp. 1077
1. Job Set-Up Informationp. 1077
Subtask 33-44-16-946-001p. 1077
Subtask 33-44-16-946-004p. 1078
Subtask 33-44-16-946-005p. 1078
2. Job Set-Upp. 1078
Subtask 33-44-16-943-001p. 1078
Subtask 33-44-16-910-001p. 1079
Subtask 33-44-16-865-001p. 1079
Subtask 33-44-16-010-001p. 1079
Subtask 33-44-16-010-002p. 1080
Subtask 33-44-16-010-003p. 1080
3. Procedurep. 1080
Subtask 33-44-16-020-001p. 1080
Subtask 33-44-16-020-002p. 1081
Beacon Light – Removal/Installationp. 1082
Figure 401p. 1082
Beacon Light – Removal/Installationp. 1083
Figure 402p. 1083
Task 33-44-16-400-801 Installation of the Beacon Lightp. 1084
1. Job Set-Up Informationp. 1084
Subtask 33-44-16-944-001p. 1084
Subtask 33-44-16-944-002p. 1084
Subtask 33-44-16-945-001p. 1084
Subtask 33-44-16-945-002p. 1085
Subtask 33-44-16-946-002p. 1085
Subtask 33-44-16-946-006p. 1085
Subtask 33-44-16-946-003p. 1086
Subtask 33-44-16-946-008p. 1086
Subtask 33-44-16-946-009p. 1087
2. Job Set-Upp. 1087
Subtask 33-44-16-869-001p. 1087
3. Procedurep. 1087
Subtask 33-44-16-420-001p. 1087
Subtask 33-44-16-420-004p. 1088
Subtask 33-44-16-420-002p. 1088
4. Close Outp. 1089
Subtask 33-44-16-865-002p. 1089
Subtask 33-44-16-710-001p. 1089
Subtask 33-44-16-410-001p. 1089
Subtask 33-44-16-410-002p. 1089
Subtask 33-44-16-410-003p. 1090
Subtask 33-44-16-941-001p. 1090
33-44-19p. 1091
401: POWER SUPPLY, BEACON LIGHT – REMOVAL/INSTALLATIONp. 1091
1. Generalp. 1091
Task 33-44-19-000-801 Removal of the Beacon Light Power Supplyp. 1091
1. Job Set-Up Informationp. 1091
Subtask 33-44-19-946-001p. 1091
2. Job Set-Upp. 1091
Subtask 33-44-19-910-001p. 1091
Subtask 33-44-19-865-001p. 1091
Subtask 33-44-19-010-001p. 1091
3. Procedurep. 1092
Subtask 33-44-19-020-001p. 1092
Beacon Light Power Supply – Removal/Installationp. 1093
Figure 401p. 1093
Task 33-44-19-400-801 Installation of the Beacon Light Power Supplyp. 1094
1. Job Set-Up Informationp. 1094
Subtask 33-44-19-945-001p. 1094
Subtask 33-44-19-946-002p. 1094
2. Job Set-Upp. 1094
Subtask 33-44-19-869-001p. 1094
3. Procedurep. 1094
Subtask 33-44-19-420-001p. 1094
4. Close Outp. 1094
Subtask 33-44-19-865-002p. 1094
Subtask 33-44-19-710-001p. 1095
Subtask 33-44-19-941-001p. 1095
Subtask 33-44-19-410-001p. 1095
Section 45p. 1097
33-45-00p. 1097
1: STAIR LIGHTS – DESCRIPTION AND OPERATIONp. 1097
1. Generalp. 1097
2. Component Detailsp. 1097
A. Stair Lightp. 1097
B. Boarding Lights Switchp. 1097
3. Operationp. 1097
4. Component Location Indexp. 1097
Stair Lights – Component Locationp. 1098
Figure 1p. 1098
Stair Lights – Schematicp. 1099
Figure 2p. 1099
501: STAIR LIGHTS – ADJUSTMENT/TESTp. 1101
1. Generalp. 1101
Task 33-45-00-710-801 Operational Test of the Air Stair Lightsp. 1101
1. Job Set-up Informationp. 1101
Subtask 33-45-00-946-001p. 1101
2. Job Set-upp. 1101
Subtask 33-45-00-861-001p. 1101
3. Procedurep. 1101
Subtask 33-45-00-710-001p. 1101
4. Close Outp. 1102
Subtask 33-45-00-861-002p. 1102
Subtask 33-45-00-941-001p. 1102
601: STAIR LIGHTS – INSPECTION/CHECKp. 1103
1. Generalp. 1103
Task 33-45-00-210-801 Visual Inspection of the Stair Lightsp. 1103
1. Procedurep. 1103
Subtask 33-45-00-210-001p. 1103
2. Close Outp. 1103
Subtask 33-45-00-941-002p. 1103
Stair Lights – Inspection/Checkp. 1104
Figure 601p. 1104
33-45-01p. 1105
401: LIGHT, STAIR – REMOVAL/INSTALLATIONp. 1105
1. Generalp. 1105
Task 33-45-01-000-801 Removal of the Stair Lightp. 1105
1. Job Set-Up Informationp. 1105
Subtask 33-45-01-946-001p. 1105
2. Job Set-Upp. 1105
Subtask 33-45-01-910-001p. 1105
Subtask 33-45-01-865-001p. 1105
Subtask 33-45-01-010-001p. 1105
3. Procedurep. 1106
Subtask 33-45-01-020-001p. 1106
Stair Light – Removal/Installationp. 1107
Figure 401p. 1107
Task 33-45-01-400-801 Installation of the Stair Lightp. 1108
1. Job Set-Up Informationp. 1108
