Vladivostok Air EASA Part-145 Maintenance Organisation Exposition (MOE) – Issue 1 Rev 4 PDF Manual
$34.95 Original price was: $34.95.$21.95Current price is: $21.95.
The complete EASA Part-145 Maintenance Organisation Exposition for JSC Vladivostok Air (approval EASA.145.0391) – Issue 1, Rev 4, covering management, maintenance procedures, quality system, line station operations and every controlled form used under the approval.
Description
The Vladivostok Air EASA Part-145 Maintenance Organisation Exposition (MOE) is the controlled compliance document that defines how JSC Vladivostok Air operates its EASA-approved aircraft maintenance organisation under approval reference EASA.145.0391. Issued as Issue 1, Revision 4 under document number CMK H18-7.5-2 and dated 14 February 2010, it sets out the organisation’s management structure, maintenance procedures, quality system, line station operations, subcontract control and occurrence reporting obligations at the depth EASA Part-145 demands. This is the full exposition text – from the front page and distribution list through every numbered procedure to the sample forms and reference lists in Part 5.
File Details
- Manual type: Maintenance Organisation Exposition (MOE) – EASA Part-145 compliance document
- Organisation: JSC Vladivostok Air, Department of Foreign-Manufactured Aircraft
- Approval reference: EASA.145.0391
- Document number: CMK H18-7.5-2
- Issue / revision: Issue 1, Rev 4 (original issue 05 Feb 2008)
- Revision date: 14 February 2010
- Language: English
- File format: PDF
- Structure: Parts 0, 1, 2, L2, 3, 4 and 5
Aircraft Types and Maintenance Locations Covered
Paragraph 1.9 of the exposition defines the organisation’s intended scope of work. For the A1 rating, the Vladivostok Air EASA Part-145 MOE covers Airbus A318-110, A319-110, A320-111, A320-210 (CFM56), A321-110 and A321-210 aircraft at line maintenance level with defect rectification, and Airbus A330-200 and A330-300 (GE CF6) aircraft up to and including weekly checks with defect rectifications. Three locations are described in detail, each with its own facilities breakdown:
- Vladivostok (VVO) – headquarters and maintenance management location at 41 Portovaya str., Artyom, Primorsky Krai
- Khabarovsk (KHV) – line maintenance station at Matveevskoe Shosse str. 34, Khabarovsk-31
- Vnukovo (VKO) – line maintenance station at 12, Pervaya Reisovaya, Vnukovo International Airport, Moscow
The exposition also names the contracted Part-145 organisations used for line maintenance, base and component maintenance, including Lufthansa Technik AG (DE.145.0001), Austrian Airlines (AT.145.001), SIBIR Technics Ltd. (EASA.145.0381) and EgyptAIR Maintenance and Engineering (EASA.145.0290).
Chapters Covered
- Part 0 – Introduction: table of contents, distribution list, issues/revisions approval list, records of revisions, list of effective pages, abbreviations, definitions
- Part 1 – Management: corporate commitment by the accountable manager, safety and quality policy, management personnel, duties and responsibilities of the management personnel, management organisation chart, list of certifying staff, manpower resources, general description of the facilities, organisation intended scope of work, notification procedure to the competent authority, exposition amendment procedures
- Part 2 – Maintenance Procedures: supplier evaluation and subcontract control; acceptance and inspection of aircraft components and material from outside contractors; storage, tagging and release of components to aircraft maintenance; acceptance of tools and equipment; calibration of tools and equipment; use of tooling and equipment by staff including alternate tools; cleanliness standards of maintenance facilities; maintenance instructions and relationship to manufacturer instructions; repair procedure; aircraft maintenance programme compliance; airworthiness directives procedure; optional modification procedure; maintenance documentation in use and completion of same; technical record control; rectification of defects and repetitive defects; release to service procedure; records for the operator; reporting of defects to the competent authority, operator and manufacturer; return of defective aircraft components to store; return of defective components to outside contractors; control of computer maintenance record systems; control of man-hour planning versus scheduled maintenance work; control of critical tasks; reference to specific maintenance procedures; procedures to detect and rectify maintenance errors; shift/task handover procedures; procedures for notification of maintenance data inaccuracies and ambiguities to the type certificate holder; production planning procedures
- Part L2 – Additional Line Maintenance Procedures: line maintenance control of aircraft components, tools and equipment; line maintenance procedures related to servicing, fuelling and de-icing; line maintenance control of defects and repetitive defects; line procedure for completion of the technical log; line procedure for pooled and loan parts; line procedure for return of defective parts removed from aircraft; line procedure control of critical tasks