Subtask 33-45-01-945-001p. 1108
Subtask 33-45-01-946-002p. 1108
2. Job Set-Upp. 1108
Subtask 33-45-01-869-001p. 1108
3. Procedurep. 1108
Subtask 33-45-01-420-001p. 1108
4. Close Outp. 1108
Subtask 33-45-01-865-002p. 1108
Subtask 33-45-01-941-001p. 1109
Subtask 33-45-01-410-001p. 1109
Subtask 33-45-01-710-001p. 1109
Section 46p. 1111
33-46-00p. 1111
1: LOGO LIGHTS – DESCRIPTION AND OPERATIONp. 1111
1. Generalp. 1111
2. Component Detailsp. 1111
A. Logo Lightp. 1111
B. Logo Light Transformerp. 1111
C. Logo Lights Switchp. 1111
3. Operationp. 1112
4. Component Location Indexp. 1112
Logo Lights – Component Location/Recognitionp. 1113
Figure 1p. 1113
Logo Lights Switch – Component Location/Recognitionp. 1114
Figure 2p. 1114
Logo Lights – Schematicp. 1115
Figure 3p. 1115
501: LOGO LIGHTS – ADJUSTMENT/TESTp. 1117
1. Generalp. 1117
Task 33-46-00-710-801 Operational Test of the Logo Lightsp. 1117
1. Job Set-Up Informationp. 1117
Subtask 33-46-00-946-001p. 1117
2. Job Set-Upp. 1118
Subtask 33-46-00-865-001p. 1118
Subtask 33-46-00-861-001p. 1118
3. Procedurep. 1118
Subtask 33-46-00-710-001p. 1118
4. Close Outp. 1118
Subtask 33-46-00-861-002p. 1118
Subtask 33-46-00-941-001p. 1118
33-46-01p. 1119
401: LIGHT, LOGO – REMOVAL/INSTALLATIONp. 1119
1. Generalp. 1119
Task 33-46-01-000-801 Removal of the Logo Lightp. 1119
1. Job Set-Up Informationp. 1119
Subtask 33-46-01-946-001p. 1119
2. Job Set-Upp. 1120
Subtask 33-46-01-910-001p. 1120
Subtask 33-46-01-865-001p. 1120
Subtask 33-46-01-010-001p. 1120
3. Procedurep. 1120
Subtask 33-46-01-020-001p. 1120
Logo Light – Removal/Installationp. 1121
Figure 401p. 1121
Task 33-46-01-400-801 Installation of the Logo Lightp. 1122
1. Job Set-Up Informationp. 1122
Subtask 33-46-01-945-001p. 1122
Subtask 33-46-01-946-002p. 1122
2. Job Set-Upp. 1122
Subtask 33-46-01-869-001p. 1122
3. Procedurep. 1122
Subtask 33-46-01-420-001p. 1122
4. Close Outp. 1123
Subtask 33-46-01-865-002p. 1123
Subtask 33-46-01-710-001p. 1123
Subtask 33-46-01-410-001p. 1123
Subtask 33-46-01-941-001p. 1123
501: LIGHT, LOGO – ADJUSTMENT/TESTp. 1125
1. Generalp. 1125
Task 33-46-01-820-801 Adjustment of the Logo Lightp. 1125
1. Job Set-Up Informationp. 1125
Subtask 33-46-01-946-003p. 1125
2. Job Set-Upp. 1126
Subtask 33-46-01-910-002p. 1126
Subtask 33-46-01-865-003p. 1126
Subtask 33-46-01-010-002p. 1126
3. Procedurep. 1126
Subtask 33-46-01-820-001p. 1126
4. Close Outp. 1127
Subtask 33-46-01-410-002p. 1127
Subtask 33-46-01-941-002p. 1127
Logo Light – Adjustment/Testp. 1128
Figure 501p. 1128
33-46-04p. 1129
401: TRANSFORMER, LOGO LIGHT – REMOVAL/INSTALLATIONp. 1129
1. Generalp. 1129
Task 33-46-04-000-801 Removal of the Logo Light Transformerp. 1129
1. Job Set-Up Informationp. 1129
Subtask 33-46-04-946-001p. 1129
2. Job Set-Upp. 1129
Subtask 33-46-04-910-001p. 1129
Subtask 33-46-04-865-001p. 1130
Subtask 33-46-04-010-001p. 1130
3. Procedurep. 1130
Subtask 33-46-04-020-001p. 1130
Logo Light Transformer – Removal/Installationp. 1131
Figure 401p. 1131
Task 33-46-04-400-801 Installation of the Logo Light Transformerp. 1132
1. Job Set-Up Informationp. 1132
Subtask 33-46-04-945-001p. 1132
Subtask 33-46-04-946-002p. 1132
2. Job Set-Upp. 1132
Subtask 33-46-04-869-001p. 1132
3. Procedurep. 1132
Subtask 33-46-04-420-001p. 1132
4. Close Outp. 1132
Subtask 33-46-04-865-002p. 1132
Subtask 33-46-04-710-001p. 1133
Subtask 33-46-04-410-001p. 1133
Subtask 33-46-04-941-001p. 1133
Section 50p. 1135
33-50-00p. 1135
1: EMERGENCY LIGHTING – DESCRIPTION AND OPERATIONp. 1135
1. Generalp. 1135
2. Descriptionp. 1135
A. Emergency Lightsp. 1135
Section 51p. 1137
33-51-00p. 1137
1: EMERGENCY LIGHTS – DESCRIPTION AND OPERATIONp. 1137
1. Generalp. 1137
2. Component Detailsp. 1138
A. Battery Packsp. 1138
B. Charger Assembliesp. 1138
C. Invertersp. 1138
D. Floor-Track Emergency Lightsp. 1138
E. Lighted Floor-Level Exit-Signsp. 1139
F. Photoluminescent Floor Proximity Marking/Lightsp. 1139
G. Lighted Floor-Level Exit-Signsp. 1140
H. Lighted Exit-Signsp. 1140
I. Lighted Ceiling Exit-Signsp. 1140
J. Ceiling Emergency Floodlightsp. 1140
K. Floor-Level Emergency Floodlightsp. 1140
L. External Emergency Lightsp. 1141
M. Emergency Light Switchesp. 1141
N. Emergency Lights Indicator-Lightp. 1142
3. Operationp. 1142
4. Component Location Indexp. 1144
Emergency Lights – Power Supply/Distribution – Component Location/Recognitionp. 1146
Figure 1p. 1146
Emergency Lights – Floor-Level – Component Location/Recognitionp. 1147
Figure 2p. 1147
Emergency Lights – Above Floor-Level – Component Location/Recognitionp. 1148
Figure 3p. 1148
External Emergency Lights – Component Location/Recognitionp. 1149
Figure 4p. 1149
Emergency Lights – Cockpit Controls – Component Location/Recognitionp. 1150
Figure 5p. 1150
Emergency Photoluminescent Lights – Floor-Level – Component Location / Recognitionp. 1151
Figure 6p. 1151
Emergency Floor Track Lights – Component Location/Recognitionp. 1152
Figure 7p. 1152
501: EMERGENCY LIGHTS – ADJUSTMENT/TESTp. 1153
1. Generalp. 1153
Task 33-51-00-710-801 Operational Test of the Emergency Lightsp. 1153
1. Job Set-Up Informationp. 1153
Subtask 33-51-00-946-001p. 1153
2. Job Set-Upp. 1153
Subtask 33-51-00-865-001p. 1153
Subtask 33-51-00-861-001p. 1154
Subtask 33-51-00-840-001p. 1154
3. Procedurep. 1154
Subtask 33-51-00-710-001p. 1154
4. Close Outp. 1157
Subtask 33-51-00-861-002p. 1157
Subtask 33-51-00-941-001p. 1157
Emergency Lights – Adjustment/Testp. 1158
Figure 501p. 1158
Task 33-51-00-710-804 Operational Test of the Emergency Lightsp. 1159
1. Reason for the Jobp. 1159
2. Job Set-Up Informationp. 1159
Subtask 33-51-00-946-006p. 1159
3. Job Set-Upp. 1159
Subtask 33-51-00-865-006p. 1159
Subtask 33-51-00-840-009p. 1159
Subtask 33-51-00-861-011p. 1159
4. Procedurep. 1159
Subtask 33-51-00-710-007p. 1159
5. Close Outp. 1160
Subtask 33-51-00-861-012p. 1160
Subtask 33-51-00-941-006p. 1160
Emergency Lights – Operational Testp. 1161
Figure 502 (Sheet 1 of 2)p. 1161
Figure 502 (Sheet 2 of 2)p. 1162
Task 33-51-00-710-802 Operational Test of the Photoluminescent Proximity Marking/Lightsp. 1163
1. Reason for the Jobp. 1163
2. Job Set-Up Informationp. 1163
Subtask 33-51-00-946-003p. 1163
3. Job Set-Upp. 1163
Subtask 33-51-00-861-005p. 1163
4. Procedurep. 1163
Subtask 33-51-00-710-005p. 1163
5. Close Outp. 1164
Subtask 33-51-00-861-006p. 1164
Subtask 33-51-00-941-003p. 1164
Task 33-51-00-710-805 Operational Test of the Emergency Light Systemp. 1165
1. Reason for the Jobp. 1165
2. Job Set-Up Informationp. 1165
Subtask 33-51-00-946-007p. 1165
3. Job Set-Upp. 1165
Subtask 33-51-00-865-007p. 1165
Subtask 33-51-00-840-010p. 1165
Subtask 33-51-00-840-011p. 1166
Subtask 33-51-00-861-013p. 1166
4. Procedurep. 1166
Subtask 33-51-00-710-008p. 1166
Subtask 33-51-00-710-009p. 1167
5. Close Outp. 1168
Subtask 33-51-00-861-014p. 1168
Subtask 33-51-00-941-007p. 1169
33-51-01p. 1171
401: LIGHT, FLOOR-TRACK EMERGENCY – REMOVAL/INSTALLATIONp. 1171
1. Generalp. 1171
Task 33-51-01-000-801 Removal of the Floor-Track Emergency Lightp. 1171
1. Job Set-Up Informationp. 1171
Subtask 33-51-01-946-001p. 1171
2. Job Set-Upp. 1172
Subtask 33-51-01-910-001p. 1172
Subtask 33-51-01-840-001p. 1172
Subtask 33-51-01-865-001p. 1172
3. Procedurep. 1172
Subtask 33-51-01-020-001p. 1172
Floor-Track Emergency Light – Removal/Installationp. 1173
Figure 401p. 1173
Task 33-51-01-400-801 Installation of the Floor-Track Emergency Lightp. 1174
1. Job Set-Up Informationp. 1174
Subtask 33-51-01-946-002p. 1174
2. Job Set-Upp. 1174
Subtask 33-51-01-869-001p. 1174
3. Procedurep. 1174
Subtask 33-51-01-420-001p. 1174