- Part 3 – Quality System Procedures: quality audit of organisation procedures; quality audit of aircraft and aircraft components; quality audit remedial action procedure; certifying staff qualification and training procedures; certifying staff records; quality audit personnel; qualifying inspectors; qualifying mechanics; aircraft maintenance task exemption control process; concession control for deviation from organisation procedures; qualification procedure for specialised activities such as non-destructive testing and welding; control of manufacturers’ and other maintenance working teams; human factors training procedure; competence assessment of personnel
- Part 4 – Operators Maintenance: contracted operators, operator procedures and maintenance paperwork, operator record completion
- Part 5 – Reference Documents: sample documents and controlled forms, list of subcontractors, list of line maintenance locations, list of contracted Part-145 organisations, list of certifying staff
How the Exposition Is Organised
Each numbered paragraph opens with a regulatory reference back to the relevant Part-145 sub-clause, so you can see immediately which requirement a procedure exists to satisfy. Responsibilities are assigned by job title rather than by name in most procedural text – accountable manager, quality assurance manager, engineering manager, PPCD manager, logistic manager, head of line maintenance shop – which makes the document usable as a template for structuring a comparable organisation. Part 5 carries the actual controlled paperwork: approved suppliers list, discrepancy report, serviceable and unserviceable tags, bin card, tool individual file, list of calibrated tools, incoming documentation list, documentation master list, engineering order, job summary sheet, maintenance job order, maintenance job card, list of deferred items, handover logbook, yearly audit plan, audit report and checklist, individual file, examination list, company authorisation, internal report and the human factors feedback form.
Management, Facilities and Personnel Detail
Part 1 names the post-holders who signed against the exposition – accountable manager, quality assurance manager, director of the foreign-manufactured aircraft department, maintenance manager, engineering manager, head of line maintenance shop, head of the Khabarovsk line maintenance station, PPCD manager and logistic manager – together with the deputising arrangements for each role. It also gives a full facilities breakdown by location, with office, store, archive and locker room areas described in square metres, plus the environmental conditions maintained in each working space. Manpower resources are stated by trade and shift, and the organisation chart shows the reporting lines from the accountable manager down through the quality department, engineering division, logistic division, PPCD and line maintenance shop.
Who This Document Serves
Anyone working inside or alongside an EASA Part-145 approved maintenance organisation will recognise the shape of this document. It is directly useful to quality assurance managers and auditors preparing or reviewing an exposition, to compliance staff mapping their own procedures against a working Part-145 MOE, to MRO engineers and planners who need to understand how acceptance, storage, release to service and deferred defect control are documented, and to students of EASA Part-145 who want a real, complete exposition rather than a textbook summary. Because Vladivostok Air’s exposition covers three separate line stations, it also shows how a multi-site organisation documents control of approved data, tools, spare parts and critical tasks when the work happens far from the main base.
Complete Bookmarks
The complete bookmarks in the βVladivostok Air EASA Part-145 Maintenance Organisation Exposition (MOE) – Issue 1 Rev 4 PDF Manualβ are as follows:
+Distributionp. 274
+VLADIVOSTOK AIRp. 297
Why the Vladivostok Air EASA Part-145 MOE Belongs in Your Library
IMAGES PREVIEW
This is a working compliance document, not a marketing brochure. Having the Vladivostok Air EASA Part-145 Maintenance Organisation Exposition in front of you means you can follow an approval holder’s own wording for supplier evaluation and subcontract control, trace how a component moves from receiving inspection through serviceable tagging to release to the aircraft, read the full release to service procedure including the rules for fitting a component without an authorised release certificate for a maximum of 30 flight hours, and see exactly how the organisation handles mandatory occurrence reporting within 72 hours on EASA Form 44. It shows the critical task control logic, the man-hour planning thresholds that trigger notification to the accountable manager, the exposition amendment procedure for major and minor revisions, and the concession process for deviation from approved maintenance programmes. Getting this kind of detail right is what separates a compliant maintenance organisation from one that fails an audit – correct procedures, correct references, correct records, every time. Delivered as an instant PDF download with no shipping and no waiting, the exposition can be opened on any device, searched at your desk, and printed for the hangar office or the audit room whenever you need the actual text in hand.
What Our Customers Say
π Related Products
Discover more professional manuals for your equipment

T55-L-712 Gas Turbine Engine Aviation Unit and Intermediate Maintenance Manual TM 55-2840-254-23-3

Zodiac ECE Power Master Box 702GC01 and 712GC01 Component Maintenance Manual

Thrush S2R-T34 Turbo Thrush Aircraft Maintenance Manual AMM-T34-2 Revision 2




Reviews
There are no reviews yet.