4. Close Outp. 1174
Subtask 33-51-01-865-002p. 1174
Subtask 33-51-01-710-001p. 1175
Subtask 33-51-01-941-001p. 1175
Task 33-51-01-000-806 Removal of the Photoluminescent Floor Marking/Lightsp. 1176
1. Job Set-Up Informationp. 1176
Subtask 33-51-01-946-011p. 1176
2. Job Set-Upp. 1176
Subtask 33-51-01-910-003p. 1176
3. Procedurep. 1176
Subtask 33-51-01-020-006p. 1176
Photoluminescent Marking/Light – Removal/Installationp. 1177
Figure 402 (Sheet 1 of 2)p. 1177
Figure 402 (Sheet 2 of 2)p. 1178
Task 33-51-01-400-806 Installation of the Photoluminescent Floor Marking/Lightsp. 1179
1. Job Set-Up Informationp. 1179
Subtask 33-51-01-943-006p. 1179
Subtask 33-51-01-944-010p. 1179
Subtask 33-51-01-945-007p. 1179
Subtask 33-51-01-946-014p. 1179
2. Job Set-Upp. 1179
Subtask 33-51-01-869-006p. 1179
3. Procedurep. 1179
Subtask 33-51-01-420-006p. 1179
4. Close Outp. 1180
Subtask 33-51-01-941-007p. 1180
Task 33-51-01-960-801 Discard Photoluminescent Emergency Floor Path Lighting Assembliesp. 1181
1. Reason for the Jobp. 1181
2. Job Set-Up Informationp. 1181
Subtask 33-51-01-946-015p. 1181
3. Job Set-Upp. 1181
Subtask 33-51-01-000-001p. 1181
4. Procedurep. 1181
Subtask 33-51-01-960-001p. 1181
5. Close Outp. 1181
Subtask 33-51-01-400-001p. 1181
33-51-04p. 1183
401: BATTERY PACK – REMOVAL/INSTALLATIONp. 1183
1. Generalp. 1183
Task 33-51-04-000-801 Removal of the Battery Packp. 1183
1. Reason for the Jobp. 1183
2. Job Set-Up Informationp. 1183
Subtask 33-51-04-946-001p. 1183
Subtask 33-51-04-946-007p. 1184
Subtask 33-51-04-946-008p. 1184
3. Job Set-Upp. 1184
Subtask 33-51-04-910-001p. 1184
Subtask 33-51-04-860-001p. 1185
Subtask 33-51-04-860-002p. 1185
Subtask 33-51-04-865-001p. 1185
Subtask 33-51-04-010-001p. 1186
Subtask 33-51-04-010-014p. 1186
Subtask 33-51-04-010-015p. 1187
4. Procedurep. 1187
Subtask 33-51-04-020-001p. 1187
Battery Pack – Removal/Installationp. 1188
Figure 401p. 1188
Task 33-51-04-400-801 Installation of the Battery Packp. 1189
1. Job Set-Up Informationp. 1189
Subtask 33-51-04-946-002p. 1189
Subtask 33-51-04-946-009p. 1189
Subtask 33-51-04-946-010p. 1190
2. Job Set-Upp. 1190
Subtask 33-51-04-869-001p. 1190
3. Procedurep. 1190
Subtask 33-51-04-420-001p. 1190
4. Close Outp. 1190
Subtask 33-51-04-865-002p. 1190
Subtask 33-51-04-740-005p. 1191
Subtask 33-51-04-410-001p. 1191
Subtask 33-51-04-410-002p. 1192
Subtask 33-51-04-410-003p. 1192
Subtask 33-51-04-941-001p. 1193
501: BATTERY PACK/CHARGER ASSEMBLY – ADJUSTMENT/TESTp. 1195
1. Generalp. 1195
Task 33-51-04-740-801 Test of the Battery Pack/Charger Assemblyp. 1195
1. Job Set-Up Informationp. 1195
Subtask 33-51-04-946-003p. 1195
Subtask 33-51-04-946-005p. 1196
Subtask 33-51-04-946-006p. 1196
Subtask 33-51-04-910-002p. 1196
2. Job Set-Upp. 1197
Subtask 33-51-04-865-003p. 1197
Subtask 33-51-04-010-003p. 1197
Subtask 33-51-04-010-004p. 1197
Subtask 33-51-04-010-002p. 1198
Subtask 33-51-04-010-011p. 1198
Subtask 33-51-04-840-001p. 1198
3. Procedurep. 1199
Subtask 33-51-04-740-001p. 1199
Subtask 33-51-04-740-002p. 1199
Subtask 33-51-04-740-003p. 1200
Subtask 33-51-04-740-004p. 1200
4. Close Outp. 1201
Subtask 33-51-04-010-005p. 1201
Subtask 33-51-04-010-006p. 1201
Subtask 33-51-04-010-012p. 1202
Subtask 33-51-04-010-013p. 1202
Subtask 33-51-04-941-002p. 1202
Task 33-51-04-710-801 Operational Test of the Emergency Lighting System Battery Packsp. 1203
1. Reason for the Jobp. 1203
2. Job Set-Up Informationp. 1203
Subtask 33-51-04-946-004p. 1203
Subtask 33-51-04-946-011p. 1203
Subtask 33-51-04-946-012p. 1204
3. Job Set-Upp. 1204
Subtask 33-51-04-010-007p. 1204
Subtask 33-51-04-010-008p. 1204
Subtask 33-51-04-010-016p. 1205
Subtask 33-51-04-010-017p. 1205
4. Procedurep. 1206
Subtask 33-51-04-740-006p. 1206
5. Close Outp. 1207
Subtask 33-51-04-010-009p. 1207
Subtask 33-51-04-010-010p. 1207
Subtask 33-51-04-010-018p. 1208
Subtask 33-51-04-010-019p. 1208
Subtask 33-51-04-941-003p. 1208
33-51-05p. 1209
401: CHARGER ASSEMBLY – REMOVAL/INSTALLATIONp. 1209
1. Generalp. 1209
Task 33-51-05-000-801 Removal of the Charger Assemblyp. 1209
1. Job Set-Up Informationp. 1209
Subtask 33-51-05-946-001p. 1209
Subtask 33-51-05-946-003p. 1210
Subtask 33-51-05-946-004p. 1210
2. Job Set-Upp. 1210
Subtask 33-51-05-910-001p. 1210
Subtask 33-51-05-840-001p. 1211
Subtask 33-51-05-840-002p. 1211
Subtask 33-51-05-865-001p. 1211
Subtask 33-51-05-010-001p. 1211
Subtask 33-51-05-010-002p. 1212
Subtask 33-51-05-010-003p. 1212
Subtask 33-51-05-010-004p. 1213
3. Procedurep. 1213
Subtask 33-51-05-020-001p. 1213
Charger Assembly – Removal/Installationp. 1214
Figure 401p. 1214
Task 33-51-05-400-801 Installation of the Charger Assemblyp. 1215
1. Job Set-Up Informationp. 1215
Subtask 33-51-05-945-001p. 1215
Subtask 33-51-05-946-002p. 1215
Subtask 33-51-05-946-005p. 1215
Subtask 33-51-05-946-006p. 1216
2. Job Set-Upp. 1216
Subtask 33-51-05-869-001p. 1216
3. Procedurep. 1216
Subtask 33-51-05-420-001p. 1216
4. Close Outp. 1217
Subtask 33-51-05-865-002p. 1217
Subtask 33-51-05-740-001p. 1217
Subtask 33-51-05-410-003p. 1217
Subtask 33-51-05-410-004p. 1217
Subtask 33-51-05-410-001p. 1218
Subtask 33-51-05-410-002p. 1218
Subtask 33-51-05-941-001p. 1218
33-51-07p. 1219
401: INVERTER – REMOVAL/INSTALLATIONp. 1219
1. Generalp. 1219
Task 33-51-07-000-801 Removal of the Inverterp. 1219
1. Job Set-Up Informationp. 1219
Subtask 33-51-07-946-001p. 1219
Subtask 33-51-07-946-003p. 1220
Subtask 33-51-07-946-004p. 1220
2. Job Set-Upp. 1220
Subtask 33-51-07-910-001p. 1220
Subtask 33-51-07-840-001p. 1221
Subtask 33-51-07-840-002p. 1221
Subtask 33-51-07-865-001p. 1221
Subtask 33-51-07-010-001p. 1221
Subtask 33-51-07-010-002p. 1222
Subtask 33-51-07-010-005p. 1222
Subtask 33-51-07-010-006p. 1223
3. Procedurep. 1223
Subtask 33-51-07-020-001p. 1223
Inverter – Removal/Installationp. 1224
Figure 401p. 1224
Task 33-51-07-400-801 Installation of the Inverterp. 1225
1. Job Set-Up Informationp. 1225
Subtask 33-51-07-945-001p. 1225
Subtask 33-51-07-946-002p. 1225
Subtask 33-51-07-946-005p. 1225
Subtask 33-51-07-946-006p. 1226
2. Job Set-Upp. 1226
Subtask 33-51-07-869-001p. 1226
3. Procedurep. 1226
Subtask 33-51-07-420-001p. 1226
4. Close Outp. 1226
Subtask 33-51-07-865-002p. 1226
Subtask 33-51-07-710-001p. 1227
Subtask 33-51-07-010-003p. 1227
Subtask 33-51-07-010-004p. 1227
Subtask 33-51-07-010-007p. 1227
Subtask 33-51-07-010-008p. 1228
Subtask 33-51-07-941-001p. 1228
33-51-09p. 1229
401: BETA LIGHTS, DOOR EXIT-SIGN – REMOVAL/INSTALLATIONp. 1229
1. Generalp. 1229
Task 33-51-09-000-801 Removal of the Beta Lights for the Passenger Doorp. 1229
1. Job Set-Upp. 1229
Subtask 33-51-09-010-002p. 1229
2. Procedurep. 1229
Subtask 33-51-09-020-001p. 1229
Task 33-51-09-400-801 Installation of the Beta Lights for the Passenger Doorp. 1230
1. Job Set-Up Informationp. 1230
Subtask 33-51-09-943-003p. 1230
Subtask 33-51-09-945-001p. 1230
Subtask 33-51-09-946-002p. 1230
2. Job Set-Upp. 1230
Subtask 33-51-09-869-001p. 1230
3. Procedurep. 1230
Subtask 33-51-09-420-001p. 1230
4. Close Outp. 1230
Subtask 33-51-09-941-002p. 1230
Subtask 33-51-09-710-001p. 1231
Task 33-51-09-000-802 Removal of the Beta Lights for the Service Doorp. 1232
1. Job Set-Upp. 1232
Subtask 33-51-09-010-003p. 1232
2. Procedurep. 1232
Subtask 33-51-09-020-003p. 1232
Task 33-51-09-400-802 Installation of the Beta Lights for the Service Doorp. 1233
1. Job Set-Up Informationp. 1233
Subtask 33-51-09-943-004p. 1233
Subtask 33-51-09-945-002p. 1233
Subtask 33-51-09-946-003p. 1233
2. Job Set-Upp. 1233
Subtask 33-51-09-869-002p. 1233
3. Procedurep. 1233
Subtask 33-51-09-420-002p. 1233
4. Close Outp. 1233
Subtask 33-51-09-941-003p. 1233
Subtask 33-51-09-710-002p. 1234
Beta Light, Passenger Door – Removal/Installationp. 1235
Figure 401p. 1235
Beta Light, Service Door – Removal/Installationp. 1236
Figure 402p. 1236
501: BETA LIGHTS, DOOR EXIT-SIGN – ADJUSTMENT/TESTp. 1237
Task 33-51-09-720-801 Functional Test of the Door Exit-Sign Beta-Lightsp. 1237
1. Reason for the Jobp. 1237
2. Job Set-Up Informationp. 1237
Subtask 33-51-09-943-001p. 1237
3. Procedurep. 1237
Subtask 33-51-09-720-001p. 1237
4. Close Outp. 1237
Subtask 33-51-09-940-001p. 1237
Door Exit-Sign Beta-Light – Functional Testp. 1238
Figure 501 (Sheet 1 of 4)p. 1238
Figure 501 (Sheet 2 of 4)p. 1239
Figure 501 (Sheet 3 of 4)p. 1240
Figure 501 (Sheet 4 of 4)p. 1241
33-51-10p. 1243
401: EXIT-SIGN, LIGHTED FLOOR-LEVEL – REMOVAL/INSTALLATIONp. 1243
1. Generalp. 1243
Task 33-51-10-000-801 Removal of the Lighted Floor-Level Exit-Signp. 1243
1. Job Set-Up Informationp. 1243
Subtask 33-51-10-946-001p. 1243
2. Job Set-Upp. 1243
Subtask 33-51-10-910-001p. 1243
Subtask 33-51-10-840-001p. 1243
Subtask 33-51-10-840-002p. 1244
Subtask 33-51-10-865-001p. 1244
Subtask 33-51-10-010-001p. 1244
3. Procedurep. 1244
Subtask 33-51-10-020-001p. 1244
Subtask 33-51-10-020-003p. 1245
Lighted Floor-Level Exit-Sign – Removal/Installationp. 1246
Figure 401p. 1246
Lighted Floor-Level Exit-Sign – Removal/Installationp. 1247
Figure 402p. 1247
Task 33-51-10-400-801 Installation of the Lighted Floor-Level Exit-Signp. 1248
1. Job Set-Up Informationp. 1248
Subtask 33-51-10-945-001p. 1248
Subtask 33-51-10-945-003p. 1248
Subtask 33-51-10-946-002p. 1248
2. Job Set-Upp. 1249
Subtask 33-51-10-869-001p. 1249
3. Procedurep. 1249
Subtask 33-51-10-420-001p. 1249
Subtask 33-51-10-420-002p. 1249
4. Close Outp. 1249
Subtask 33-51-10-410-001p. 1249
Subtask 33-51-10-865-002p. 1249
Subtask 33-51-10-710-001p. 1250
Subtask 33-51-10-941-001p. 1250
33-51-13p. 1251
401: EXIT-SIGN, LIGHTED – REMOVAL/INSTALLATIONp. 1251
1. Generalp. 1251
Task 33-51-13-000-801 Removal of the Lighted Exit-Signp. 1251
1. Job Set-Up Informationp. 1251
Subtask 33-51-13-946-001p. 1251
2. Job Set-Upp. 1251
Subtask 33-51-13-910-001p. 1251
Subtask 33-51-13-840-002p. 1251
Subtask 33-51-13-865-001p. 1251
Subtask 33-51-13-010-001p. 1252
3. Procedurep. 1252
Subtask 33-51-13-020-001p. 1252
Subtask 33-51-13-020-002p. 1252
Lighted Exit-Sign – Removal/Installationp. 1253
Figure 401p. 1253
Lighted Exit-Sign – Removal/Installationp. 1254
Figure 402p. 1254
Task 33-51-13-400-801 Installation of the Lighted Exit-Signp. 1255
1. Job Set-Up Informationp. 1255
Subtask 33-51-13-945-001p. 1255
Subtask 33-51-13-946-002p. 1255
Subtask 33-51-13-410-001p. 1255
2. Job Set-Upp. 1255
Subtask 33-51-13-869-001p. 1255
3. Procedurep. 1256
Subtask 33-51-13-420-001p. 1256
Subtask 33-51-13-420-002p. 1256
4. Close Outp. 1256
Subtask 33-51-13-865-002p. 1256
Subtask 33-51-13-710-001p. 1256
Subtask 33-51-13-941-001p. 1257
33-51-14p. 1259
401: CEILING EXIT SIGNS (FORWARD AND CENTER) – REMOVAL/INSTALLATIONp. 1259
1. Generalp. 1259
Task 33-51-14-000-801 Removal of the Lighted Ceiling Exit Signp. 1259
1. Job Set-Up Informationp. 1259
Subtask 33-51-14-946-001p. 1259
Subtask 33-51-14-946-003p. 1260
Subtask 33-51-14-946-004p. 1260
2. Job Set-Upp. 1260
Subtask 33-51-14-910-001p. 1260
Subtask 33-51-14-860-001p. 1261
Subtask 33-51-14-860-002p. 1261
Subtask 33-51-14-865-001p. 1262
Subtask 33-51-14-010-001p. 1262
3. Procedurep. 1262
Subtask 33-51-14-020-001p. 1262
Subtask 33-51-14-020-002p. 1262
Forward Lighted-Ceiling Exit-Sign – Removal/Installationp. 1263
Figure 401p. 1263
Center Lighted-Ceiling Exit-Sign – Removal/Installationp. 1264
Figure 402p. 1264
Task 33-51-14-400-801 Installation of the Lighted Ceiling Exit Signp. 1265
1. Job Set-Up Informationp. 1265
Subtask 33-51-14-945-001p. 1265
Subtask 33-51-14-946-002p. 1265
Subtask 33-51-14-946-005p. 1265
Subtask 33-51-14-946-006p. 1266
2. Job Set-Upp. 1266
Subtask 33-51-14-869-001p. 1266
Subtask 33-51-14-410-001p. 1266
3. Procedurep. 1266
Subtask 33-51-14-420-001p. 1266
Subtask 33-51-14-420-002p. 1267
4. Close Outp. 1267
Subtask 33-51-14-865-002p. 1267
Subtask 33-51-14-710-001p. 1267
Subtask 33-51-14-941-001p. 1267
33-51-16p. 1269
401: FLOODLIGHT, CEILING EMERGENCY – REMOVAL/INSTALLATIONp. 1269
1. Generalp. 1269
Task 33-51-16-000-801 Removal of the Ceiling Emergency Floodlightp. 1269
1. Job Set-Up Informationp. 1269
Subtask 33-51-16-946-001p. 1269
Subtask 33-51-16-946-003p. 1270
Subtask 33-51-16-946-004p. 1270
2. Job Set-Upp. 1270
Subtask 33-51-16-910-001p. 1270
Subtask 33-51-16-840-001p. 1271
Subtask 33-51-16-840-002p. 1271
Subtask 33-51-16-865-001p. 1271
Subtask 33-51-16-010-001p. 1272
Subtask 33-51-16-010-002p. 1272
Subtask 33-51-16-010-003p. 1273
3. Procedurep. 1273
Subtask 33-51-16-020-001p. 1273
Ceiling Emergency Floodlight – Removal/Installationp. 1274
Figure 401p. 1274
Task 33-51-16-400-801 Installation of the Ceiling Emergency Floodlightp. 1275
1. Job Set-Up Informationp. 1275
Subtask 33-51-16-945-001p. 1275
Subtask 33-51-16-946-002p. 1275
Subtask 33-51-16-946-005p. 1276
Subtask 33-51-16-946-006p. 1276
2. Job Set-Upp. 1276
Subtask 33-51-16-869-001p. 1276
3. Procedurep. 1277
Subtask 33-51-16-420-001p. 1277
4. Close Outp. 1277
Subtask 33-51-16-865-002p. 1277
Subtask 33-51-16-710-001p. 1277
Subtask 33-51-16-410-001p. 1277
Subtask 33-51-16-410-002p. 1278
Subtask 33-51-16-410-003p. 1278
Subtask 33-51-16-941-001p. 1279
33-51-19p. 1281
401: FLOODLIGHT, FLOOR-LEVEL EMERGENCY – REMOVAL/INSTALLATIONp. 1281
1. Generalp. 1281
Task 33-51-19-000-801 Removal of the Floor-Level Emergency Floodlightp. 1281
1. Job Set-Up Informationp. 1281
Subtask 33-51-19-946-001p. 1281
2. Job Set-Upp. 1281
Subtask 33-51-19-910-001p. 1281
Subtask 33-51-19-860-003p. 1281
Subtask 33-51-19-860-002p. 1282
Subtask 33-51-19-865-001p. 1282
Subtask 33-51-19-010-001p. 1282
3. Procedurep. 1282
Subtask 33-51-19-020-001p. 1282
Floor-Level Emergency Floodlight – Removal/Installationp. 1283
Figure 401p. 1283
Task 33-51-19-400-801 Installation of the Floor-Level Emergency Floodlightp. 1284
1. Job Set-Up Informationp. 1284
Subtask 33-51-19-945-001p. 1284
Subtask 33-51-19-946-002p. 1284
2. Job Set-Upp. 1284
Subtask 33-51-19-869-001p. 1284
3. Procedurep. 1284
Subtask 33-51-19-420-001p. 1284
4. Close Outp. 1284
Subtask 33-51-19-865-002p. 1284
Subtask 33-51-19-710-001p. 1285
Subtask 33-51-19-410-001p. 1285
Subtask 33-51-19-941-001p. 1285
33-51-21p. 1287
401: LIGHT, EXTERIOR EMERGENCY – REMOVAL/INSTALLATIONp. 1287
1. Generalp. 1287
Task 33-51-21-000-801 Removal of the Exterior Emergency Lightp. 1287
1. Job Set-Up Informationp. 1287
Subtask 33-51-21-943-001p. 1287
Subtask 33-51-21-946-001p. 1287
2. Job Set-Upp. 1287
Subtask 33-51-21-910-001p. 1287
Subtask 33-51-21-865-001p. 1288
Subtask 33-51-21-860-001p. 1288
Subtask 33-51-21-860-002p. 1288
Subtask 33-51-21-010-001p. 1288
3. Procedurep. 1289
Subtask 33-51-21-020-001p. 1289
Subtask 33-51-21-020-002p. 1289
Subtask 33-51-21-020-003p. 1289
Exterior Emergency Light – Removal/Installationp. 1290
Figure 401p. 1290
Task 33-51-21-400-801 Installation of the Exterior Emergency Lightp. 1291
1. Job Set-Up Informationp. 1291
Subtask 33-51-21-944-001p. 1291
Subtask 33-51-21-945-001p. 1291
Subtask 33-51-21-946-002p. 1291
2. Job Set-Upp. 1291
Subtask 33-51-21-869-001p. 1291
3. Procedurep. 1291
Subtask 33-51-21-420-001p. 1291
Subtask 33-51-21-420-002p. 1292
Subtask 33-51-21-420-003p. 1292
4. Close Outp. 1293
Subtask 33-51-21-865-002p. 1293
Subtask 33-51-21-710-001p. 1293
Subtask 33-51-21-410-001p. 1293
Subtask 33-51-21-941-001p. 1293

Removal, Installation and Operational Test Procedures

A large part of this 1294-page Chapter 33 manual consists of practical maintenance tasks. Removal and installation procedures identify preparatory steps, electrical safety requirements, circuit breakers to open and tag, connectors and fasteners to disconnect, access points, and the sequence needed to remove or refit the applicable lighting component. Illustrated figures accompany many procedures and identify screws, washers, brackets, retaining rings, electrical leads, lamps, holders, power units, dimmers, panels, and other hardware.

Operational tests are provided for numerous systems so that technicians can verify correct function after maintenance or when investigating a lighting problem. Typical procedures specify the required power configuration, control-switch or dimmer positions, expected lamp response, and close-out actions. The chapter also includes adjustment procedures where light aim or system setup must be checked, along with visual inspections for applicable installations.

Electrical and Component Location Information

The Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005 contains a large number of component-location drawings and simplified electrical schematics. These illustrations show where lighting equipment is installed in the flight compartment, passenger cabin, aircraft exterior, and emergency-lighting areas. Exterior-lighting diagrams identify the positions of landing, taxi/recognition, navigation, anticollision, beacon, logo, stair, and wing inspection lights around the aircraft.

System schematics illustrate relationships between lamps, switches, dimmers, potentiometers, circuit breakers, transformers, relays, power buses, and control panels. This information is useful when tracing how a lighting circuit is supplied and controlled or when confirming that a fault is in the lamp assembly rather than the upstream switch, dimmer, relay, transformer, or electrical supply.

Aircraft Effectivity and Configuration Detail

Chapter 33 repeatedly provides specific aircraft-effectivity information where lighting installations changed between aircraft configurations or service-bulletin states. Some subjects apply to all aircraft, while others identify individual aircraft numbers and groups. This is especially important for passenger-compartment equipment, navigation-light arrangements, beacon and emergency-light installations, and other systems where components or procedures differ. Technicians can therefore match the applicable pageblock and procedure to the configuration being maintained instead of treating every Regional Jet lighting installation as identical.

Maintain and Diagnose Canadair Regional Jet Lighting Systems

The Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005 supports a wide range of real maintenance work: understanding lighting-system operation, locating components, checking circuit and control functions, performing operational tests, removing and installing lights and associated electrical equipment, inspecting applicable installations, adjusting lighting systems, and working through configuration-specific procedures. Having the correct maintenance sequence, electrical precautions, component references, and effectivity information available is especially valuable when a lighting fault involves more than simply replacing a lamp.

This manual is supplied as an instant PDF download after payment. There is no physical book and no shipping delay. You can open the PDF on a computer, tablet, or other compatible device and print the pages required for workshop or maintenance use.

Reviews

There are no reviews yet.

Be the first to review “Canadair Regional Jet Aircraft Maintenance Manual Chapter 33 Lights – December 2005”

What Our Customers Say

★★★★★ Live reviews from customers
Loading customer reviews...
0
    0
    Your Cart
    Your cart is emptyReturn to Shop
    🛒
    Recently Purchased
    🕒 verified order